CountermeasureTestSets_SOW.docx
DOCX document 17 KB Posted
- Attached to
- Repair Services for Countermeasure Test Sets
- Solicitation number
- N6852024P0097
About this file
This document is a Statement of Work (SOW) for the repair, inspection, and calibration of 9 Countermeasure Test Sets under a sole source contract. The SOW outlines the general work requirements, including that all repairs must be made using original manufactured replacement parts to return the units to a fully operational Ready-for-Issue (RFI) condition. It specifies the part numbers, National Stock Numbers, and serial numbers of the Countermeasure Test Sets to be repaired. The contractor will be responsible for determining if any units are Beyond Economical Repair (BER) and notifying the government. Upon completion, the contractor will ship the repaired items to the Fleet Readiness Center Aviation Support Equipment in Solomons, Maryland. The related federal contract opportunity is a sole source procurement with a 14-month period of performance for the repair services.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 1 - GFE.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work for
COUNTERMEASURE TEST SETS
1.0 SCOPE
1.1. This Statement of Work (SOW) addresses requirements for inspection, repair, and calibration of the End Item; COUNTERMEASURE TEST SETS Part Number (P/N) 188100-7001 / NSN 4920-01-423-8143 that meet criteria specified in this SOW.
2.0 WORK REQUIREMENTS
2.1. General Requirements. The contract will cover repair services that cannot be accomplished at Navy Maintenance Activities. The services will include inspection, repair and/or calibration of the end item as necessary. All repairs will be made using original manufactured replacement parts and the units will be returned to fully operational Ready for Issue (RFI) condition. The Contractor will provide proper documentation and reporting requirements as specified herein.
2.2. Place of Performance. All work shall be performed at the contractor’s approved facility or approved sub-contractor facility. The contractor will be responsible for providing adequate indoor storage of all items for repair while in the contractor or sub-contractor’s custody.
3.0 SPECIFICATIONS
Request for repair of 9 Countermeasure Test Sets:
ITEM: Countermeasure Test Sets (Each Case Contains 2 Individual Testers) P/N: 188100-7001
NSN: 4920-01-423-8143
Serial Numbers:
2010097 2005187 2005235 2005033 2005020 2005211 682-U-065 2005219 2005022
3.1. Ready-For-Issue. The Contractor will repair, test, inspect, and certify as Ready-For-Issue (RFI), which shall include all necessary calibration documentation. In order for an item to be considered RFI, it must conform to the latest Government approved operational/functional test procedures. The configuration of each item must meet the intent of the Form, Fit, and Function requirements of the Lowest Acceptable Revision (LAR) level. The Contractor is to ensure that all required parts are installed and that the external interfaces are fully compatible.
3.2. Beyond Economical Repair (BER). The Contractor will be responsible for determining whether an item is Beyond Economical Repair (BER) and notifying the contract Technical Point of Contact (TPOC). For repairs estimated to exceed 80% of the acquisition cost of the component the Contractor will advise the contract TPOC of the cost details and await Government approval/disposition instructions.
3.3. Final Inspection and Acceptance. Upon completion of all repairs, the item will be tested by the Contractor to verify that it is serviceable and in RFI condition. Applicable calibration standards rework specifications, design drawings, and associated test requirements are to be used in measuring minimum performance standards.
*A copy of the Material Inspection and Receiving Report (MIRR) DD250 should be submitted electronically through Wide Area Work Flow (WAWF) and in paper format to the TPOC with the item upon shipment.
3.4. Repair Records. A copy of the detailed repair records held by the contractor shall be forwarded with each component repair. Each repair record shall include an itemized list indicating components replaced in the end item in order to satisfy the requirements to bring the item to RFI Condition.
3.5. Shipment. The Contractor shall ship the item after completion of inspection, acceptance and packaging, with appropriate shipping documents, to the destination provided by the customer. Normal repair shipments shall be in accordance with “Best Commercial Practices”. Shipment earlier than the date specified in the Schedule is authorized and requested whenever possible. In the event that any repair action would take more than the estimated turnaround time identified in the contract, the Contractor shall notify by email the contract TPOC.
Upon completion of repairs, the item(s) are to be shipped to:
Fleet Readiness Center Aviation Support Equipment Attn: Karen Tippett Building 105 B Avenue Solomons, MD 20688
*All shipments must include a copy of the DD1149 shipping document, Copy of Repair Record and a copy of the Material Inspection and Receiving Report (DD250).
*Reference the Contract Number on all documentation.
*Provide shipment tracking information to the TPOC via email upon shipping each asset.
3.6. Technical Point of Contact (TPOC)
Al Wolf 410-326-7561 alan.w.wolf.civ@us.navy.mil
File details come from the government source that posted it. Updated .