Corpus Christi Fire Alarm Replacement Past Performance Questionnaire.docx
DOCX document 192 KB Posted
- Attached to
- Corpus Christi Fire Alarm Replacement Project
- Solicitation number
- 32966
- Issued by
- Not on record
About this file
This is a Past Performance Questionnaire template for the Corpus Christi Fire Alarm Replacement project, designed for clients to evaluate contractor performance on completed work related to solicitation 47PD5226R0044.
The questionnaire requires clients to submit completed evaluations directly to GSA Contracting Officer Kevin Mack at kevin.mack@gsa.gov no later than Friday, May 22, 2026, at 4:00 p.m. Central Time. Clients must rate contractor performance across seven evaluation categories: Quality, Schedule/Timeliness of Performance, Management/Personnel/Labor, Safety/Security, General (responsiveness to changes and fair pricing), and Customer Satisfaction. Each category uses a six-point rating scale: Exceptional (E), Very Good (VG), Satisfactory (S), Marginal (M), Unsatisfactory (U), and Not Applicable (N). The questionnaire also requests basic contract information including contractor firm name, UEID number, contract type (Cost Reimbursement or Firm Fixed Price), award date, original and final contract prices, contract location, and project description (identifying whether work involved occupied or non-occupied buildings and specific tasks such as architectural, electrical, fire alarm replacement/installation, fire sprinkler installation/alteration, elevator replacement/installation, or telecommunications). Clients must confirm contract information accuracy, describe their role in the project, and provide explanatory comments for any Marginal or Unsatisfactory ratings. The questionnaire concludes with a yes/no question asking whether the client would award another contract to the contractor.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PBS PAST PERFORMANCE QUESTIONNAIRE
CONTRACT INFORMATION (Contractor/Offeror to complete Blocks 1-4)
1. CONTRACTOR/OFFEROR INFORMATION
Firm Name:
Address:
| Phone Number: |
| UEID Number: |
Contact Name:
| Email Address: |
| Contact Phone Number: |
2. GENERAL WORK INFORMATION
Other _____________ Prime Contractor Work performed as:
Major Subcontractor If a subcontractor, who was the prime (Name/Phone #):
3. CONTRACT INFORMATION
Contract / BPA Number:
Delivery / Task Order / Call Number (if applicable):
Contract Type:
Contract/Project Title: Contract Location:
Other (Please explain) Cost Reimbursement Firm Fixed Price
Award Date (mm/dd/yy):
Originally Scheduled Contract Completion Date (mm/dd/yy): Actual Completion Date (mm/dd/yy):
Original Contract Price (Award Amount):
Final Contract Price (to include all modifications, if applicable):
4. PROJECT DESCRIPTION (check all applicable)
Project involved: □ Occupied building □ Non-occupied building □ Multi-Story
Tasks involved: □ Architectural □ Electrical □ Fire Alarm Replacement/Installation
□ Fire Sprinkler Installation/Alteration □ Elevator Replacement/Installation
□ Telecommunications
Brief Description of Project:
INSTRUCTIONS FOR CLIENTS COMPLETING THIS QUESTIONNAIRE: PBS requires the Client to email the completed questionnaire directly to the Contracting Officer, Kevin.Mack@gsa.gov, no later than Friday, May 22, 2026, 4:00 p.m Central Time. PBS will not accept completed questionnaires sent from the Offeror. Handwritten responses are sufficient. All respondents will be contacted personally to verify their submission. The government reserves the right to verify any and all information on this form. The Client’s signature is confirmation allowing the General Services Administration to use the information contained herein as source selection information.
THIS PROPOSAL PACKAGE IS FOR THE CORPUS CHRISTI ALARM REPLACEMENT
PBS Past Performance Questionnaire, tailored for 47PD5226R0044
| FOR OFFICIAL USE ONLY SOURCE SELECTION SENSITIVE INFORMATION, see FAR 3.104 and 2.101 | |
| TO BE COMPLETED BY CLIENT |
CLIENT INFORMATION
Client Point of Contact Information Name: Title:
Phone Number: Email:
Address:
Describe your role in the project:
I confirm that the contract information provided on the first page is correct and complete. (Correct 1st page if necessary)
Client’s Signature: Date questionnaire was completed:
Instructions: Select the adjective rating that best reflects your evaluation of the contractor’s performance. Please briefly explain any score of Unsatisfactory or Marginal in the comments section.
The contractor…See rating descriptions on page 4
| 1. QUALITY |
| U M S VG E N |
| U M S VG E N |
Provided professional quality work and the finished work compared favorably to the original intent of the project.
Displayed initiative to identify and correct problems or mistakes as they occurred, and demonstrated consideration for client/tenant concerns (cleanliness, noise, schedule coordination, etc).
| 2. SCHEDULE/TIMELINESS OF PERFORMANCE |
| U M S VG E N |
Developed and met realistic progress schedules, managed schedule variances to remain on time, and submitted deliverables on time.
| 3. MANAGEMENT/ PERSONNEL/LABOR |
| U M S VG E N |
Provided experienced managers and supervisors with the technical and administrative abilities needed to meet contract requirements.
Demonstrated ability to hire, maintain, and replace, if necessary, qualified personnel and subcontractors during the contract period, with limited turnover that did not negatively affect quality or schedule.
| 4. SAFETY/SECURITY |
| U M S VG E N |
Maintained an environment of safety, adheres to its approved safety plan, and responded to safety issues. Maintained construction site security.
| 5. GENERAL |
| U M S VG E N |
Was responsive to contract changes, and negotiated fair pricing for modifications.
| 6. CUSTOMER SATISFACTION |
| U M S VG E N |
How would you rate the contractor's overall performance, including timely resolution of warranty defects after construction was completed?
7. SUMMARY
| Would you award another contract to this contractor? |
| Yes |
No
COMMENTS SECTION
Please provide additional information below, and attach additional pages if necessary.
Please provide an explanation of any rating of Unsatisfactory or Marginal (if applicable) and/or additional remarks.
Use the following adjective ratings and definitions in your evaluation of the Contractor’s performance.
| RATING |
| DEFINITION |
| NOTE |
| (E) Exceptional |
| Performance met contractual requirements and exceeded many to the Government/Owner’s benefit. The contractual performance of the element being evaluated was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective. |
| An Exceptional rating is appropriate when the contractor successfully performed multiple significant events that exceeded requirements and were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone merits an Exceptional rating. There should have been NO significant weaknesses identified. |
| (VG) Very Good |
| Performance met contractual requirements and exceeded some to the Government’s/Owner’s benefit. The contractual performance of the element being evaluated was accomplished with some minor problems for which corrective actions taken by the contractor were effective. |
| A Very Good rating is appropriate when the contractor successfully performed a significant event that exceeded requirements and was of benefit to the Government/Owner. There should have been NO significant weaknesses identified. |
| (S) Satisfactory |
| Performance met all contractual requirements. The contractual performance of the element contained some minor problems for which corrective actions taken by the contractor were satisfactory. |
| A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract. There should have been NO significant weaknesses identified. |
The contractor should not be given a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.
| (M) Marginal |
| Performance did not meet some contractual requirements. The contractual performance of the element being evaluated reflected a serious problem for which the contractor did not identify corrective actions. The contractor's proposed actions were only marginally effective or were not fully implemented. |
| A Marginal rating is appropriate when one or two significant events occurred that the contractor had trouble overcoming, with negative effects. |
| (U) Unsatisfactory |
| Performance did not meet most contractual requirements and recovery was not accomplished in a timely manner. The contractual performance of the element contained serious problem(s) for which the contractor's corrective actions were ineffective. |
| An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming, with negative effects. A singular problem, however, could be of such serious magnitude that it alone merits an Unsatisfactory rating. |
| (N) Not Applicable |
| No information or did not apply to your contract |
| Rating will be neither positive nor negative. |