About this file

The document is a set of roadway resurfacing and widening plans prepared by the Escambia County, Florida Public Works Department, Engineering/Infrastructure Division for County Road 4A. The plans, dated June 2025, are a 100% submittal release for bid and cover a comprehensive roadway improvement project involving 16,833 square yards of roadway surface treatment, including partial reconstruction and mill/pave operations. The project scope includes widening existing 10-foot travel lanes to 11-foot lanes, adding 1-2 foot shoulders, installing new asphalt overlay (2" Type SP 12.5 Pg 76-22), leveling course, and black base. Additional work includes earthwork, traffic markings, guardrail upgrades, mailbox relocations, concrete work, and utility adjustments.

The project quantity summary indicates multiple specific line items, such as 5,150 cubic yards of earthwork excavation, 50,090 square yards of 2" asphalt overlay, 30,000 square yards of asphalt leveling, and 216 linear feet of W-beam guardrail with steel posts. The plans detail precise roadway cross-sections, showing existing and proposed road configurations, with specific attention to roadside swales, shoulder treatments, and tie-back details. The project encompasses multiple road intersections including Stucky Road, Poplar Dell Road, Killam Road, Creamer Road, Townsend Lane, and Tulip Road, spanning District 5 of Escambia County.

View the file

Other files for this state and local contract opportunity

Other files attached to CR 4A Roadway Safety Improvements, newest first.
File Type Posted
CR_4A_Roadway_Safety_Improvements.pdf PDF
Escambia_County_Technical_Specifications_07.01.2020.pdf PDF
Escambia_Rural_Roads_Widening_Analysis-_TM.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5-7

KEY SHEET

GENERAL NOTES

SUMMARY OF QUANTITIES

TYPICAL SECTIONS

PLAN VIEW - COUNTY ROAD 4A

ESCAMBIA COUNTY, FLORIDA

PLANS PROPOSED FOR

INDEX OF PLANS

100% PLANS SUBMITTAL

RELEASE FOR BID

JUNE 2025

ENGINEERING / INFRASTRUCTURE DIVISION

SHEET NO. SHEET DESCRIPTION

BOARD OF COUNTY COMMISSIONERS

PROJECT MANAGER:

PROJECT ENGINEER:

JOHN ROSENEAU

SECTION / TOWNSHIP / RANGE:

SIGNATURE:

DISTRICT:

REG FLA ENG NO:

DATE:

THESE PLANS HAVE BEEN PREPARED IN ACCORDANCE WITH THE LATEST ESCAMBIA

COUNTY TECHNICAL SPECIFICATIONS.

ANY REFERENCE TO FDOT STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE

CONSTRUCTION, LATEST EDITION, DIVISION 1, GENERAL REQUIREMENTS AND COVENANTS,

SHALL BE EXCLUDED AND NOT APPLICAPABLE TO ANY SPECIFICATION REFERED HEREIN

OR OTHERWISE LISTED IN THESE PLANS OR RELATED DOCUMENTS OR THE ESCAMBIA

COUNTY TECHNICAL SPECIFICATIONS.

PUBLIC WORKS DEPARTMENT

JUNE 2025

PROPOSED RESURFACING

PLANS

COUNTY ROAD 4A

AutoCAD SHX Text

TRANS.

AutoCAD SHX Text

CSX

AutoCAD SHX Text

CSX

AutoCAD SHX Text

SS

AutoCAD SHX Text

SYSTEM

AutoCAD SHX Text

SEABOARD

AutoCAD SHX Text

ST. L.S.F. RY.

AutoCAD SHX Text

RY.

AutoCAD SHX Text L

AutoCAD SHX Text

ST

AutoCAD SHX Text

SF

AutoCAD SHX Text

ROAD

AutoCAD SHX Text

IL

AutoCAD SHX Text

RA

AutoCAD SHX Text

RY

AutoCAD SHX Text

AutoCAD SHX Text

SF

AutoCAD SHX Text L

AutoCAD SHX Text

ST.

AutoCAD SHX Text

RR

AutoCAD SHX Text

RR

AutoCAD SHX Text

RAILWAY

AutoCAD SHX Text

FRANCISCO

AutoCAD SHX Text

SAN

AutoCAD SHX Text

AND

AutoCAD SHX Text

ST. LOUIS

AutoCAD SHX Text

DISTRICT TWO

AutoCAD SHX Text

DISTRICT ONE

AutoCAD SHX Text

DISTRICT FIVE

AutoCAD SHX Text

DISTRICT FOUR

AutoCAD SHX Text

DISTRICT THREE

AutoCAD SHX Text

COMMISSIONERS

AutoCAD SHX Text

MIKE KOHLER, CHAIRMAN

AutoCAD SHX Text

STEVE STROBERGER

AutoCAD SHX Text

STEVEN BARRY

AutoCAD SHX Text

ASHLEE HOFBERGER, VICE CHAIR

AutoCAD SHX Text

LUMON MAY

GENERAL NOTES:

1. ALL CONDITIONS AND STIPULATIONS OF THE CONSTRUCTION PERMITS AND THE APPROVALS ISSUED BY THE ESCAMBIA COUNTY

ENGINEER SHALL BE COMPLIED WITH IN EVERY DETAIL.

2. ALL ROADS DAMAGED BY CONSTRUCTION OPERATIONS ARE TO BE PATCHED OR RECONSTRUCTED AS DIRECTED BY THE COUNTY

ENGINEER OR DESIGNEE.

3. THE CONTRACTOR SHALL TAKE STEPS NECESSARY TO PREVENT EROSION AND ANY OFF SITE SEDIMENT TRANSPORT RESULTING FROM INCREASED RUNOFF DURING CONSTRUCTION BY PROVIDING SILT FENCE AND/OR STAKED HAY BALES AS REQUIRED BY FDOT, THE FLORIDA STORMWATER, EROSION, AND SEDIMENT CONTROL INSPECTOR'S MANUAL, 2000 EDITION, OR AS INDICATED ON THE PLANS. ALL EROSION CONTROL MEASURES SHALL REMAIN IN PLACE UNTIL ASSOCIATED DISTURBED AREAS ARE STABILIZED AS TO

REDUCE SEDIMENT RUNOFF, UNLESS OTHERWISE DIRECTED BY THE ENGINEER OR DESIGNEE.

4. COMPLIANCE OF NECESSARY PERMITS WILL BE THE RESPONSIBILITY OF THE CONTRACTOR.

5. THE CONTRACTOR IS CAUTIONED TO VISIT THE SITE AND FAMILIARIZE THEMSELVES WITH THE PROJECT PRIOR TO BIDDING AND/OR

CONSTRUCTION.

6. IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO PRESERVE OR RELOCATE ALL BENCHMARKS (VERTICAL CONTROL) AS NEEDED DURING CONSTRUCTION. ALL PUBLIC OR PRIVATE CORNER MONUMENTATION SHALL BE PROTECTED. IF A PUBLIC OR PRIVATE CORNER MONUMENTATION IS IN DANGER OF BEING DESTROYED AND HAS NOT BEEN PROPERLY REFERENCED, THE CONTRACTOR SHALL NOTIFY THE ENGINEER OR DESIGNEE IMMEDIATELY. ANY ESCAMBIA COUNTY HARN/GPS NETWORK MONUMENTS OR BUREAU OF SURVEY AND MAPPING GPS NETWORK MONUMENTS WITHIN THE LIMITS OF CONSTRUCTION SHALL BE PROTECTED. IF A HARN/GPS NETWORK MONUMENTS OR BUREAU OF SURVEY AND MAPPING GPS NETWORK MONUMENTS ARE DISTURBED OR DESTROYED THE CONTRACTOR SHALL BE RESPONSIBLE FOR RELACEMENT OF THE MONUMENTS AND HAVE THE MONUMENTS POSITION DETERMINED BY A FLORIDA LICENSED PROFESSIONAL SURVEYOR AND MAPPER USING GUIDELINES AS

ESTABLISHED BY NATIONAL GEODETIC SURVEY FOR BLUE BOOKING AND APPROVAL.

7. EXISTING DRAINAGE FEATURES WITHIN CONSTRUCTION LIMITS SHALL REMAIN UNLESS OTHERWISE NOTED.

8. THE CONTRACTOR SHALL MATCH EXISTING CONDITIONS AT THE BEGINNING AND END OF CONSTRUCTION AS DIRECTED BY THE

COUNTY ENGINEER OR DESIGNEE.

9. EXISTING STREETS AND DRIVES SHALL BE MAINTAINED TO LOCAL TRAFFIC AND PROPERTY OWNERS.

10. ALL ROADWAY CONSTRUCTION SHALL COMPLY WITH THE ESCAMBIA COUNTY TECHNICAL SPECIFICATIONS, LATEST EDITION.

11. ALL MATERIALS, TESTING AND CONSTRUCTION METHODS SHALL CONFORM TO THE ESCAMBIA COUNTY TECHNICAL

SPECIFICATIONS, LATEST EDITION.

12. ANY REFERENCE TO FDOT STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION, LATEST EDITION, DIVISION 1, GENERAL REQUIREMENTS AND COVENANTS, SHALL BE EXCLUDED AND NOT APPLICABLE TO ANY SPECIFICATION REFERRED HEREIN OR OTHERWISE LISTED IN THESE PLANS OR RELATED DOCUMENTS OR THE ESCAMBIA COUNTY TECHNICAL SPECIFICATIONS.

13. EXISTING STREET AND ROAD NAME SIGNS ON THE PROJECT SHALL BE KEPT VISIBLE AT ALL TIMES FOR THE FACILITATION OF ACCESS BY EMERGENCY VEHICLES. ALL OTHER EXISTING SIGNS THAT CONFLICT WITH CONSTRUCTION OPERATIONS SHALL BE TAKEN DOWN AND STOCKPILED WITHIN THE R/W LIMITS BY THE CONTRACTOR AS DIRECTED BY THE COUNTY ENGINEER OR DESIGNEE. ANY EXISTING SIGNS THAT ARE TO BE RELOCATED AND ARE DAMAGED BEYOND USE BY THE CONTRACTOR SHALL BE

REPLACED BY THE CONTRACTOR AT HIS EXPENSE.

14. THE CONTRACTOR SHALL MAINTAIN AT LEAST ONE 10' OPEN LANE AT ALL TIMES. NO OPEN EXCAVATION SHALL REMAIN OVER NIGHT. CONTRACTOR SHALL RESTORE ROAD TO TWO LANES OF TRAFFIC AT THE END OF EACH WORK DAY.

15. CONTRACTOR SHALL COMPLY WITH ALL LOCAL, STATE, AND FEDERAL REQUIREMENTS.

16. ONLY ACCESS TO THE ROAD R/W AS SHOWN IS GUARANTEED BY THE COUNTY. PRIVATE R/W REQUIRED BY THE CONTRACTOR TO FACILITATE CONSTRUCTION SHALL BE ACQUIRED BY THE CONTRACTOR WITH NO ADDITIONAL COMPENSATION OR ASSISTANCE

FROM THE COUNTY.

17. VEGETATION ON R/W AND EASEMENTS SHALL BE RESTORED TO ORIGINAL CONDITION UNLESS OTHERWISE NOTED ON THE PLAN SHEETS. COST OF SAID RESTORATION SHALL BE CONSIDERED INCIDENTAL TO OTHER PAY ITEMS.

18. GRADED AGGREGATE BASE SHALL BE REQUIRED FOR ROADWAYS UNLESS OTHERWISE SHOWN.

19. ALL TREES WITHIN LIMITS OF CONSTRUCTION SHALL REMAIN UNLESS OTHERWISE NOTED IN PLANS. REMOVAL OF ANY TREES OR SHRUBS SHALL BE COORDINATED WITH HOME OWNER PRIOR TO REMOVAL. ALL PROPOSED SOD SHALL MATCH EXISTING TYPE.

20. ALL COMPACTED FILL SHALL BE PLACED IN LAYERS OR LIFTS NOT MORE THAN 12" IN LOOSE DEPTH FOR MATERIAL COMPACTED BY HEAVY COMPACTION EQUIPMENT, AND NOT MORE THAN 8" IN LOOSE DEPTH FOR MATERIAL COMPACTED BY HAND-OPERATED

TAMPERS.

21. MAINTENANCE OF TRAFFIC AS PER FDOT.

22. ALL SPEED BUMPS THAT ARE DISTURBED DURING CONSTRUCTION SHALL BE REPLACED TO THE LATEST ESCAMBIA COUNTY DESIGN SPECIFICATIONS. ALL COSTS FOR REPLACEMENT OF SAID SPEED BUMPS SHALL BE INCIDENTAL TO OTHER ITEMS AND NO

ADDITIONAL COMPENSATION SHALL BE CONSIDERED.

23. ALL EXISTING MAILBOXES SHALL BE REPLACED BY THE CONTRACTOR IN ACCORDANCE WITH POSTAL REQUIREMENTS AND IN ACCORDANCE WITH ESCAMBIA COUNTY TECHNICAL SPECIFICATION, FDOT DESIGN STANDARDS AND UNITED POSTAL REQUIREMENTS. ALL EXISTING BRICK MAILBOXES WITHIN LIMITS OF CONSTRUCTION OR COUNTY RIGHT OF WAY SHALL BE REMOVED AND PLACED ON THE PROPERTY LINE OF THE OWNER. CONTRACTOR SHALL REPLACE EXISTING BRICK MAILBOX WITH

APPROVED PLASTIC BREAK AWAY MAILBOX.

24. THE CONTRACTOR SHALL, AT A MINIMUM, MATCH EXISTING SIGNING AND PAVEMENT MARKINGS INCLUDING THE ADDITION OF REFLECTIVE PAVEMENT MARKERS (RPM'S). ALL SIGNING AND PAVEMENT MARKINGS SHALL BE PLACED IN ACCORDANCE WITH THE LATEST FDOT DESIGN STANDARDS. THE CONTRACTOR SHALL CONTACT THE COUNTY TRAFFIC DEPARTMENT PRIOR TO

INSTALLATION OF ANY SIGNING AND PAVEMENT MARKINGS. ALL SHALL BE 6" STRIPING.

25. WHERE UNSUITABLE MATERIAL, AS DEFINED BY THE COUNTY SPECIFICATIONS SECTION 02300, 1.3(I), IS ENCOUNTERED IN THE AREAS PROPOSED FOR PAVING, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE COUNTY ENGINEER OR DESIGNEE PRIOR TO

ANY EXCAVATION.

26. IF ARCHAEOLOGICAL MATERIAL/PREHISTORIC ARTIFACTS SUCH AS POTTERY OR CERAMICS, STONE TOOLS OR METAL IMPLEMENTS, OR ANY OTHER PHYSICAL REMAINS THAT COULD BE ASSOCIATED WITH NATIVE AMERICAN CULTURES, OR EARLY COLONIAL OR AMERICAN SETTLEMENT ARE ENCOUNTERED AT ANY TIME, THE PROJECT SHOULD CEASE ALL ACTIVITIES INVOLVING SUBSURFACE DISTURBANCE IN THE IMMEDIATE VICINITY OF SUCH DISCOVERIES. THE APPLICANT/RECIPIENT, OR OTHER DESIGNEE, SHOULD

CONTACT THE FLORIDA DEPARTMENT OF STATE, DIVISION OF HISTORICAL RESOURCES, THE STATE HISTORIC PRESERVATION OFFICER (SHPO) AND THE DSH/FEMA REGION IV ENVIRONMENTAL OFFICER AND FDEM STATE ENVIRONMENTAL LIAISON OFFICER FOR FURTHER GUIDANCE. PROJECT ACTIVITIES SHOULD NOT RESUME WITHOUT VERBAL AND/OR WRITTEN AUTHORIZATION FROM

THE DIVISION OF HISTORICAL RESOURCES.

27. IN THE EVENT THAT UNMARKED HUMAN REMAINS ARE ENCOUNTERED DURING PERMITTED ACTIVITIES, ALL WORK MUST STOP

IMMEDIATELY AND THE PROPER AUTHORITIES NOTIFIED IN ACCORDANCE WITH F.S. 872.05.

28. CONTRACTOR SHALL MAINTAIN RECORD DRAWINGS DURING CONSTRUCTION WHICH SHOW "AS-BUILT" CONDITIONS OF ALL WORK INCLUDING PIPING, DRAINAGE STRUCTURES, TOPO OF POND(S), OUTLET STRUCTURES, DIMENSIONS, ELEVATIONS, GRADING, ETC.

RECORD DRAWINGS SHALL BE PROVIDED TO THE ENGINEER OF RECORD PRIOR TO REQUESTING FINAL INSPECTION.

29. CONTRACTOR SHALL OBTAIN COUNTY APPROVED CHANGE ORDER PRIOR TO PERFORMING ANY ADDITIONAL WORK.

30. ANY DAMAGE TO EXISTING ROADS DURING CONSTRUCTION WILL BE REPAIRED BY THE DEVELOPER PRIOR TO FINAL "AS-BUILT"

SIGN OFF FROM THE COUNTY.

31. THE PROJECT ENGINEER (ENGINEER OF RECORD) SHALL PROVIDE TO ESCAMBIA COUNTY (DRC) "AS-BUILT" RECORD DRAWINGS FOR VERIFICATION AND APPROVAL BY ESCAMBIA COUNTY ONE WEEK PRIOR TO REQUESTING A FINAL INSPECTION AND ACCEPTANCE, OR PROVIDE "AS-BUILT" CERTIFICATION THAT THE PROJECT CONSTRUCTION ADHERES TO THE PERMITTED PLANS AND SPECIFICATIONS. THE "AS-BUILT" CERTIFICATION OR THE "AS-BUILT" RECORD DRAWINGS MUST BE SIGNED, SEALED AND

DATED BY A REGISTERED FLORIDA PROFESSIONAL ENGINEER.

32. ALL SIDEWALKS, SHARED PATH WALKWAYS, AND CURB RAMPS ARE TO BE BUILT TO ADA STANDARDS USING THE LATEST EDITION OF THE DESIGN STANDARDS PARK ADA REQUIREMENTS AND PUBLIC RIGHTS OF WAY ACCESSIBILTY GUIDELINES (PROWAG).

33. THE OWNER OR HIS AGENT SHALL ARRANGE/SCHEDULE WITH THE COUNTY A FINAL INSPECTION OF THE DEVELOPMENT UPON COMPLETION AND ANY INTERMEDIATE INSPECTIONS AT (850)595-3472. AS-BUILT CERTIFICATION IS REQUIRED PRIOR TO REQUEST

FOR FINAL INSPECTION/ APPROVAL.

34. CONTRACTOR IS TO PROVIDE/COORDINATE WITH THE COUNTY ROAD DEPARTMENT FOR 60 LOADS (APPROXIMATELY 1,200 CY) OF

MILLINGS PERFORMED UNDER THIS CONTRACT.

35. THE CONTRACTOR SHALL NOTIFY THE COUNTY DESIGN ENGINEER OR DESIGNEE 48 HOURS PRIOR TO CONSTRUCTION FOR EACH

ROAD.

36. CONTRACTOR SHALL BE RESPONSIBLE FOR ASSURING ALL MANHOLES AND VALVES ARE WITHIN 0.50" TOLERANCE OF FINAL GRADE

OF THE ROAD.

UTILITY NOTES:

THE LOCATION SHOWN FOR EXISTING UNDERGROUND UTILITIES IS APPROXIMATE. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK IN EACH AREA. THE CONTRACTOR AGREES TO BE COMPLETELY RESPONSIBLE FOR ALL DAMAGES WHICH MIGHT OCCUR BY HIS FAILURE TO EXACTLY LOCATE AND PRESERVE ALL

1. UTILITY OWNERS SHALL BE NOTIFIED AT LEAST 48 HOURS PRIOR TO ANY CONSTRUCTION SO THAT THE UTILITY OWNER CAN SPOT

VERIFY AND/OR EXPOSE THEIR UTILITIES. NOTIFY SUNSHINE STATE ONE-CALL FOR UTILITY LOCATES AT:

SUNSHINE STATE ONE-CALL

7200 LAKE ELLENOR DRIVE, SUITE 200

ORLANDO, FL. 32809 PH: (800) 432-4770

2. AT&T FLORIDA WILL COMPLETE ALL WORK DURING THE HOURS OF 7:30 AM - 4:30 PM, MONDAY THRU FRIDAY. NO NIGHT OR

WEEKEND WORK.

3. ALL CABLE DAMAGE MUST BE REPORTED TO THE ATT FLORIDA REPAIR SERVICE DEPARTMENT AT 611 FROM A LAND LINE OR

877-737-2478 IF USING A CELL PHONE.

4. ALL LOOP DETECTOR INSTALLATION SHALL BE DONE AS PER FDOT INDEX 17781.

5. CONTRACTOR IS TO USE CAUTION WHEN WORKING IN OR AROUND AREAS OF OVERHEAD TRANSMISSION LINES AND

UNDERGROUND UTILITIES.

6. UTILITIES TO REMAIN AND BE PROTECTED DURING CONSTRUCTION. NECESSARY REPAIRS SHALL BE CONSIDERED INCIDENTAL TO

OTHER PAY ITEMS AND SHALL BE TO THE SATISFACTION OF UTILITY OWNERS.

7. MOST IF NOT ALL OF ECUA'S WATER METERS, VALVE BOXES, AND SEWER MANHOLES ARE DEPICTED ON PLANS.

8. CONTRACTOR SHALL CALL SSOCOF FOR LOCATES (DIG TICKET). PLACE IN NOTES SECTION OF LOCATE REQUEST THAT LOCATES ARE FOR A SIDEWALK PROJECT AND THAT ONLY WATER METERS, VALVES, AND MANHOLES ALONG THE APPROXIMATE PATH OF

PROPOSED SIDEWALK REQUIRE LOCATES.

9. AT LEAST 1 WEEK PRIOR TO SIDEWALK CONSTRUCTION, CONTRACTOR SHALL CONTACT ECUA'S REGIONAL SUPERVISOR MIKE LAMBERT (698-4613) TO COMMUNICATE THE NUMBER AND LOCATION OF METERSREQUIRING RELOCATION AND VALVE BOXES REQUIRING ADJUSTMENT. IF MANHOLES REQUIRE ADJUSTMENT, CONTRACTOR SHALL ALSO CONTACT ECUA'S MANHOLE COORDINATOR, EDDIE CARTER (698-9272) TO COMMUNICATE THE NUMBER AND LOCATION OF MANHOLES REQUIRING ADJUSTMENT.

10. ON METER RELOCATIONS, CTS COUPLINGS WITH INSERTS CAN BE USED ON WATER SERVICE TUBING UNDER SIDEWALKS AND GRASS, BUT NOT UNDER PAVEMENT. CONTRACTOR SHALL DISCUSS ANY ADDITIONAL TECHNICAL REQUIREMENTS OF THE

REQUIRED WORK ON ECUA FACILITIES WITH THE APPROPRIATE PERSONS LISTED IN NOTE 3.

11. UPON COMPLETION OF ALL WORK ON ECUA FACILITIES, CONTRACTOR SHALL CONTACT ECUA PERSONNEL IN NOTE 3 AND INQUIRE FROM THE ECUA PERSONNEL ABOUT POTENTIAL INSPECTIONS OF THE RELOCATIONS AND/OR ADJUSTMENTS AND SHALL CORRECT

ANY DEFICIENCIES AS NOTED DURING INSPECTIONS WITHIN ONE WEEK OF INSPECTIONS.

STORMWATER NOTES:

1. NO DEVIATIONS OR REVISIONS FROM THESE PLANS BY THE CONTRACTOR SHALL BE ALLOWED WITHOUT PRIOR APPROVAL FROM THE ESCAMBIA COUNTY. ANY DEVIATIONS MAY RESULT IN DELAYS IN OBTAINING A CERTIFICATE OF OCCUPANCY.

2. RETENTION/DETENTION AREAS SHALL BE SUBSTANTIALLY COMPLETE PRIOR TO ANY CONSTRUCTION ACTIVITIES THAT MAY INCREASE STORMWATER RUNOFF RATES. THE CONTRACTOR SHALL CONTROL STORMWATER DURING ALL PHASES OF CONSTRUCTION AND TAKE ADEQUATE MEASURES TO PREVENT THE EXCAVATED POND FROM BLINDING DUE TO SEDIMENTS.

3. ALL DISTURBED AREAS WHICH ARE NOT PAVED SHALL BE STABILIZED WITH SEEDING, FERTILIZER AND MULCH, HYDROSEED AND/OR

SOD.

4. DEVELOPER/CONTRACTOR SHALL RESHAPE PER PLAN SPECIFICATIONS, CLEAN OUT ACCUMULATED SILT, AND STABILIZE RETENTION/DETENTION POND AT THE END OF CONSTRUCTION WHEN ALL DISTURBED AREAS HAVE BEEN STABILIZED AND PRIOR TO

REQUEST FOR INSPECTION.

5. ALL ASPECTS OF THE STORMWATER/DRAINAGE COMPONENTS AND/OR TRANSPORTATION COMPONENTS SHALL BE COMPLETED

PRIOR TO CONSTRUCTION.

SURVEY

NUMBER

PROJECT

NUMBER

DRAWING

NUMBER

N U

M B

ER

W

ES

T

PA

R K

P

LA

C E, P

EN

SA

C

O

LA

, F

LO

R

ID

A

R

EV

IS

IO

N S

D R

A W

N B

Y

D A

TE

A

PP

R

O V

ED

B

Y

D A

TE

FI

EL

D B

O O

K

PA

G

ES

D A

TE

R

EG

. F

LA

. E N

G . N

O

D

ES

IG

N

ED

B

Y

ES

C

A M

B

IA

C O

U N

TY

, F

LO

R

ID

A

SI

G

N A

TU

R

E:

C H

EC

K

ED

B

Y

SE

C

TI

O

N

TO

W

N

SH

IP

R A

N G

E

EN

G

IN

EE

R

IN

G D

IV

IS

IO

N

PR

O

JE

C

T M

A N

A G

ER

D

IS

TR

IC

T:

SHEET OF

D . M

C V

EY

JU

N

E

D . M

C V

EY

PR

OP

OS

ED

R

ES

UR

FA

CI

NG

PL

AN

S

CO

UN

TY

R

OA

D 4A

J.

R

O

SE

N A

U

J.

R

O

SE

N A

U

GE

NE

RA

L

NO

TE

S

AutoCAD SHX Text CHANGE INCORPORATION (Yellow HighLighter)

AutoCAD SHX Text CHECKER (RP) (Red Pen X-Out to Disagrree or Remark)

AutoCAD SHX Text ORIGINATOR (QR) Correct (Green Highlighter) Change (Red Pen)

AutoCAD SHX Text

PRODUCTION CHECKING COMPLETE, READY FOR SUBMITTAL REVIEW (RP)

AutoCAD SHX Text

ORIGINATOR (RP)

AutoCAD SHX Text

PHASE REVIEW

AutoCAD SHX Text

SIGNATURE:

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text REMARK INCORPORATION (Blue Highlighter)

AutoCAD SHX Text VERIFICATION, CHECKER (QR) (Blue Highlighter)

AutoCAD SHX Text ORIGINATOR VERIFICATION Correct (Pink Highlighter)

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

DATE

SURVEY

NUMBER

PROJECT

NUMBER

DRAWING

NUMBER

N U

M B

ER

W

ES

T

PA

R K

P

LA

C E, P

EN

SA

C

O

LA

, F

LO

R

ID

A

R

EV

IS

IO

N S

D R

A W

N B

Y

D A

TE

A

PP

R

O V

ED

B

Y

D A

TE

FI

EL

D B

O O

K

PA

G

ES

D A

TE

R

EG

. F

LA

. E N

G . N

O

D

ES

IG

N

ED

B

Y

ES

C

A M

B

IA

C O

U N

TY

, F

LO

R

ID

A

SI

G

N A

TU

R

E:

C H

EC

K

ED

B

Y

SE

C

TI

O

N

TO

W

N

SH

IP

R A

N G

E

EN

G

IN

EE

R

IN

G D

IV

IS

IO

N

PR

O

JE

C

T M

A N

A G

ER

D

IS

TR

IC

T:

SHEET OF

D . M

C V

EY

JU

N

E

D . M

C V

EY

PR

OP

OS

ED

R

ES

UR

FA

CI

NG

PL

AN

S

CO

UN

TY

R

OA

D 4A

J.

