Crawford Branch Stabilization Project Summary
This is an Invitation for Bids (IFB) issued by Macon County Finance Department in Franklin, North Carolina for waterway bank stabilization work at Crawford Branch. The project requires comprehensive erosion and sediment control, including installation of silt fence, selective herbicide treatment, earthwork, geolifts with riprap, erosion control matting, seeding, live stakes, and planting of trees and shrubs. Bid quantities include 0.7 acres of herbicide treatment, 70 cubic yards of earthwork, 55 linear feet of geolifts, 90 tons of Class 1 riprap, 100 linear feet of silt fence, 360 square yards of erosion control matting, 0.6 acres of bank and buffer seeding, 0.1 acre of lawn reseeding, 300 live stakes, and 300 trees and shrubs. A mandatory pre-bid meeting is scheduled for July 29, 2026 at 10:00 AM on site, with attendance required for contract award eligibility. Bids must be received by August 6, 2026 at 4:00 PM local time. All work must be completed by December 1, 2026. The project site is located at latitude 35.178306 and longitude -83.379767 in Franklin, North Carolina.
Bidders must hold a current North Carolina General Contractor's license for projects costing $40,000 or above and must comply with all applicable North Carolina General Statutes governing construction procurement. The contract will be awarded to the lowest responsible, responsive bidder considering quality, performance, and completion schedule. All bid proposals must be sealed and submitted to Macon County Finance Department with a completed Non-Collusion Affidavit, itemized bid list, and signed Bid Sheet and Contract Terms Acceptance Form. Payment will be made within thirty days after project completion, final inspection, and acceptance notification from the County's Soil and Water Director. Contractors must maintain minimum insurance coverage including $2,000,000 general liability with combined single limits and $1,000,000 annual aggregate, $1,000,000 automobile liability, Workers Compensation insurance, and builders risk coverage naming Macon County as secondary insured. All bids remain open for acceptance for a minimum of 120 days from the bid closing date.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID NO. 03-1032W
INVITATION FOR BIDS
BID REQUEST NO. #03-1032W
CRAWFORD BRANCH
STABILIZATION
ISSUE DATE: July 15th, 2026
BID OPENING DATE: August 6, 2026
4:00 P.M. LOCAL TIME
ISSUED BY: MACON COUNTY FINANCE DEPARTMENT
5 WEST MAIN STREET
FRANKLIN, NC 28734
PHONE: (828) 349-2027
JACLYN MATHIS, PURCHASING AGENT
**Note: As of July 1, 1997, informal bids received under N.C.G.S. 143-131 are
“CONFIDENTIAL” and are not subject to public inspection until the Contract or Purchase
Order is awarded.**
A. INTRODUCTION
Macon County is requesting bids for the stabilization of the waterway bank at Crawford Branch. Work is to be accomplished as specified in the Construction Plan and Scope of Work.
A mandatory pre-bid meeting will be held on July 29, 2026 at 10:00 AM on site. Parking will be available at the Phillips Street Dog Park in Franklin, NC that is adjacent to the work site.
Attendance at this meeting is required for awarding this contract.
For questions regarding technical & site specification, site visits, installations, construction questions, project management, etc.
Joe Allen jallen@maconnc.org Phone 828.371.4422
For questions regarding Bid Process, Documents, Bid and Contract Terms & Conditions, etc.
Jaclyn Mathis Purchasing Agent jmathis@maconnc.org Phone 828.349.2027
All questions regarding this IFB must be submitted in writing. Responses to all questions received will be made in writing and sent to all known bid holders by addendum.
B. GENERAL BID & DOCUMENT REQUIREMENTS
All bidders submitting bids in relation to this request should familiarize themselves with the following general bid terms and conditions. Bidders not in compliance with these documents subject their bid proposals to rejection. Bid proposals must be submitted complete with all required signed documents, final pricing, signature pages, etc., at the time of submission.
Macon County will not request required information after bid opening and the lack thereof may subject a bid to rejection.
It is the responsibility of all respondents to contact Macon County prior to submitting a response to the IFB to ascertain if any addenda have been issued, and to obtain any and all addenda, execute them, and return addenda with their response to the IFB.
1. The bidder and/or bidders to whom the contract is awarded must comply with all aspects of this bidding process, which are designed to meet the requirements of North Carolina G.S. 143-128, 129 & 131, as amended, which collectively govern bidding procedures for government construction projects in North Carolina.
2. Bids submitted in response to this request will be governed by N.C. General Statute and the general provisions outlined in this request.
3. All bidders for construction, renovation or improvement projects costing $40,000 or above must hold a current, proper North Carolina General Contractor’s license for the project at the time they submit their bid. The quantities provided on the bid form are for general information purposes and the bidder shall be responsible for determining final quantities for each bid item in determining the lump sum price.
4. Macon County Government does not discriminate on the basis of race, color, sex, national origin, religion, age, or disability. Any contractors or vendors who provide services, programs or goods for Macon County are expected to fully comply with the County's non-discrimination policy.
5. Macon County reserves the right to accept or reject any or all bids, evaluate all bids, especially where there is a wide range in specifications, and make an award in the best interest of the County. Macon County reserves the right to take exception to or waive any item in the bid.
