Att. 3 - Figure2.pdf
PDF 527 KB Posted
- Attached to
- RAF Croughton Underground Cable Install
- Solicitation number
- CROUGHTON001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation questions.docx | DOCX document | |
| Solicitation questions.docx | DOCX document | |
| Solicitation questions.docx | DOCX document | |
| Att.1 - Croughton Cable PWS.pdf | ||
| Att. 2 - Figure1.pdf | ||
| Att. 4 - 1449 Solicitation.pdf | ||
| COMBO Solicitation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FIGURE 2
Proposed Fiber Route
Fiber Between B180 & B34
EXSW-2018-00003
RAF Croughton, UK
LEGEND
PROPOSED
MANHOLE
HANDHOLE
CONDUIT
96SM FOC
EXISTING
MANHOLE
HANDHOLE
CONDUIT
ALL DISTANCES
SHOWN ARE
APPROXIMATES
MH17 FUTURE
ADMIN BLD
MH19
MH20
MH18
FUTURE
PARKING LOT
FUTURE
BLD
MH22
B180
B34
B30
HH141
HH140
HH139
MH 1
MH23
HH138
HH137
MH2
HH135
HH136
NEW MH ATMH10
MH9
NEW MH AQ
MH16
MH15
MH8
APPROX 450 FT APPROX 450 FT
APPROX 450 FT
APPRO
X 450 FT
APPRO
X 450 FT
PROPOSED
MH-AD
PROPOSED
HH-B
PROPOSED
MH-AC
PROPOSED
HH-C
PROPOSED
HH-D
APPROX
250 FT
PROPOSED HH-A
PROPOSED
MH-AA
PROPOSED
MH-AB
PROPOSED NEW 96SM FOC TO BE INSTALLED IN
NEW DUCTS INSTALLED BY THIS PROJECT FROM
B180 TO MH17
AND
IN NEW DUCTS INSTALLED UNDER A PROJECT
UNDERWAY FROM MH17 TO B34.
NEW DUCTS FROM MH17 TO B34 WILL BE
INSTALLED PRIOR TO START OF THIS PROJECT.
NO FIBER
TO BE
INSTALLED
BETWEEN
MH-AA,
MH-AD AND
MH-5C