R

O

SE

N A

U

J.

R

O

SE

N A

U

SU

M

M

AR

Y

OF

Q

UA

NT

IT

IE

S

PR

OJ

EC

T

DE

TA

IL

S

HIGHWAY WIDENING DETAIL

NOT TO SCALE

(TYPICAL BOTH SIDES OF HIGHWAY 4A)

10'± EX. ROADWAY SECTION

1'± NEW

WIDENING NEW 2' SHOULDER

@ 6% W/ BAHIA SOD

PROPOSED 11' WIDE TRAVEL LANE

TIE BACK TO BOTTOM OF

EX. ROADSIDE SWALE SODDED

W/ BAHIA SOD

FDOT-76-22 2" TYPE SP 12.5 ASPHALT

OVER TYPE SP 12.5 ASPHALT LEVELING

(110 LBS./SY) FOR COMPLETE 11' WIDE

TRAVEL LANES

EX. BASE

4"-12.5" ASPHALT BLACK BASE

CL

C

OU

NT

Y

RO

AD

4A

REMOVE EX. TOPSOIL, STOCKPILE TO

DRESS NEW ROADSIDE SLOPE

EX. ROADSIDE SWALE

AutoCAD SHX Text

BID TAB

AutoCAD SHX Text

ITEM

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

QUANTITY

AutoCAD SHX Text

UNIT

AutoCAD SHX Text

MOBILIZATION

AutoCAD SHX Text

AutoCAD SHX Text

LS

AutoCAD SHX Text MAITENANCE OF TRAFFIC TO INCLUDE FIVE(5) VMB PLACED 14 DAYS PRIOR TO PROJECT START. INCLUDES TRAFFIC CONTROL PLAN.

AutoCAD SHX Text

AutoCAD SHX Text

LS

AutoCAD SHX Text

TEMPORARY TRAFFIC MARKINGS TO INCLUDE LAYOUT

AutoCAD SHX Text

AutoCAD SHX Text

LS

AutoCAD SHX Text THERMOPLASTIC TRAFFIC MARKINGS W/ RPMs

AutoCAD SHX Text

AutoCAD SHX Text

LS

AutoCAD SHX Text

EARTHWORK EXCAVATE, HAUL AND INSTALL, ON-SITE

AutoCAD SHX Text

AutoCAD SHX Text

CY

AutoCAD SHX Text

EARTHWORK BORROW, FILL

AutoCAD SHX Text

AutoCAD SHX Text

CY

AutoCAD SHX Text

EARTHWORK TO ESTABLISH GRADE

AutoCAD SHX Text 14000

AutoCAD SHX Text

SY

AutoCAD SHX Text

MILLING EXISTING ASPHALT, 1.5" -3" DEPTH

AutoCAD SHX Text

AutoCAD SHX Text

SY

AutoCAD SHX Text

2" TYPE SP 12.5 PG 76-22 ASPHALT OVERLAY

AutoCAD SHX Text 50900

AutoCAD SHX Text

SY

AutoCAD SHX Text

TYPE SP 12.5 ASPHALT LEVELING (110 LBS/SY)

AutoCAD SHX Text 30000

AutoCAD SHX Text

SY

AutoCAD SHX Text

5" TYPE B 12.5 LBR 100 ASPHALT BASE

AutoCAD SHX Text 11088

AutoCAD SHX Text

SY

AutoCAD SHX Text

ASPHALT MILLINGS FOR DRIVEWAYS

AutoCAD SHX Text

AutoCAD SHX Text

SY

AutoCAD SHX Text

RELOCATE/ REPLACE MAIL BOXES

AutoCAD SHX Text

AutoCAD SHX Text

EA

AutoCAD SHX Text

RELOCATE TRAFFIC SIGNS

AutoCAD SHX Text

AutoCAD SHX Text

EA

AutoCAD SHX Text LOOP ASSEMBLY, TYPE A AT Hwy 4 intersection

AutoCAD SHX Text

AutoCAD SHX Text

AS

AutoCAD SHX Text

W-BEAM GUARDRAIL W/STEEL POSTS AND END UNITS. FDOT INDEX 536

AutoCAD SHX Text

AutoCAD SHX Text

LF

AutoCAD SHX Text

REMOVAL OF EXISTING GUARDRAIL

AutoCAD SHX Text

AutoCAD SHX Text

LF

AutoCAD SHX Text

CONCRETE CURB TO MATCH EXISTING

AutoCAD SHX Text

AutoCAD SHX Text

LF

AutoCAD SHX Text

SAW CUT EXISTING CONCRETE

AutoCAD SHX Text

AutoCAD SHX Text

LF

AutoCAD SHX Text

REMOVE EXISTING CONCRETE

AutoCAD SHX Text

AutoCAD SHX Text

SY

AutoCAD SHX Text

6" CONCRETE DRIVEWAY APRON

AutoCAD SHX Text

AutoCAD SHX Text

SY

AutoCAD SHX Text ADJUST WATER METER/VALVES INCLUDES ALL APPURTENANCES FOR ADJUSTMENT TO FINAL GRADE

AutoCAD SHX Text

AutoCAD SHX Text

EA

AutoCAD SHX Text

ARGENTINE BAHIA SOD, STAKED

AutoCAD SHX Text 12000

AutoCAD SHX Text

SY

AutoCAD SHX Text

SILT FENCE TYPE III

AutoCAD SHX Text

AutoCAD SHX Text

LF

AutoCAD SHX Text

BALED HAY OR STRAW

AutoCAD SHX Text

AutoCAD SHX Text

EA

AutoCAD SHX Text NPDES NOI and NOT Permit, including SWPPP and monitoring (for use only with disturbed areas over 1.0 Acre)

AutoCAD SHX Text

AutoCAD SHX Text

EA

AutoCAD SHX Text CHANGE INCORPORATION (Yellow HighLighter)

AutoCAD SHX Text CHECKER (RP) (Red Pen X-Out to Disagrree or Remark)

AutoCAD SHX Text ORIGINATOR (QR) Correct (Green Highlighter) Change (Red Pen)

AutoCAD SHX Text

PRODUCTION CHECKING COMPLETE, READY FOR SUBMITTAL REVIEW (RP)

AutoCAD SHX Text

ORIGINATOR (RP)

AutoCAD SHX Text

PHASE REVIEW

AutoCAD SHX Text

SIGNATURE:

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text REMARK INCORPORATION (Blue Highlighter)

AutoCAD SHX Text VERIFICATION, CHECKER (QR) (Blue Highlighter)

AutoCAD SHX Text ORIGINATOR VERIFICATION Correct (Pink Highlighter)

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

COUNTY ROAD 4

M O

R G

A N

R O

A D

STUCKY ROAD

10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00 26+00 27+00 28+00 29+00 30+00 31+0 0 32+0

0 33+0 0 34+0

0 35+0 0 36+0

0 37+0 0 38+0

0 39+0 0 40+00 41+00 42+00 43+00 44+00 45+00 46+00 47+00 48+00 49+00 50+00 51+00 52+00 53+00 54+00 55+00 56+00 57+00 58+00 59+00 60+00 61+00 62+00 63+00 64+00 65+00 66+00 67+00 68+00 69+00 70+00 71+00 72+00 73+00 74+00 75+00 76+00 77+00 78+00 79+00 80+00 81+00 82+00 83+00 84+00 85+00 86+00 87+00 88+00

16,833 SYCOUNTY ROAD 4A

TREATMENTROADWAY SURFACEROADWAY

PARTIAL RECON MILL/PAVE

LEGEND

DI

ST

RI

CT

FO

R

CO

NT

IN

UA

TI

ON

SE

E

SH

EE

T 5 O

F

SURVEY

NUMBER

PROJECT

NUMBER

DRAWING

NUMBER

N U

M B

ER

W

ES

T

PA

R K

P

LA

C E, P

EN

SA

C

O

LA

, F

LO

R

ID

A

R

EV

IS

IO

N S

D R

A W

N B

Y

D A

TE

A

PP

R

O V

ED

B

Y

D A

TE

FI

EL

D B

O O

K

PA

G

ES

D A

TE

R

EG

. F

LA

. E N

G . N

O

D

ES

IG

N

ED

B

Y

ES

C

A M

B

IA

C O

U N

TY

, F

LO

R

ID

A

SI

G

N A

TU

R

E:

C H

EC

K

ED

B

Y

SE

C

TI

O

N

TO

W

N

SH

IP

R A

N G

E

EN

G

IN

EE

R

IN

G D

IV

IS

IO

N

PR

O

JE

C

T M

A N

A G

ER

D

IS

TR

IC

T:

SHEET OF

D . M

C V

EY

JU

N

E

D . M

C V

EY

PR

OP

OS

ED

R

ES

UR

FA

CI

NG

PL

AN

S

CO

UN

TY

R

OA

D 4A

J.

R

O

SE

N A

U

J.

R

O

SE

N A

U

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 500'

AutoCAD SHX Text 1000'

AutoCAD SHX Text CHANGE INCORPORATION (Yellow HighLighter)

AutoCAD SHX Text CHECKER (RP) (Red Pen X-Out to Disagrree or Remark)

AutoCAD SHX Text ORIGINATOR (QR) Correct (Green Highlighter) Change (Red Pen)

AutoCAD SHX Text

PRODUCTION CHECKING COMPLETE, READY FOR SUBMITTAL REVIEW (RP)

AutoCAD SHX Text

ORIGINATOR (RP)

AutoCAD SHX Text

PHASE REVIEW

AutoCAD SHX Text

SIGNATURE:

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text REMARK INCORPORATION (Blue Highlighter)

AutoCAD SHX Text VERIFICATION, CHECKER (QR) (Blue Highlighter)

AutoCAD SHX Text ORIGINATOR VERIFICATION Correct (Pink Highlighter)

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

COUNTY ROAD 4A

TO

W

N

SO

N L

A N

E

C R

EA

M

ER

R

O A

D

POPLAR DELL ROAD

K

IL

LA

M

R O

A D

86+00 87+00 88+00 89+00 90+00 91+00 92+00 93+00 94+00 95+00 96+00 97+00 98+00 99+00 100+00101+00102+00103+00104+00105+00106+00107+00108+00109+00110+00111+00112+00113+00114+00115+00116+00117+00118+00119+00120+00121+00122+00123+00124+00125+00126+00127+00128+00129+00130+00131+00132+00133+00134+00135+00136+00137+00138+00139+00140+00141+00142+00143+00144+00145+00146+00147+00148+00149+00150+00151+00152+00153+00154+00155+00156+00157+00158+00159+00160+00

16,833 SYCOUNTY ROAD 4A

TREATMENTROADWAY SURFACEROADWAY

PARTIAL RECON MILL/PAVE

LEGEND

DI

ST

RI

CT

FO

R

CO

NT

IN

UA

TI

ON

SE

E

SH

EE

T 6 O

F

SURVEY

NUMBER

PROJECT

NUMBER

DRAWING

NUMBER

N U

M B

ER

W

ES

T

PA

R K

P

LA

C E, P

EN

SA

C

O

LA

, F

LO

R

ID

A

R

EV

IS

IO

N S

D R

A W

N B

Y

D A

TE

A

PP

R

O V

ED

B

Y

D A

TE

FI

EL

D B

O O

K

PA

G

ES

D A

TE

R

EG

. F

LA

. E N

G . N

O

D

ES

IG

N

ED

B

Y

ES

C

A M

B

IA

C O

U N

TY

, F

LO

R

ID

A

SI

G

N A

TU

R

E:

C H

EC

K

ED

B

Y

SE

C

TI

O

N

TO

W

N

SH

IP

R A

N G

E

EN

G

IN

EE

R

IN

G D

IV

IS

IO

N

PR

O

JE

C

T M

A N

A G

ER

D

IS

TR

IC

T:

SHEET OF

D . M

C V

EY

JU

N

E

D . M

C V

EY

PR

OP

OS

ED

R

ES

UR

FA

CI

NG

PL

AN

S

CO

UN

TY

R

OA

D 4A

J.