6. Bid Submissions, Bid Evaluation and Contract Award: All informal contracts for construction or repair work shall be awarded to the lowest responsible, responsive bidder, taking into consideration quality, performance, and the time specified in the bid for the performance of the contract. In making a determination of responsibility, Macon County may use criteria such as:
• Compliance with bid package requirement
• Contractor’s qualifications
• References
• Financial ability
• Insurance coverage
• Etc.
7. All bids for combinations of work and product must be accompanied by the vendor’s proposed start and completions schedule or timeline and other pertinent project data.
8. All bid proposals must use the forms included. All bid proposals must be signed by an individual authorized to bind the contractor to a contract prior to submission.
9. Delivery of Bids: Electronically transmitted bids will not be accepted. To be considered, bid proposals should include:
i. Completed Non-collusion Affidavit (page 6)
ii. Bid item list (page 7)
iii. Completed Bid Sheet and Contract Terms Acceptance Form (page 8)
Bid proposal must be sealed upon delivery with the project name and number present on the outside of sealed bid proposal.
All bid proposal packages shall be delivered or mailed direct to:
Macon County Finance Department Attn: Jaclyn Mathis 5 W Main Street Franklin, NC 28734
PROMPT DELIVERY OF BIDS TO PURCHASING AGENT IS THE SOLE RESPONSIBILITY OF THE
BIDDER. BIDS RECEIVED AFTER THE BID DEADLINE, REGARDLESS
OF REASON, WILL NOT BE CONSIDERED.
10. Macon County shall not be held responsible for nor will it pay any costs or expense associated with the preparation or submission of a bid proposal submitted in response to this solicitation, such expenses and costs being the sole responsibility of the bidder.
Nothing in this solicitation or any response submitted pursuant to shall obligate Macon County to award a contract to a bidder.
11. In case of default of an awarded contractor, Macon County may procure the articles and/or services from other sources and may hold the defaulting contractor responsible for any excess cost occasioned thereby.
12. Payment: Full payment will be made by check within thirty-days after project completion and final inspection and notification of acceptance is given to the Finance Department by the County’s Soil and Water Director. Once proof of acceptance is received, the Finance Department will process the invoice for payment. No payment will be made until contractor completes all delivery, construction, installation or other provisions or responsibilities as agreed upon prior to project start and corrected any deficiencies found.
13. Terms & Conditions Acceptance: By submitting a signed proposal in response to this solicitation, the individual is verifying that he/she is a duly authorized representative of the company and is able to legally bind the company to this agreement. Signature also denotes agreement that the terms and conditions of this bid shall override all other terms and conditions, regardless of form or delivery.
14. Minimum Insurance Requirements: Macon County requires that all contractors performing site preparation, paving, installation, construction, repairs or renovations on County property shall provide insurance certificates to the County naming Macon County as secondary insured. The contractor shall procure, maintain and provide proof of insurance coverage for injuries to persons and/or property damage as may arise from, or in conjunction with, the work performed on behalf of the county by the contractor, his agents, representatives, employees or subcontractors. Proof of coverage as contained herein shall be submitted prior to the commencement of work and the contractor shall maintain such coverage for the duration of the contract period.
15. Minimum Insurance Coverage Limits: General Liability: $2,000,000 combined single limits, $1,000,000 annual aggregate ($1,000,000 products and completed operations aggregate)
• Automobile Liability: $1,000,000 combined single limits, $1,000,000 annual aggregate.
• Workers Compensation: Workers Compensation is required by all contractors or subcontractors regardless of the number of employees.
16. Builders Risk: Contractor to decide amount of coverage needed for the project materials. The contractor’s insurance shall be primary over any applicable insurance or self-insurance maintained by the County. The contractor shall provide 30 days written notice to the County before any cancellation, suspension, or void of coverage in whole or part, where such provision is reasonable.
• All coverage for subcontractors of the contractor shall be subject to all of the requirements stated herein.
C. SCOPE OF WORK
Work will need to be completed before December 1st 2026. Macon County. Bidders should utilize Construction Plans, Crawford Branch attachment for complete technical Scope of Work.
General Notes:
• Erosion and sediment control practices must be installed, inspected and maintained.
• Silt fence shall be installed on the stream side of any stockpiles.
• Work shall be staged such that no more stream bank is disturbed than can be stabilized with seed, mulch and matting at the end of each work day.
• Disturbed upland areas must be stabilized with seed and mulch within 7 days of reaching final grades.
• Work shall be scheduled during periods of low flow.
• Flow shall be pumped around the work area until all structures and bank stabilization is complete.
• Excess excavated materials not useful to the project shall be disposed off-site.
• Equipment should be cleaned and free of fuel, oil and lubricant leaks.
• All fueling should be preformed at least 100 feet from flowing water.
• Equipment shall operate from the top of bank as much as practical and shall take precautions to limit downstream sediment migration.
• Contractor shall repair any damage and return work areas to pre-project conditions.
• Herbicide should be selectively applied at least two weeks prior to excavation.
o Existing native trees and shrubs, including dogwood, willow, and alder, shall be protected from herbicide impacts.
• Exotic plants shall me stripped and removed from site.
Plan and Profile:
• Conform downstream creek bed to upstream culvert inverts.
• Slope and stabilize lower bank 1.5:1
• Slope and stabilize upper bank 2:1
• Plant approved trees and shrubs along south slope.
