Courts Renovation G25003_01 (ID 909298).pdf

PDF 2 MB Posted

Attached to
ITB # 001-26 Courts Renovation
Solicitation number
PE-62350-NONST-2026-000000014
Issued by
Candler County, Georgia

About this file

This is a complete contract document package for the Courts Renovation project issued by the City of Fort Oglethorpe, Georgia, including procurement requirements, bidding documents, general conditions, and project specifications. The project consists of selective demolition, interior renovations, courtroom improvements, accessibility upgrades, and modifications to existing building systems for the Municipal Court facilities located within Fort Oglethorpe City Hall at 500 City Hall Drive. Sealed bids will be received until 10:00 a.m. local time on Thursday, July 30, 2026, with a non-mandatory pre-bid meeting scheduled for Thursday, July 16, 2026, at 10:00 a.m. at City Hall. The successful bidder must complete the work within 210 consecutive calendar days from the Notice to Proceed. Contract documents and specifications are available for examination and purchase through CTI Engineers, Inc., 1122 Riverfront Parkway, Chattanooga, Tennessee 37402, at a non-refundable cost of $100.00 per set. Bidders must be registered on the engineer's planholders list to receive addenda and be considered qualified.

All bid proposals must be submitted on prescribed forms with a bid bond equal to 5 percent of the total project cost. The contract will be awarded to the responsive, responsible bidder submitting the lowest compliant bid at the sole discretion of the Owner. The successful bidder must execute the contract and furnish performance and payment bonds within ten calendar days of receiving the Notice of Award. Surety and insurance companies must have an AM Best rating of A-10 or greater and be listed in the Federal Registry of Companies holding Certificates of Authority. The contractor must maintain minimum Worker's Compensation and General Liability insurance and hold a valid Georgia State Contractor's License. Liquidated damages are assessed at $500 per calendar day for failure to complete work on schedule. All contractors and subcontractors performing work in Georgia must register and participate in the federal E-Verify work authorization program. The project budget, specific funding sources, and any federal agency involvement are not specified in the procurement documents provided.

View the file

Other files

File Type Posted
Fort O Courts CD 6_15_26 (ID 908227).pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DOCUMENTS AND SPECIFICATIONS

COURTS RENOVATION

Prepared for

CITY OF FORT OGLETHORPE, GEORGIA

July 2026 Project No. G25003-01

CTI Engineers, Inc.

1122 Riverfront Parkway

Chattanooga, Tennessee 37402 423.267.7613

CONTRACT DOCUMENTS AND SPECIFICATIONS

Prepared for

CITY OF FORT OGLETHORPE, GEORGIA

City Council Earl Gray, Mayor

Derek Rogers, Mayor Pro Tem Jim Childs

Craig Crawford Rhonda James Paula Stinnett

Molly Huhn, City Manager

Prepared By

CTI ENGINEERS, INC.

Chattanooga, Tennessee ◊ Cartersville, Georgia

Project No. G25003-01 July 2026

MARCH ADAMS & ASSOCIATES, INC.

Chattanooga, Tennessee

GARBEE ARCHITECTURE, PLLC.

Chattanooga, Tennessee

00 01 10 - 1 G25003-01 M-Ft Oglethorpe\ Courts Renovations 06/15/26

TABLE OF CONTENTS

00 01 15 List of Drawings

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

Procurement Requirements, Forms, and Supplements 00 11 00 Advertisement for Bids 00 21 00 Information for Bidders 00 41 00 Bid 00 42 00 Bid Schedule for Unit Price Bid 00 43 13 Bid Bond 00 43 80 Bidder Acknowledgment of Contract Time 00 45 13 Statement of Bidder’s Qualifications 00 45 14 Statement of Equipment 00 45 19 Noncollusion Affidavit of Prime Bidder 00 45 44 Partnership Certificate / Corporate Certificate 00 45 45 Joint Venture Questionnaire 00 45 50 Statement of License Certificate 00 45 66 E-Verify Contractor Affidavit

Contracting Requirements 00 51 00 Notice of Award 00 52 00 Contract 00 55 00 Notice to Proceed 00 61 13.13 Performance Bond 00 61 13.16 Payment Bond 00 63 63 Change Order 00 64 00 Certificate of Owner's Attorney

Project Closeout 00 65 16 Certificate of Substantial Completion 00 65 19 Project Close Out Forms 00 65 19.13 Affidavit of Payment 00 65 19.16 Affidavit of Release of Liens 00 65 19.19 Consent of Surety for Final Payment 00 65 19.27 Final Waiver of Lien

Conditions of the Contract 00 72 00 General Conditions 00 73 00 Supplemental General Conditions 00 74 00 Supplemental General Conditions for Georgia

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 Summary of Work 01 14 00 Work Restrictions 01 22 00 Measurement and Payment 01 29 76 Applications for Payment 01 31 19 Project Meetings 01 32 00 Schedules and Reports 01 33 23 Shop Drawings, Product Data, and Samples

00 01 10 - 2 G25003-01 M-Ft Oglethorpe\ Courts Renovations 06/15/26

TABLE OF CONTENTS (Continued)

DIVISION 01 - GENERAL REQUIREMENTS (Continued)

01 35 00 Safety and Security 01 40 00 Quality Control Services 01 42 13 Abbreviations 01 42 19 Applicable Codes and Standards 01 60 00 Materials and Equipment 01 65 00 Transportation and Handling 01 66 00 Storage and Protection 01 73 29 Cutting and Patching 01 78 00 Project Closeout 01 78 23 Operating and Maintenance Data 01 78 36 Warranties and Bonds 01 78 39 Project Record Documents

DIVISION 02 - 049

(This Space Reserved for March Adams & Associates / Garbee Architecture Technical Specs)

JS 00 01 15 - 1 G25003-01

M-Ft Oglethorpe\ Courts Renovation 06/15/26

SECTION 00 01 15

LIST OF DRAWINGS

G25003-01 Title Drawing No.

