Cost Estimate Breakdown AF 3052.xls
XLS spreadsheet 157 KB Posted
- Attached to
- MFH Neighborhood Federal contract opportunity
- Solicitation number
- FA557520B0002
About this file
This document outlines a federal contract opportunity for construction services. The Department of the Air Force United States Air Forces in Europe - Air Forces Africa is soliciting bids for a project titled "RPR & ADD MFH NEIGHBORHOOD" with an estimated value between $1,000,000 and $5,000,000. A pre-proposal conference will be held on July 30, 2020 and bids are due by 11:00 hours local time on August 17, 2020. In accordance with the agreement between the U.S. and Spain, Spanish material, labor, and equipment should be used whenever feasible for this work. Funding is not presently available and no award will be made until funds are allocated, and the government reserves the right to cancel the solicitation.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment FA557520B00020001 SF 30.pdf | ||
| Statement of Work Eng R1.pdf | ||
| Attacnment B_Environmental Final Governing Standards for Spain _May 2014.pdf | ||
| Statement of Work Esp R1.pdf | ||
| Attachment A Integrated Natural Resources Management Plan for Moron Air Base_2015_2020.pdf | ||
| Solicitation FA557520B0002.pdf | ||
| Drawings QUUG 19 1005.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BASE BID
| CONSTRUCTION COST ESTIMATE BREAKDOWN | ||||||||||
| CONTRACTOR | ADDRESS | |||||||||
| INDEPENDENT GOVERNMENT ESTIMATE | MORÓN AIR BASE, SPAIN | |||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| RPR & ADD MFH NEIGHBORHOOD - BASE BID - REPAIR WORKS HOUSING NEIGHBORHOOD | ||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| QUUG 19-1005 | MORÓN AIR BASE, SPAIN | |||||||||
| UNIT | MATERIAL COST | LABOR COSTS | OTHER | |||||||
| LIN | ITEM | OF | DIRECT | LINE | ||||||
| NO. | MEAS. | QUANTI. | UNIT | TOTAL | MH/MD | AV.RAT | TOTAL | COSTS | TOTAL | |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| BASE BID - REPAIR WORKS HOUSING NEIGHBORHOOD | ||||||||||
| OFERTA BASE - TRABAJOS DE REPARACIÓN EN VECINDARIO | ||||||||||
| ARCHITECTURAL WORK HOUSING NEIGHBORHOOD | ||||||||||
| TRABAJOS DE ARQUITECTURA EN VECINDARIO | ||||||||||
| Previous and Demolition Work Housing Neighborhood | ||||||||||
| Trabajos Previos y de Demolición en vecindario | ||||||||||
| 1 | Mortar Coating in Walls Removal | |||||||||
| Picado de Enfoscado de Cemento en Paredes | SM | |||||||||
| 2 | Football Goal with Basket Temporary Disassembly | |||||||||
| Desmontaje de Porteria de Futbol con Canasta | EA | |||||||||
| 3 | Removal of Artificial Grass Sport Court | |||||||||
| Demoler Césped Artificial de la Pista Deportiva | SM | |||||||||
| 4 | Partial Removal 3% of Gazebo´s Ceramic Tile Floor | |||||||||
| Demolición partial del 3% de Suelo Cerámico del Gazebo | SM | |||||||||
| 5 | Removal of Gazebo´s Electric Panel | |||||||||
| Demolición del Cuadro electrico del Gazebo | SM | |||||||||
| 6 | Removal of Existing Steel Gutter and Downspouts in Gazebo | |||||||||
| Demolición de Canalón y Bajantes Existentes en Gazebo | SM | |||||||||
| 7 | Removal and Cleaning Exisitng Coating in Athletic Court | |||||||||
| Demolición y Limpieza del Revestimiento Existente de la Pista Deportiva | SM | |||||||||
| Total Previous and Demoliton Work | ||||||||||
| Total Trabajos Previos y de Demolición | ||||||||||
| Earthworks Housing Neighborhood | ||||||||||
| Trabajos de Movimiento de tierras de en Vecindario | ||||||||||
| 8 | Playground 2 Foundation Excavation | |||||||||
| Excavación de Zapatas para Cimentación de Playground 2 | CM | |||||||||
| 9 | Aggregate Backfill for Outdoor Gym Slab | |||||||||
| Zahorra artificial para losa de Gymnasio Exterior | CM | |||||||||
| 10 | Stone Backfill (Macadam) for Outdoor Gym Slab Foundation | |||||||||
| Subbase de Macadam para Cimentación de Gymnasio Exterior | CM | |||||||||
| Total EarthWorks | ||||||||||
| Total Trabajos de Movimiento de Tierras | ||||||||||
| Foundation and Structural Works Housing Neighborhood | ||||||||||
| Trabajos de Cimentación y Estructura en Vecindario | ||||||||||
| 11 | Roof playgrounds Reinforce Concrete footing | |||||||||
| Zapata de Hormigón Armado Para Cimentación de la Cubierta del Playground 2 | CM | |||||||||
| 12 | Reinforce Concrete Pilar in Playground 2, including form, concrete and steel. | |||||||||
| Pilar de hormigón armado para soporte de cubierta delPlaygound 2, incluye encofrado, hormigonafo y armado | CM | |||||||||
