Cravens Landing Gate SOW.pdf

PDF 565 KB Posted

Attached to
RFQ TRD01-TRD03 Removal and Replacement of Leaf Gate in Sandwich MA
Solicitation number
BD-25-1046-DMF-FWE20-114300
Issued by
Barnstable County, Massachusetts

About this file

The document is a Scope of Work Statement for the Craven's Landing Gate Replacement Project (Project #25073) issued by the Massachusetts Department of Fish and Game's Division of Marine Fisheries. The project involves removing and replacing a single leaf gate at Craven's Landing on Holway Road in Sandwich, Massachusetts, with an estimated construction cost of $12,000. The bid deadline is April 4, 2025, with a planned start date as soon as feasible and contract completion date of June 30, 2025. The scope requires furnishing and delivering one single leaf swing gate, two hold open/closed posts, and locking posts in accordance with detailed technical specifications.

The contract will be awarded as a lump sum under MGL Chapter 149 for projects between $10,000 and $49,999. Technical specifications mandate that all gate components be Schedule 40 steel pipe hot-dipped galvanized after fabrication, with specific requirements for materials including steel plate (ASTM-A-36), hardened steel pins, galvanized chain, and epoxy-coated rebar. The gate assembly must be hot-dipped galvanized in accordance with AASHTO-M111 standards, with pivot posts to be filled with 4,000 P.S.I. concrete. The contractor will be responsible for all materials, labor, equipment, and installation as directed by the project engineer.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Craven’s Landing Gate Replacement Project # 25073

Sample Scope of Work Statement Page 1 of 3

TRD01-TRD03 RFQ

Scope of Work Statement

MGL Chapter 149 Projects: With Costs of $10,000 to $49,999

AWARDING ENTITY

Awarding Entity: Department of Fish and Game’s Division of Marine Fisheries Agency Name and Address: 836 S Rodney French BLVD, New Bedford MA, 02744 Project Number: 25073 Estimated Construction Cost: $ 12,000.00

CONTACT INFORMATION

Name and Title: Ross Kessler Phone: 978-559-1701 Email Address: ross.kessler@mass.gov

CONTRACT AND BIDDING INFORMATION

Project Name: Craven’s Landing Single Leaf Gate Project Description (brief overview): Remove and replace single leaf gate at Craven’s Landing, Holway Rd., Sandwich Ma. Area is tidally dependent permitting will be completed by Awarding Entity.

Bid Deadline: April 4, 2025

OSD Trade Category:

Additional Information:

SCOPE OF WORK

Detailed Scope of Work: Provide detailed scope of work of sufficient detail to bid on the project. Provide additional drawings, sketches, notes or specifications as needed and check he appropriate boxes below.

X Drawings or sketches attached X Notes or specification attached x Other attachment, if so, indicate: Full Specs Attached

PROJECT SCHEDULE

Planned Start Date: As soon as is feasible Contract Duration Until Substantial Completion: June 30, 2025 Contract Duration Until Final Completion: June 30, 2025

Sample Scope of Work Statement Page 2 of 3

Technical Specifications

Existing gate shall be removed and disposed of. One new gate will be installed in same location according to specifications below.

ITEM 660.1 SINGLE LEAF GATE LUMP SUM

Description

The Contractor shall furnish and deliver 1- single leaf swing gate and 2 hold open/closed posts and locking posts in accordance with these Specifications, and as shown on the plans.

Materials and Construction Methods

Pivot posts, sleeve posts, hold open/closed posts (2), crossbar and bracing shall be Schedule 40 steel pipe hot dipped galvanized after fabrication.

Steel plate shall conform to ASTM-A-36. Sharp edges shall be ground smooth.

The pin shall be steel hardened to a minimum of 40 Rockwell (HRC).

Chain shall be 3/8” proof coil, grade 30, hot dipped galvanized.

Weld connections shall be fillet welds, ¼” minimum size, E60XX or E70XX electrodes, and be continuous along all exposed joints including both top and bottom of the locking plated etc.

The Contractor shall furnish and install #6 epoxy coated rebar, 18” long thru the base of the pivot posts and hold open and locking posts.

The completed gate assembly including posts, locking plates, crossbar, bracing, plates etc. shall be hot dipped galvanized after fabrication in accordance with AASHTO-M111 with a minimum nickel content of 0.5% by weight.

The pivot posts shall be filled with concrete. Concrete shall be ¾” aggregate, 4,000 P.S.I. with entrained air of 6% +/- 1%.

Method of Measurement and Basis of Payment

Under Item 660.1, the Contractor will be paid the contract lump sum price for Single Leaf Gate, which price shall include all materials, labor, equipment, and other items required to furnish and deliver the single leaf gate assembly as shown on the Drawings, as specified herein, and as directed by the Engineer.

Sample Scope of Work Statement Page 3 of 3