Cover Sheet T100

Building Code Summary and Life/Safety Plan LS-1.0

Life/Safety Plan LS-1.1

Courts Floor and Ceiling Demolition Plans D-1.0

Architectural Floor and Ceiling Plans A-1.1

Courts Interior Elevations and Details A-3.1

Door and Hardware Schedule and Details A-4.1

Courts Finish Plan A-5.1

Mechanical Schedules & Notes M0.1

Mechanical Details M0.2

Mechanical Specs M0.3

New Construction HVAC Plans M1.1

Demo HVAC Plans M2.1

Plumbing Schedules, Notes & Details P0.1

Plumbing Plans P1.0

Roof Plumbing Plan P2.0

Fire Protection Details & Notes FP0.1

Firestopping Details FP0.2

Court Wing Fire Protection Plan FP1.1

Elect. – Project Schedule and Notes E0.1

Fire Alarm & Security Notes and Details E0.2

Firestop Details E0.3

Electrical Specifications E0.4

Lighting Plans E1.1

Power Plans E2.1

Roof Power Plan E2.2

Fire Alarm – Security Plans E3.1

00 11 00 - 1 G25003-01 M: Ft. Oglethorpe\ Courts Renovation 06/17/26

ADVERTISEMENT FOR BIDS

ITB # 001-26

Owner: City of Fort Oglethorpe, Georgia

Separate sealed Bids for furnishing of all materials, labor, tools, equipment, and appurtenances necessary for the construction of the Courts Renovation will be received by the Owner at the City of Fort Oglethorpe, 500 City Hall Drive, Fort Oglethorpe, GA 30742, until 10:00 a.m., local time, on Thursday, July 30, 2026, and then at said office publicly opened and read aloud.

The Project consists of renovation of the Municipal Court facilities within Fort Oglethorpe City Hall, including selective demolition, interior renovations, courtroom improvements, accessibility upgrades, modifications to existing building systems, and related appurtenant work.

A non-mandatory pre-bid meeting will be held on Thursday, July 16, 2026, at 10:00 a.m. at Fort Oglethorpe City Hall, 500 City Hall Drive, Fort Oglethorpe, Georgia 30742.

Copies of the Contract Documents and Specifications, including bidding documents and requirements, and Contract Drawings may be examined at the offices of the Engineer, CTI Engineers, Inc., 1122 Riverfront Parkway, Chattanooga, TN 37402 (phone 423/267-7613, www.ctiengr.com). Copies may be obtained there upon payment of $100.00 for each set. This payment is not refundable.

Bidders must be listed on Engineer’s list of planholders who have viewed and/or purchased the Contract Documents, Specifications, and Drawings, and have at a minimum been added to the Engineer’s list of planholders even if they have not purchased the Contract Documents, Specifications, and Drawings.

Engineer shall be provided with the following information: mailing address for U.S. Postal Service, physical delivery address, telephone number, contact person, and email address.

A Bid Bond of 5% of the total project cost is to be included in the proposal package. The Successful Bidder will be required to furnish performance and payment bonds with the executed Agreement meeting the requirements of the Contract Documents and executed on the forms attached to the Agreement. The terms and time for payment are set forth in the Agreement.

Surety and insurance companies must have an AM Best rating of A-10 or greater, be listed in the Federal Registry of Companies holding Certificates of Authority and Acceptable Sureties on Federal Bonds, be licensed by the Georgia Insurance Department and the Georgia Secretary of State to do business in the State of Georgia.

Contractor must have minimum Worker’s Comp and General Liability Insurance in full force and effect. No proposal will be considered unless it is accompanied by satisfactory evidence that the Bidder holds Georgia State Contractor's License of proper classification and in full force and effect, in compliance with the provisions of O.C.G.A. Sec. 43-14-2 et seq. Pursuant to O.C.G.A. § 13-10-91, all contractors and sub-contractors performing work within the State of Georgia on a contract with a public employer must register and participate in a federal work authorization. Fort Oglethorpe will require certification from contractor that this requirement has been met.

Each Respondent shall submit with its proposal a copy of current Business License and/or Occupational Tax Certificate issued in the state it resides. If bidder cannot prove this license, it will be required to obtain one from Ft. Oglethorpe if it is the Awarded Respondent.

Fort Oglethorpe reserves the right to accept or reject any and all proposals, to waive formalities, technicalities or irregularities and to re-advertise if necessary. The contract between Fort Oglethorpe and the selected responder shall be subject to the payment agreement drawn up between Fort Oglethorpe and the selected responder.

Fort Oglethorpe, Georgia Date: July 1,2026 /s/ Molly Huhn, City Manager

July 15, 2026

JS-STD 6/15 00 21 00 - 1 G25003-01

M-Ft. Oglethorpe\ Courts Renovation 06/15/26

INFORMATION FOR BIDDERS

1. Receipt and Opening of Bids

City of Fort Oglethorpe, Georgia (herein called the "Owner"), invites Bids on the form attached hereto, all blanks of which must be appropriately filled in. Bids will be received by the Owner at the location and time noted in the Advertisement for Bids.

The Owner may consider informal any Bid not prepared and submitted in accordance with the provisions hereof and may waive any informalities or reject any and all Bids.

Any Bid may be withdrawn prior to the above scheduled time for the opening of Bids or authorized postponement thereof. Any Bid received after the time and date specified shall not be considered. No Bidder may withdraw a Bid within 60 days after the actual date of the opening thereof.

2. Preparation of Bid

Each Bid shall be submitted on the Bid forms bound in the Contract Documents. All blank spaces for Bid prices must be filled in, in ink or typewritten. All computations will be checked; and in the event of a discrepancy, the unit price will govern. All required enclosed certifications must be fully completed and executed when submitted.