| 13 | Reinforce Concrete slab Thickness 20 cms for Outdoor Gym Slab | |||||||||
| Losa de hormigón armado 20 cms de espesor, para gymnasio Exteiror | CM | |||||||||
| Total Structural Works | ||||||||||
| Total Trabajos de Cimentación y Estructura | ||||||||||
| Finish Work Housing Neighborhood | ||||||||||
| Trabajos de Revestimientos en Vecindario | ||||||||||
| 14 | Epoxy Resin Pavement Applied in 4 Layers for Athletic Court Pavement | |||||||||
| Pavimento de Resina Epoxy Aplicadado en 4 Capas en Pista Atletica | SM | |||||||||
| 15 | Repair and Restore Damage Tiles Floor and Regrout Joints | |||||||||
| Reponer baldosa cerámica en Gazebo (3,16m2) y reparar la lechada del rejuntado | SM | |||||||||
| 16 | Cement Mortar Coating | |||||||||
| Enfoscado Maestreado y Fratasado de mortero de cemento | SM | |||||||||
| 17 | Polymeric Exterior Coating | |||||||||
| Revestimemiento Exterior Polimérico | SM | |||||||||
| 18 | New Atificial Turf Multipurpose Court | |||||||||
| Nuevo Cesped Artificial en Pista Multifunción | SM | |||||||||
| 19 | Geo-Draining Sheet for Artificial Turf | |||||||||
| Lámina Geodrenante para Cesped Artificial | SM | |||||||||
| 20 | Precast concrete header | |||||||||
| Encitado Perimetral del Hormigón Prefabricado bicapa | SM | |||||||||
| 21 | Eslastic Floor in Playgrounds Repair works | |||||||||
| Reparación de Suelo Elástico de las Zonas de Juego | SM | |||||||||
| 22 | Repair works in Existing Barbecue | |||||||||
| Reparación de Barbacoa existente | EA | |||||||||
| 23 | Assembly of Football Goal with Basket | |||||||||
| Montaje de Porteria de Futbol con Canasta | SM | |||||||||
| Total Finished Works | ||||||||||
| Total Trabajos de Revestimiento | ||||||||||
| Roof System Works | ||||||||||
| Sistemas de Cubierta | ||||||||||
| 24 | New Textile Sunshade Playground 2 | |||||||||
| Nueva Cubierta Textil de la Zona de Juegos 2 | SM | |||||||||
| 25 | Gazebo Roof Fall Arresting system | |||||||||
| Lines de vida en Gazebo | SM | |||||||||
| Total Roof System Works | ||||||||||
| Total Trabajos de Sistemas de Cubierta | ||||||||||
| ARCHITECTURAL WORK SUMMARY | ||||||||||
| RESUMEN TRABAJOS DE ARQUITECTURA | ||||||||||
| Total Previous and Demolition Works | ||||||||||
| Total Trabajos de Demolición | ||||||||||
| Total Structural Earthworks | ||||||||||
| Total Trabajos de Movimientos de Tierras | ||||||||||
| Total Structural Works | ||||||||||
| Total Trabajos de Cimentación y Estructura | ||||||||||
| Total Finish Works | ||||||||||
| Total Trabajos de Acabados | ||||||||||
| Total Roof System Works | ||||||||||
| Total Trabajos de Sistemas de Cubiertas | ||||||||||
| TOTAL ARCHITECTURAL WORK | ||||||||||
| TOTAL TRABAJOS DE ARQUITECTURA | ||||||||||
| CIVIL WORKS HOUSING NEIGHBORHOOD | ||||||||||
| TRABAJOS DE CIVIL EN VECINDARIO | ||||||||||
| Demolition Civil Work Housing Neighborhood | ||||||||||
| Trabajos de Demolición de Civil en vecindario | ||||||||||
| 26 | Remove Exisitng Waste Bins | |||||||||
| Demolición y Retirada de Papeleras Existentes | EA | |||||||||
| 27 | Remove Existing Wood Benches | |||||||||
| Demolición y Retirada de Bancos de Madera Existente | EA | |||||||||
| 28 | Demolition of existing Irrigation System | |||||||||
| Demoler Sistema de Riego | JOB | |||||||||
| 29 | Sawcuts on Existing Sidewalks | |||||||||
| Corte de Losa de acerado de Hormigón | LM | |||||||||
| 30 | Concrete Sidewalks demolition | |||||||||
| Demolición de Acerado de Hormigón | SM | |||||||||
| 31 | Sawcut Existing Shoulder Aphalt Pavement | |||||||||
| Corte de Arcen de Pavimento Asfáltico | LM | |||||||||
| 32 | Removal of Existing Shoulder Asphalt Pavement | |||||||||
| Demoler Pavimento Asfáltico en Arcen Existente | LM | |||||||||
| 33 | Removal of Existing Shoulder Asphalt Pavement | |||||||||
| Demoler Pavimento Asfáltico en Arcen Existente | LM | |||||||||
| 34 | Existing lighting poles temporary desassembly | |||||||||
| Desmontaje temporal de farolas existentes | EA | |||||||||
| Total Demoliton Civil Work | ||||||||||
| Total Trabajos de Demolición de Civil | ||||||||||
| Civil Earthworks Housing Neighborhood | ||||||||||
| Trabajos de Movimiento de tierras de Civil en Vecindario | ||||||||||
| 35 | Clearing and Grubbing | |||||||||
| Limpieza y desbroce del terreno | SM | |||||||||
| 36 | Ëxisting Ditches shaping works | |||||||||
| Perfilado de Trincheras | LM | |||||||||
| 37 | Infiltration Trench excavation | |||||||||
