CQ19242WJ_-_Parts_Cleaning_System_Amendment_003.pdf
PDF 779 KB Posted
- Attached to
- CQ19242WJ - Parts Cleaning System
- Solicitation number
- CQ19242WJ
About this file
Amendment 003 - Solicitation Extension, Solicitation Responses
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
M metro
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
600 Fifth Street, NW, Washington, DC 20001-2651
AMENDMENT OF SOLICITATION/ MODIFICATION OF CONTRACT
1. AMENDMENT/MODIFICATION
A003
3. ISSUED BY PURCHASING SECTION
William Johnson Department of Procurement Washington Metropolitan Area Transit Authority
5. CONTRACTOR
NAME AND ADDRESS
2. EFFECTIVE DATE
(Same as block 17)
4. ADMINISTERED BY (If other than block 3)
6. FORM TYPE
(Check only one)
0MENDMENT OF SOLICITATION NO.: CQ} 92 4 2/W J
DATE (See block 7)
(Street, city, county, state, and Zip Code) □DATE _
MODIFICATION OF CONTRACT/ORDER NO.
(See block 9)
7.THIS BLOCK APPLIES ONLY TO AMENDMENTS OF SOLICITATIONS ~ íJ The above numbered solicitation is amended as set forth in block 10. The hour and date specified for receipt of Offers LJ is extended, LJ Ois not extended. Offerers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation, or as amended, by one of the following methods; (a) By signing and returning _l copies of this amendment; (b) by acknowledging receipt of this amendment on each copy of the offer submitted; or (c) by separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE ISSUING OFFICE PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If, by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided such telegram makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
8. ACCOUNTING AND APPROPRIATION DATA (If required)
9. THIS BLOCK APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS (ao (bo
(c)D
This Change Order is issued pursuant to------------------------------- The Changes set forth in block 1 O are made to the above numbered contract/order.
The above numbered contract/order is modified to reflect the administrative changes (such as changes in paying office, appropriation data, etc.) set forth in block 1 O.
This Supplemental Agreement is entered into pursuant to authority of _ It modifies the above numbered contract as set forth in block 10.
10. DESCRIPTION OF AMENDMENT/MODIFICATION
The purpose of this amendment is to:
l. The bid due date is extended from 2:00PM June 19, 2019 to 2:00PM June 26, 2019.
2. SEE ATTACHED "Solicitation Notice - IFB No.: CQ19242/WJ Parts Cleaning System Q&A Round 2 06/18/2019
Except as provided herein, all terms and conditions of the document referenced in block 6, as heretofore changed, remain unchanged and in full force and effect.
11. r--;-i CONTRACTOR/OFFEROR IS REQUIRED TO SIGN THIS O CONTRACTOR/OFFEROR IS NOT REQUIRED TO SIGN THIS ~ MODIFICATION AND RETURN _l_ COPIES TO DOCUMENT
ISSUING OFFICE.
12. NAME OF CONTRACTOR/OFFICE 15. WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY
BY --------------------- (Signature of person authorized to sign)
13. NAME AND TITLE OF SIGNER (Type or print) 14. DATE SIGNED
BY / ....,_ r<, V ~ ~ÁAJc::
(Signature of Contracmg Officer)
16. NAME OF CONTRACTING OFFICER (Type or print) 17. DATE SIGNED
Fred Voellm ~/1r )"b-011
CQ19111/WJ Parts Washing System
Solicitation Notice- lFB No.: CQ19242/WJ Parts Washing System Q&A Round 2 06/18/2019
l. Please describe in detail "Automatic ID sprayer manifold" as listed in the Technical Specs.
Response: The parts cleaner has a manifold in it that will automatically lower and raise the parts that are being cleaned. There is also a collision sensor that will come on the manifold so that it will not raise or lower if there is something blocking the path.
2. Is there any 'plus or minus' allowances on the overall dimensions? To provide space for the chip/sludge drag out conveyor and hand cleaning tray?
Response: Yes, the offerer should state the size of their machine. The machine will not be going in an enclosed space.
3. Is there any flexibility on the 120 day delivery time?
Response: Yes, a maximum of 150 days will be accepted.
4. Do the installation requirements include trades i.e., electrical hook-ups, water, venting?
Response: The vendor must identify all installation requirements (electrical hook-ups, water, venting, etc.), so that when it is connected to required utilities, it can be used for any function for which it is designed and constructed.
File details come from the government source that posted it.