USDA FOREST SERVICE, R-1

ELK CITY RESIDENCE #1025 METAL ROOF REPLACEMENT Page 1 of 22

ELK CITY RESIDENCE #1025 METAL ROOF REPLACEMENT

SECTION 00050 – SUMMARY OF WORK

GENERAL

1.1 This item shall consist of installing a new roof on the Elk City District Administrative Site

Duplex #1009 on the Nez Perce-Clearwater National Forests. Work includes but is not lim-ited to removing, replacing roofing, repairing sub roof assemblies, installing weather proof-ing and water barriers.

The project is located at Elk City District Administrative Site, this site is accessible year-round.

1.2 Measurement and Payment - Measurement and payment for contract work will be made only for and under those pay items included in the SCHEDULE OF ITEMS. All other work and materials will be considered as incidental to the pay items shown.

1.3 All Submittals - It will be the Contractor's responsibility to submit information on all items required with such promptness as to cause no delay in the work. Approvals must be ob-tained before starting work on parts of the project which involves the submittal. Contractor shall allow 10 calendar days for processing of submittals by the Government.

A. Submit four copies of submittals and shop drawings to the Contracting Officer for approval on the items required herein. Literature which is not marked or otherwise designated to show the exact model and size that the contractor proposes to use will be returned by the Contracting Officer "without action." Circle or check items to be used on submittals. Highlighter pens may print black writing or may not show up at all when copied and should not be used. One copy of all submittals and shop draw-ings will be returned to the contractor. Information must be adequate to determine compliance with specifications.

B. Substitution - Materials in the specifications may be followed by the words "or ap-proved equal." In these cases, wherever the name or brand of a manufacturer's article is specified, it is used as a measure of quality and utility or a standard. If the Contrac-tor prefers to use any other brand or manufacturer of same quality, appearance and utility to that specified, he shall request substitution as provided below, not less than 10 days before the planned installation of the item. The Contracting Officer will ap-prove or disapprove the request for substitution and his decision shall be final. Un-less substitutions are requested within the time stated above and as provided below, no deviation from the specifications will be allowed.

ELK CITY RESIDENCE #1025 METAL ROOF REPLACEMENT Page 2 of 22

Requests for substitutions will only be considered if contractor submits the following:

1. Complete technical data including drawings, complete performance specifica-tions, test data, samples and performance tests of the article proposed for substitu-tion. Submit additional information if required by Contracting Officer. All items in the above information shall be circled, tagged, or marked in some way to indicate all deviations or differences which the proposed item differs from the originally speci-fied item.

2. Similar data as above for item originally specified. All items shall be marked to identify where/how the proposed substitution will differ.

3. A statement by the Contractor that the proposed substitution is in full compli-ance with the contract documents, applicable codes, and laws; and that the Con-tractor takes on the responsiblity for any effect upon related work in the project for any substitution and shall pay any additional costs generated by any substitutions.

1.4 Related Work - The work shall be in accordance with these specifications. The follow-ing is a list of the specifications that are included with this package.

SECTION 000500 – SUMMARY OF WORK

SECTION 001900 – MOBILIZATION

SECTION 011250 - MEASUREMENT AND PAYMENT

SECTION 017320 – SELECTIVE DEMOLITION

SECTION 021350 - WASTE MATERIAL DISPOSAL (LANDFILL)

SECTION 062030 - CARPENTRY

SECTION 074113 - METAL ROOF PANELS

SECTION 077253 - COLORGARD SNOW GUARDS

SECTION 079000 - CAULKING AND SEALANTS

END OF SECTION

ELK CITY RESIDENCE #1025 METAL ROOF REPLACEMENT Page 3 of 22

USDA FOREST SERVICE, R-1

ELK CITY RESIDENCE #1025 METAL ROOF REPLACEMENT

SECTION 001900 - MOBILIZATION

PART I - GENERAL

1.1 Mobilization - This item is intended to compensate the Contractor for operations including, but not limited to, those necessary for the movement of personnel, equipment, supplies, and inci-dentals to the project site; for payment of premiums for bonds and in-surance for the project;

and for any other work and operations which must be performed or costs that must be in-curred incident to the initiation of meaningful work at the site and for which payment is not otherwise provided for under the contract.

1.2 Method of Measurement - The measurement shall be lump sum for mobilization.

1.3 Basis of Payment - The lump sum price shall include full compensation for mobilization.

Progress payments for mobilization will be made as follows:

A. Bond premiums will be reimbursed after receipt of the evidence of payment.

B. 50% of the lump sum, not to exceed 5% of the original contract amount, will be paid follow-ing completion of 5% of the original contract amount not including mobilization and bond premiums.

C. Payment of the remaining portion of the lump sum, up to 10% of the original contract amount, will be paid following completion of 10% of the original contract amount not in-cluding mobilization and bond premiums.

D. Any portion of the lump sum in excess of 10% of the original contract amount will be paid after final acceptance.

Progress payments for mobilization and preparatory work shall be subject to retainage.

