CSG Aviation Engineering COnsultant ADDENDUM .pdf

PDF 127 KB Posted

Attached to
Aviation Engineering Consulting State and local contract opportunity
Solicitation number
PE-33067-NONST-2025-000000002
Issued by
Muscogee County, Georgia

About this file

This document is an addendum to a solicitation issued by the Columbus Airport Commission in Columbus, Georgia for aviation engineering consulting services. The addendum modifies the previously issued solicitation documents, including changes to the scope of services for the Master Plan Update Phase 2. The scope now focuses on future forecasting and planning, including developing a new Airport Layout Plan. The addendum also removes certain submission requirements related to relevant experience for Master Plan projects.

The overall contract opportunity is for professional planning, engineering, architectural, and construction administration services in connection with the Airport Capital Improvement Plan at the Columbus Airport, serving the jurisdictions of Muscogee County and Columbus City in the state of Georgia. No other details regarding pricing, set asides, incumbents, funding sources, or contract term are provided in the addendum.

View the file

Other files for this state and local contract opportunity

Other files attached to Aviation Engineering Consulting, newest first.
File Type Posted
CSG 2024 NOTICE OF REQUEST FOR STATEMENT OF Q.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM

Posted Date:07/08/2024 Addendum Number: 01

Solicitation Title:_ Aviation Engineering Consulting________________________________

Solicitation Number:PE-33067-NONST-2025-000000002__ Opening Date:08/09/2024

To All Respondents:

It is the Respondents’ responsibility to assure receipt of all addenda, clarifications and inquiries regarding this Solicitation. The Respondent should verify with the designated Columbus Airport Representative prior to submitting a response, that all, if any have been received.

This addendum is issued to modify the previously issued Solicitation documents and/or given for informational purposes, and is herby made part of the Solicitation documents, Pages 2-3

Scope of Services:

Master Plan Update – Phase 2

a. Phase one of CSG’s Master Plan has been completed. Phase 1 focused on inventorying CSG’s assets (i.e. Runways, Taxiways, Hangars, Buildings, etc.) Phase two will focus on the future forecasting and planning for CSG. (New ALP etc.)

Submission Requirements:

3. Relevant Experience:

f. Master Plan Projects

i. Provide a brief scope of work required for the project

ii. Provide original scheduled date for completion and final completion date

1. Explain why there was a variance if necessary

iii. Provide original budget and final cost

1. Explain why there was a variance if necessary

iv. Provide explanation of challenges faced during the project and how the challenges were overcome

v. Provide the airport reference contact information for this project

Were removed from RFQ, subsequent items were renumbered.

*****All other items remain the same***** End of Addendum