Cost_Proposal_Form___Water_System_Master_Plan_06162026.xlsx

XLSX spreadsheet 21 KB Posted

Attached to
Water System Master Plan State and local contract opportunity
Solicitation number
RFP198186
Issued by
Santa Clara County, California

About this file

This is a Cost Proposal Form for the City of Palo Alto Utilities Department's Water System Master Plan project, a California-based engineering consulting opportunity. The project requires proposals from engineering firms to deliver comprehensive potable water system master planning services over a two to three-year contract term. The scope encompasses three phases: Phase 1 includes capital improvement planning, demand and projection modeling, and existing conditions cost estimates; Phase 2 addresses operational efficiency, storage and water quality efficiency, groundwater emergency resiliency, and system resiliency planning; and Phase 3 is an optional scope covering enhanced resiliency improvements, emerging contaminants analysis, and additional modeling. The evaluation will focus on engineering assessment and capital improvement program planning for the City's water distribution, storage, water supply, and distribution piping network across a 20-year time horizon, with recommendations for five, ten, and twenty-year capital improvement projections.

Pricing shall be submitted using the provided Cost Proposal Form, which requires no alterations and serves as the sole basis for cost evaluation. Quoted costs must include all taxes, charges, and travel expenses. Proposals must additionally submit a Cost Rate Sheet and Schedule of Rates detailing hourly rates, estimated hours, and total upper limits for each scope; however, this supplementary information is for reference only and will not be used in the cost evaluation. All quantities listed are estimates with no guaranteed minimums or maximums. Proposals that do not comply with submission requirements are subject to total rejection.

View the file

Other files for this state and local contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

COST PROPOSAL FORM (Used for Evaluation)
COST SHALL BE SUBMITTED ON THIS COST PROPOSAL FORM FOR EVALUATION. NO ALTERATIONS OR CHANGES OF ANY KIND ARE PERMITTED. Proposals that do not comply will be subject to rejection in total. The cost quoted shall include all taxes and all other charges, including travel expenses, and is the cost the City will pay for the two to three year term of any contract that is a result of this proposal.
Quantities listed on this Excel spreadsheet COST FORM are estimates and are not to be construed as a commitment. No minimum or maximum is guaranteed or implied.
Pricing
ScopeTotal Cost
Phase 1 Services: Capital Improvement Planning
Demand and Projection Modeling
Existing Conditions
Cost Estimates for Capital Improvement Projects
Phase 1 Total$ - 0
Phase 2 Services: Operational Efficiency
Operational, Storage, and Water Quality Efficiency
System Resiliency
Groundwater Emergency Resiliency
System Resiliency Planning
Phase 2 Total$ - 0
Phase 3 (Optional) Services: Enhanced Resiliency Improvements
Emerging Contaminants
Additional Modeling
Phase 3 Total$ - 0
PROJECT TOTAL$ - 0
In addition to this Cost Proposal Form, submit a Cost Rate Sheet and a Schedule of Rates. Include hourly rates, estimated hours, and total upper limits for each scope. The Cost Rate Sheet and Schedule of Rates will be used for additional information only. Cost will only be evaluated using the Cost Proposal Form.

Sheet2 FOR INFORMATIONAL PURPOSE ONLY AND WILL BE PART OF THE EVALUATION BUT WILL BE PART OF THE CONTRACT.

Hourly Rates for "As-Needed" Consulting Services
DESCRIPTION Of SERVICEHourly Rates
$
$
$
$
$
$