Counterfeit Prevention Plan.pdf

PDF 232 KB Posted

Attached to
Indicator Federal contract opportunity
Solicitation number
SPRHA5-25-R-0484
Issued by
Defense Logistics Agency Aviation

About this file

This DD Form 1423-1 is a Contract Data Requirements List (CDRL) for a Counterfeit Prevention Plan (CPP) associated with contract number FD20202500484 for the AN/MST-T1A system. The document specifies that the contractor must submit a Counterfeit Prevention Plan within 30 days of contract award, with the government providing comments within 14 days and the contractor required to re-submit within 7 days after receiving those comments. The plan must include all items from section 3 of SAE AS5553 and be submitted electronically using MS Office 2016 or newer, or PDF format. The document is marked with Distribution Statement D, limiting access to the Department of Defense and U.S. DoD contractors for administration and operational purposes, with a destruction notice mandating complete elimination of the document to prevent disclosure or reconstruction.

View the file

Other files for this federal contract opportunity

Other files attached to Indicator, newest first.
File Type Posted
Special Packaging Instructions.pdf PDF
SPRHA525R0484 CUI SSI.pdf PDF
Packaging Statement of Work.pdf PDF
Engineering Data List.pdf PDF
Manufacturing Qualification Requirements.pdf PDF
Unmarked Eng Data 2022.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

C MISC

AN/MST-T1A FD20202500484

A005 Counterfeit Prevention Plan CPP

DI- MISC-81832 415 SCMS/GUEA

DD

A D

1TIME

N/A

30DAC

N/A

FY2073 1

415 SCMS/EN 1

0 1 1

Changes to office symbols and/or e-mail addresses, when necessary, shall be made by letter through the CO/ACO without further revision to this CDRL.

Block 4: Plan shall include all items from section 3 of SAE AS5553.

Block 12: Contractor shall deliver the Counterfeit Prevention Plan within 30 days of contract award. Government comments provided to the contractor within 14 days after receipt, with contractor re-submittal due 7 days after receipt of comments.

Block 14: Document submission shall be made electronically using MS Office 2016 or newer format or Portable Document Format (PDF).

Address e-mail submissions to: USAF AFMC 415 SCMS/EN, 415SCMS.en@us.af.mil

DODAAC: FY2073

Address Line 1: FY2073 GLSC 415 SCMS Address Line 2: BLDG 1226 CP 801 586 1368 Address Line 3: 6041 GUM LN Address Line 4: HILL AFB UT 84056-5820

Block 9:

DISTRIBUTION STATEMENT D: Distribution authorized to the Department of Defense and U.S. DoD contractors only for administration and operational purposes, contains limited access information, 21 Nov 2008. Other requests for this document shall be referred to OO-ALC/ AFMC 415 SCMS/GUEA.

DESTRUCTION NOTICE: Destroy by any means that will prevent disclosure of the contents or reconstruction of the document.

NSP

0.00

Engineer 415 SCMS/GUEA

KINCAID.JAMES.RYAN.1247004

Digitally signed by

KINCAID.JAMES.RYAN.1247004943

Date: 2025.01.29 09:19:23 -07'00'

29 JAN 2025

Jackson Andrasko 415 SCMS/GUEA

ANDRASKO.JACKSON.125

8051030

Digitally signed by

ANDRASKO.JACKSON.1258051030

Date: 2022.05.11 09:13:04 -06'00'

5/11/2022

Adobe Professional 8.0

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

C MISC

AN/MST-T1A FD20202500484

File details come from the government source that posted it. Updated .