R

O

SE

N A

U

J.

R

O

SE

N A

U

SE

E

SH

EE

T 4 O

F

FO

R

CO

NT

IN

UA

TI

ON

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 500'

AutoCAD SHX Text 1000'

AutoCAD SHX Text CHANGE INCORPORATION (Yellow HighLighter)

AutoCAD SHX Text CHECKER (RP) (Red Pen X-Out to Disagrree or Remark)

AutoCAD SHX Text ORIGINATOR (QR) Correct (Green Highlighter) Change (Red Pen)

AutoCAD SHX Text

PRODUCTION CHECKING COMPLETE, READY FOR SUBMITTAL REVIEW (RP)

AutoCAD SHX Text

ORIGINATOR (RP)

AutoCAD SHX Text

PHASE REVIEW

AutoCAD SHX Text

SIGNATURE:

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text REMARK INCORPORATION (Blue Highlighter)

AutoCAD SHX Text VERIFICATION, CHECKER (QR) (Blue Highlighter)

AutoCAD SHX Text ORIGINATOR VERIFICATION Correct (Pink Highlighter)

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

B R

O O

M

ES

R O

A D

TULIP ROAD

COUNTY ROAD 4A

157+00158+00159+00160+00161+00162+00163+00164+00165+00166+00167+00168+00169+00170+00171+00172+00173+00 174+00175+00 176+00 177+00 178+00179+00180+00181+00182+00183+00184+00185+00186+00187+00188 +001

89+0

+001 91+

2+0

3+0

4+0

0 19 5+0

0 19 6+0

7+0

8+0

9+0

0+0

1+0

2+0

3+0

4+0

0 20 5+0

6+0

7+0

08+

09+

00 2 10+

00 2 11+

00 212+ 00 213+

00 214+00215+00 216+00 217+00218+00 219+00220+00221+00222+00223+00224+00225+00226+00227+00228+00229+00230+00231+00232+00233+00 234+00 235+00 236+00 237+00237+54

16,833 SYCOUNTY ROAD 4A

TREATMENTROADWAY SURFACEROADWAY

PARTIAL RECON MILL/PAVE

LEGEND

DI

ST

RI

CT

SURVEY

NUMBER

PROJECT

NUMBER

DRAWING

NUMBER

N U

M B

ER

W

ES

T

PA

R K

P

LA

C E, P

EN

SA

C

O

LA

, F

LO

R

ID

A

R

EV

IS

IO

N S

D R

A W

N B

Y

D A

TE

A

PP

R

O V

ED

B

Y

D A

TE

FI

EL

D B

O O

K

PA

G

ES

D A

TE

R

EG

. F

LA

. E N

G . N

O

D

ES

IG

N

ED

B

Y

ES

C

A M

B

IA

C O

U N

TY

, F

LO

R

ID

A

SI

G

N A

TU

R

E:

C H

EC

K

ED

B

Y

SE

C

TI

O

N

TO

W

N

SH

IP

R A

N G

E

EN

G

IN

EE

R

IN

G D

IV

IS

IO

N

PR

O

JE

C

T M

A N

A G

ER

D

IS

TR

IC

T:

SHEET OF

D . M

C V

EY

JU

N

E

D . M

C V

EY

PR

OP

OS

ED

R

ES

UR

FA

CI

NG

PL

AN

S

CO

UN

TY

R

OA

D 4A

J.

R

O

SE

N A

U

J.

R

O

SE

N A

U

SE

E

SH

EE

T 5 O

F

FO

R

CO

NT

IN

UA

TI

ON

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 500'

AutoCAD SHX Text 1000'

AutoCAD SHX Text CHANGE INCORPORATION (Yellow HighLighter)

AutoCAD SHX Text CHECKER (RP) (Red Pen X-Out to Disagrree or Remark)

AutoCAD SHX Text ORIGINATOR (QR) Correct (Green Highlighter) Change (Red Pen)

AutoCAD SHX Text

PRODUCTION CHECKING COMPLETE, READY FOR SUBMITTAL REVIEW (RP)

AutoCAD SHX Text

ORIGINATOR (RP)

AutoCAD SHX Text

PHASE REVIEW

AutoCAD SHX Text

SIGNATURE:

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text REMARK INCORPORATION (Blue Highlighter)

AutoCAD SHX Text VERIFICATION, CHECKER (QR) (Blue Highlighter)

AutoCAD SHX Text ORIGINATOR VERIFICATION Correct (Pink Highlighter)

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

Sheets and Views
1 Cover Sheet - Sheet
Sheet
2 CR 4A Resurfacing Sheets 2-3 - Sheet 2
3 CR 4A Resurfacing Sheets 2-3 - Sheet 3
4 CR 4A Resurfacing Plan Sheets - Sheet 04
5 CR 4A Resurfacing Plan Sheets - Sheet 05
6 CR 4A Resurfacing Plan Sheets - Sheet 06

File details come from the government source that posted it. Updated .