This is a Construction Cost Estimate Breakdown spreadsheet for a plumbing project at Maxwell Air Force Base (AFB). The document is a blank template for estimating costs related to investigating and clearing a blocked drain in Building 1403, with line items for labor, materials, taxes, insurance, overhead, and profit. The associated federal contract opportunity is a competitive small business set-aside solicitation (FA330025R0030) valued between $25,000 to $75,000, limited to vendors within 250 miles of Maxwell AFB, Alabama. The project requires furnishing all necessary labor, materials, and equipment to address sewer pipe restrictions, and is being issued by the Department of the Air Force Air Education and Training Command.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
| OMB No. 0704-0193 | ||||||||||
| CONSTRUCTION COST ESTIMATE BREAKDOWN | ||||||||||
| CONTRACTOR | ADDRESS | |||||||||
| Bldg 1403 | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| Inspect and Repair No-Flow Sewer Pipe | $0.00 | |||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| NONE | 1.6403068E7 | Bldg 1403 Maxwell | ||||||||
| UNIT | MATERIAL/EQUIP. COSTS | LABOR RATES | OTHER | |||||||
| LINE | ITEM | OF | QUANTITY | MAN-HOURS | AVERAGE | DIRECT | LINE | |||
| NO. | MEASURE | UNIT | TOTAL | RATE | TOTAL | COSTS | TOTAL | |||
| 0.0 | 0.0 | |||||||||
| 1.0 | Labor & Materials to Investigate and Clear Blocked Drain | ea | $0.00 | |||||||
| 2.0 | 0.0 | 0.0 | $0.00 | |||||||
| 3.0 | 0.0 | 0.0 | $0.00 | |||||||
| 4.0 | 0.0 | 0.0 | $0.00 | |||||||
| 5.0 | 0.0 | 0.0 | $0.00 | |||||||
| 6.0 | 0.0 | 0.0 | $0.00 | |||||||
| 7.0 | 0.0 | 0.0 | $0.00 | |||||||
| 8.0 | 0.0 | 0.0 | $0.00 | |||||||
| 9.0 | 0.0 | 0.0 | $0.00 | |||||||
| 10.0 | 0.0 | 0.0 | $0.00 | |||||||
| 11.0 | 0.0 | 0.0 | $0.00 | |||||||
| 12.0 | 0.0 | 0.0 | $0.00 | |||||||
| 13.0 | 0.0 | 0.0 | $0.00 | |||||||
| 14.0 | 0.0 | 0.0 | $0.00 | |||||||
| 15.0 | 0.0 | 0.0 | $0.00 | |||||||
| 6.0 | 0.0 | 0.0 | ||||||||
| TOTAL | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 0.00 | 0.00 | $0.00 | ||||||||
| Material Costs | 0.00 | |||||||||
| 10% Tax on Materials | 0.1 | 0.00 | 0.00 | |||||||
| TOTAL MATERIAL COST | 0.00 | 0.00 | 0.00 | 0.00 | $0.00 | |||||
| 0.00 | 0.00 | $0.00 | ||||||||
| Labor Cost | $0.00 | |||||||||
| Insurance & Tax on Labor (18%) | 0.18 | |||||||||
| TOTAL LABOR COST | 0.00 | $0.00 | ||||||||
| 0.00 | 0.00 | $0.00 | ||||||||
| Total Other Direct Costs | 0.00 | 0.00 | $0.00 | |||||||
| Total Material, Labor, Tax & Insurance | 0.00 | 0.00 | ||||||||
| Labor and Material Bonds (2.5%) | 0.00 | |||||||||
| TOTAL DIRECT COSTS WITH BONDS | 0.00 | 0.00 | $0.00 | |||||||
| 0.00 | 0.00 | $0.00 | ||||||||
| Overhead (20%) | 0.2 | 0.00 | 0.00 | |||||||
| Subtotal | 0.00 | 0.00 | 0.00 | $0.00 | ||||||
| Profit (10%) | 0.1 | 0.00 | 0.00 | $0.00 | ||||||
| TOTAL | 0.00 | 0.00 | $0.00 | |||||||
| 0.00 | 0.00 | $0.00 | ||||||||
| 0.00 | 0.00 | $0.00 |