| Excavación de Zanja de infiltración | CM | |||||||||
| 38 | Utilities Trench excavation | |||||||||
| Excavación de Zanja de para instalaciones | CM | |||||||||
| 39 | Utilities Trench Backfill | |||||||||
| Relleno de Zanja de para instalaciones | CM | |||||||||
| 40 | Excavation Works | |||||||||
| Trabajos de Desmonte | CM | |||||||||
| 41 | Backfill Works | |||||||||
| Trabajos de Rellenos y Terraplenados | CM | |||||||||
| Total Civil Earthworks | ||||||||||
| Total Trabajos de Movimiento de Tierras de Civil | ||||||||||
| Pavements Works Housing Neighborhood | ||||||||||
| Trabajos de Pavimentación en Vecindario | ||||||||||
| 42 | New Concrete Sidewalk Thickness 18 cms | |||||||||
| Nuevo acerado de Hormigón de 18 cms de Espesor | SM | |||||||||
| 43 | Precast Concrete Dual Layer Curbing | |||||||||
| Bordillo Bicapa prefabricado de Hormigón | LM | |||||||||
| 44 | Precast Concrete Dual Layer Header | |||||||||
| Encitado Acanalado Bicapa prefabricado de Hormigón | LM | |||||||||
| 45 | Aggregate subbase 98% Compacted Thickness 20 cms | |||||||||
| Subbase de Zahorra Artificial compactada 98% Proctor, 20 cms de espesor | CM | |||||||||
| 46 | Stone Backfill (Macadam) diameter 40/70 mm, compacted | |||||||||
| Enchado de grava (macadam) diameter 40/70 mm Compactado | CM | |||||||||
| 47 | Polyethylene Separator Sheet | |||||||||
| Lamina separadora de Polietileno | SM | |||||||||
| 48 | Contraction Joints | |||||||||
| Junta de contracción | LM | |||||||||
| 49 | Expansión Joints | |||||||||
| Junta de Expansión | LM | |||||||||
| Total Pavement Works | ||||||||||
| Total Trabajos de Pavimentación | ||||||||||
| Grading and Drainage Works Neighborhood | ||||||||||
| Drenaje y Evacuación de Pluviales en Vecind. | ||||||||||
| 50 | Trench Drain ACO SPORT H150 | |||||||||
| Sumidero Lineal ACO SPORT H150 | LM | |||||||||
| 51 | Buried Pipe PVC diameter 160 mm | |||||||||
| Colector enterrado Tubería Pres. PVC ø160mm | LM | |||||||||
| 52 | Concrete Headwalls | |||||||||
| Marcos de hormigón Armado | JOB | |||||||||
| 53 | Culvert outlet Protection | |||||||||
| Protección de entradas de la alcantarilla | JOB | |||||||||
| 54 | New Concrete Catch Basin | |||||||||
| Imbornal prefabricado de hormigón marco y rejilla de fundición | JOB | |||||||||
| 55 | Filtering ditch Hydrobox Sytem | |||||||||
| Zanja drenante relaizada con encarchado de roca y Sistema Hydrobox 3.1 de Hidrostank o similar | LM | |||||||||
| 56 | Manhole filtering ditch | |||||||||
| Arqueta de Registro en Zanja Filtrante | EA | |||||||||
| Total Grading and Drainage Works | ||||||||||
| Total Trabajos de Evacuación y Drenaje | ||||||||||
| Landscape Works Neighborhood | ||||||||||
| Trabajos de Paisajismo en Vecindario | ||||||||||
| 57 | Platanus Hispanica Heigth 1,50/1,80m Calibre 50mm | |||||||||
| Platanus Hispánica Altura 1,50/1,80m Calibre 50 mm | EA | |||||||||
| 58 | Fraxinus Angustifolia Heigth 1,50/1,80 m Calibre 50mm | |||||||||
| Fraxinus Angustifolia Altura 1,50/1,80m Calibre 50 mm | EA | |||||||||
| 59 | Jacaranda Mimosifolia Heigth 1,50/1,80 m Calibre 50mm | |||||||||
| Jacaranda Mimosifolia Altura 1,50/1,80m Calibre 50 mm | EA | |||||||||
| 60 | Celtris australis Heigth 1,50/1,80 m Calibre 50mm | |||||||||
| Celtris Australis Altura 1,50/1,80m Calibre 50 mm | EA | |||||||||
| 61 | Morus Alba Heigth 1,50/1,80 m Calibre 50mm | |||||||||
| Morus Alba Altura 1,50/1,80m Calibre 50 mm | EA | |||||||||
| 62 | Laurus Nobilis Heigth 1,50/1,80 m Calibre 50mm | |||||||||
| Laurus Nobilis Altura 1,50/1,80m Calibre 50 mm | EA | |||||||||
| 63 | Thymus Vulgaris Heigth 0,30/0,40 m | |||||||||
| Thymus Vulgaris Altura 0,30/0,40m | EA | |||||||||
| 64 | Salvia Rosmarinus Heigth 0,30/0,40 m | |||||||||
| Salvia Rosmarinus Altura 0,30/0,40m | EA | |||||||||
| 65 | Seedeing Cynodon Dactylon 'Tifway 419' | |||||||||
| Seeding Cynodon Dactylon 'Tifway 419' | SM | |||||||||
| 66 | Topsoil | |||||||||
| Tierra Vegetal | CM | |||||||||
| Total Landcaspe Works | ||||||||||
| Total Trabajos de Paisajismo de Civil | ||||||||||
| Street Furniture Works Neighborhood | ||||||||||
| Mobiliario Urbano en Vecindario | ||||||||||
| 67 | Precast concrete New Garbage | |||||||||
| Papelera de Hormigón Prefabricado | EA | |||||||||
| 68 | New Bench | |||||||||
| Nuevo Banco | EA | |||||||||
| 69 | Fountain | |||||||||
| Fuente | EA | |||||||||
| 70 | Outdoor Gym Equipment installation | |||||||||
| Instalación de Equipo de ejercicio al Aire Libre | EA | |||||||||
| Total Street Furniture Works | ||||||||||
