Cost Estimating Services RFI final.docx
DOCX document 83 KB Posted
- Attached to
- RFI for Construction Cost Estimating
- Solicitation number
- RFI IHHA 2018000036 1
- Issued by
- Denver County, Denver City, Colorado
About this file
This is a Request for Information (RFI 2018000036) issued by the State of Colorado Department of Human Services (CDHS) Division of Facilities Management seeking construction cost estimating services. The Division manages a portfolio of 343 buildings encompassing approximately 4 million gross square feet across more than 20 campuses throughout Colorado. CDHS seeks information from qualified firms willing to provide construction cost estimating services on an as-needed basis for projects with varying scopes and budgets. The scope of work requires estimators to develop conceptual-level cost estimates based on documentation provided by DFM, conduct one site visit per project to understand existing conditions and proposed work, and submit fee proposals within ten business days of initial contact. Estimators must be available to meet with DFM representatives and deliver completed cost estimates within ten business days of fee proposal acceptance. The RFI covers a six-month period from March 1, 2018 through August 31, 2018, with an anticipated volume of up to 20 construction cost estimates for projects with budgets historically ranging between $300,000 and $16 million. Projects may be located at any Department facility throughout Colorado, though preliminary site visits outside the Metro Denver area represent the only required travel. Inquiries regarding the RFI were accepted through January 25, 2018, with submissions required by January 30, 2018 at 3:00 p.m.
Respondents must submit statements of interest, qualifications and experience including any prior work for the State of Colorado, and typical cost estimating fees and hourly billable rates for projects of varying sizes and complexities. Construction cost estimates must include architectural and engineering design fees, full-time on-site construction supervision, surveying, project management, insurance, warranties, as-built drawings, construction schedule estimates, contractor's and owner's contingencies, escalation, bonds, site protection, demolition where necessary, and final cleaning. Estimates shall exclude hazardous material assessment and removal, environmental hazards, third-party engineering, special insurance, liquidated damages, and overtime or weekend work. DFM will provide all necessary documentation, drawings, and specifications to enable the estimator to perform services in a manner consistent with the degree of skill and care ordinarily exercised by practicing professionals in Colorado. This RFI is not a competitive solicitation and does not obligate the State to make any contractual commitments; rather, it is intended to assess vendor interest and fee structures to inform potential future procurement processes.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF COLORADO
OFFICE OF THE STATE ARCHITECT
STATE BUILDINGS PROGRAMS
REQUEST FOR INFORMATION
For
CONSTRUCTION COST ESTIMATING SERVICES
For The Colorado Department of Human Services Division of Facilities Management
1. ISSUING DIVISION:
This Request for Information (RFI) 2018000036 is issued for the State of Colorado (State) by the Department of Human Services (CDHS or Department), for the benefit of the Department through the Division of Facilities Management (DFM). The sole point of contact at DFM concerning this RFI is Curtis Marwitz.
1. INVITATION TO SUBMIT INFORMATION:
The State of Colorado is posting this RFI on the Colorado Vender Self-Service page (Colorado VSS) so that firms that have an interest may submit information to aid DFM in further procurement processes.
1. INQUIRIES:
Prospective responders may make e-mail inquiries concerning this RFI to obtain clarification of scope and requirements. No inquiries will be accepted after Thursday, January 25, 2018.
E-mail all inquiries to: curtis.marwitz@state.co.us Clearly identify your inquiries as:
RFI 2018000036 – Construction Cost Estimating Services.
1. PROPOSAL SUBMISSION:
Please email your submission to Curtis Marwitz at curtis.marwitz@state.co.us or by delivery or USPS mail to:
Attn: Curtis Marwitz Planning & Technical Services 4112 S. Knox Ct.
Denver, CO 80236
Your submission must be received no later than Tuesday, January 30 at 3 p.m. Only one (1) copy of the submittal is required.
Any information submitted for this RFI will be kept confidential until a determination has been posted, or the need of any further solicitation is not needed as determined by the department.
Background Information The Division of Facilities Management (DFM) is a customer-driven support organization responsible for providing facilities management services to the entire CDHS facility portfolio (encompassing all DHS offices and Divisions) comprising 343 buildings, and approximately 4 million GSF over 1,500 acres spread over more than 20 campuses. These services include the day-to-day facility maintenance and operational needs of buildings and grounds, custodial services, and laundry/linen services administered through three geographically dispersed regional districts: North, South, and Western. These services also include planning and technical services for the entire Department administered and dispersed from a centrally-located Planning and Technical Services Group (PTS), which provides professional expertise in the area of land and building development, planning of future facilities, initiation and implementation of appropriated and large non-appropriated projects, development of the Capital Construction and Controlled Maintenance budget requests, development of grants for funding sources outside of State government, management of the Department's energy budget, contract management for projects and capital facilities related procurement, leasing of real estate, fleet management, and the provision of consulting services to the Division and the Department in the areas of architecture, engineering, and the interpretation of the application of building codes and facility standards.
In the past, PTS has relied on the experience of vendors, construction contractors, subcontractors, and in-house personnel to generate detailed estimates of probable cost to aid in compiling documentation and justifications for future planning and construction projects to be considered for funding by State legislative approvals and other funding sources.
The goal of DFM is to contract with a single firm offering construction cost estimating services to generate numerous cost estimates for DFM in a reliable and timely manner.
Information Requested & Scope of Work CDHS Division of Facilities Management (DFM) is seeking information from firms offering construction cost estimating services. Information is requested in order to reach an understanding if vendors in the construction estimating business are willing and able to offer services on an as-needed basis to DFM. Information should be based on the following terms of conditions for the work to be performed:
· Based on documentation provided by DFM, estimator would develop a conceptual-level estimate of construction cost for a project. The sole use of each estimate will be to aid DFM in developing a budget as part of a funding request for each project.
· Estimator would make one site visit to each project to gain better understanding of the scope of work, and in the case of proposed additions, remodels, renovations, or repairs, how that work may affect an existing building.
· Estimator would agree to be available to meet with a DFM representative on-site, and subsequently submit a fee proposal within ten (10) business days of initial contact regarding each project.
· Unless noted otherwise, after acceptance by DFM of estimator’s fee proposal for each project, estimator would prepare and deliver a construction cost estimate to DFM within ten (10) business days.
· Estimator would agree to prepare up to 20 construction cost estimates for planned projects during the period of March 1, 2018 to August 31, 2018.
The basis for the estimates would include the following requirements:
· The size and scope of each project will vary. As an example, during the State’s fiscal year 2017-18, approximately 20 estimates were prepared for projects with budgets between $300,000 and $16 million. Neither the number of projects nor the dollar amount of the projects for the described time period are known yet.
· Construction cost estimates could be for projects located at any Department facility or campus throughout the State of Colorado.
· Other than preliminary site visits outside the Metro Denver area, there will be no additional requirements for estimator to travel or attend meetings outside of the Metro Denver area.
· Estimator will source local pricing for materials and labor.
· Unless noted otherwise, each construction cost estimate will include architectural & engineering design fees; full-time on-site construction supervision; surveying; project management; standard insurance; warrantees; as-built drawing preparation; an estimate of construction schedule; contractor’s contingency; owner’s contingency; escalation; performance and payment bonds; dumpsters; temporary fencing; landscape protection and erosion control; demolition (where necessary); protection of existing finishes (where necessary); and final construction clean.
· Unless noted otherwise, each construction cost estimate will exclude hazardous material testing, survey, removal, handling, and disposal; environmental hazards; third-party engineering; special insurance; liquidated & consequential damages; and overtime or weekend work.
· Where appropriate, estimator will include quantity takeoffs (prepared in as much detail as possible) for components of the project.
· Unless noted otherwise, any fee proposals prepared for DFM will be based on preparing one construction cost estimate for one proposed project. If studies of alternative project options become necessary, the estimator will prepare an added scope-of-work fee proposal for the consideration of DFM.
· Estimating services shall be performed in a matter consistent with that degree of skill and care ordinarily exercised by practicing professionals performing similar services in the State of Colorado, and under the same or similar circumstances and conditions.
· DFM will provide the estimator with all documents, drawings, specifications, and instructions necessary to enable the estimator to carry out the professional duties the estimator is engaged to perform.
If firms are interested in offering construction cost estimating services as described above, please submit the following:
1. Statement of Interest by the estimating firm in this type of on-call arrangement.
2. Statement of Qualifications and Experience of the estimating firm with projects of varying scope, and a list of any work performed for the State of Colorado.
3. Statement Outlining Cost Estimating Fees and Hourly Billable Rates typically charged for estimating the costs of construction projects of varying sizes, scopes, and complexities.
4. Any Additional Information deemed by the estimator to be useful to the Division of Facilities Management regarding this RFI.
This RFI is not a competitive solicitation for the services described above, and does not obligate the State of Colorado nor the Division of Facilities Management to make any purchases or contractual obligations.
This RFI is solely intended as a means to assess the interest and fee structures of firms in an on-call type service arrangement.
Based on the information provided by the respondents to this RFI, a determination will be made regarding any further action with this process.
oleObject1.bin image1.wmf
File details come from the government source that posted it. Updated .