• Selectively apply aquatic safe herbicide to kudzu, honeysuckle and multi-flora rose prior to grading
• Construct Geolifts and Riprap per construction plan specs.
Refer to the Construction Plan for specs on each proposed area of work.
D. Non-Collusion Affidavit
State of North Carolina County of Macon
1. The signer of this document is the _______________________________(Title) of _______________________________(Company), who is the respondent that has submitted the attached bid response.
2. The undersigned person is fully informed concerning the preparation and contents of the attached response and of all pertinent circumstances related to it, and is authorized to sign this affidavit. This affidavit is given under penalty of perjury as provided by law.
1. Such bid response is genuine and is not collusive or sham in anyway whatsoever.
4. Neither the person responding nor any of its officers, partners, owners, agents, representatives, employees or parties in interest, including the signer of this affidavit, have in any way colluded, conspired, connived or agreed, directly or indirectly, with any other respondent, firm or person to submit collusive or submit a sham response in connection with the contract for which the attached response has been submitted or to refrain from responding in connection with such contract, or has in any manner, directly or indirectly, sought by agreement or collusion or communication or conference with any other responder, firm or person to fix the price or prices in the attached response or of any other responder, or to fix any overhead, profit , or cost to secure through collusion, conspiracy, connivance or unlawful agreement and advantage against any person interested in the proposed contract.
5. The price or prices quoted in the attached response are fair and proper and are not derived by any collusion, conspiracy, connivance or unlawful agreement on the part of the respondent or any of its agents, representatives, owners, employees, or parties in interest.
__________________________ (Seal) Signature of Officer
Subscribed and sworn to before me, this _______ day of _____________, 20 ______.
Notary Public ________________________
My commission expires: ________________
Item Description Quantity Unit Unit Price Extended 1 Mobilization 1 LS 2 Construction Entrance/Exit 1 LS 3 Pump-around Flow Diversion 1 LS 4 Selective Herbicide Treatment 0.7 AC 5 Earthwork 70 CY 6 Geolifts (soil, coir logs, coir matting, stakes) 55 LF 7 Class 1 Riprap for Riffles and Geolift Foundation 90 TON 8 Silt fence 100 LF 9 Erosion Control Matting 360 SY
10 Bank and Buffer Seeding (temporary, permanent, mulching) 0.6 AC 11 Lawn Re-seeding (tall fescue) 0.1 AC 12 Live Stakes (during dormancy) 300 EA 13 Trees and Shrubs (during dormancy) 300 EA
Bid Submitted By: Date:
Bid Item List Crawford Branch Stabilization
June 17, 2026
Headwaters Engineering, PC 6/17/2026
E. BID SHEET & CONTRACT TERMS ACCEPTANCE FORM
Crawford Branch Stabilization
Bid# 03-1032W Company ____________________________________________________________
Address/City/State/Zip _________________________________________________
Telephone Number: _______________ Cell Phone: ___________________
Email Address: _______________________________________________________
OFFER
A. This offer shall be open to acceptance and is irrevocable for a minimum of 120 Days from the bid closing date.
B. Having examined the Place of Work and all matters referred to in the Bid/Contract
Documents prepared by Macon County for the above-mentioned project, we, the undersigned, hereby offer to provide a complete work product.
TOTAL BASE BID $__________________________
Addenda (if none, state “N/A”): #1 __________, #2 __________, #3__________.
Terms & Conditions Acceptance: By signing below, the individual accepts and verifies:
A. That he/she is a duly authorized representative of the company and is able to legally bind the company to this agreement.
B. Understanding of all terms and conditions contained within this solicitation and that this solicitation, its terms and conditions, become the entire contract to which Macon County and contractor will be bound for this project, and shall override and supersede all other terms and conditions, regardless of form or delivery.
C. That this offer is not a “sham” offer and is made without collusion.
D. Acceptance of and agreement to fulfill the insurance & risk requirements set forth above.
Printed Name of Authorized Individual Title
Signature of Authorized Individual Date
PROJECT SITE
LAT: 35.178306; LONG
: -83.379767
1.
TITLE
LIST O
F SH
EETS
2.
N
O
TES & SYM
BO
LS
3.
PLA
N
& PRO
FILE
4.
TYPIC
AL SEC
TIO
N
S 5-7.
DETAILS
N T
S
C O
N S
T R
U C
T
IO
N P
L A
R
AW
F
O R
D B
R A
N C
H S
TA
B
IL
IZ
A T
IO
F
A N
K L
IN
, N
O R
T H
C A
R O
L
IN
A
M
ALO
II
LE l�ILL
M
0(1
Oll n t, A rpo
I
E HILL
t Y '-'
L
D ra n k lin
V
IC
IN
IT
Y M
P u g el M i>d lc
I c
�m e, FINAL FO
CO
N
STRUCTIO
PREPARED FO
R:
(I)
0...
w a:::
E
Ill
"'f a::
1:1 ci> o
W
Z t-
Q) ffi
I.Liz c
...J
I.LI
"C
J:
(I]
UJ
..c z
T E
J U
N E
A L
E
A S
S H
O
C/O
KESSEL EN
G
IN
EERIN
G
G
RO
UP, PLLC
TITLE
582 HEN
DERSO
N
VILLE RO
AD
ASHEVILLE
, N C 28803
S H
E E
T
O
0::::
G
N E
R A
L N O
TE
S
PA
R
C
LS
1-FO
T C O
N
TO
U R
E D
G E
O
F WAT
E R
S A
N
ITA
R Y S
E W
FE
U
LV
E
R T
E X
IS
T s
--0--0--0--0--0
G E
N
TE
R
LIN
TO
O F B
A
K
N S
T. R
IFFLE
LIFTS
N S
TR
U
C
TIO
N E
N
TR
A N
C E
/E X
IT
S E
LE
C
TIV
E
H E
R B
IC
ID
E A
P P
LIC
A
TIO
O P
O S
A L
F
N S
T R
U C
T
1.
R O
S
IO
N A
N D
S E
D
IM
E N
T C O
N
TR
O L P
R A
C
TIC
E S
M U
S T B
E
IN
S
TA
LLE
D
, IN
S
P E
C
TE
D A
N D
M A
IN
TA
IN
E
D
IN
A C
C O
R D
A N
C E
W
ITH
FE
D
E R
A L, S
TAT
E
A N
D
LO
C A
L R E
G U
LAT
IO
N S
2.
A
LL E
Q U
IP
M
E N
T M U
S T B
E C
LE
A
N E
D R
E G
U
LA
R
LY
A N
D M
A
IN
TA
IN
E D
TO
B
E
FR
E E
O
F FU
E L, O
IL A
N
D
LU
B R
IC
A
N
T LE
A K
S
3.
FU
E
LIN
G S
H A
LL B
E
P E
R
FO
R M
E D
AT
LE
A S
T 100 FE
E
T FR
O
M
FLO
W
IN
G
WAT
E R
4.
H E
R B
IC
ID
E S
H A
LL B
E
S E
LE
C
TIV
E
LY A
P
P
LIE
D
AT LE
A S
T TW
O
W E
E K
S P
R
IO
R
TO
E X
C
AVATIO
N , A
N D
TR
E
A
TE
D E
X O
TIC
P
LA
N
TS
S
H A
LL B
E
S
TR
IP
P
E D
A N
D R
E M
O V
E D
FR
O
M
TH
E S
ITE
E X
IS
TIN
G N
AT
IV
E
TR
E E
S A
N D
S H
R U
B S
, IN
LC
U D
IN
G
D O
G W
O O
D , W
ILLO
W
A N
D A
LD
E
R , S
H A
LL B
E
P R
O
TE
C
TE
D
FR
O M
H E
R B
IC
ID
E
IM
PA
C
TS
5.
TH
E C
O N
TR
A
C
TO
R S
H A
LL P
R
O
TE
C T S
ITE
FE
AT
U
R E
S B
E
YO
N D
TH
E
G R
A D
IN
G
LIM
ITS
. C O
N
TR
A C
TO
R
S H
A
LL R
E P
A
IR
A N
Y D A
M A
G E
A N
D R
E
TU
R N
W O
R K
A R
E A
S
TO
P R
E -P
R O
JE
C
T C O
N D
ITIO
N
S
6.
E
Q U
IP
M
E N
T S H
A
LL O
P E
R A
TE
FR
O M
TH
E
TO
P
O F B
A N
K A
S M
U C
H A
S P
R A
C
TIC
A L A
N D
S H
A
LL TA
K E
P R
E C
A U
TIO
N
S
TO
LIM
IT D
O W
N S
TR
E
A M
S E
D
IM
E N
T M
IG
R A
TIO
N
7.
FLO
W
S H
A
LL B
E P
U M
P E
D A
R O
U N
D
TH
E W
O R
K A
R E
A U
N
TIL A
LL S
TR
U C
TU
R
E S
A N
D B
A N
K S
TA
B
ILIZATIO
N
IS
C
O M
P
LE
TE
. W
O R
K S
H A
LL B
E
S C
H E
D U
LE
D
D U
R
IN
G P
E R
IO
D
S O
F LO
W
FLO
W
8.
S
ILT FE
N C
E S
H A
LL B
E
IN
S
TA
LLE
D O
N
TH
E S
TR
E
A M
S
ID
E O
F A N
Y S
TO
C K
P
ILE
S
9.
E
X C
E S
S E
X C
AVAT
E
D M
AT
E
R
IA
LS
N
O T U
S E
FU
L TO
TH
E
P R
O
JE
C T S
H A
LL B
E
D
IS
P O
S E
D O
FF-S
ITE
10.
W O
R K
S H
A
LL B
E S
TA
G
E D
S U
C H
TH
AT
N O
M O
R E
S
TR
E A
M B
A N
K
IS
D
IS
TU
R
B E
D
TH
A N
C A
N B
E S
TA
B
ILIZE
D
W
ITH
S E
E D
, M U
LC
H
A N
D M
AT
TIN
G A
T TH
E
E N
D O
F E A
C H
W O
R K
D A
Y 11.
D
IS
TU
R
B E
D U
P
LA
N D
A R
E A
S M
U S
T B E
S
TA
B
ILIZE
D W
ITH
S
E E
D A
N D
M U
LC
H
W
ITH
IN
7 D
AY
S
O F R
E A
C H
IN
G
FIN
A
L G R
A D
E S
12.