PART II - PRODUCTS (Not Applicable)

PART III - EXECUTION (Not Applicable)

ELK CITY RESIDENCE #1025 METAL ROOF REPLACEMENT Page 4 of 22

USDA FOREST SERVICE, R-1

ELK CITY RESIDENCE #1025 METAL ROOF REPLACEMENT

SECTION 011250 - MEASUREMENT AND PAYMENT

PART 1 - GENERAL

1.1 SUMMARY

A. Measurement and payment for contract work will be made only for and under those pay items included in the Schedule of Items. All other work, labor, materials, equipment, and in-cidentals necessary to successfully complete the project will be considered as included in the payment for items shown.

This section defines the method of measurements and basis of payment for work items listed in the Schedule of Items.

B. When more than one class, size, type, thickness, etc. is specified in the Schedule of Items for any pay item, suffixes will be added to the item number to differentiate between the pay items.

1.2 DETERMINATION OF QUANTITIES

A. The following measurements and calculations shall be used to determine contract quantities for payment.

1. For individual construction items, longitudinal and lateral measurements for area computa-tions shall be made horizontally or corrected to horizontal measurement unless otherwise speci-fied. Measurements for geotextiles, netting and erosion control blankets shall be along slope lines.

2. For excavation or embankment volumes, the average end area method shall be used to com-pute volumes. However, if in the judgment of the Contracting Officer (CO), the average end area method is impractical, measurement shall be made by volume in hauling vehicles or by other three-dimensional methods.

3. For Structures, they shall be measured according to neat lines shown on the drawings or as altered by the CO, in writing, to fit field conditions.

4. For items that are measured by the linear foot, such as pipe culverts, fencing, guardrail, pip-ing, utilities, and underdrains, measurements shall be made parallel to the base or foundation upon which the structures are placed.

5. For aggregates weighed for payment, the tonnage shall not be adjusted for moisture content, unless otherwise provided for.

B. Earthwork Tolerances - Adjustments of horizontal or vertical alignment, within the toler-ances specified in this contract, or shifts of balance points up to 100 feet shall be made by the contractor as necessary to produce the designed sections and to balance earthwork.

Such adjustments shall not be considered as "Changes."

ELK CITY RESIDENCE #1025 METAL ROOF REPLACEMENT Page 5 of 22

1.3 UNITS OF MEASUREMENT

A. Payment shall be by units defined and determined according to U.S. Standard measure and by the following:

a. Excavation, Embankment, or Borrow. The measurement computed by the average end area method from measurements made longitudinally along a centerline or reference line.

b. Material in Place or Stockpile. The measurement computed using the dimensions of the in-place material.

c. Material in the Delivery Vehicle. The measurement computed using measurements of ma-terial in the hauling vehicles at the point of delivery. Vehicles shall be loaded to at least their water level capacity. Leveling of the loads may be required when vehicles arrive at the delivery point. a. Measured volume in container.

d. Metered volume by approved metering system.

e. Commercially package volume.

6. For standard manufactured items (such as fence, wire, plates, rolled shapes, pipe conduits) identi-fied by gauge, weight, section dimensions, and so forth, such identifications shall be considered the nominal weights or dimensions. Unless controlled by tolerances in cited specifications, manufactur-er's tolerances shall be accepted.

1. Acre: Make longitudinal and transverse measurements for area computations horizontally.

2. 50lb Bag: Measurement will be for the actual number of 50lb bags of standard bentonite grout.

3. 94lb Bag: Measurement will be for the actual number of 94lb bags of standard cement or grout.

4. Cubic Yard (CY): A measurement computed by one of the following methods:

5. Each (EA): One complete unit, which may consist of one or more parts.

6. Gallons (GAL): The quantity shall be measured by any of the following methods:

7. Hour (HR): Measurement will be for the actual number of hours (or fraction thereof) ordered by the Contracting Officer and performed by the contractor.

8. Linear Foot (LF): Measurement of work along its length from point-to-point; parallel to the base or foundation. Do not measure overlaps.

9. Lump Sum (LS): One complete unit.

10. Mile: Measured horizontally along the centerline of each roadway, approach, or ramp.

11. Pound (LB): For sacked or packaged material, measurement will be the net weight as packed by the manufacturer.

12. Square Foot (SF): Measured on a plane parallel to the surface being measured.

13. Square Yard (SY): Measured on a plane parallel to the surface being measured.

14. Ton: Measured as a short ton consisting of 2,000 pounds.

1.4 METHOD OF MEASUREMENT A. One of the following methods of measurement for deter-mining final payment is designated on the Schedule of Items for each pay item:

1. ACTUAL QUANTITIES (AQ) - These quantities are determined from actual measurements of completed work.

2. DESIGNED QUANTITIES (DQ) - These quantities denote the final number or units to be paid for under the terms of the contract. They are based upon the original design data available prior to advertising the project. Original design data include the preliminary survey information, design assumptions, calculations, drawings, and the presentation in the contract. Changes in the number of units shown in the Schedule of Items may be authorized under any of the following conditions:

ELK CITY RESIDENCE #1025 METAL ROOF REPLACEMENT Page 6 of 22

a. As a result of changes in the work authorized by the CO.

b. As a result of the CO determining that errors exist in the original design that cause a pay item quantity to change by 15 percent or more.

c. As a result of the Contractor submitting to the CO a written request showing evidence of errors in the original design that cause a pay item quantity to change by 15 percent or more. The evidence must be verifiable and consist of calculations, drawings, or other data that show how the designed quantity is believed to be in error.