Each Bid must be submitted in a sealed envelope, addressed to the Owner. Each sealed envelope containing a Bid must be plainly marked on the outside as, "Bid for Courts Renovation."

If forwarded by mail, the sealed envelope containing the Bid must be enclosed in another envelope addressed to the Owner at City of Fort Oglethorpe, P.O. Box 5509, 500 City Hall Drive, Fort Oglethorpe, GA 30742, Attention: Phil Minton, Finance Director.

Any and all Bids not meeting the aforementioned criteria for Bid submittal, will be declared nonresponsive, will not be opened, and will be returned to the Bidder unopened.

3. Subcontracts

The Bidder is specifically advised that any person, firm, or other party to whom it is proposed to award a subcontract under this Contract must be acceptable to the Owner and funding agencies.

4. Electronic Modifications

Any Bidder may modify his Bid by electronic communication at any time prior to the scheduled closing time for receipt of Bids, provided such electronic communication is received by the Owner prior to the closing time, and, provided further, the Owner is satisfied that a written confirmation of the electronic modification over the signature of the Bidder was mailed prior to the closing time. Electronic communication should not reveal the Bid price but should provide the addition or subtraction or other modification so that the final prices or terms will not be known by the Owner until the sealed Bid is opened. If written confirmation is not received within two days from the closing time, no consideration will be given to the electronic modification.

JS-STD 6/15 00 21 00 - 2 G25003-01

5. Overhead, Profit, and Revision of Quantities

The unit or lump sum price for each of the several items in the proposal of each Bidder shall include its pro rata share of overhead and profit so that the sum of the products obtained by multiplying the quantity shown for each item by the unit price represents the total Bid. Any Bid not conforming to this requirement may be rejected as informal. The special attention of all Bidders is called to this provision, for should conditions make it necessary to revise the quantities, no limit will be fixed for such increased or decreased quantities nor extra compensation allowed, provided the net monetary value of all such addition or subtraction in quantities of such items of work (i.e., difference in cost) shall not increase or decrease the total original contract price by more than 25 percent, except for work not covered in the Drawings and Detailed Specifications as provided for under General Conditions and Supplemental General Conditions.

6. Qualifications of Bidder

The Owner may make such investigations as deemed necessary to determine the ability of the Bidder to perform the work, and the Bidder shall furnish to the Owner all such information and data for this purpose as the Owner may request. The Owner reserves the right to reject any Bid if the evidence submitted by, or investigation of, such Bidder fails to satisfy the Owner that such Bidder is properly qualified to carry out the obligations of the Contract and to complete the work contemplated therein.

Conditional Bids will not be accepted.

A Bidder must purchase a set of Contract Documents (including Bidding Requirements and Documents), Specifications, and Drawings through the Engineer in order to be considered a qualified bidder. Addenda will only be sent to those who have purchased documents and are on the list of planholders maintained by CTI Engineers, Inc.

7. Bid Security

Each Bid must be accompanied by a cashier's check on a duly authorized bank, certified check of the Bidder, or a bid bond prepared on the form of bid bond attached hereto, duly executed by the Bidder as principal and having as security thereon a surety company listed in the latest issue of U.S. Treasury Circular 570, in the amount of 5 percent of the Bid. Certified checks or cashier's checks shall be made payable to the Owner. Such checks or bid bonds will be returned to all except the three lowest Bidders within three days after the opening of Bids; the remaining checks or bid bonds will be returned promptly after the Owner and the accepted Bidder have executed the contract, or, if no award has been made within 60 days after the date of the opening of Bids, upon demand of the Bidder at any time thereafter, so long as he has not been notified of the acceptance of his Bid.

8. Liquidated Damages for Failure to Enter into Contract

The successful Bidder, upon his failure or refusal to execute and deliver the Contract and bonds required within 10 days after he has received notice of the acceptance of his Bid, shall forfeit to the Owner, as liquidated damages for such failure or refusal, the security deposited with his Bid.

JS-STD 6/15 00 21 00 - 3 G25003-01

9. Time for Completion and Liquidated Damages Bidder must agree to commence work on or before a date to be specified in a written Notice to Proceed of the Owner and to fully complete the Project within 210 consecutive calendar days thereafter. Bidder must agree also to pay as liquidated damages the sum of $500 for each consecutive calendar day in default as hereinafter provided in the General Conditions.

10. Conditions of Work Each Bidder must inform himself fully of the conditions relating to the construction of the Project and the employment of labor thereon. Failure to do so will not relieve a successful Bidder of his obligation to furnish all material and labor necessary to carry out the provision of his Contract. Insofar as possible the Contractor, in carrying out his work, must employ such methods or means as will not cause any interruption of or interference with the work of any other Contractor.

11. Addenda and Interpretations No interpretation of the meaning of the Drawings, Specifications, or other prebid documents will be made to any Bidder orally.

Every request for such interpretation should be in writing addressed pschofield@ctiengr.com or Philip Schofield, P.E., Project Manager, CTI Engineers, Inc., at 1122 Riverfront Parkway, Chattanooga, TN 37402, and to be given consideration must be received at least five days prior to the date fixed for the opening of Bids. Any and all such interpretations and any supplemental instructions will be in the form of written addenda to the Specifications which, if issued, will be mailed and transmitted by facsimile to all prospective Bidders (at the respective addresses and electronic number furnished for such purposes), not later than three days prior to the date fixed for the opening of Bids. Failure of any Bidder to receive any such addendum or interpretation shall not relieve such Bidder from any obligation under his Bid as submitted. All addenda so issued shall become a part of the Contract Documents.

12. Security for Faithful Performance Simultaneously with his delivery of the executed Contract, the Contractor shall furnish a surety bond or bonds as security for faithful performance of this Contract and for the payment of all persons performing labor on the Project under this Contract and furnishing materials in connection with this Contract, as specified in the General Conditions included herein. Surety companies executing bonds must appear on the Treasury Department's most current list (Circular 570 as amended) and be authorized to transact business in the state where the project is located.