P
LA
N T M
A
TE
R
IA
LS
S
H A
LL B
E
IN
S
TA
LLE
D D
U R
IN
G
TH
E
D O
R M
A N
T S E
A S
O N
, G E
N E
R A
LLY D
E
C E
M B
E R
TH
R
O U
G H
M A
R C
H
C O
N S
TR
U
C
TIO
N S
TO
R
M
WAT
E R
IN
S
P E
C
TIO
N S
1.
TH
E C
O N
TR
A
C
TO
R
IS
R E
S P
O N
S
IB
LE
FO
R K
E E
P
IN
G D
A
ILY R
E C
O R
D S
O F R
A
IN
FA
LL E
V E
N
TS
IN
A
N O
N -S
ITE
P
E R
M
IT B
O X
2.
E R
O S
IO
N
A N
D S
E D
IM
E
N T C
O N
TR
O
L P R
A C
TIC
E
S M
U S
T B E
IN
S
P E
C
TE
D
AT
LE
A
S T O
N C
E P
E R
7 C A
LE
N
D A
R D
AY
S
A N
D W
ITH
IN
24 H O
U R
S O
F A
LL R
A
IN
FA
LL E
V E
N
TS
G R
E
AT
E R
TH
A
N
0.5 IN
C H
P E
R 24 H
O U
R P
E R
IO
D
3.
N E
C E
S S
A R
Y M A
IN
TE
N A
N C
E O
R R
E
PA
IR
S
M U
S T B
E C
O M
P
LE
TE
D
IM
M
E D
IAT
E
LY U
P
O N
ID
E
N
TIFIC
A
TIO
N O
F TH
E
P R
O B
LE
M
4.
E R
O S
IO
N
A N
D S
E D
IM
E
N T C
O N
TR
O
L C O
N
TA
C
TS
D U
R
IN
G C
O N
S
TR
U C
TIO
N
; A
N D
R E
W B
IC
K
, H E
A D
W A
TE
R
S E
N G
. 828.606.0306
VI
c::
I!)
C)
1-
W t)
::c
DATE:
JUN
E 2
SCALE:
AS SH
O
T E
Y
M B
O
SH
EET2
O F 7
\ \ AER
IAL I
ER
Y D
AT
ED
FR
O M
N C
O N
EM
AP W
EBSITE
EXISTIN
G
R
IPR
AP
I'
TFA
LL
'..J
PR
TEC
T FEN
C E l--
---t
---t
-----1 r--t--
--t- ---1
1-_- �+
�-f-f, :>., ;::--,� l-::,� ----f
�-:��:;+,���--f
-g-,_-/ --f�l�-i'!��-�t----i
N ;rr-- --f_,-_ --�� --+
•.iri. r _--1:_�/ --+
O>
"<t t--i!
r---v
L._ ..L._
_j__ __J_
--1...
v__J_ v_._ _...i.._
....Lll ll....-
-rl
�rl - ;r,- ·
LEG
EN
EXISTIN
PO
SED
0...0...<(
Ill a::
ffi
I.Liz c(
I.LI
T E
J U
N E
A L
E
A S
S H
O W
R
O F
IL
H
E E
T
O
END
PRO
SED
I-
21.0' l
L______..:=
---.c
2-� f
SEED
, M
AT
TIN
G
2•5 (TYP) j----2
g. o• ----1
LIVE STA
KIN
G
(TYP)
TYPIC
AL SEC
IFFLE
I-
20.0' +/-
-1
N O
T y
SEED
, M
ATTIN
G
LIVE STA
6.-0 -....,' r - � �
G
EO
LIFTS, SEE D
ETA
IL
O'
TYPIC
AL SEC
L
TYPIC
AL SEC
TIO
N
N O
TES:
10'
1.
TYPIC
AL SEC
TIO
N
DRAW
N
LO
O
KIN
G D
O W
N
STREAM
. PO
O
L SEC
TIO
N
IS FO
R
LEFT-BEN
D
IN
G M
EAN
DER; RIG
HT-BEN
DIN
G
PO
O L W
ILL BE M
IR
R O
R
IM
AG
E.
2.
RIG
H
T BAN
K FO
R
PO
O
L N
EAR ST
A 5+15 W
ILL BE REIN
FO
RC
ED W
ITH
G
EO
LIFTS.
SEE DETAIL.
3.
O
U
TSID
E BAN
K SLO
PE VARIES FR
O
M
1.5: 1 TO
2 .5: 1 DEPEN
DIN
G O
N
SPA
C E
AVA
ILABLE.
4.
BAN
KS AN
D
G R
AD
ED
SLO
PES SH
ALL BE RO
U
G H
EN
ED
PERPEN
D
IC
U
LAR TO
SLO
PE, C
O
VERED
W
ITH 3" LAYER O
F TO
PSO
IL, SEED
ED
, M
U
LC
H
ED
AN
D
M
AT
TED
W
ITH 780 G
/M
CO
IR FIBER M
ATTIN
G
5.
BAN
KS SH
ALL BE LIVE-STAKED
AT 3' O
.C
. D U
RIN
G
TH
E D
O
RM
AN
T SEASO
N
FO
LLO
W
IN
G
G
RAD
IN
G
6.
PLAN
T TR
EES AN
D
SH
R
U
BS ALO
N G
TO
P O
F BAN
K AS SPAC
E PERM
ITS.
20'
FINAL FO
N
STR
U
C
30' c..
CJ
T E
J U
N E
A L
E
A S
S H
O
TYPIC
AL
SEC
TIO
N S
S H
E E
T
O
Cl)
0::
A L
F
N S
T R
U C
T
G R
O U
PO
SED
G R
AD
E
12" C O
IR
LO
G
AN
C O
ED
/ 18" W O
O D
EN
STA
KES
LIVE STA
KES AT
3'
O .C
.; SEE N
O
TE 11
BR
U
SH
C
U
TTIN
G S;
SEE N
O
TE 11
IR
M
ATTIN
G
(780 G /M
2) W R
APPED
G
EO
LIFT N
O
TES:
1 , ------------ --------- --- ------ ---- ---
O
I
G E
O L
IF
BASE FLO
EPTH
1' +/-
1.
TO
P O
F STO
N
E FO
U N
D
ATIO
N
TO
C O
IN
C
ID
E W
ITH
BASE FLO
W W
ATER
SU
R
FA
C
E TH
R O
U G
H R
EPAIR
SEC
TIO
N
2.
R
EM
O
VE SLU
M
PED
AN
D
LO
O
SE SO
IL
AN
D
O
VER
EXC
AVAT
E FO
R
STO
N
E FO
U
N D
AT
IO
N
3.
PLAC
E EN
TIR
E LEN
G
TH
O
F STO
N
E FO
U
N D
ATIO
N
4.
R O
LL C
O
IR
M
ATTIN
G
LEN
G
TH
W
ISE ALO
N
G
BAN
K, LEAVIN
G
2' O F 6.5' R
O
LL W
ID
TH
O
VER
STO
N
E
FO
U N
D
ATIO
N
AN
D
EXTEN
D
IN
G
FLAP O
F R
EM
AIN
IN
G C
O
IR
M
ATTIN
G O
VER
TH
E SLO
PE.
5.
PLAC
E C O
IR
LO
G S O
N
TO
P O F C
O
IR
M
AT
TIN
G
AN
D
AN
C
H O
R
TO
SU
BG
R
AD
E W
ITH
W O
O D
EN
STAKES
EVER
Y 3'.
6.
PLAC
E AN
D
C O
M
PA
C
T 12" LIFT O
F C
LEAN
SO
IL O
VER
C
O
IR
AN
D
AG
AIN
ST C
O
IR
LO
G
7.
APPLY
TEM
PO
R
AR
Y AN
D
PER
M
AN
EN
T SEED
M
IX
AN
D
STR
AW
M
U
LC
H O
N
FLAT, EXPO
SED
PO
R
TIO
N O
F TH
E LIFT.
8.
W
R
AP R
EM
AIN
D
ER
O F C
O
IR
R O
LL W
ID
TH
U
P AN
D
O
VER
C O
IR
LO
G
AN
D
STA
KE C
O
IR
M
AT
TIN
G W
ITH
W
O O
D
EN
STA
KES EVER
Y 3'.
9.
PLAC
E TH
IN
LAY
ER
O
F SO
IL O
VER
C
O i R
AN
D
LAY
D
O R
M
AN
T BR
U
SH
C
U
TTIN
G
S AT
6" O .C
10.
R
EPEAT
STEPS 4 -9 TO
R
EAC
H
TH
E TO
P LIFT.
11.
FO
R
W O
R K D
O N
E O U
TSID
E O
F TH
E D
O R
M
AN
T SEASO
N
, O M
IT BR
U
SH
C
U
TTIN
G
S AN
D R
ETU
R
N
TO
TH
E SITE D
U R
IN
G
D O
R M
AN
C
Y TO
IN
STA
LL LIVE STAKES IN
STEAD
i,-
AR
O U
N D
EAC
H
C O
IR
LO
G
AN
D
LIFT;
AN
C H
O R
W
/ 12" EC
O
STA
KES
M
PAC
TED
C
LEAN
SO
IL
W
ITH
3-5%
O R
G
AN
IC
S
C
LASS 1 R
IPR
AP
R
EM
O
VE SO
FT AN
SLU
PED
SO
IL
TO
E O
F BAN
K;
R
IFFLE EXTEN
S , II
6" BEYO
N
D
TO
SEE PLAN
FO
R
IFFLE
LEN
TH
"T1 r
J
L:
18" M
ELEVAT
IO
N
PO
IN
T O
N
PR
O
FILE
A ' C
LASS 1 R
IPR
AP W
ITH
-SITE C
O
BBLE AN
AVEL FILLIN
G
VO
ID
S
SC
AR
IFY SU
BG
R
AD
E
PR
IO
R
TO
STO
N
E PLAC
EM
EN
T
S E
C T
IO
N
A -A
C O
N S
T R
U C
T E
D R
IF
F
Q
-.::1"
1/) o:
jji ch
2:
w -� o
1o
3=
CJ)
a:i
T E
J U
N E
A L
E
A S
S H
O
T A
E E
T S
O
IPA
R
IA
N S
E E
D M
IX
A P
P L
IE
D
T O
S T
R E
A M
B A
N K
S A
N D
B U
F F
E
M P
O R
A R
Y S
E E
D
IX
E E
A N
D S
H R
U B
P L
A N
T
L E
C T
AT
L
E A
S T
T H
R E
E O
F T
H E
F O
L L
O W a te
(lb /a cre
S e e d in g
R ate
= 2 0 lb
/a cre p p lica tio n D a te s C o m m o n N a m e cie ntific N a p p lie d te
(lb /a cre ) A p p lie d
IE
N T
IF
IC
N A
A
C
M M
O N
N A
(F
E
T
M u lch in g : w h e a t o r o a t stra w m u lch a p p lie d at 2 to n s/a cre p a ra te ly w
/ R ip a ria n M ix
C om m on N am cie ntific N am rce n ta g g u st 15 to M a y 1
R ye
G ra in ln d ia n g ra ss S o rg h a stru m n u ta n s y 1 to
A u g u st 15 B ro w n to p M ille t
B ig
B lu e ste d ro p o g o n g e ra rd i
V irg in ia
W ild rye lym u s virg in icu s oft
R sh
Ju cu s e ff u su s
B a ke d P a n icg ra ss P a n icu m a n ce p x S e d g re x vu lp in o id
. 2 N O
D
ES ABO
VE G
R
AD
E m l 1 11 I1 1 111 I I
1' TO
FIR
ST R
-•11 -1 11
111-
BASEFLO
W W
.S.
'I
I -1
LIVE STA
KE
1- 111=
111= 111 =
1 11-
3 N O
D
ES M
l
N O
TES:
1.
STA
KE SPAC
IN
G
3' IN
R
IFFLES AN
D
PO
IN
T BAR
S, 2'
O N
PO
O
L O U
TSID
E BAN
KS.
2.
LIVE STAKE M
IX TO
IN
C
LU
D
E
AT LEAST TW
O O
F TH
E
FO
LLO
W
IN
G
SPEC
IES: SILKY
S E
C T
.J_
G W
O O
D
, SILKY W
ILLO
W
24" M
IN
ELD
ER
BER
R
Y, N
IN
EBAR
K, BU
TTO
N
BU
SH
TO
P C
U
T AT
AFTER
STA
LLATIO
BU
S PO
TED
PW
AR
1/2" TO
2"
BASE C
U
T
AT
45 D
EG
S e ca le ce re le n icu m ra m o su
E D
M
IX
E
A N
T L
IS
AN
H O
R M
ATTIN
6"TR
AT
P O
F BAN
K
M
AT
TIN
G
SH
ALL BE
7 80 G /M
2 C
IR
R
EM
O
VE ALL D
EBR
IS,
SC
AR
IFY SU
R
FAC
E, PLAC
E
TO
PSO
IL AN
D
SEED
/M U
LC
BEFO
E PLAC
IN
G
M
ATTIN
STEEL T-PO
ST _
FILTER
FABR
W
IR
E BAC
KIN
G
C O
M
PAC
TED
BAC
KFILL
RUNOFF-
C R
EEK
SID
E
M
IN
SEC
IV
E S
TA
K
IV
E S
T A
K E
D E
T
A L
F
T F
E N
N S
T R
U C
T ive r B irch tu la n ig
S e rvice b e rry
A m e la n ch ie r a rb o re
T ag A ld e r A ln u s se rru la ta in e b a rk
P h yso ca rp u s o p u lifo liu s
W itch
-h a ze l
H a m a m e lis virg in ia tto n
B sh p h a la n th u s o ccid e n ta lis
S w e e tsp ire lte virg in ica u n ta in
C le th le th ra a cu m in ta
AT
TIN
G
PLAC
ED
FLU
SH
W
ITH
BAN
K
SU
R
FA
C
E, LAP O
VER
D O
W N
STR
EAM
D
O W
N
SLO
PE SEAM
S
12" W O
O D
STA
KE PLAC
3' O
.C . D
IAM
O
N D
PAT
TER
ATTIN
G
AN
C H
O R
ED
1'
BELO
W
STR
EAM
BED
R
O S
IO
N
C O
N T
R O
L M
A T
T
S
8 ' M
AX
PR
O
FILE
FILTER
FA
BR
IC
IR
E BAC
STALLATIO
N
AN
D M
AIN
TEN
AN
C
E N O
TES:
8-
8-
8-
8-
8-
8-
1.
SILT FEN
C
E SH
ALL BE PLAC
ED
O N
STR
EAM
SID
E
O
F ALL STO
C
KPILES.
2.
SILT FEN
C
E SH
ALL BE R
EM
O
VED
U
M
PLETIO
N O
F EAR
TH
W O
R K.
3.
R
EM
O
VE AC
C
U M
ULATED SED
IM
EN
T BEFO
R E H
ALF
O
F TH
E SILT FEN
C E C
APAC
ITY IS R
EAC
H
ED
c..<( ch
2:
ro
_J
_J Lll w
DATE:
JUNE 20
SCALE: AS SH
OW
N Cl)
A N
T
IN
G A
S C
O N
T R
T A
SH
EET6 OF 7
PU
P-AR
O
U N
D
IN
STA
LLATIO
N
AN
D M
AIN
TEN
AN
C
E N O
TES:
1.