3. LUMP SUM QUANTITIES (LSQ) - These quantities denote one complete unit of work as required by or described in the contract, including necessary materials, equipment, and labor to complete the job. They shall not be measured.

4. STAKED QUANTITIES (SQ) - These quantities are determined from staked measurements prior to construction.

5. VEHICLE QUANTITIES (VQ) - These quantities are measured or weighed in hauling vehicles.

PART 2 - PRODUCTS (NOT APPLICABLE)

PART 3 - EXECUTION (NOT APPLICABLE)

END OF SECTION 011250

ELK CITY RESIDENCE #1025 METAL ROOF REPLACEMENT Page 7 of 22

USDA FOREST SERVICE, R-1

ELK CITY RESIDENCE #1025 METAL ROOF REPLACEMENT

SECTION 017320 - SELECTIVE DEMOLITION

PART 1 - GENERAL

1.1 SUMMARY

A. This Section includes demolition and removal of the following:

1. Damaged Roof Deck

1.2 DEFINITIONS

A. Remove: Detach items from existing construction and legally dispose of them off-site, unless indicated to be removed and salvaged or removed and reinstalled.

B. Existing to Remain: Existing items of construction that are not to be removed and that are not otherwise indicated to be removed, removed and salvaged, or removed and reinstalled.

1.3 MATERIALS OWNERSHIP

A. Except for items or materials indicated to be reused, salvaged, reinstalled, or other-wise indi-cated to remain Government property, demolished materials shall become Contractor's property and shall be removed from project site.

1.4 QUALITY ASSURANCE

A. Regulatory Requirements: Comply with hauling and disposal regulations of authorities having jurisdiction.

1.5 PROJECT CONDITIONS

A. Government will occupy major portions of buildings that will be immediately adja-cent to se-lective demolition area. Conduct selective demolition so Government opera-tions will not be dis-rupted. Provide not less than 72 hours' notice to CO of activities that will affect Government op-erations.

B. Maintain access to existing walkways, corridors, and other adjacent occupied or used facili-ties.

1. Do not close or obstruct walkways, corridors, or other occupied or used facili-ties without written permission from COR.

C. Hazardous Materials: In some buildings small areas of flooring materials containing non friable asbestos are known to exist. It is NOT anticipated that this building has asbestos materials.

1. If materials suspected of containing hazardous materials are encountered, do not disturb;

immediately notify Contracting Officer (CO). Hazardous materials will be removed by Gov-ernment under a separate contract.

D. Storage or sale of removed items or materials on-site will not be permitted.

E. Utility Service: Maintain existing utilities indicated to remain in service and protect them against damage during selective demolition operations.

1.6 WARRANTY

A. Existing Warranties: Remove, replace, patch, and repair materials and surfaces cut or dam-aged during selective demolition, by methods and with materials so as not to void existing war-ranties.

B. System plan and Workmanship shall be warranted for a minimum of one year.

ELK CITY RESIDENCE #1025 METAL ROOF REPLACEMENT Page 8 of 22

PART 2 – PRODUCTS

2.1 REPAIR MATERIALS

A. Use repair materials identical to existing materials.

1. If identical materials are unavailable or cannot be used for exposed surfaces, use materials that visually fully match the existing adjacent surfaces.

2. Use materials whose installed performance equal or surpasses that of existing materials.

PART 3 – EXECUTION

3.1 EXAMINATION

A. When unanticipated mechanical, electrical, or structural elements that conflict with intended function or design are encountered, investigate, and measure the nature and extent of conflict.

Promptly submit a written report to CO.

3.2 UTILITY SERVICES

A. Existing Utilities: Maintain services indicated to remain and protect them against damage during selective demolition operations.

B. Do not interrupt existing utilities serving occupied or operating facilities unless authorized in writing by CO and authorities having jurisdiction. Provide temporary services during interruptions to existing utilities, as acceptable to CO.

1. Provide at least 72 hours’ notice to CO if shutdown of service is required during changeover.

3.3 PREPARATION

A. Temporary Enclosures: Provide temporary enclosures for protection of existing building and construction, in progress and completed, from exposure, foul weather, or other construction operations, and similar activities. Provide temporary weathertight enclosure for building exterior.

B. Temporary Partitions: Erect and maintain dustproof partitions and temporary enclosures if required to limit dust and dirt migration and to separate areas from fumes and noise.

3.4 POLLUTION CONTROLS

A. Dust Control: Use temporary enclosures, and other suitable methods to limit spread of dust and dirt.

B. Wet mop floors to eliminate trackable dirt and wipe down walls and doors within demolition enclosure. Vacuum carpeted areas.

3.5 DISPOSAL OF DEMOLISHED MATERIALS

A. General: Promptly dispose of demolished materials. Do not allow demolished materials to accumulate on-site.

B. Disposal: Transport demolished materials off Government property and legally disposes of them.

END OF SECTION 01732

ELK CITY RESIDENCE #1025 METAL ROOF REPLACEMENT Page 9 of 22

USDA FOREST SERVICE, R-1

ELK CITY RESIDENCE #1025 METAL ROOF REPLACEMENT

SECTION 021350 - WASTE MATERIAL DISPOSAL (LANDFILL)

GENERAL

1.1 This item shall consist of loading, handling, hauling, and disposal of excess materials and trash re-sulting from construction activities. The waste disposal site shall be off National Forest lands at the county landfill or by other legal means. The Contractor shall be responsible for all costs, royal-ties, arrangements, procurement, cleanup, and work associated with a waste disposal area.

1.2 Measurement of Payment - No separate measurement or payment will be made for disposal of waste material disposal, rather payment will be considered to be incidental to other items of work.

PRODUCTS (Not Applicable)

EXECUTION

All trash and construction debris resulting from installation, demolition, and construction are the responsibility of the Contractor and shall be removed and disposed of legally.

ELK CITY RESIDENCE #1025 METAL ROOF REPLACEMENT Page 10 of 22

USDA FOREST SERVICE, R-1

ELK CITY RESIDENCE #1025 METAL ROOF REPLACEMENT

SECTION 062030 - CARPENTRY

GENERAL

Description of Work - Perform all work necessary or required for the construction of the project, as indicated on the drawings. Such work includes, but is not necessarily limited to, the finishing and installing of all rough and finish carpentry work, as shown, and noted on the drawings and specified herein.

Grade Marks - All lumber and plywood shall be grade stamped.

Measurement and Payment - No separate payment will be made for work included under this section.

Payment for this work will be included in the contract unit price for Carpentry – Roof Ridge Vent & Soffit Vent Inserts, or Optional Carpentry – Roof Deck Replacement as shown on the schedule of items.

PRODUCTS

Materials - All lumber shall be seasoned, surfaced four sides (S4S), except where shown rough-sawn on drawings, shall not exceed a moisture content of 19 percent for (A), (B), and (C) below and 15 percent for all others, and shall not be less than the following grades:

Light Framing - Douglas Fir, Standard and better grade, as graded by Western Wood Products As-sociation or West Coast Lumber Inspection Bureau, or equal.

Pressure Treated Framing - FDN grade Douglas fir as designated by American Wood Preservers Association or American Wood Preservers Bureau.

Roof Sheathing and Exterior Wall Sheathing – APA Rated ¾” sheathing or as determined in the field and as graded by The Engineered Wood Association (formerly American Plywood Asso-ciation). Use of the term "plywood" on the drawings does not exclude the use of other panels with equivalent span ratings.

Interior Plywood Wall Sheathing - CDX fir, interior type, with exterior glue, as graded by the American Plywood Association.

Trim and Moldings - Interior - C select pine, as graded by the Western Wood Products Association.

General Nailing - Nailing shall conform with the requirements of the International Building Code, unless otherwise specified.

Rough Carpentry General - All framing shall be accurately cut and constructed plumb, straight, and true to lines and dimensions shown. No cutting and boring of joists and beams shall be done without permission from the Contracting Officer.

Roof Sheathing - The roof sheathing shall be installed with the face grain laid perpendicular to the rafters, end joints staggered, and nailed at each crossing and end. Butted end joints shall occur only over bearing points.

Blocking and Bracing - Blocking needed for bracing, edge support, and backing for miscellaneous accessories, grab bars, toilet paper dispensers, door stops, any needed to stabilize walls and other building elements, and other miscellaneous blocking shall be included as part of this work.

ELK CITY RESIDENCE #1025 METAL ROOF REPLACEMENT Page 11 of 22

Finish Carpentry Exterior siding, trim, soffit, and fascia – General: Seal butt joints at inside and outside corners and at trim locations.

EXECUTION

All Carpentry work shall be executed at the roof ridge vent and soffit locations unless areas of deterioration are found on the wood roof deck then the Optional pay item for wood deck replace-ment shall ensue.

ELK CITY RESIDENCE #1025 METAL ROOF REPLACEMENT Page 12 of 22

SECTION 07 41 13 - METAL ROOF PANELS

PART 1 - GENERAL

1.1 SECTION INCLUDES

A. Snap joint-seamed, standing seam metal roof panels, with related metal trim and accessories.

1.2 REFERENCES

A. American Society of Civil Engineers (ASCE): www.asce.org/codes-standards:

1. ASCE 7 - Minimum Design Loads for Buildings and Other Structures.

B. ASTM International (ASTM): www.astm.org:

1. ASTM A 755 - Specification for Steel Sheet, Metallic Coated by the Hot-Dip Process and Pre-painted by the Coil-Coating Process for Exterior Exposed Building Products.

2. ASTM D 226 - Standard Specification for Asphalt-Saturated Organic Felt Used in Roofing and Waterproofing.

3. ASTM D 4214 - Test Methods for Evaluating Degree of Chalking of Exterior Paint Films.

4. ASTM E 1592 - Standard Test Method for Structural Performance of Sheet Metal Roof and Siding Systems by Uniform Static Air Pressure Difference.

5. ASTM E 1980 - Practice for Calculating Solar Reflectance Index of Horizontal and Low-Sloped Opaque Surfaces.

C. Underwriters Laboratories, Inc. (UL): www.ul.com:

1. UL 580 - Tests for Uplift Resistance of Roof Assemblies

1.3 ADMINISTRATIVE REQUIREMENTS

A. Preinstallation Meeting: Prior to installation of metal roof panels, conduct preinstallation meeting at site attended by Contracting Officer (CO), Contracting Officer’s Representative (COR), manufacturer's technical representative, and related trade contractors.

1. Coordinate openings and penetrations of metal panel system.

http://www.asce.org/codes-standards http://www.astm.org/ http://www.ul.com/

ELK CITY RESIDENCE #1025 METAL ROOF REPLACEMENT Page 13 of 22

1.4 QUALITY ASSURANCE

A. Manufacturer/Source: Provide metal roof panel assembly and accessories from a single manufacturer providing fixed-base roll forming, and accredited under IAS AC 472 Part B.

B. Manufacturer Qualifications: Approved manufacturer listed in this Section with minimum five years’ experience in manufacture of similar products in successful use in similar applications.

1. Approval of Comparable Products: Submit the following in accordance with project substitution requirements, within time allowed for substitution review:

a. Product data, including certified independent test data indicating compliance with requirements.

b. Samples of each component.

c. Project references

d. Sample warranty.

e. IAS AC 472 certificate.

2. Approved manufacturers must meet separate requirements of Submittals Article.

C. Installer Qualifications: Experienced Installer [certified by metal panel manufacturer] with minimum of five years’ experience with successfully completed projects of a similar nature and scope.

1. Installer's Field Supervisor: Experienced mechanic certified by metal panel manufacturer supervising work on site whenever work is underway.

D. Buy American Compliance: Materials provided under work of this Section shall comply with the following requirements:

1. Buy American Act of 1933 BAA-41 U.S.C §§ 10a – 10d.

2. Buy American provisions of Section 1605 of the American Recovery and

Reinvestment Act of 2009 (ARRA).

1.5 ACTION SUBMITTALS

A. Product Data: Manufacturer’s data sheets for specified products.

B. Shop Drawings: Show layouts of metal panels. Include details of each condition of installation, panel profiles, and attachment to building. Provide details at a minimum scale 1-1/2-inch per foot showing edge conditions, joints, fastener and sealant placement, flashings, openings, penetrations, roof accessories, lightning arresting equipment, and special details. Make distinctions between factory and field assembled work.

1. Include data indicating compliance with performance requirements.

2. Include structural data indicating compliance with requirements of authorities having jurisdiction.

ELK CITY RESIDENCE #1025 METAL ROOF REPLACEMENT Page 14 of 22

C. Samples for Verification: Provide 12-inch- (305 mm-) long section of each metal panel profile. Provide color chip verifying color selection.

1.6 INFORMATIONAL SUBMITTALS

A. Product Test Reports: Indicating compliance of products with requirements, witnessed by a professional engineer.

B. Qualification Information: For Installer firm and Installer’s field supervisor.

C. IAS Accreditation Certificate: Indicating that manufacturer is accredited under provisions of IAS AC 472.

D. Buy American Certification: Manufacturers' letters of compliance acceptable to authorities having jurisdiction, indicating that products comply with requirements.

1.7 CLOSEOUT SUBMITTALS

A. Maintenance data.

B. Manufacturer's Warranty: Executed copy of manufacturer's standard warranty.

1.8 DELIVERY, STORAGE, AND HANDLING

A. Protect products of metal panel system during shipping, handling, and storage to prevent staining, denting, deterioration of components or other damage. Protect panels and trim bundles during shipping.

1. Deliver, unload, store, and erect metal panel system and accessory items without misshaping panels or exposing panels to surface damage from weather or construction operations.

2. Store in accordance with Manufacturer's written instructions. Provide wood collars for stacking and handling in the field.

1.9 WARRANTY

A. Special Manufacturer’s Warranty: On manufacturer’s standard form, in which manufacturer agrees to repair or replace metal panel assemblies that fail in materials and workmanship within one year from date of Substantial Completion.

B. Special Weathertightness Warranty: On manufacturer’s standard form, in which manufacturer agrees to repair or replace metal panel assemblies that fail to remain weathertight, including leaks, within 20 years from date of Substantial Completion.

C. Special Panel Finish Warranty: On Manufacturer’s standard form, in which Manufacturer agrees to repair or replace metal panels that evidence deterioration of factory-applied finish within 25 years from date of Substantial Completion, including:

1. Fluoropolymer Two- Coat System:

ELK CITY RESIDENCE #1025 METAL ROOF REPLACEMENT Page 15 of 22

a. Color fading in excess of 5 Hunter units per ASTM D 2244.

b. Chalking in excess of No. 8 rating per ASTM D 4214.

c. Failure of adhesion, peeling, checking, or cracking.

PART 2 - PRODUCTS

2.1 MANUFACTURER

A. Basis of Design Manufacturer: MBCI Metal Roof and Wall Systems, Division of NCI Group, Inc.; Houston TX. Tel: (877) 713-6224; Email: info@mbci.com; Web:

www.mbci.com.

1. Provide basis of design product, or comparable product approved by Contracting Officer (CO).

2.2 PERFORMANCE REQUIREMENTS

A. General: Provide metal roof panel system meeting performance requirements as determined by application of specified tests by a qualified testing facility on manufacturer's standard assemblies.

B. Radiative Property Performance:

1. Solar Reflectance Index: Minimum 78 for roof slopes of 2:12 or less and 29 for roof slopes greater than 2:12 under medium wind conditions, per ASTM E 1980.

C. Structural Performance: Provide metal panel assemblies capable of withstanding the effects of indicated loads and stresses within limits and under conditions indicated:

1. Snow Load: 200 PSF Elk City,

2. Wind Load: 70 MPH, Exposure C, with uplift considerations.

a. Wind Prying shall be considered for roof panels and accessories with the following factors of safety:

1) Single fastener in each connection 3.00

2) Two or more fasteners in each connection 2.25

3. Live Load: 20 PSF

4. Seismic Loads: Per IBC 2008 Edition

5. Span: Varies

6. Thermal Loads: free movement of roof panels in response to temperature changes of 150 degrees F during the life of the structure.

D. Wind Uplift Resistance: Comply with UL 580 for wind-uplift class [UL-30] [UL-60]

[UL-90].

E. Thermal Movements: Allow for thermal movements from variations in both ambient and internal temperatures. Accommodate movement of support structure caused by thermal expansion and contraction. Allow for deflection and design for thermal stresses caused by temperature differences from one side of the panel to the other.

mailto:info@ecoficientseries.com http://www.mbci.com/

ELK CITY RESIDENCE #1025 METAL ROOF REPLACEMENT Page 16 of 22

F. Self-Adhering, High-Temperature Underlayment: Cold-applied sheet underlayment minimum 30 mils (0.76 mm) thick, consisting of slip-resistant, polyethylene-film top surface laminated to a layer of butyl or SBS-modified asphalt adhesive, with release-paper backing. Provide primer when recommended by underlayment manufacturer for substrate.

Ice & Water Shield – Provide Titanium PSU 30 Synthetic Roofing Underlayment (Or Equal product) over roof decking for Protection from Wind Driven Rain, Water, Snow and Ice Dams. Incidental to Underlayment pay item.

2.3 METAL ROOF PANELS

A. Mechanically-seamed, Concealed Fastener, Metal Roof Panels: Structural metal roof panel consisting of formed metal sheet with vertical ribs at panel edges, installed by lapping and mechanically interlocking edges of adjacent panels, and attaching panels to supports using concealed clips and fasteners in a weathertight installation.

1. Basis of Design: MBCI, LokSeam, www.mbci.com/lokseam.html.

2. Aluminum-Zinc Alloy-Coated Steel Sheet: ASTM A 792/A 792M, structural quality, Grade 50, Coating Class AZ50 (Grade 340, Coating Class AZM150), pre-painted by the coil-coating process per ASTM A 755/A 755M.

a. Nominal Coated Thickness: 24 gage.

b. Panel Surface: Smooth with striations in pan.

c. Exterior Finish: Fluoropolymer two-coat system

d. Color: Forest Green.

3. Panel Width: 16 inches (406 mm)

4. Panel Seam Height: 1.75 inch (44.4 mm).

5. Joint Type: Snap joint-seamed.

2.4 METAL ROOF PANEL ACCESSORIES

A. General: Provide complete metal roof panel assembly incorporating trim, copings, fasciae, gutters and downspouts, and miscellaneous flashings, in manufacturer's standard profiles. Provide required fasteners, closure strips, thermal spacers, splice plates, support plates, and sealants as indicated in manufacturer's written instructions.

B. Flashing and Trim: Match material, thickness, and finish of metal panel face sheet.

C. Panel Clips: ASTM C 645, with ASTM A 653/A 653M, G90 (Z180) hot-dip galvanized zinc coating, configured for concealment in panel joints, and identical to clips utilized in tests demonstrating compliance with performance requirements.

D. Panel Fasteners: Provide concealed anchors at all panel attachment locations inclusive of roofing components such as fascia, rake etc.

E. Joint Sealers: Manufacturer's standard or recommended liquid and preformed sealers and tapes, and as follows:

http://www.mbci.com/lokseam.html

ELK CITY RESIDENCE #1025 METAL ROOF REPLACEMENT Page 17 of 22

1. Factory-Applied Seam Sealant: Manufacturer's standard hot-melt type.

2. Tape Sealers: Manufacturer's standard non-curing butyl tape, AAMA 809.2.

3. Concealed Joint Sealant: Non-curing butyl, AAMA 809.2.

F. Roof Accessories: Approved by metal roof panel manufacturer. Refer to metal roof manufacturer" for requirements for curbs, equipment supports, roof hatches, heat and smoke vents, ventilators, and preformed flashing sleeves.

1. All roof chimneys to have nonpenetrating tiebacks fabricated and installed with concealed fasteners for wind and snow loads.

