CRP No. 3279.pdf
PDF 195 KB Posted
- Attached to
- Medical Lake Interchange Roundabout Meter
- Solicitation number
- CRP No. 3279
- Issued by
- Spokane County, Tacoma City, Washington
About this file
CRP No. 3279 - Medical Lake Interchange Roundabout Meter
This file is a Contract Requirements Plan (CRP) document from the Washington State Department of Transportation (WSDOT) for the Medical Lake Interchange Roundabout Meter project. The project involves improvements to Geiger Boulevard and SR 902 Roundabout located in Sections 1 and 12 in Township 24 N, Range 41 E.W.M. The scope of work includes installing a roundabout meter system, removing existing cement concrete driveway and asphalt concrete pavement, performing HMA patching, installing a traffic signal system, and completing signing and pavement markings in accordance with contract plans, contract provisions, and standard specifications. The project is executed under the Standard Specifications of Washington State, with all work to be performed according to the attached Contract Plans and relevant provisions.
The document establishes the framework for bidding and contract execution for this transportation infrastructure improvement project. Bidders are required to comply with all contract documents, including the detailed plans, specifications, and provisions outlined in the CRP. The project represents a standard state highway improvement contract typical of WSDOT's capital program, with all work subject to state transportation standards and specifications. Specific details regarding bid submission dates, project timeline, funding sources, and contract award criteria would be detailed in the associated bid documents and contract specifications not summarized in this overview.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .