CP_04_002_V_VI_AFB.pdf
PDF 245 KB Posted
- Attached to
- Natural Gas Main Extension
- Solicitation number
- PE-60899-NONST-2026-000000072
- Issued by
- Bartow County, Georgia
About this file
This is an Advertisement for Bid issued by the City of Cartersville Gas System for a natural gas main extension project across two phases in Cartersville, Georgia. The project involves the construction of natural gas infrastructure serving the Toyo Tire North America/Zion Road Development Area, with Phase V extending from IDI Northwest 75 to Pettit Creek and Phase VI extending from Beauflor USA to IDI Northwest 75 (Project No. CP-04-002-V/CP-04-002-VI). The principal construction items include 4,400 linear feet of 8-5/8" O.D. steel line pipe with FBE coating, 1,760 linear feet of 8-5/8" O.D. bore pipe, 415 linear feet of 6-5/8" O.D. bore pipe, and approximately 1,655 linear feet of directional boring work across multiple segments. Sealed proposals must be received by the City of Cartersville Gas System offices at 155 Old Mill Road, Cartersville, Georgia 30120 by Thursday, April 9, 2026 at 2:00 PM local time. A single contract will be awarded covering all work, with a maximum completion time of 90 consecutive calendar days from the Notice to Proceed, with liquidated damages assessed at $200.00 per day for delays beyond this period.
Bids must be accompanied by a Certified Check or Bid Bond equal to at least five percent of the total bid amount. The City of Cartersville will furnish certain materials as specified in the contract documents. Bidders are required to subscribe to the Municipal Gas Authority of Georgia's Subscribed Regulatory Compliance Service and maintain current Operator Qualification records, welder qualifications, and drug and alcohol testing plans in compliance with Pipeline Safety Regulations (49 CFR Parts 192 and 199) and API Standard 1104. All bidders must hold a current utility contractor license from the Georgia Construction Industry Licensing Board and employ a full-time person holding a valid utility manager certificate from the Division of Utility Contractors. All federal, state, and local permits, rights of way, and easements have been obtained by the City. Plans and specifications are available for inspection at the Gas System offices or may be downloaded electronically at no charge from the City of Cartersville website, with physical copies available for a $100.00 deposit per set (non-refundable). Bids must include a properly notarized affidavit attesting compliance with applicable Georgia laws and federal regulations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CP_04_002_V_IV_Construction Plans.pdf | ||
| CP_04_002_V_VI_Contract Documents.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Natural Gas Main Extension Prepared: March 2, 2026 Toyo Tire North America/Zion Road Development Area Phase V: IDI Northwest 75 to Pettit Creek/Toyo Tire North America/Zion Road Development Area Phase VI: Beauflor USA to IDI Northwest 75 Cartersville Project No. CP-04-002-V/CP-04-002-VI
\\File\Gas\Users\Engineering\Projects\Cp-04-002-V\Specifications\Cp-04-002-V-Vi-Afb.Doc
ADVERTISEMENT FOR BID
NATURAL GAS MAIN EXTENSION
TOYO TIRE NORTH AMERICA/ZION ROAD DEVELOPMENT AREA PHASE V: IDI
NORTHWEST 75 TO PETTIT CREEK/TOYO TIRE NORTH AMERICA/ZION ROAD
DEVELOPMENT AREA PHASE VI: BEAUFLOR USA TO IDI NORTHWEST 75
CARTERSVILLE PROJECT NO. CP-04-002-V/CP-04-002-VI
Sealed proposals will be received by the City of Cartersville Gas System in the Gas System offices located at 155 Old Mill Road, Cartersville, Georgia 30120 until:
THURSDAY, APRIL 9, 2026 AT 2:00 PM, LOCAL TIME
for the furnishing of all materials, labor, tools, skill, equipment and incidentals unless noted otherwise for the construction of the project entitled:
NATURAL GAS MAIN EXTENSION
TOYO TIRE NORTH AMERICA/ZION ROAD DEVELOPMENT AREA PHASE V: IDI
NORTHWEST 75 TO PETTIT CREEK/TOYO TIRE NORTH AMERICA/ZION ROAD
DEVELOPMENT AREA PHASE VI: BEAUFLOR USA TO IDI NORTHWEST 75
CARTERSVILLE PROJECT NO. CP-04-002-V/CP-04-002-VI
at which time and place the proposal will be publicly opened and read aloud.
Proposals received after the designated time will not be considered.
The principal items of construction are:
4,400 L.F. – 8-5/8” O.D.-.219” W.T., F.B.E. Coated, ERW X42/X52 Steel Line Pipe 1,760 L.F. – 8-5/8” O.D.-.322” W.T., F.B.E./2040 Coated, ERW X42/X52 Steel Bore Pipe 415 L.F. – 6-5/8” O.D.-.280” W.T., F.B.E./2040 Coated, ERW X42/X52 Steel Bore Pipe 570 L.F. – 8" Directional Bore (Sta. 41+30 to Sta. 35+60) 360 L.F. – 8” Directional Bore (Sta. 41+60 to Sta. 45+20) 370 L.F. – 8” Directional Bore (Sta. 1+90 to Sta. 5+60) 355 L.F. – 6” Directional Bore (Sta. 46+00 to Sta. 49+55)
Bidders shall be aware that a portion of the materials for the construction of this project will be furnished by the City of Cartersville as called for in the specifications.
All anticipated federal, state, or local permits and anticipated rights of way and easements required for the project have been obtained.
Bidders must subscribe to the Municipal Gas Authority of Georgia’s Subscribed Regulatory Compliance Service (SRCS) and be a member in good standing with up-to-date Operator
Northwest 75 to Pettit Creek/Toyo Tire North America/Zion Road
Qualification records in accordance with the requirements of the Pipeline Safety Regulations, Code of Federal Regulations, Title 49, Latest Edition, Part 192 and Part 199.
All covered tasks associated with the construction of this project shall be performed in accordance with the Operator Qualification Program subscribed to by the Bidder in accordance with the requirements of the Pipeline Safety Regulations, Code of Federal Regulations, Title 49, Latest Edition, Part 192 and Part 199.
Bidders must subscribe to the Municipal Gas Authority of Georgia’s Subscribed Regulatory Compliance Service (SRCS) and be a member in good standing with up-to-date alcohol misuse plan records meeting the requirements of the Pipeline Safety Regulations, Code of Federal Regulations, Title 49, Latest Edition, Part 199 Drug and alcohol testing.
Bidders must subscribe to the Municipal Gas Authority of Georgia’s Subscribed Regulatory Compliance Service (SRCS) and be a member in good standing with up-to-date anti-drug plan records meeting the requirements of the Pipeline Safety Regulations, Code of Federal Regulations, Title 49, Latest Edition, Part 199 Drug and alcohol testing.
Bidders must subscribe to the Municipal Gas Authority of Georgia’s Subscribed Regulatory Compliance Service (SRCS) and be a member in good standing with up-to-date welder qualification records meeting the requirements of the Pipeline Safety Regulations, Code of Federal Regulations, Title 49, Latest Edition, Part 192 and API Standard 1104 Welding of Pipelines and Related Facilities, Latest Edition incorporated by reference in the Code of Federal Regulations.
Bidders shall inform themselves of and comply with all conditions and specifications contained in the bid package, contract, related documents and State and Federal Law.
The successful bidder must comply with O.C.G.A. §36-84-1.
The successful bidder must also comply with O.C.G.A. §50-36-1 et. Seq. and O.C.G.A.
§13-10-91 et. Seq. and DOL Rule 300-10-1-.02. Proposals received without a properly prepared and notarized affidavit specific to this project attesting to the requirements of the Laws and provided in the Contract Documents will not be considered.
Bidders shall inform themselves concerning Georgia Laws and comply with the same.
Bidders shall hold a current utility contractor license issued by the State of Georgia Construction Industry Licensing Board and shall have in their employment on a full-time basis a person who holds a valid utility manager certificate issued by the Division of Utility Contractors.
Plans, specifications and contract documents are open to public inspection at the City of Cartersville Gas System offices located at 155 Old Mill Road, Cartersville, Georgia 30120.
The Gas System offices may be contacted by telephone at 770.387.5642 or by mail at P.O. Box 1390, Cartersville, Georgia 30120.
Northwest 75 to Pettit Creek/Toyo Tire North America/Zion Road
Plans, specifications and contract documents may be obtained from the City of Cartersville Gas System upon deposit of $100.00 per set. No refund will be made. Potential bidders may download a copy of the official plans, specifications and contract documents electronically in Acrobat PDF format at no charge by visiting the City of Cartersville official website.
One Contract shall be awarded covering all work and the maximum time for completion shall not exceed 90 consecutive calendar days from the starting date specified in the Notice to Proceed. Bidders must agree to pay as liquidated damages the sum of $200.00 per each consecutive calendar day thereafter. Due consideration will be given to delivery of materials in specifying starting date.
The successful bidder will be furnished, free of charge, three sets of plans and specifications.
Bids must be accompanied by a Certified Check or Bid Bond in an amount equal to not less than five percent (5%) of the bid to be considered.
No bid may be withdrawn after the scheduled closing time for receiving bids for a period of sixty (60) days.
The Owner reserves the right to accept or reject in whole or in part any or all bids and to waive formalities and re-advertise.
CITY OF CARTERSVILLE, GEORGIA
BY
Michael Dickson, Gas System Director bfriery Dickson
File details come from the government source that posted it. Updated .