G. Snow Guards: Approved by metal roof panel manufacturer. Refer to Section 07 72 53 "Snow Guards" for requirements for snow guards attached to metal roof panels.

2.5 FABRICATION

A. General: Provide factory fabricated and finished metal panels and accessories meeting performance requirements, indicated profiles, and structural requirements.

B. Fabricate metal panel joints configured to accept factory-applied sealant providing weathertight seal and preventing metal-to-metal contact and minimizing noise resulting from thermal movement.

C. Form panels in continuous lengths for full length of detailed runs, except where otherwise indicated on approved shop drawings.

D. Sheet Metal Flashing and Trim: Fabricate flashing and trim to comply with manufacturer's written instructions, approved shop drawings, and project drawings.

Form from materials matching metal panel substrate and finish.

2.6 FINISHES

A. Finishes, General: Prepare, pretreat, and apply coating to exposed metal surfaces to comply with coating and resin manufacturers' written instructions.

A. Fluoropolymer Two-Coat System: 0.2 – 0.3 mil primer with 0.7 - 0.8 mil 70 percent PVDF fluoropolymer color coat, AAMA 621[, meeting solar reflectance index requirements].

1. Basis of Design: MBCI, Signature 300.

B. Interior Finish: 0.5 mil total dry film thickness consisting of primer coat and wash coat of manufacturer's standard light-colored acrylic or polyester backer finish.

ELK CITY RESIDENCE #1025 METAL ROOF REPLACEMENT Page 18 of 22

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine metal panel system substrate and supports with Installer present. Inspect for erection tolerances and other conditions that would adversely affect installation of metal panel installation.

1. Inspect metal panel support substrate to determine if support components are installed as indicated on approved shop drawings. Confirm presence of acceptable supports at recommended spacing to match installation requirements of metal panels.

3.2 PREPARATION

A. Self-Adhering Sheet Underlayment: Apply in accordance with underlayment manufacturer's written instructions; apply primer if required. Apply at locations indicated below. Roll laps with roller.

Ice & Water Shield – Provide Titanium PSU 30 Synthetic Roofing Underlayment over roof decking for Protection from Wind Driven Rain, Water, Snow and Ice Dams.

Incidental to Underlayment pay item.

1. Apply over the entire roof surface.

B. Flashings: Provide flashings as required to complete metal roof panel system. Install in accordance with Manufacturers Recommendations.

3.3 METAL PANEL INSTALLATION

A. Snap-Joint-Seamed, Standing Seam Metal Roof Panels: Install weathertight metal panel system in accordance with manufacturer's written instructions, approved shop drawings, and project drawings. Install metal roof panels in orientation, sizes, and locations indicated, free of waves, warps, buckles, fastening stresses, and distortions.

Anchor panels and other components securely in place. Provide for thermal and structural movement.

B. Attach panels to supports using clips, screws, fasteners, and sealants recommended by manufacturer and indicated on approved shop drawings.

1. Fasten metal panels to supports with concealed clips at each location indicated on approved shop drawings, with spacing and fasteners recommended by manufacturer.

2. Snap Joint: Nest standing seams and fasten together by interlocking and completely engaging factory-applied sealant.

3. Provide weatherproof jacks for pipe and conduit penetrating metal panels of types recommended by manufacturer.

ELK CITY RESIDENCE #1025 METAL ROOF REPLACEMENT Page 19 of 22

4. Dissimilar Materials: Where elements of metal panel system will come into contact with dissimilar materials, treat faces and edges in contact with dissimilar materials as recommended by manufacturer.

3.4 ACCESSORY INSTALLATION

A. General: Install metal panel trim, flashing, and accessories using recommended fasteners and joint sealers, with positive anchorage to building, and with weather tight mounting.

Provide for thermal expansion. Coordinate installation with flashings and other components.

1. Install components required for a complete metal panel assembly, including trim, copings, flashings, sealants, closure strips, and similar items.

2. Comply with details of assemblies utilized to establish compliance with performance requirements and manufacturer's written installation instructions.

3. Provide concealed fasteners.

4. Set units true to line and level as indicated. Install work with laps, joints, and seams that will be permanently weather resistant.

B. Joint Sealers: Install joint sealers where indicated and where required for weathertight performance of metal panel assemblies, in accordance with manufacturer's written instructions.

3.5 FIELD QUALITY CONTROL

A. Contractor is responsible for the Quality Control with Metal Roof Manufacturer accepting final workmanship.

3.6 CLEANING AND PROTECTION

A. Remove temporary protective films immediately in accordance with metal roof panel manufacturer's instructions. Clean finished surfaces as recommended by metal roof panel manufacturer.

B. Replace damaged panels and accessories that cannot be repaired to the satisfaction of the Architect.

ELK CITY RESIDENCE #1025 METAL ROOF REPLACEMENT Page 20 of 22

SECTION 07 72 53 - COLORGARD® SNOW GUARDS

-GENERAL

1.1 SUMMARY

Section Includes:

Snow guards for metal roofs.

Non-penetrating attachment system.