| Total Trabajos de Mobiliario Urbano | ||||||||||
| CIVIL WORK SUMMARY | ||||||||||
| RESUMEN TRABAJOS DE CIVIL | ||||||||||
| Demolition Civil Work Housing Neighborhood | ||||||||||
| Trabajos de Demolición de Civil en vecindario | ||||||||||
| Civil Earthworks Housing Neighborhood | ||||||||||
| Trabajos de Movimiento de tierras de Civil en Vecindario | ||||||||||
| Pavements works Housing Neighborhood | ||||||||||
| Trabajos de Pavimentación en Vecindario | ||||||||||
| Grading and Drainage Works Neighborhood | ||||||||||
| Trabajos de Drenaje y evacuación de pluviales en Vecind. | ||||||||||
| Landcaspe Works Neighborhood | ||||||||||
| Trabajos de Paisajismo en Vecindario | ||||||||||
| Street Furniture Works Neighborhood | ||||||||||
| Trabajos Mobiliario Urbano en Vecindario | ||||||||||
| TOTAL CIVIL WORK | ||||||||||
| TOTAL TRABAJOS DE CIVIL | ||||||||||
| MECHANICAL WORKS HOUSING NEIGHBORHOOD | ||||||||||
| TRABAJOS DE MECÁNICA EN VECINDARIO | ||||||||||
| Green Areas Irrigation Works Neighborhood | ||||||||||
| Trabajos de Riegos de Zonas verdes en Vecindario | ||||||||||
| 71 | New Irrigation System Pop-Up Splinkler 1", Range=17,9 meters | |||||||||
| Nuevo Aspersor Emergente alcance 17,9 metros | EA | |||||||||
| 72 | Irrigation System HDPE pipe for Drippers (894EA) | |||||||||
| Sistema de riego por Goteo, tubería HDEP(894 Goteros) | LM | |||||||||
| 73 | Secondary Irrigation System HDPE Pipe | |||||||||
| Red Secundaria para Sistema de Riego tubería HDEP | LM | |||||||||
| 74 | Main Irrigation System HDPE Pipe | |||||||||
| Red Principal para Sistema de Riego tubería PEAD | LM | |||||||||
| 75 | 3 EA Remote control valve in precast concrete handhole | |||||||||
| 3 Electrovavulas en Arqueta de Hormigón Prefabricado | JOB | |||||||||
| 76 | New Irrigation Control System | |||||||||
| Nuevo Comtrol del Sistema de Riego | JOB | |||||||||
| Total Green Zones Irrigation Works | ||||||||||
| Total Trabajos de Sistema de Riego de Zonas Verdes | ||||||||||
| MECHANICAL WORK SUMMARY | ||||||||||
| RESUMEN TRABAJOS DE MECÁNICA | ||||||||||
| Green areas Irrigation works Neighborhood | ||||||||||
| Trabajos Sistema de Riego Zonas Verdes en Vecindario | ||||||||||
| TOTAL MECHANICAL WORK | ||||||||||
| TOTAL TRABAJOS DE MECÁNICA | ||||||||||
| ELECTRICAL WORK HOUSING NEIGHBORHOOD | ||||||||||
| TRABAJOS DE ELECTRICDAD EN VECINDARIO | ||||||||||
| Lighting System Works Neighborhood | ||||||||||
| Trabajos Instalación de Iluminación en Vecindario | ||||||||||
| 77 | Works in Transformer Switchboard | |||||||||
| Trabajos de Acometida en cuadro de Baja Tensión del Centro de Transformación | JOB | |||||||||
| 78 | Service Power Supply line Size 16mm2 / (1-1) 16 mm2 GND Copper 3-1/C 0,6 /* 1kv | |||||||||
| Circuito de Acometida 16mm2 / (1-1) 16 mm2 GND Copper 3-1/C 0,6 /* 1kv | LM | |||||||||
| 79 | Metallic Enclosure IP66 Capacity 12 elementos | |||||||||
| Armario Metálico IP66 Para CMP Capacidad 12 Elementos | EA | |||||||||
| 80 | Main Breaker Lighting Panel | |||||||||
| Interruptor Magnetotérmico Principal del Panel De Alumbrado | EA | |||||||||
| 81 | Breaker lighting Circuit 25 A | |||||||||
| Interruptor Magnetotérmico de circuito Alumbrado 25 A | EA | |||||||||
| 82 | Timer Electrical Control Switch | |||||||||
| Interruptor de Control Horario | EA | |||||||||
| 83 | Outdoor led Bolard | |||||||||
| Baliza Exterior led | EA | |||||||||
| 84 | Precast Concrete lighting Handhole | |||||||||
| Arqueta Prefabricada de Hormigón para Alumbrado | EA | |||||||||
| 85 | 2 Way Ductbank Ext. Diam 110 mm | |||||||||
| Prisma de 2 tubos de Polietileno Diam Ext. 110mm | LM | |||||||||
| 86 | Underground lighting Circuit 4x6 mm2 | |||||||||
| Circuito de Alumbrado Enterrado 4x6mm2 | EA | |||||||||
| 87 | Underground lighting Circuit 4x6 mm2 | |||||||||
| Circuito de Alumbrado Enterrado 4x6mm2 | EA | |||||||||
| 88 | Outdoor led Post - top | |||||||||
| Farola Led exterior sobre Báculo | EA | |||||||||
| 90 | Assembly Existing Lighting pole on concrete Block Base Modified | |||||||||
| Recolocación de Farolas Existentes sobre Bases de Hormigón Modificadas | EA | |||||||||
| Total Lighting System Works | ||||||||||
| Total Trabajos de Sistema de Iluminación | ||||||||||
| ELECTRICAL WORK SUMMARY | ||||||||||
| RESUMEN TRABAJOS DE ELECTRICIDAD | ||||||||||
| Lighting system works Neighborhood | ||||||||||
| Trabajos de Instalación de Iluminación en Vecindario | ||||||||||
| TOTAL ELECTRICAL WORK | ||||||||||
| TOTAL TRABAJOS DE ELECTRICDAD | ||||||||||
| SUMMARY BASE BID - REPAIR WORKS HOUSING NEIGHBORHOOD | ||||||||||
| RESUMEN OFERTA BASE - TRABAJOS DE REPARACIÓN EN VECINDARIO | ||||||||||
| TOTAL ARCHITECTURAL WORK | ||||||||||
| TOTAL TRABAJOS ARQUITECTURA | ||||||||||
| TOTAL CIVIL WORK | ||||||||||
| TOTAL OBRA CIVL | ||||||||||
| TOTAL MECHANICAL WORK | ||||||||||
| TOTAL TRABAJOS DE MECÁNICA | ||||||||||
| TOTAL ELECTRICAL WORK | ||||||||||
| TOTAL TRABAJOS DE ELECTRICDAD | ||||||||||
| GRAND TOTAL | ||||||||||
| GRAN TOTAL | ||||||||||
| TOTAL DIRECT COSTS | ||||||||||
| OVERHEAD | ||||||||||
| SUBTOTAL | ||||||||||
| PROFIT | ||||||||||
| TOTAL PROJECT EUROS | ||||||||||
| $1 | euros | |||||||||
| TOTAL PROJECT US$ | ||||||||||
| DATE: | FIRM NAME: | |||||||||
| TITLE: | BY: |
&L&"Times New Roman,Normal"INDEPENDENT GOVERMENT ESTIMATE&C&"Times New Roman,Normal"FOR OFFICIAL USE ONLY&R&"Times New Roman,Normal"Page &P of &N
ITEM1 NEW TEX-SUNSHADE SOUTH PG
| CONSTRUCTION COST ESTIMATE BREAKDOWN | ||||||||||
| CONTRACTOR | ADDRESS | |||||||||
| INDEPENDENT GOVERNMENT ESTIMATE | MORÓN AIR BASE, SPAIN | |||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| RPR & ADD MFH NEIGHBORHOOD - ITEM 1 NEW TEXTILE SHUNSADE SOUTH PLAYGROUND | ||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| QUUG 19-1005 | MORÓN AIR BASE, SPAIN | |||||||||
| UNIT | MATERIAL COST | LABOR COSTS | OTHER | |||||||
| LIN | ITEM 1 | OF | DIRECT | LINE | ||||||
| NO. | MEAS. | QUANTI. | UNIT | TOTAL | MH/MD | AV.RAT | TOTAL | COSTS | TOTAL | |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| ITEM 1 - NEW TEXTIL SUNSHADE ON SOUTH PLAYGROUND | ||||||||||
| ITEM 1 - NUEVA ESTRUCTURA TEXTIL EN PARQUE DE JUEGOS SUR | ||||||||||
| ARCHITECTURAL WORK | ||||||||||
| TRABAJOS DE ARQUITECTURA | ||||||||||
| Previous and Demolition Work | ||||||||||
| Trabajos Previos y de Demolición | ||||||||||
| 1 | Removal of Sunshade Textile Roof Playground 1 | |||||||||
| Demoler Tejido de la Cubierta del Playground 1 | SM | |||||||||
| 2 | Remove playground 1 roof foundation | |||||||||
| Demoler Cimentación de la cubierta del Playground 1 | CM | |||||||||
| Total Previous and Demoliton Work | ||||||||||
| Total Trabajos Previos y de Demolición | ||||||||||
| Earthworks | ||||||||||
| Trabajos de Movimiento de tierras | ||||||||||
| 3 | Playground 1 Foundation Excavation | |||||||||
| Excavación de Zapatas para Cimentación de Playground 1 | CM | |||||||||
| 4 | Aggregate Backfill for Outdoor Gym Slab | |||||||||
| Zahorra artificial para losa de Gymnasio Exterior | CM | |||||||||
| Total EarthWorks | ||||||||||
| Total Trabajos de Movimiento de Tierras | ||||||||||
| Foundation and Structural Works | ||||||||||
| Trabajos de Cimentación y Estructura | ||||||||||
| 4 | Roof playgrounds Reinforce Concrete footing | |||||||||
| Zapata de Hormigón Armado Para Cimentación de la Cubierta del Playground 2 | CM | |||||||||
| Total Structural Works | ||||||||||
| Total Trabajos de Cimentación y Estructura | ||||||||||
| Roof System Works | ||||||||||
| Sistemas de Cubierta | ||||||||||
| 5 | New Textile Sunshade Playground 1 | |||||||||
| Nueva Cubierta Textil de la Zona de Juegos 1 | SM | |||||||||
| Total Roof System Works | ||||||||||
| Total Trabajos de Sistemas de Cubierta | ||||||||||
| ARCHITECTURAL WORK SUMMARY | ||||||||||
| RESUMEN TRABAJOS DE ARQUITECTURA | ||||||||||
| Total Previous and Demolition Works | ||||||||||
| Total Trabajos de Demolición | ||||||||||
| Total Structural Earthworks | ||||||||||
| Total Trabajos de Movimientos de Tierras | ||||||||||
| Total Structural Works | ||||||||||
| Total Trabajos de Cimentación y Estructura | ||||||||||
| Total Roof System Works | ||||||||||
| Total Trabajos de Sistemas de Cubiertas | ||||||||||
| TOTAL ARCHITECTURAL WORK | ||||||||||
| TOTAL TRABAJOS DE ARQUITECTURA | ||||||||||
| SUMMARY ITEM 1 - NEW TEXTILE SUNSHADE SOUTH PLAYGROUND | ||||||||||
| RESUMEN ITEM 1 - NUEVA ESTRUCTURA TEXTIL EN PARQUE DE JUEGOS SUR | ||||||||||
| TOTAL ARCHITECTURAL WORK | ||||||||||
| TOTAL TRABAJOS ARQUITECTURA | ||||||||||
| GRAND TOTAL | ||||||||||
| GRAN TOTAL | ||||||||||
| TOTAL DIRECT COSTS | ||||||||||
| OVERHEAD | ||||||||||
| SUBTOTAL | ||||||||||
| PROFIT | ||||||||||
| TOTAL PROJECT EUROS | ||||||||||
| $1 | euros | |||||||||
| TOTAL PROJECT US$ | ||||||||||
| DATE: | FIRM NAME: | |||||||||
| TITLE: | BY: |
&L&"Times New Roman,Normal"INDEPENDENT GOVERMENT ESTIMATE&C&"Times New Roman,Normal"FOR OFFICIAL USE ONLY&R&"Times New Roman,Normal"Page &P of &N
ITEM2 NON POTABLE WATER CONNEC
| CONSTRUCTION COST ESTIMATE BREAKDOWN | ||||||||||
| CONTRACTOR | ADDRESS | |||||||||
| INDEPENDENT GOVERNMENT ESTIMATE | MORÓN AIR BASE, SPAIN | |||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| RPR & ADD MFH NEIGHBORHOOD - ITEM 2 NON POTABLE WATER CONNECTION FOR HOUSES IRRIGATION | ||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| QUUG 19-1005 | MORÓN AIR BASE, SPAIN | |||||||||
| UNIT | MATERIAL COST | LABOR COSTS | OTHER | |||||||
| LIN | ITEM 3 | OF | DIRECT | LINE | ||||||
| NO. | MEAS. | QUANTI. | UNIT | TOTAL | MH/MD | AV.RAT | TOTAL | COSTS | TOTAL | |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| ITEM 2 - NON POTABLE WATER CONNECTION FOR HOUSES IRRIGATION | ||||||||||
| ITEM 2 - CONEXIÓN DE AGUA NO POTABLE PARA RIEGO DE CASAS | ||||||||||
| CIVIL WORKS | ||||||||||
| TRABAJOS DE CIVIL | ||||||||||
| Civil Earthworks | ||||||||||
| Trabajos de Movimiento de tierras de Civil | ||||||||||
| 1 | Utilities Trench excavation | |||||||||
| Excavación de Zanja de para instalaciones | CM | |||||||||
| 2 | Utilities Trench Backfill | |||||||||
| Relleno de Zanja de para instalaciones | CM | |||||||||
| Total Civil Earthworks | ||||||||||
| Total Trabajos de Movimiento de Tierras de Civil | ||||||||||
| CIVIL WORK SUMMARY | ||||||||||
| RESUMEN TRABAJOS DE CIVIL | ||||||||||
| Civil Earthworks | ||||||||||
| Trabajos de Movimiento de tierras de Civil | ||||||||||
| TOTAL CIVIL WORK | ||||||||||
| TOTAL TRABAJOS DE CIVIL | ||||||||||
| MECHANICAL WORKS | ||||||||||
| TRABAJOS DE MECÁNICA | ||||||||||
| Green Areas Irrigation Works Neighborhood | ||||||||||
| Trabajos de Riegos de Zonas verdes en Vecindario | ||||||||||
| 3 | Connection point | |||||||||
| Acometida a red existente | EA | |||||||||
| 4 | New Flow Meter Ø 2 1/2" With 2 Gate Valve | |||||||||
| Nuevo dispositivo contador de Ø 2 1/2" incluidas 2 Válvulas de Compuerta | EA | |||||||||
| 5 | Shut Off Underground Valve Ø 2 1/2" in hand hole | |||||||||
| Valvula de Corte enterrada Ø 2 1/2" en Arqueta | EA | |||||||||
| 6 | Main Irrigation System HDEP PE100 PN10 Pipe Ø8" | |||||||||
| Red principal de Riego tubería PEAD PE100 PN10 Ø8" | LM | |||||||||
| 7 | Irrigation System for Houses PEAD Pipe Ø2 1/2" | |||||||||
| Red para Sistema de Riego de Viviendas tubería PEAD Ø2 1/2" | LM | |||||||||
| 8 | Irrigation System for Houses PEAD Pipe Ø3/4" | |||||||||
| Red para Sistema de Riego de Viviendas tubería PEAD Ø3/4" | LM | |||||||||
| 9 | Hosebibbse | |||||||||
| Toma de Riego | EA | |||||||||
| 10 | Hosebibbse Cabinet | |||||||||
| Armario para Toma de Riego | JOB | |||||||||
| 11 | Directional Boring G Street | |||||||||
| Paso subterraneo de conductor en calle G | JOB | |||||||||
| Total Green Zones Irrigation Works | ||||||||||
| Total Trabajos de Sistema de Riego de Zonas Verdes | ||||||||||
| MECHANICAL WORK SUMMARY | ||||||||||
| RESUMEN TRABAJOS DE MECÁNICA | ||||||||||
| Green areas Irrigation works Neighborhood | ||||||||||
| Trabajos Sistema de Riego Zonas Verdes en Vecindario | ||||||||||
| TOTAL MECHANICAL WORK | ||||||||||
| TOTAL TRABAJOS DE MECÁNICA | ||||||||||
| SUMMARY ITEM 2 - NON POTABLE WATER CONNECTION FOR HOUSES IRRIGATION | ||||||||||
| RESUMEN ITEM 2 - CONEXIÓN DE AGUA NO POTABLE PARA RIEGO DE CASAS | ||||||||||
| TOTAL CIVIL WORK | ||||||||||
| TOTAL OBRA CIVL | ||||||||||
| TOTAL MECHANICAL WORK | ||||||||||
| TOTAL TRABAJOS DE MECÁNICA | ||||||||||
| GRAND TOTAL | ||||||||||
| GRAN TOTAL | ||||||||||
| TOTAL DIRECT COSTS | ||||||||||
| OVERHEAD | ||||||||||
| SUBTOTAL | ||||||||||
| PROFIT | ||||||||||
| TOTAL PROJECT EUROS | ||||||||||
| $1 | euros | |||||||||
| TOTAL PROJECT US$ | ||||||||||
| DATE: | FIRM NAME: | |||||||||
| TITLE: | BY: |
&L&"Times New Roman,Normal"INDEPENDENT GOVERMENT ESTIMATE&C&"Times New Roman,Normal"FOR OFFICIAL USE ONLY&R&"Times New Roman,Normal"Page &P of &N
ITEM3 WORKS ON EAST OPEN AREA
| CONSTRUCTION COST ESTIMATE BREAKDOWN | ||||||||||
| CONTRACTOR | ADDRESS | |||||||||
| INDEPENDENT GOVERNMENT ESTIMATE | MORÓN AIR BASE, SPAIN | |||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| RPR & ADD MFH NEIGHBORHOOD - ITEM 3 WORKS ON EAST OPEN AREA | ||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| QUUG 19-1005 | MORÓN AIR BASE, SPAIN | |||||||||
| UNIT | MATERIAL COST | LABOR COSTS | OTHER | |||||||
| LIN | ITEM 4 | OF | DIRECT | LINE | ||||||
| NO. | MEAS. | QUANTI. | UNIT | TOTAL | MH/MD | AV.RAT | TOTAL | COSTS | TOTAL | |
| (1) | (2) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | ||
| ITEM 4 - WORKS OF EAST OPEN AREA | ||||||||||
| ITEM 3 - TRABAJOS EN ZONA ABIERTA ESTE | ||||||||||
| CIVIL WORKS OF EAST OPEN AREA | ||||||||||
| TRABAJOS DE CIVIL EN ZONA ABIERTA ESTE | ||||||||||
| Demolition Civil Work | ||||||||||
| Trabajos de Demolición de Civil | ||||||||||
| 1 | Sawcut Existing Shoulder Aphalt Pavement | |||||||||
| Corte de Arcen de Pavimento Asfáltico | LM | |||||||||
| 2 | Removal of Existing Shoulder Asphalt Pavement | |||||||||
| Demoler Pavimento Asfáltico en Arcen Existente | LM | |||||||||
| 3 | Existing lighting poles temporary desassembly | |||||||||
| Desmontaje temporal de farolas existentes | EA | |||||||||
| Total Demoliton Civil Work | ||||||||||
| Total Trabajos de Demolición de Civil | ||||||||||
| Civil Earthworks | ||||||||||
| Trabajos de Movimiento de tierras de Civil | ||||||||||
| 4 | Ëxisting Ditches shaping works | |||||||||
| Perfilado de Trincheras | LM | |||||||||
| 5 | Utilities Trench excavation | |||||||||
| Excavación de Zanja de para instalaciones | CM | |||||||||
| 6 | Utilities Trench Backfill | |||||||||
| Relleno de Zanja de para instalaciones | CM | |||||||||
| Total Civil Earthworks | ||||||||||
| Total Trabajos de Movimiento de Tierras de Civil | ||||||||||
| Pavements Works | ||||||||||
| Trabajos de Pavimentación | ||||||||||
| 7 | New Concrete Sidewalk Thickness 18 cms | |||||||||
| Nuevo acerado de Hormigón de 18 cms de Espesor | SM | |||||||||
| 8 | Precast Concrete Dual Layer Curbing | |||||||||
| Bordillo Bicapa prefabricado de Hormigón | LM | |||||||||
| 9 | Precast Concrete Dual Layer Header | |||||||||
| Encitado Acanalado Bicapa prefabricado de Hormigón | LM | |||||||||
| 10 | Aggregate subbase 98% Compacted Thickness 20 cms | |||||||||
| Subbase de Zahorra Artificial compactada 98% Proctor, 20 cms de espesor | CM | |||||||||
| 11 | Stone Backfill (Macadam) diameter 40/70 mm, compacted | |||||||||
| Enchado de grava (macadam) diameter 40/70 mm Compactado | CM | |||||||||
| 12 | Polyethylene Separator Sheet | |||||||||
| Lamina separadora de Polietileno | SM | |||||||||
| 13 | Contraction Joints | |||||||||
| Junta de contracción | LM | |||||||||
| 14 | Expansión Joints | |||||||||
| Junta de Expansión | LM | |||||||||
| Total Pavement Works | ||||||||||
| Total Trabajos de Pavimentación | ||||||||||
| Grading and Drainage Works | ||||||||||
| Drenaje y Evacuación de Pluviales | ||||||||||
| 15 | Buried Pipe PVC diameter 160 mm | |||||||||
| Colector enterrado Tubería Pres. PVC ø160mm | LM | |||||||||
| 16 | Culvert outlet Protection | |||||||||
| Protección de entradas de la alcantarilla | JOB | |||||||||
| 17 | New Concrete Catch Basin | |||||||||
| Imbornal prefabricado de hormigón marco y rejilla de fundición | JOB | |||||||||
| Total Grading and Drainage Works | ||||||||||
| Total Trabajos de Evacuación y Drenaje | ||||||||||
| Landscape Works | ||||||||||
| Trabajos de Paisajismo | ||||||||||
| 18 | Platanus Hispanica Heigth 1,50/1,80m Calibre 50mm | |||||||||
| Platanus Hispánica Altura 1,50/1,80m Calibre 50 mm | EA | |||||||||
| 19 | Fraxinus Angustifolia Heigth 1,50/1,80 m Calibre 50mm | |||||||||
| Fraxinus Angustifolia Altura 1,50/1,80m Calibre 50 mm | EA | |||||||||
| 20 | Jacaranda Mimosifolia Heigth 1,50/1,80 m Calibre 50mm | |||||||||
| Jacaranda Mimosifolia Altura 1,50/1,80m Calibre 50 mm | EA | |||||||||
| 21 | Morus Alba Heigth 1,50/1,80 m Calibre 50mm | |||||||||
| Morus Alba Altura 1,50/1,80m Calibre 50 mm | EA | |||||||||
| 22 | Laurus Nobilis Heigth 1,50/1,80 m Calibre 50mm | |||||||||
| Laurus Nobilis Altura 1,50/1,80m Calibre 50 mm | EA | |||||||||
| 23 | Thymus Vulgaris Heigth 0,30/0,40 m | |||||||||
| Thymus Vulgaris Altura 0,30/0,40m | EA | |||||||||
| 24 | Salvia Rosmarinus Heigth 0,30/0,40 m | |||||||||
| Salvia Rosmarinus Altura 0,30/0,40m | EA | |||||||||
| 25 | Seedeing Cynodon Dactylon 'Tifway 419' | |||||||||
| Seeding Cynodon Dactylon 'Tifway 419' | SM | |||||||||
| 26 | Topsoil | |||||||||
| Tierra Vegetal | CM | |||||||||
| Total Landcaspe Works | ||||||||||
| Total Trabajos de Paisajismo de Civil | ||||||||||
| Street Furniture Works | ||||||||||
| Mobiliario Urbano | ||||||||||
| 27 | Precast concrete New Garbage | |||||||||
| Papelera de Hormigón Prefabricado | EA | |||||||||
| Total Street Furniture Works | ||||||||||
| Total Trabajos de Mobiliario Urbano | ||||||||||
| CIVIL WORK SUMMARY | ||||||||||
| RESUMEN TRABAJOS DE CIVIL | ||||||||||
| Demolition Civil Work | ||||||||||
| Trabajos de Demolición de Civil | ||||||||||
| Civil Earthworks | ||||||||||
| Trabajos de Movimiento de tierras de Civil | ||||||||||
| Pavements works | ||||||||||
| Trabajos de Pavimentación | ||||||||||
| Grading and Drainage Works | ||||||||||
| Trabajos de Drenaje y evacuación de pluviales | ||||||||||
| Landcaspe Works | ||||||||||
| Trabajos de Paisajismo | ||||||||||
| Street Furniture Works | ||||||||||
| Trabajos Mobiliario Urbano | ||||||||||
| TOTAL CIVIL WORK | ||||||||||
| TOTAL TRABAJOS DE CIVIL | ||||||||||
| MECHANICAL WORKS OF EAST OPEN AREA | ||||||||||
| TRABAJOS DE MECÁNICA EN ZONA ABIERTA ESTE | ||||||||||
| Green Areas Irrigation Works | ||||||||||
| Trabajos de Riegos de Zonas verdes | ||||||||||
| 28 | New Irrigation System Pop-Up Splinkler 1", Range=17,9 meters | |||||||||
| Nuevo Aspersor Emergente alcance 17,9 metros | EA | |||||||||
| 29 | Irrigation System HDPE pipe for Drippers (894EA) | |||||||||
| Sistema de riego por Goteo, tubería HDEP(894 Goteros) | LM | |||||||||
| 30 | Secondary Irrigation System HDPE Pipe | |||||||||
| Red Secundaria para Sistema de Riego tubería HDEP | LM | |||||||||
| 31 | Main Irrigation System HDPE Pipe | |||||||||
| Red Principal para Sistema de Riego tubería PEAD | LM | |||||||||
| 32 | 1 EA Remote control valve in precast concrete handhole | |||||||||
| 1 Electrovavula en Arqueta de Hormigón Prefabricado | JOB | |||||||||
| 33 | Directional Boring G Street | |||||||||
| Paso subterraneo de conductor en calle G | JOB | |||||||||
| Total Green Zones Irrigation Works | ||||||||||
| Total Trabajos de Sistema de Riego de Zonas Verdes | ||||||||||
| MECHANICAL WORK SUMMARY | ||||||||||
| RESUMEN TRABAJOS DE MECÁNICA | ||||||||||
| Green areas Irrigation works | ||||||||||
| Trabajos Sistema de Riego Zonas Verdes | ||||||||||
| TOTAL MECHANICAL WORK | ||||||||||
| TOTAL TRABAJOS DE MECÁNICA | ||||||||||
| ELECTRICAL WORK OF EAST OPEN AREA | ||||||||||
| TRABAJOS DE ELECTRICDAD EN ZONA ABIERTA ESTE | ||||||||||
| Lighting System Works | ||||||||||
| Trabajos Instalación de Iluminación | ||||||||||
| 34 | Assembly Existing Lighting pole on concrete Block Base Modified | |||||||||
| Recolocación de Farolas Existentes sobre Bases de Hormigón Modificadas | EA | |||||||||
| Total Lighting System Works | ||||||||||
| Total Trabajos de Sistema de Iluminación | ||||||||||
| ELECTRICAL WORK SUMMARY | ||||||||||
| RESUMEN TRABAJOS DE ELECTRICIDAD | ||||||||||
| Lighting system works | ||||||||||
| Trabajos de Instalación de Iluminación | ||||||||||
| TOTAL ELECTRICAL WORK | ||||||||||
| TOTAL TRABAJOS DE ELECTRICDAD | ||||||||||
| SUMMARY ITEM 3 - WORK OF EAST OPEN AREA | ||||||||||
| RESUMEN ITEM 3 - TRABAJOS EN ZONA ABIERTA ESTE | ||||||||||
| TOTAL CIVIL WORK | ||||||||||
| TOTAL OBRA CIVL | ||||||||||
| TOTAL MECHANICAL WORK | ||||||||||
| TOTAL TRABAJOS DE MECÁNICA | ||||||||||
| TOTAL ELECTRICAL WORK | ||||||||||
| TOTAL TRABAJOS DE ELECTRICDAD | ||||||||||
| GRAND TOTAL | ||||||||||
| GRAN TOTAL | ||||||||||
| TOTAL DIRECT COSTS | ||||||||||
| OVERHEAD | ||||||||||
| SUBTOTAL | ||||||||||
| PROFIT | ||||||||||
| TOTAL PROJECT EUROS | ||||||||||
| $1 | euros | |||||||||
| TOTAL PROJECT US$ | ||||||||||
| DATE: | FIRM NAME: | |||||||||
| TITLE: | BY: |
&L&"Times New Roman,Normal"INDEPENDENT GOVERMENT ESTIMATE&C&"Times New Roman,Normal"FOR OFFICIAL USE ONLY&R&"Times New Roman,Normal"Page &P of &N
SUMARY
| CONSTRUCTION COST ESTIMATE SUMMARY | ||||||||
| CONTRACTOR | ADDRESS | |||||||
| INDEPENDENT GOVERNMENT ESTIMATE | MORON AIR BASE, SPAIN | |||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||
| RPR & ADD MFH NEIGHBORHOOD | ||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||
| QUUG 19-1005 | MORÓN AIR BASE, SPAIN | |||||||
| GRAND TOTAL | 15% OVERHEAD | 10% PROFIT | TOTAL PROJETS EUROS | TOTAL PROJETS US $ (0,8587€/$) | ||||
| BASE BID - REPAIR WORKS HOUSING NEIGHBORHOOD |
PRESUPUESTO BASE - TRABAJOS DE REPARACIÓN EN VENCIDARIO
| ITEM 1 - NEW TEXTILE SUNSHADE ON SOUTH PLAYGROUND ITEM 1 - NUEVA ESTRUCTURA TEXTIL EN PARQUE DE JUEGOS SUR | ||
| ITEM 2 - NON POTABLE WATER CONNECTION FOR HOUSES IRRIGATIONS ITEM 2 - CONEXIÓN DE AGUA NO POTABLE PARA RIEGO DE CASAS | ||
| ITEM 3 - WORK OF EAST OPEN AREA ITEM 3 - TRABAJOS EN ZONA ABIERTA ESTE | ||
| DATE: | FIRM NAME: | |
| TITLE: | BY: |
&LINDEPENDENT GOVERMENT ESTIMATE&CFOR OFFICIAL USE ONLY&RPage &P of &N