About this file
This materials list document supports a bid solicitation by the Maine Department of Transportation (MDOT) for the construction of a 28x60 crew quarters facility at the Plymouth Camp in Plymouth, Maine. The project encompasses 77 line items spanning structural materials, insulation, roofing, siding, interior finishes, cabinets, windows, and doors with hardware specifications. Structural materials include pressure-treated and kiln-dried spruce lumber in various dimensions, Advantech zip wall and roof systems, rigid styrofoam and Roxul insulation, and 29 trusses with specified pitch and cant measurements. The scope specifies metal roofing manufactured exclusively by ABC Roofing in Ivy Green color (SL-12 series panels, 12 inches wide by 17 feet 7.5 inches long at 29 gauge), metal siding by Fabrel in Patina Green color, maple cabinetry with natural finish, Matthews Brothers double-pane windows, and hollow metal and wood doors with specified hardware from Sargent and other manufacturers. Items 1 through 40 are designated for delivery within seven days of bid award, with remaining items to be coordinated by the Project Manager. Delivery location is MDOT Plymouth Camp, 2510 Moosehead Trail, Plymouth, Maine 04969, with primary contacts being Eric Willete (Project Manager) at 441-4379 and Rick Gradie at Augusta HQ (592-1500).
The document does not provide explicit pricing terms, bid submission deadlines, contract duration, or funding source information in the materials list. The specifications section details precise requirements for hollow metal frames (16 gauge, prime painted, manufactured by Curries Manufacturing), hollow metal doors (1 inch thick, 18 gauge, series 707 with polystyrene core), wood doors (rotary cut natural birch veneer, 1 inch thick, WDMA compliant), and comprehensive hardware requirements including hinges, closers, locksets in US26D finish, thresholds, weatherstripping, and door sweeps for different room types (exterior openings, offices, mechanical room, toilet rooms, and break/training room). The specifications mandate factory pre-finishing and pre-preparation of doors for hardware installation, with new key systems coordinated to Sargent LA keyway per owner requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation_terms.docm | DOCM document | |
| Questions and Answers.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Materials list for Plymouth Crew Quarters | |||||||
| NOTE : Items 1 - 40 to be delivered witin 7 days after bid award | |||||||
| all other items to be determined by Project Manager | |||||||
| Delivered to: | MDOT Plymouth Camp | ||||||
| 2510 Moosehead Trail | |||||||
| Plymouth, Maine 04969 | |||||||
| Contacts: | Eric Willete | Project Manager | 441-4379 | ||||
| Rick Gradie | Augusta HQ | 592-1500 | |||||
| Overview: | |||||||
| 28x60 crew quarters, 8' posted 16"oc. 5/12 pitch trusses 32' with 2' cant each side for 28' bearing | |||||||
| Item | Description | QTY | UNIT | ||||
| 1 | Pressure treated 2x6x16' | 12 | each | ||||
| 2 | KD Spruce 2x6x16' | 40 | each | ||||
| 3 | kD Spruce 2x6x92 5/8" | 200 | each | ||||
| 4 | 1/2" Advantech "zip" wall system | 55 | each | ||||
| 5 | "zip" wall system tape | 5 | rolls | ||||
| 6 | 2" rigid styrofoam insulation r-7.5 min. 4'x8' | 54 | each | ||||
| 7 | 1/2" rigid styrofoam insulation 4'x8' | 1 | each | ||||
| 8 | KD spruce 2x10x12 | 10 | each | ||||
| 9 | 1x4 pine strapping | 3700 | LF | ||||
| 10 | foam sill sealer 5 1/5"x50' roll | 4 | rolls | ||||
| 11 | trusses 5/12pitch 28' bearing with 2' cant. Each side | 29 | each | ||||
| 12 | trusses 5/12pitch 28' bearing with 2' cant. Each side | gable end | 2 | each | |||
| 13 | KD 2x12x16' | 9 | each | ||||
| 14 | 5/8" advantech "zip" roof system | 80 | each | ||||
| 15 | "zip" roof system tape | 10 | rolls | ||||
| 16 | grace ice/watershield 3'x75' | 8 | rolls | ||||
| 17 | simpson truss spacer 24" | 240 | each | ||||
| 18 | pine #2 1x8 300lf | 300 | lf | ||||
| 19 | KD spruce 2x6x20' | 10 | each | ||||
| 20 | roxul 5 1/5" x 15 1/4" | 1408 | sqft | ||||
| 21 | PT 2x4x16' | 7 | each | ||||
| 22 | PT 2x6X10' | 3 | each | ||||
| 23 | KD spruce2x4x8' | 110 | each | ||||
| 24 | KD spruce2x4x16' | 21 | each | ||||
| 25 | KD spruce 2x6x10' | 9 | each | ||||
| 26 | 5/8"x4'x12' type X gypsum board | 105 | each | ||||
| 27 | all purpose joint compound 5/gl pails | 10 | each | ||||
| 28 | joint tape mesh | 250' rolls | 6 | each | |||
| 29 | cal 5 gal/pails por ltx primer white | 6 | each | ||||
| 30 | cal 5 gal/pails pro2000 pastel base | 6 | each | ||||
| 31 | 3 1/2" vinyl base trim | dark brown | 350 | lf | |||
| 32 | 12"x12" VCT TILE FLOOR | Armstrong #54004 civic square | 1700 | each | |||
| 33 | VCT tile glue 12gal. | 12 | gal. | ||||
| 34 | dens pack blown-in cellulose insulation | 1700 | cf | ||||
| 35 | paslode hot dipprd galvanized 3 1/4" 2000 qty box # 650388 | 3 | boxes | ||||
| 36 | paslode hot dipprd galvanized 2 3/8" ring 2000 qty box # 650383 | 6 | boxes | ||||
| 37 | paslode fuel cells red part # 816000 | 10 | pkgs | ||||
| 38 | 1 5/8"pro-twist coarse drywall screws 5000/bucket | 3 | buckets | ||||
| 39 | D5 white solid soffit | 180 | sqft | ||||
| 40 | D5 white pepf. soffit | 280 | sqft | ||||
| Metal Roofing | |||||||
| All metal roofing & components to be manufactured by ABC Roofing only Roofing to be Ivy Green in Color, you can bid SL-16 series panels as alternative | |||||||
| Roofing | |||||||
| 41 | ABC SL-12 series panel 12" wide 17'-7.5" long | ivy green29 gauge | 132 | each | |||
| 42 | ABC denver gable LG-118 | ivy green29 gauge | 16 | each | |||
| 43 | ABC W formed valley lg-139 | ivy green29 gauge | 4 | each | |||
| 44 | ABC Z closure cf-117 | ivy green29 gauge | 14 | each | |||
| 45 | ABC metal vent HW-525 | ivy green29 gauge | 14 | each | |||
| 46 | ABC plain ridge cap lg-101c | ivy green29 gauge | 9 | each | |||
| 47 | ABC eave trim cf-107 | ivy green29 gauge | 14 | each | |||
| 48 | ABC fascia lg-146S | ivy green29 gauge | 36 | each | |||
| 49 | ABC woodgrip coated fastener 8A | ivy green29 gauge | 1000 | each | |||
| 50 | ABC tape sealer tri-bead HW-504 | 500 | LF | ||||
| 51 | ABC urethane sealant 11oz tubes 30 per carton | HW -540 white | 1 | carton | |||
| Metal Siding | |||||||
| All metal siding and components are to be manufactured by Fabrel | |||||||
| All siding and components to be Patina Green in color | |||||||
| Siding | |||||||
| 52 | Fabrel grandrib 36" 96"long | Patina 29 gauge | 65 | each | |||
| 53 | Fabrel grandrib 36" 120"long | Patina 29 gauge | 16 | each | |||
| 54 | "j" channel | Patina 29 gauge | 43 | each | |||
| 55 | 1" hex head screws | Patina 29 gauge | 3000 | each | |||
| 56 | outside corner | Patina 29 gauge | 4 | each | |||
| 57 | PVC coated white coilstock 2'x50' | pvc white | 3 | each | |||
| Cabinets: | All wood construction [on particle board] Maple with a natural finish flat panel doors | ||||||
| 58 | 36" base cabinet | 1 | each | ||||
| 59 | 18" base cabinet | 1 | each | ||||
| 60 | 36" wide 30"tall wall cabinet | 1 | each | ||||
| 61 | 36" wide 24"tall wall cabinet | 1 | each | ||||
| 62 | 24" wide 24"tall wal cabinet | 5 | each | ||||
| 63 | 18" wide 30"tall wall cabinet | 1 | each | ||||
| 64 | 1"x6"x36" filler | 1 | each | ||||
| 65 | 7' 6" counter top with backsplash [post formed] | ||||||