W O
R
KIN
G
FR
O M
TH
E TO
P O
F BAN
K, IN
STALL SAN
D
BAG
C O
FFER
D
AM
S, D
IVER
SIO
N
PU
M
P, AN
D
SU
C
TIO
N
AN
D
D
ISC
H
AR
G E H
O
SES. R
U N
TH
E
D
IVER
SIO
N
PU
M
P AN
D
IN
SPEC
T W O
R
K AR
EA FO
R
C O
FFER
D
AM
LEAKS.
2.
IN
STALL D
EWAT
ER
IN
G
PU
M
P AN
D
SILT BAG
O
NLY IF WAT
ER
IS EN
TER
IN
G
TH
E W
O R
K
AR
EA.
3.
PU
M
P-AR
O
U N
D
SYSTEM
SH
ALL N
O
T BE LEFT U
N
AT
TEN
D
ED
FO
R
AN
Y LEN
G
TH
O
F TIM
E D
U R
IN
G
O
PER
AT
IO
N S.
4.
PR
IO
R
TO
D
AILY D
ISM
AN
TLIN
G O
F TH
E PU
M
P-AR
O U
N D
SYSTEM
, STABILIZE TH
E
STR
EAM
BAN
KS AN
D
BED
W
ITH
IN
TH
E W
O R
K AR
EA W
ITH
SEED
, M U
LC
H
ER
O
SIO
N C
O N
TR
O
L M
ATTIN
G
AN
D
IN
-STR
EAM
STR
U
C
TU
R
ES.
5.
R
EM
O
VE AC
C
U M
U
LATED
SED
IM
EN
T FR
O M
U
PSTR
EAM
SID
E O F D
O W
N
STR
EAM
C
O
FFER
D
AM
AN
D
AN
Y LO
O
SE SO
IL FR
O
M W
ITH
IN
TH
E W
O R
K AR
EA.
6.
R
EM
O
VE D
EWAT
ER
IN
G
PU
M
P (IF U
SED
7.
W
H
ILE D
IVER
SIO
N
PU
M
P IS R
U N
N
IN
G , R
EM
O
VE PO
R
TIO
N
S O F C
O
FFER
D
AM
S
ABO
VE TH
E W
ATER
SU
R
FA
C E.
8.
TU
R N
O
FF D
IVER
SIO
N
PU
M
P AN
D R
EM
O
VE R
EM
AIN
IN
G
PO
R
TIO
N S O
F C O
FFER
D
AM
S BY H
AN
D
9.
PU
M
P-AR
O
U N
D
SH
ALL BE D
ISM
AN
TLED
AN
D
D
ISTU
R
BED
AR
EAS PR
O
TEC
TED
H O
PE SH
EETIN
G O
R
ER
O
SIO
N C
O N
TR
O
L M
AT
TIN
G
IN
AD
VA
N
C E O
F AN
Y
R
AIN
EVEN
T TH
AT
W
O U
LD
C
AU
SE STR
EAM
FLO
W
TO
EXC
EED
TH
E FLO
APAC
ITY O
F TH
E SYSTEM
R O
AD
/D
R
IVEW
AY
R =20'
9" M
IN
. TH
IC
KN
ESS
50' M
C
LASS A STO
N E
O
VER
N O
N -W
VEN
FILTER
FABR
12' M
C O
N S
T R
U C
T
IO
N E
N T
R A
N C
E
E X
IT
A L
F
O N
-W O
VEN
SILT
BAG
N S
T R
U C
T
10' M
IN
. FR
O M
STR
LASS B
S O
N
E PAD
O R
PA
LLET
C O
FFER
D
AM
; C
LASS B STO
N
E W
/ PLASTIC
SH
EETIN
1' D
EEP
SETTLIN
G
PO
O L
S
IL
T B
EW
ATER
IN
G
PU
M
P I SILT BAG
O N
STO
N
E PA
D
AS N
EED
i� SEE D
ETA
IL
ABO
VE
C W
O R
K
AR
EA�
E O
F BAN
K (TYP)
TO
P O
F BAN
K (TYP)
PR
O
TEC
T EXIST.�
BAN
K VEG
ETAT
IO
FO
AD
'L FILTER
VAR
I ES-
O N
-SI TE C
O
B BLE
D
IVER
SIO
N
PU
M
P C
APAC
ITY
= 150% O
F
BASE FLO
FLO
AX D
EPTH
-1'
H
OPE SH
EETIN
G
W
ITH
6" O F
O N
-SITE C
O
BBLE O
VER
LAY
U
SE SAN
D
BAG
S AT
BASE
AS N
EC
ESSAR
Y
PR
O
FILE
SPLASH
PA
*N
TE:
W
O R
K AR
EA SH
ALL BE STA
BILIZED
BY
TH
E EN
D
O
F EAC
H W
O R
K D
AY
TO
P O
F BAN
K
M
AX D
EPTH
STR
BO
TTO
F F
E R
D
M P
A
R O
U N
D S
C H
E M
A
SEC
ch 2:
1o
3=
0z
T E
J U
N E
A L
E
A S
S H
O
A N
T
T A
E E
T
O
| 03-1032W Informal Bid Request.pdf |
| crawford bid item list 061726.pdf |
| 03-1032W Informal Bid Request |
| crawford branch const plans 061726.pdf |
File details come from the government source that posted it. Updated .