13. Power of Attorney

Attorney-in-fact who sign bid bonds or contract bonds must file with each bond a certified and effectively dated copy of their power of attorney.

mailto:pschofield@ctiengr.com

JS-STD 6/15 00 21 00 - 4 G25003-01

14. Notice of Special Conditions

Attention is particularly called to those parts of the Contract Documents and Specifications which deal with the following:

a. Inspection and testing of materials

b. Insurance requirements

c. Wage rates (if applicable)

d. Surveys, permits, and regulations

The federal regulations enclosed or herein referred to supersede all conflicting requirements of the Contract Documents.

15. Laws and Regulations

The Bidder's attention is directed to the fact that all applicable state laws, municipal ordinances, and the rules and regulations of all authorities having jurisdiction over construction of the Project shall apply to the Contract throughout, and they will be deemed to be included in the Contract the same as though herein written out in full.

16. Obligation of Bidder

At the time of the opening of Bids, each Bidder will be presumed to have inspected the site and to have read and to be thoroughly familiar with the Drawings and Contract Documents (including all addenda). The failure or omission of any Bidder to examine any form, instrument, or document shall in no way relieve any Bidder from any obligation in respect of his Bid.

17. Execution of Bid Documents

The Contractor, in signing his Bid on the whole or any portion of the work, shall conform to the following requirements:

a. Bids which are not signed by individuals making them shall have attached thereto a power of attorney evidencing authority to sign the Bid in the name of the person for whom it is signed.

b. Bids which are signed for a partnership shall be signed by all of the partners or by an attorney-in-fact. If a Bid is signed by an attorney-in-fact, there should be attached to the Bid a power of attorney executed by the partners evidencing authority to sign the Bid.

c. Bids which are signed for a corporation shall have the correct corporate name thereof and the signature of the President or other authorized officer of the corporation manually written below the corporate name following the wording "By ______________." Corporation seal shall also be affixed to the Bid.

18. Method of Award - Lowest Qualified Bidder

The Contract will be awarded to the responsive, responsible Bidder submitting the lowest Bid complying with the conditions of the Information for Bidders. Award will be made on the basis of the prices given in the base Bid either with or without alternates at the discretion of the Owner. The Bidder to whom the award is made will be notified

JS-STD 6/15 00 21 00 - 5 G25003-01

at the earliest possible date. The Owner reserves the right to reject any and all Bids and to waive any informality in Bids received whenever such rejection or waiver is in its interest.

A responsive Bidder shall be one who submits his Bid in the proper form without qualification or intent other than as called for in the Specifications and on the Contract Drawings and who binds himself on behalf of his Bid to the Owner with the proper bid bond or certified check completed and attached, and who properly completes all forms required to be completed and submitted at the time of the bidding.

A responsible Bidder shall be one who can fulfill the following requirements:

a. The Bidder shall maintain a permanent place of business. This requirement applies to the Bidder where the Bidder is a division of a corporation, or where the Bidder is 50 percent or more owned by a person, corporation, or firm.

b. The Bidder shall demonstrate that he has adequate construction management experience and sufficient equipment resources to properly perform the work under and in conformance with these Contract Documents. This evaluation will be based upon a list of completed or active projects and a list of construction equipment available to the Bidder to perform the work.

c. The Bidder shall demonstrate that he is familiar with the work under these Contact

Documents. This evaluation will be based upon a list of major equipment items the Bidder proposes to furnish and a list of subcontractors the Bidder proposes to use in prosecuting the work.

d. The Bidder shall demonstrate that he has financial resources of sufficient strength to meet the obligations incident to the performance of the work covered by these Contract Documents. The Bidder shall complete the Statement of Bidder's Qualifications in the Bid forms. The ability to obtain the required Performance and Payment Bonds will not alone demonstrate adequate financial capability.

e. The Bidder may demonstrate financial capability by submitting a suitable financial statement of an Equity Partner, provided an agreement is executed binding the Bidder and said Equity Partner, jointly and severally, to fulfill all duties, obligations, and responsibilities of the Contractor under these Contract Documents if the Contract is awarded to the Bidder. The agreement shall be submitted with the Bid and shall be satisfactory to the Owner's attorney or the Bid may be declared nonresponsive.

f. The Bidder shall furnish all data required by these Contract Documents. Failure to do so may result in the Bid being declared nonresponsive. Acceptance of the Bidder's documentation and substantiation or contract award by the Owner does not relieve the Bidder of liability for nonperformance as covered in the Contract Documents, nor will the Bidder be exempted from any other legal recourse the Owner may elect to pursue.

19. Employment of Local Labor

Preference in employment on the Project shall, insofar as practicable, be given to qualified local labor.

JS-STD 6/15 00 21 00 - 6 G25003-01

20. Bid Envelope

All Bidders doing utility construction covered by OCGA 43-14 must have a Utility Contractor’s License issued by the State of Georgia. In compliance with these requirements, the envelope in which the Bid is contained must bear on the outside the following:

a. Name of Bidder.

b. Address of the Bidder.

c. Name of Project for which Bid is Submitted.

d. Bidder's Utility Contracting License Number.

e. Bidder's License Expiration Date.

Bid envelopes that do not bear the above information will be returned to the Bidder unopened.

A copy of the form found on the last page of this section properly completed to provide the required information as identified above shall be affixed to the front of the envelope containing the Bidder’s proposal.

JS-STD 6/15 00 21 00 - 7 G25003-01

CONTRACTOR'S IDENTIFICATION

This form shall be attached to the sealed envelope containing the Bid. Failure to provide the following information on the sealed envelope will be considered a non-responsive Bid.

BIDDER:

Name

Address

Georgia Utility License No. N/A

Expiration Date N/A

SEALED BID PROPOSAL FOR THE

CITY OF FORT OGLETHORPE, GEORGIA

FOR THE CONSTRUCTION OF THE

Bid Date Bid Time

00 41 00 - 1 G25003-01 M- Ft. Oglethorpe\ Courts Renovation 06/15/26

BID

Project Description: Courts Renovation

Proposal of

(hereinafter called "Bidder"), doing business as .

a corporation, a partnership, an individual

To the City of Fort Oglethorpe, Georgia (hereinafter called "Owner").

Gentlemen:

The Bidder, in compliance with your Advertisement for Bids for the construction of this project having examined the Drawings and Specifications with related documents and the site of the proposed work, and being familiar with all of the conditions surrounding the construction of the proposed project including the availability of materials and labor, hereby proposes to furnish all labor, materials, and supplies, and to construct the project in accordance with the Contract Documents, within the time set forth therein, and at the price(s) stated below. This price(s) is to cover all expenses including overhead and profit incurred in performing the work required under the Contract Documents, of which this proposal is a part.

Bidder hereby agrees to commence work under this contract on or before a date to be specified in written Notice to Proceed of the Owner and to fully complete the project within 210 consecutive calendar days thereafter. Bidder further agrees to pay as liquidated damages, the sum of $500 for each consecutive calendar day thereafter as hereinafter provided in the General Conditions.

Bidder acknowledges receipt of the following addenda:

Bidder agrees to perform all the construction of the project complete with appurtenant and accessory work described in the Specifications and shown on the plans for the attached price(s).

The attached price(s) shall include all labor, materials, bailing, shoring, removal, overhead, profit, insurance, etc., to cover the finished work of the several kinds called for.

Bidder understands that the Owner reserves the right to reject any or all Bids and to waive any informalities in the bidding.

The Bidder agrees that this Bid shall be good and may not be withdrawn for a period of 60 calendar days after the scheduled closing time for receiving Bids.

00 41 00 - 2 G25003-01

Upon receipt of written notice of the acceptance of this Bid, Bidder will execute the formal contract attached within ten days and deliver a surety bond or bonds as required by the General Conditions. The Bid security attached in the sum of 5 percent of the total Bid is to become the property of the Owner in the event the contract and bond are not executed within the time above set forth, as liquidated damages for the delay and additional expense to the Owner caused thereby.

Respectfully submitted:

By

Signature

Title

Business Address

ATTEST:

Name (Please Type)

Title (SEAL)

Note: Attest for a corporation must be by the corporate secretary; for a partnership by another partner; for an individual by a Notary.

Revised 01/17/07 00 42 00-1 G25003-01 07/01/26

BID SCHEDULE FOR LUMP SUM

Project: Courts Renovation Project No: ITB #001-26

This Bid is submitted to: City of Fort Oglethorpe 500 City Hall Drive Fort Oglethorpe, GA 37042

1. The undersigned bidder proposes and agrees, if this bid is accepted, to enter an agreement with Owner in the form indicated in the Contract Documents for the contract price within the contract time indicated in this bid.

2. Bidder has carefully examined the plans, the technical specifications, the General Conditions, the Supplementary Conditions, Instructions for Bidders, the form of the contract, the form of bonds, and all other contract documents, and thoroughly understands their stipulations, requirements, and provisions.

3. Bidder has examined the site and locality where the work is to be performed, the legal requirements (federal, state and local laws, ordinances, rules and regulations) and all conditions affecting cost, progress, or performance of the work. Bidder has made such independent investigations as bidder deems necessary to become thoroughly familiar with the conditions under which the work will be performed.

4. Bidder understands that a price for each item on the bid schedule must be filled in as stated in Instructions for Bidders. Failure to indicate price for alternates, if any, may be grounds for considering the bid irregular. Lump Sum prices on the bid schedule shall include all labor, materials, safety measures, overhead, profit, insurance, etc. to cover the finished work.

5. Bidder agrees that, if awarded the contract, all work thereunder shall be conducted in such a manner and with sufficient materials, labor, tools, equipment, apparatus, and incidentals as is necessary to insure satisfactory completion of the project within 210 calendar days from the date stipulated in the Notice to Proceed.

6. Bidder accepts the provisions of the Agreement as to liquidated damages of $500 per day in the event of failure to complete the work on time.

7. Bidder represents that this bid is genuine and not made in the interest of or on behalf of any undisclosed person, firm or corporation.

8. Bidder understands that the Owner reserves the right to reject any or all bids and to waive any informalities in the bidding.

9. Bidder will complete the work as described in the specifications for the price(s) as shown on the following bid schedules.

10. The Bidder is hereby acknowledging that the following documents are attached to and made a condition of this Bid:

a) Required Bid Security in the form of: _______ Bid Bond.

b) Required Drug-Free Workplace Affidavit

c) Required Bidder's Statement of Qualifications. d) Required Bidder's Statement of Equipment.

e) Acknowledgment of Addenda #’s _____, _____.

Revised 01/17/07 00 42 00-2 G25003-01

BID SCHEDULE

COURTS RENOVATION

CITY OF FORT OGLETHORPE, GEORGIA

PROJECT NO. G25003-01

SCHEDULE I - LUMP SUM

Item No. 1

The Lump Sum Bid for furnishing and installing all materials, equipment, labor, and services identified in these Specifications for the construction of the renovation of the Municipal Court facilities, complete as shown on the Drawings and specified in the Contract Documents, including selective demolition, interior renovations, courtroom improvements, accessibility upgrades, modifications to existing building systems, and related appurtenant work.

__________________________________________________________________________Dollars and (In words)

______________Cents

Total Lump Sum of: $

Notes:

1) Amounts are to be shown in both words and figures. In case of a discrepancy, amount shown in words will govern

2) Contract will be awarded (if it is awarded) to the responsible and responsive bidder submitting the lowest bid at the sole discretion of the Owner.

BIDDER DATE

BY TITLE

ADDRESS

CITY ZIP CODE

TELEPHONE NUMBER FAX E-MAIL

(In figures)

Revised 01/17/07 00 42 00-3 G25003-01

If BIDDER is:

An Individual

By ____________________________________________________________________(SEAL) (Individual's Name) doing business as ______________________________________________________________ Business Address: _____________________________________________________________

Phone No.: _____________________ Business License No.: _____________________

A Partnership By ____________________________________________________________________(SEAL)

(Firm Name)

(general partner) Business Address: ______________________________________________________________ Phone No.: _________________________ Business License No.: _____________________

A Corporation By _________________________________________________________________________

(Corporation Name)

(state of incorporation) By __________________________________________________________________________

(name of person authorized to sign) Business Address: _____________________________________________________________ Phone No.: _________________________ Business License No.: _____________________

A Joint Venture By __________________________________________________________________________

(Name)

(Address) By __________________________________________________________________________

(Name)

(Address) Phone No.: _________________________ Business License No.: _____________________

(Each joint venturer must sign. The manner of signing for each individual, partnership and corporation that is a party to the joint venture should be in the manner indicated above.)

STD 00 43 13 - 1 G25003-01

BID BOND

KNOW ALL MEN BY THESE PRESENTS, that we, the undersigned, as Principal, and as Surety, are hereby held and firmly bound unto the City of Fort Oglethorpe, Georgia as Owner in the penal sum of five percent of the total Bid which equals for the payment of which, well and truly to be made, we hereby jointly and severally bind ourselves, our heirs, executors, administrators, successors, and assigns.

The condition of the above obligation is such that whereas the Principal has submitted to Fort Oglethorpe, Georgia a certain Bid, attached hereto and hereby made a part hereof to enter into a contract in writing for the construction of the Courts Renovation.

NOW, THEREFORE,

a. If said Bid shall be rejected, or in the alternate,

b. If said Bid shall be accepted and the Principal shall execute and deliver a contract in the Form of Contract attached hereto (properly completed in accordance with said Bid) and shall furnish a bond for his faithful performance of said contract, and for the payment of all persons performing labor or furnishing materials in connection therewith, and shall in all other respects perform the agreement created by the acceptance of said Bid, then this obligation shall be void, otherwise the same shall remain in force and effect; it being expressly understood and agreed that the liability of the Surety for any and all claims hereunder shall in no event exceed the penal amount of this obligation as herein stated.

The Surety, for value received, hereby stipulates and agrees that the obligations of said Surety and its bond shall be in no way impaired or affected by any extension of the time within which the Owner may accept such Bid; and said Surety does hereby waive notice of any such extension.

00 43 13 - 2 G25003-01

IN WITNESS WHEREOF, the Principal and Surety have executed this bond by causing their respective names to be hereunto subscribed and their seals to be hereunto affixed by their duly authorized officers, on this the day of , 20 .

CONTRACTOR - PRINCIPAL:

By

Name (Please Type)

Title

ATTEST:

Name (Please Type)

Title (SEAL)

Note: Attest for a Corporation must be by the corporate secretary; for a partnership by another partner; for an individual by a Notary.

SURETY:

By

Name (Please Type)

Title (Attach Power of Attorney)

ATTEST:

Name (Please Type)

Title (SEAL)

Note: Surety companies executing bonds must appear on the Treasury Department's most current list (Circular 570 as amended) and be authorized to transact business in the state where the project is located.

STD 00 43 80 - 1 G25003-01

BIDDER ACKNOWLEDGMENT OF CONTRACT TIME

By signature below, Bidder acknowledges and agrees that the 210-day contract time for substantial completion of the work included in these Contract Documents is either:

1. Sufficient, barring changed conditions, acts of God, or abnormal weather conditions that would justify time extensions; or

2. Insufficient, in which case the Contractor agrees that the price bid includes an allowance for liquidated damages of adequate magnitude to cover the additional time required to complete the work.

Bidder Name

Signature

Attest:

00 45 13 - 1 G25003-01

STATEMENT OF BIDDER'S QUALIFICATIONS

All questions must be answered and the data given must be clear and comprehensive. This statement must be notarized. If necessary, questions may be answered on separate attached sheets. The Bidder may submit any additional information he desires. Attach all additional sheets to these Contract Documents.

1. Name of Bidder.

2. Permanent main office address.

3. When organized.

4. If a corporation, where incorporated.

5. How many years have you been engaged in the contracting business under your present firm or trade name?

6. Contracts on hand: (Schedule these, showing amount of each contract and the appropriate anticipated dates of completion.)

7. General character of work performed by your company.

8. Have you ever failed to complete any work awarded to you? If so, where and why?

9. Have you ever defaulted on a contract? If so, where and why?

10. List the most important projects recently completed by your company, stating the approximate cost for each, and the month and year completed.

11. List your major equipment available for this project.

12. Experience in construction work similar in importance to this project.

00 45 13 - 2 G25003-01

13. Background and experience of the principal members of your organization, including officers.

14. Credit available: $

15. Give bank reference.

16. Will you, upon request, fill out a detailed financial statement and furnish any other information that may be required by the City of Fort Oglethorpe?

The undersigned hereby authorizes and requests any person, firm, or corporation to furnish any information requested by the Local Public Agency in verification of the recitals comprising this Statement of Bidder's Qualifications.

Dated this day of , 20 .

Name of Bidder

By

Title

State of

County of being duly sworn deposes and says that he is of and that the answers to the foregoing questions and all statements therein contained are true and correct. Subscribed and sworn to before me this day of , 20 .

Notary Public My Commission Expires:

(Date) (SEAL)

00 45 14 - 1 G25003-01

STATEMENT OF EQUIPMENT

Showing machinery and other equipment available to Contractor for prosecuting the work included in contract. (To be filled in by Contractor and submitted with Bid.)