| wilsonart laminate #4726k-52 milano quartz | 1 | each | |||||
| 66 | 10' 0" counter top with backsplash [post formed] | ||||||
| wilsonart laminate #4726k-52 milano quartz | 1 | each | |||||
| Windows: All windows shall be Matthews Brothers, Clara Starrett energy core double pane or an equal substitute | |||||||
| 67 | 4' 0" tall 3' 0" wide | double hung | 7 | each | |||
| 68 | 2' 0" tall 3' 0" wide | fixed casement | 2 | each | |||
| Doors and Hardware: See specification notes below | |||||||
| Doors | |||||||
| 69 | Type 1 | left hand outswing 3'-0"x6'-8" | 2 | each | |||
| 70 | Type 2 | left hand 3'-0"x6'-8" | 3 | each | |||
| 71 | Type 2 | right hand 3'-0"x6'-8" | 3 | each | |||
| 72 | Type3 | right hand 3'-0"x6'-8" | 1 | each | |||
| Hardware: | See specification notes below | ||||||
| 73 | exterior * | 2 | each | ||||
| 74 | offices* | 3 | each | ||||
| 75 | mechanical room * | 1 | each | ||||
| 76 | toilet room * | 2 | each | ||||
| 77 | break/training room * | 1 | each | ||||
| SPECIFICATIONS | |||||||
| Maine Department of Transportation | |||||||
| Outline Specification for Hollow Metal Doors, Hollow Metal Frames,wood doors & hardware | |||||||
| 1. Hollow Metal Frames | |||||||
| General: Hollow metal frames shall be 16ga. prime painted, manufactured by | Curries Mfg. – Mason City, IA | ||||||
| Interior Frames: "C" Series equipped with drywall compression anchors | |||||||
| Exterior Frames: "M" Series equipped with wood-stud anchors | |||||||
| 2. Hollow Metal Doors | |||||||
| Type 1: Hollow metal doors shall be 1 ¾" thick, 18ga. prime painted, series 707 | |||||||
| with bonded polystyrene core, manufactured by Curries Mfg. Mason City, IA | |||||||
| Doors to be factory prepped & reinforced for finish hardware, reference | |||||||
| hardware schedule. Provide preparation for future use deadlock, | |||||||
| equipped with removable filler plates. | |||||||
| Vision Lites: Provide half glass vision lites glazed w/ ¼" clear tempered insulated glass | |||||||
| 3. Wood Doors | |||||||
| General: Wood doors shall be 1 ¾" thick, rotary cut natural birch veneer with | |||||||
| matching edges, 5 or 7 ply complying with WDMA standards. | |||||||
| Doors shall be factory pre-finished "Clear". | |||||||
| Type 2: Doors shall be particle core with flush faces. | |||||||
| Type 3: Doors shall be 90 min. fire rated mineral core, with 24" x 12" fusible link | |||||||
| louvers, reference door elevation. | |||||||
| 4. Finish Hardware | |||||||
| General: Hardware to be US26D finish. | |||||||
| Hinges to be synthetic or ball bearing. Provide non-removable pins at exterior doors | |||||||
| Provide new key system in Sargent LA keyway, keying to be coordinated with owner | |||||||
| *Exterior Openings: | |||||||
| (3) Hinges – non removable pin | |||||||
| (1) Closer Sargent EN 281 P9 | |||||||
| (1) Lockset Sargent 28-10G37 LL 26D | |||||||
| (1) Threshold | |||||||
| (1) Set Perimeter Weatherstrip | |||||||
| (1) Door Sweep | |||||||
| (3) Silencers | |||||||
| *Offices: | |||||||
| (3) Hinges | |||||||
| (1) Lockset Sargent 28-65G05 LL 26D | |||||||
| (1) Wall Stop | |||||||
| (3) Silencers | |||||||
| *Mechanical Room: | |||||||
| (3) Hinges | |||||||
| (1) Closer Sargent EN 281 O | |||||||
| (1) Wall Stop | |||||||
| (3) Silencers | |||||||
| (1) Lockset Sargent 28-65G04 LL 26D | |||||||
| *Toilet Rooms: | |||||||
| (3) Hinges | |||||||
| (1) Privacy Sargent 28-65U65 LL 26D | |||||||
| (1) Wall Stop | |||||||
| (3) Silencers | |||||||
| *Break / Training Room | |||||||
| (3) Hinges | |||||||
| (1) Passage Sargent 28-65U15 LL 26D | |||||||
| (1) Wall Stop | |||||||
| (3) Silencers |