RELATED SECTIONS

A. Division 01: Administrative, procedural, and temporary work requirements apply to this section.

B. Section 07 41 13 - Metal Roof Panels

REFERENCES

Aluminum Association (AA) - Aluminum Standards and Data, 2003 Edition.

ASTM International (ASTM):

B85-03 - Standard Specification for Aluminum-Alloy Die Castings.

B221-04a - Standard Specification for Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Profiles, and Tubes.

SUBMITTALS

Action Submittal:

Shop Drawings: Include roof plans showing locations of snow guards on roof and attachment details and spacing.

Product Data:

Product description.

Construction details.

Material descriptions.

Individual component dimensions.

Finishes.

Installation instructions.

Samples:

Clamp samples.

12-inch-long cross member samples including all associated hardware.

Informational Submittals:

Include calculation of number and location of snow guards based on designed roof snow load, roof slope, roof type, components, spacing’s and finish Test results: Results of product tensile load testing, issued by a recognized inde-pendent testing laboratory, showing ultimate load-to-failure value of attachment.

Closeout Submittals:

Certification: Installer's certification that snow guard system was installed in accordance with manufacturer's instructions and approved Shop Drawings.

ELK CITY RESIDENCE #1025 METAL ROOF REPLACEMENT Page 21 of 22

QUALITY ASSURANCE

Manufacturer Qualifications: Manufacturer to specialize in production of Snow Guard Products of the type specified with a minimum of 20 years documented expe-rience.

DELIVERY, STORGE AND HANDLING

Deliver components to jobsite properly packaged to provide protection during transport, delivery and handling.

Store products in manufacturer’s original labeled and unopened packaging in a clean and dry location, protected from potential damage, until ready for application.

- PRODUCTS

SYSTEM DESCRIPTION

Attachment system to provide attachment to standing seam metal roofs:

With only minor dimpling of panel seams.

Without penetrations through roof seams or panels.

Without use of sealers or adhesives.

Without voiding roof warranty.

B. Performance Requirements: Provide snow guards to withstand exposure to the weather and environmental elements, and resist design forces without failure due to defective manufacture.

1. Loading: Design snow guard system to resist minimum in-service vector load in conjunction with the S-5 distributor.

2. Factor of safety: Utilize a factor of safety 2 to determine allowable loads from ultimate tested clamp tensile load values.

3. Source Limitation: Provide snow guard system as designed and tested by the manufacturer as a complete system. Install components by the same manufacturer.

MANUFACTURER

Acceptable Manufacturer: S-5! Metal Roof Innovations, Ltd., 8655 Table Butte Road, Colorado Springs, CO. 80908; Tel: 888-825-3432; Fax: 719-495-0045; Email: sup-port@s-5.com; Web:

www.s-5.com Substitutions: Approved substitutions by COR.

2.3 BAR/RAIL-TYPE SNOW RETENTION SYSTEMS FOR STANDING SEAM METAL ROOFS

A. Basis of Design: ColorGard, manufactured by S-5! Metal Roof Innovations, Ltd.

B. Components:

Clamps

a. Manufactured from 6061-T6 aluminum extrusions conforming to ASTM B221 or aluminum castings conforming to ASTM B85 and to AA Aluminum Standards and Data.

1) Model: No. [S-5-U.] [S-5-S.] [S-5-T.] [S-5-Z.] [S-5-E.] [S-5-B.] [S-5-Q.] [S-5-H.] [S-5-K700.] [S- 5-H90.] [S-5-N.] [S-5-N 1.5.] [S-5-KHD.] [S-5-V.] [S-5-K Grip.] [S-5-R465.]

b. Set screws: 300 Series stainless steel, 18-8 alloy, 3/8-inch diameter, with round nose point.

c. Attachment bolts: 300 Series stainless steel, 18-8 alloy, 8 mm or 10 mm diameter, hex flange bolt.

ELK CITY RESIDENCE #1025 METAL ROOF REPLACEMENT Page 22 of 22

PART 3- EXECUTION

3.1 EXAMINATION

Prior to beginning installation, verify that:

1. Panel seaming is complete.

2. Panel attachment is sufficient to withstand loads applied by snow guard system.

3. Installation will not be impeded roof drainage.

3.2 PREPARATION

Clean areas to receive attachments; remove loose and foreign matter that could interfere with installation or performance.

3.3 LOCATION

A. Snow Retention System shall be located (12’) over garage door, (18’) over front en-trance inclusive of both sides of structure, and (10’) over rear sliding glass door ( both sides)

3.3 INSTALLATION

Install system in accordance with manufacturer's instructions and approved Shop Drawings B. ColorGard Snow Retention System:

Place clamps at maximum 32 inches on center or as required by in-service loads.

Place clamps in straight, aligned rows.

Place both set screws on same side of clamp.

Tighten set screws to manufacturer's recommended torque. Randomly test set screw torque using calibrated torque wrench.

Insert color-matched metal strips into cross members, staggering strips to cover cross member joints.

Attach cross members to clamps; tighten bolts to manufacturer's recommended torque.

Install splice connectors at cross member end joints.

Do not cantilever cross members more than 4 inches beyond last clamp at ends.