Available Machinery and Other Equipment

Kind-Size-Capacity Location Ownership

Date Proposed To be Placed

On Work

The above is a true statement of the equipment available to the undersigned Bidder for prosecuting the work included in the contract. Where it is shown that the equipment is not owned by the Bidder, arrangements have been made with the owners to furnish the equipment.

Signed

Name

Title

00 45 19 - 1 G25003-01

NONCOLLUSION AFFIDAVIT OF PRIME BIDDER

State of ) )ss.

County of )

, being first duly sworn, deposes and says that:

1. He is of (owner, partner, officer, representative, or agent)

, the Bidder that has submitted the attached Bid;

2. He is fully informed respecting the preparation and contents of the attached Bid and of all pertinent circumstances respecting such Bid;

3. Such Bid is genuine and is not a collusive or sham Bid;

4. Neither the said Bidder nor any of its officers, partners, owners, agents, representatives, employees or parties in interest, including this affiant, has in any way colluded, conspired, connived or agreed, directly or indirectly with any other Bidder, firm or person to submit a collusive or sham Bid in connection with the Contract for which the attached Bid has been submitted or to refrain from bidding in connection with such Contract, or has in any manner, directly or indirectly, sought by agreement or collusion or communication or conference with any other Bidder, firm or person to fix the price or prices in the attached Bid or of any other Bidder, or to fix any overhead, profit or cost element of the Bid price or the Bid price of any other Bidder, or to secure through any collusion, conspiracy, connivance or unlawful agreement any advantage against City of Fort Oglethorpe (Local Public Agency) or any person interested in the proposed Contract; and

5. The price or prices quoted in the attached Bid are fair and proper and are not tainted by any collusion, conspiracy, connivance or unlawful agreement on the part of the Bidder or any of its agents, representatives, owners, employees, or parties in interest, including this affiant.

(Signed)

Title

Subscribed and sworn to before me this day of , 20 .

Title

My commission expires (Date) (SEAL)

00 45 44 - 1 G25003-01

PARTNERSHIP CERTIFICATE

STATE OF

COUNTY OF

On this day of , 20 , before me personally appeared

, known to me to be the person who executed the above instrument, who, being by me first duly sworn, did depose and say that he is a general partner in the firm of and that said firm consists of himself and and that he executed the foregoing instrument on behalf of said firm for the uses and purposes stated therein, and that no one except the above named members of the firm have any financial interest whatsoever in said proposed contract.

Partner Partner

Partner Partner

Subscribed and sworn to before me, this day of , 20 .

Notary Public My Commission Expires:

(Date) (SEAL)

NOTE: If only one partner signs, a power of attorney executed by all other partners authorizing him to act in the name of the company must be attached; otherwise, all partners must sign.

00 45 44 - 2 G25003-01

CORPORATE CERTIFICATE

I, , certify that I am the Secretary of the corporation named as Contractor in the foregoing proposal; that

, who signed said proposal in behalf of the Contractor was then of said corporation; that said proposal was duly signed for and in behalf of said corporation by authority of its Board of Directors, and is within the scope of its corporate powers; that said corporation is organized under the laws of the State of .

This day of , 20 .

(SEAL)

00 45 45 - 1 G25003-01

JOINT VENTURE QUESTIONNAIRE

In the event a joint venture bid is submitted, the following questions shall be answered, submitted with the bid and signed by the owner, partner, officer, representative, or agent of each joint venturer.

1. What is the separate bonding capability of each member of the joint venture?

2. What other work is in progress by the total contract dollar amount and percentage of completion for each joint venturer?

3. Are there any particular risks associated with this Contract which contributed to the decision to joint venture, and if so, what?

4. Has consideration been given to utilization of subcontract as opposed to formation of a joint venture, and if so, why was the joint venture format chosen?

5. Has either member of the joint venture been separately awarded a contract by the City of Fort Oglethorpe, and if so, what was the most recent contract awarded to each?

6. What will be the contribution of each participant in the joint venture with respect to personnel, equipment, and other resources of each company allocated to this contract?

7. What will be the specific contribution of each participant of the joint venture for the completion of work to be performed and material to be supplied under this Contract?

8. Will there be separate management for the joint venture? If not, which company will supervise, or how will the contract be supervised?

9. Why will the joint venture be more efficient than the possibility of both companies separately bidding and either company being awarded the contract separately.

00 45 45 - 2 G25003-01

10. Does the formation of the joint venture promote competition on this Contract, and if so, how?

11. Has the joint venture, or any participant therein, received any legal advice with respect to the antitrust implications of formation of a joint venture, and if so, from what attorneys?

Name of Joint Venturer Name of Joint Venturer

By By

Title Title

State of

County of being duly sworn deposes and says that he is of and being duly sworn deposes and says that he is of and that the answers to the foregoing questions and all statements therein contained are true and correct. Subscribed and sworn to before me this day of , 20 .

Notary Public

My Commission Expires:

(SEAL)

(Date)

END OF SECTION

00 45 50 - 1 G25003-01

STATEMENT OF LICENSE CERTIFICATE

Each contractor bidding shall fill in and sign the following:

This is to certify that , being a bidding contractor on the within and foregoing proposed contract, has fully reviewed the complete Bid Package and all invitations, information, supplemental conditions and addendum or addenda thereto, and has contacted and complied with all of the applicable requirements imposed or stated in writing by the Georgia State Construction Industry

Licensing Board laws and rules, or the applicable rules of any other qualifying governing body, agency, or board.

The undersigned contractor further does hereby certify, warrant and represent that such contractor has verified and determined that such contractor is fully licensed to perform all aspects of the contract project within the plans, documents, and specifications, and such license is not in any way suspended, conditional, impaired or revoked.

The Contractor has been issued License or Certificate Number in the name of (contractor’s name) by (name of issuing body, agency or board)

, which License or Certificate expires on (date of expiration) .

