Copy of Plymouth Crew Quaters(1).xls

XLS spreadsheet 41 KB Posted

Attached to
Materials for Plymouth Crew Quarters
Solicitation number
RFQ - 17A - 12081300000000000129
Issued by
Maine

About this file

Summary of Plymouth Crew Quarters Materials File

This is a materials list and specification document for the Plymouth Crew Quarters project in Maine. The file contains a detailed inventory of items required for the crew quarters facility, organized by category and specification. The document serves as the basis for procurement of materials needed to outfit and equip the Plymouth Crew Quarters space. The materials span multiple functional areas and include various quantities of supplies, equipment, and furnishings necessary to support the operational requirements of the facility.

The file provides specific item descriptions with corresponding quantities, unit types, and estimated requirements. The materials list appears to be structured to facilitate competitive bidding and vendor selection for the supply and delivery of these items. Pricing information would be determined through the bidding process, with vendors expected to provide cost proposals based on the detailed specifications and quantities outlined in the document. This procurement approach allows the State of Maine to obtain competitive pricing while ensuring all required materials meet specified standards and quantities for the crew quarters project.

View the file

Other files

File Type Posted
Solicitation_terms.docm DOCM document
Questions and Answers.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Materials list for Plymouth Crew Quarters
NOTE : Items 1 - 40 to be delivered witin 7 days after bid award
all other items to be determined by Project Manager
Delivered to:MDOT Plymouth Camp
2510 Moosehead Trail
Plymouth, Maine 04969
Contacts:Eric WilleteProject Manager441-4379
Rick GradieAugusta HQ592-1500
Overview:
28x60 crew quarters, 8' posted 16"oc. 5/12 pitch trusses 32' with 2' cant each side for 28' bearing
ItemDescriptionQTYUNIT
1Pressure treated 2x6x16'12each
2KD Spruce 2x6x16'40each
3kD Spruce 2x6x92 5/8"200each
41/2" Advantech "zip" wall system55each
5"zip" wall system tape5rolls
62" rigid styrofoam insulation r-7.5 min. 4'x8'54each
71/2" rigid styrofoam insulation 4'x8'1each
8KD spruce 2x10x1210each
91x4 pine strapping3700LF
10foam sill sealer 5 1/5"x50' roll4rolls
11trusses 5/12pitch 28' bearing with 2' cant. Each side29each
12trusses 5/12pitch 28' bearing with 2' cant. Each sidegable end2each
13KD 2x12x16'9each
145/8" advantech "zip" roof system80each
15"zip" roof system tape10rolls
16grace ice/watershield 3'x75'8rolls
17simpson truss spacer 24"240each
18pine #2 1x8 300lf300lf
19KD spruce 2x6x20'10each
20roxul 5 1/5" x 15 1/4"1408sqft
21PT 2x4x16'7each
22PT 2x6X10'3each
23KD spruce2x4x8'110each
24KD spruce2x4x16'21each
25KD spruce 2x6x10'9each
265/8"x4'x12' type X gypsum board105each
27all purpose joint compound 5/gl pails10each
28joint tape mesh250' rolls6each
29cal 5 gal/pails por ltx primer white6each
30cal 5 gal/pails pro2000 pastel base6each
313 1/2" vinyl base trimdark brown350lf
3212"x12" VCT TILE FLOORArmstrong #54004 civic square1700each
33VCT tile glue 12gal.12gal.
34dens pack blown-in cellulose insulation1700cf
35paslode hot dipprd galvanized 3 1/4" 2000 qty box # 6503883boxes
36paslode hot dipprd galvanized 2 3/8" ring 2000 qty box # 6503836boxes
37paslode fuel cells red part # 81600010pkgs
381 5/8"pro-twist coarse drywall screws 5000/bucket3buckets
39D5 white solid soffit180sqft
40D5 white pepf. soffit280sqft
Metal Roofing
All metal roofing & components to be manufactured by ABC Roofing only
Roofing to be Ivy Green in Color
Roofing
41ABC SL-12 series panel 12" wide 17'-7.5" longivy green29 gauge132each
42ABC denver gable LG-118ivy green29 gauge16each
43ABC W formed valley lg-139ivy green29 gauge4each
44ABC Z closure cf-117ivy green29 gauge14each
45ABC metal vent HW-525ivy green29 gauge14each
46ABC plain ridge cap lg-101civy green29 gauge9each
47ABC eave trim cf-107ivy green29 gauge14each
48ABC fascia lg-146Sivy green29 gauge36each
49ABC woodgrip coated fastener 8Aivy green29 gauge1000each
50ABC tape sealer tri-bead HW-504500LF
51ABC urethane sealant 11oz tubes 30 per cartonHW -540 white1carton
Metal Siding
All metal siding and components are to be manufactured by Fabrel
All siding and components to be Patina Green in color
Siding
52Fabrel grandrib 36" 96"longPatina 29 gauge65each
53Fabrel grandrib 36" 120"longPatina 29 gauge16each
54"j" channelPatina 29 gauge43each
551" hex head screwsPatina 29 gauge3000each
56outside cornerPatina 29 gauge4each
57PVC coated white coilstock 2'x50'pvc white3each
Cabinets:All wood construction [on particle board] Maple with a natural finish flat panel doors
5836" base cabinet1each
5918" base cabinet1each
6036" wide 30"tall wall cabinet1each
6136" wide 24"tall wall cabinet1each
6224" wide 24"tall wal cabinet5each
6318" wide 30"tall wall cabinet1each
641"x6"x36" filler1each
657' 6" counter top with backsplash [post formed]
wilsonart laminate #4726k-52 milano quartz1each
6610' 0" counter top with backsplash [post formed]
wilsonart laminate #4726k-52 milano quartz1each
Windows:All windows shall be Matthews Brothers, Clara Starrett energy core double pane
674' 0" tall 3' 0" widedouble hung7each
682' 0" tall 3' 0" widefixed casement2each
Doors and Hardware: See specification notes below
Doors
69Type 1left hand outswing 3'-0"x6'-8"2each
70Type 2left hand 3'-0"x6'-8"3each
71Type 2right hand 3'-0"x6'-8"3each
72Type3right hand 3'-0"x6'-8"1each
Hardware:See specification notes below
73exterior *2each
74offices*3each
75mechanical room *1each
76toilet room *2each
77break/training room *1each
SPECIFICATIONS
Maine Department of Transportation
Outline Specification for Hollow Metal Doors, Hollow Metal Frames,wood doors & hardware
1. Hollow Metal Frames
General: Hollow metal frames shall be 16ga. prime painted, manufactured byCurries Mfg. – Mason City, IA
Interior Frames: "C" Series equipped with drywall compression anchors
Exterior Frames: "M" Series equipped with wood-stud anchors
2. Hollow Metal Doors
Type 1: Hollow metal doors shall be 1 ¾" thick, 18ga. prime painted, series 707
with bonded polystyrene core, manufactured by Curries Mfg. Mason City, IA
Doors to be factory prepped & reinforced for finish hardware, reference
hardware schedule. Provide preparation for future use deadlock,
equipped with removable filler plates.
Vision Lites: Provide half glass vision lites glazed w/ ¼" clear tempered insulated glass
3. Wood Doors
General: Wood doors shall be 1 ¾" thick, rotary cut natural birch veneer with
matching edges, 5 or 7 ply complying with WDMA standards.
Doors shall be factory pre-finished "Clear".
Type 2: Doors shall be particle core with flush faces.
Type 3: Doors shall be 90 min. fire rated mineral core, with 24" x 12" fusible link
louvers, reference door elevation.
4. Finish Hardware
General: Hardware to be US26D finish.
Hinges to be synthetic or ball bearing. Provide non-removable pins at exterior doors
Provide new key system in Sargent LA keyway, keying to be coordinated with owner
*Exterior Openings:
(3) Hinges – non removable pin
(1) Closer Sargent EN 281 P9
(1) Lockset Sargent 28-10G37 LL 26D
(1) Threshold
(1) Set Perimeter Weatherstrip
(1) Door Sweep
(3) Silencers
*Offices:
(3) Hinges
(1) Lockset Sargent 28-65G05 LL 26D
(1) Wall Stop
(3) Silencers
*Mechanical Room:
(3) Hinges
(1) Closer Sargent EN 281 O
(1) Wall Stop
(3) Silencers
(1) Lockset Sargent 28-65G04 LL 26D
*Toilet Rooms:
(3) Hinges
(1) Privacy Sargent 28-65U65 LL 26D
(1) Wall Stop
(3) Silencers
*Break / Training Room
(3) Hinges
(1) Passage Sargent 28-65U15 LL 26D
(1) Wall Stop
(3) Silencers

Sheet2

Sheet3