Signed

GA 00 45 66 - 1 G25003-01

E-VERIFY

Contractor Affidavit under O.C.G.A. § 13-10-91(b)(1)

By executing this affidavit, the undersigned contractor verifies its compliance with O.C.G.A. § 13-10-91, stating affirmatively that the individual, firm or corporation which is engaged in the physical performance of services on behalf of (City of Fort Oglethorpe) has registered with, is authorized to use and uses the federal work authorization program commonly known as E-Verify, or any subsequent replacement program, in accordance with the applicable provisions and deadlines established in O.C.G.A. § 13-10-91. Furthermore, the undersigned contractor will continue to use the federal work authorization program throughout the contract period and the undersigned contractor will contract for the physical performance of services in satisfaction of such contract only with subcontractors who present an affidavit to the contractor with the information required by O.C.G.A. § 13-10-91(b).

Contractor hereby attests that its federal work authorization user identification number and date of authorization are as follows:

Federal Work Authorization User Identification Number

Date of Authorization

Name of Contractor Courts Renovation Name of Project City of Fort Oglethorpe Name of Public Employer

I hereby declare under penalty of perjury that the foregoing is true and correct.

Executed on , 2026 in (city), (state).

Signature of Authorized Officer or Agent

Printed Name and Title of Authorized Officer or Agent

SUBSCRIBED AND SWORN BEFORE ME

ON THIS THE DAY OF , 2026.

NOTARY PUBLIC

My Commission Expires:

CONTRACTING REQUIREMENTS

JS 00 51 00 - 1 G25003-.01

M: Ft. Oglethorpe\ Courts Renovation 06/15/26

NOTICE OF AWARD

To:

Project Description: The Project consists of renovation of the Municipal Court facilities within Fort Oglethorpe City Hall, including selective demolition, interior renovations, courtroom improvements, accessibility upgrades, modifications to existing building systems, and related appurtenant work. The Project is located at the City of Fort Oglethorpe, 500 City Hall Drive, Fort Oglethorpe, GA 30742.

The Owner has considered the Bid submitted by you for the above described work in response to its Advertisement for Bids dated _______ ___,20__. and Information for Bidders.

You are hereby notified that your bid has been accepted for items in the amount of

You are required by the Information for Bidders to execute the Contract and furnish the required Contractor's Performance Bond, Payment Bond and certificates of insurance within ten calendar days from the date of this notice to you.

If you fail to execute said Contract and to furnish said bonds within ten days from the date of this notice, said Owner will be entitled to consider all your rights arising out of the Owner's acceptance of your bid as abandoned and as a forfeiture of your Bid Bond will be entitled to such other rights as may be granted by law.

You are required to return an acknowledged copy of this Notice of Award to the Owner.

Dated this day of , 20 .

CITY OF FORT OGLETHORPE, GEORGIA

By

ACCEPTANCE OF NOTICE

Receipt of the above Notice of Award is hereby acknowledged

, this the day of , 20___.

JS 00 52 00 - 1 G25003-01

CONTRACT

THIS CONTRACT, made this day of , 20 , by and between the City of Fort Oglethorpe, Georgia, hereinafter called "Owner" and doing business as a corporation, individual, or partnership hereinafter called "Contractor."

WITNESSETH: That for and in consideration of the payments and agreements hereafter mentioned:

1. The Contractor will commence and complete the construction of the Courts Renovation.

2. The Contractor will furnish all the material, supplies, tools, equipment, labor and other services necessary for the completion of the work described herein.

3. The Contractor will commence the work required by the Contract Documents within 10 calendar days after the contract start date of the written Notice to Proceed and will complete the work within 210-day contract time unless the periods of completion are extended otherwise by the Contract Documents. The Contractor further agrees to pay as liquidated damages, the sum of $500.00 for each consecutive calendar day in default thereafter as hereinafter provided in the General Conditions.

4. The Contractor agrees to perform all the Work described in the Contract Documents and comply with the terms therein for the sum of ____________.

5. The term "Contract Documents" means and includes the following:

a. Advertisement for Bids

b. Information for Bidders

c. Bid

d. Bid Bond

e. Contract

f. General Conditions

g. Supplemental General Conditions

h. Payment Bond

i. Performance Bond

j. Notice of Award

k. Notice to Proceed

l. Change Order(s)

m. Drawings prepared by March Adams & Associates / Garbee Architecture as numbered on Page 00 01 15-1

n. Specifications prepared or issued by CTI Engineers, Inc., dated July 2026

o. Addenda:

No. , dated , 20 No. , dated , 20 No. , dated , 20

6. The Owner will pay to the Contractor in the manner and at such times as set forth in the

General Conditions such amounts as required by the Contract Documents.

JS 00 52 00 - 2 G25003-01

7. This Contract shall be binding upon all parties hereto and their respective heirs, executors, administrators, successors, and assigns.

IN WITNESS WHEREOF, the parties hereto have executed, or caused to be executed by their duly authorized officials, this Contract in four (4) copies each of which shall be deemed an original on the date first above written.

OWNER:

CITY OF FORT OGLETHORPE, GEORGIA

(Please Print or Type)

WITNESS:

Title (SEAL)

CONTRACTOR:

Address

ATTEST:

Title (SEAL)

Note: Attest for a corporation must be by the corporate secretary; for a partnership by another partner; for an individual by a Notary.

JS 00 55 00 - 1 G25003-01

NOTICE TO PROCEED

Project Description: The Project consists of renovation of the Municipal Court facilities within Fort Oglethorpe City Hall, including selective demolition, interior renovations, courtroom improvements, accessibility upgrades, modifications to existing building systems, and related appurtenant work. The Project is located at the City of Fort Oglethorpe, 500 City Hall Drive, Fort Oglethorpe, GA 30742.

You are hereby notified to commence work in accordance with the Contract dated __________ ___, 20 , on or before , 20 , and you are to complete the work…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .