This is a Construction Cost Estimate Breakdown spreadsheet for a plumbing project at Maxwell Air Force Base (AFB). The document is a blank template for estimating costs related to investigating and clearing a blocked drain in Building 1403, with line items for labor, materials, taxes, insurance, overhead, and profit. The associated federal contract opportunity is a competitive small business set-aside solicitation (FA330025R0030) valued between $25,000 to $75,000, limited to vendors within 250 miles of Maxwell AFB, Alabama. The project requires furnishing all necessary labor, materials, and equipment to address sewer pipe restrictions, and is being issued by the Department of the Air Force Air Education and Training Command.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OMB No. 0704-0193
CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
Bldg 1403
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
Inspect and Repair No-Flow Sewer Pipe$0.00
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
NONE1.6403068E7Bldg 1403 Maxwell
UNITMATERIAL/EQUIP. COSTSLABOR RATESOTHER
LINEITEMOFQUANTITYMAN-HOURSAVERAGEDIRECTLINE
NO.MEASUREUNITTOTALRATETOTALCOSTSTOTAL
0.00.0
1.0Labor & Materials to Investigate and Clear Blocked Drainea$0.00
2.00.00.0$0.00
3.00.00.0$0.00
4.00.00.0$0.00
5.00.00.0$0.00
6.00.00.0$0.00
7.00.00.0$0.00
8.00.00.0$0.00
9.00.00.0$0.00
10.00.00.0$0.00
11.00.00.0$0.00
12.00.00.0$0.00
13.00.00.0$0.00
14.00.00.0$0.00
15.00.00.0$0.00
6.00.00.0
TOTAL$0.00$0.00$0.00$0.00$0.00
0.000.00$0.00
Material Costs0.00
10% Tax on Materials0.10.000.00
TOTAL MATERIAL COST0.000.000.000.00$0.00
0.000.00$0.00
Labor Cost$0.00
Insurance & Tax on Labor (18%)0.18
TOTAL LABOR COST0.00$0.00
0.000.00$0.00
Total Other Direct Costs0.000.00$0.00
Total Material, Labor, Tax & Insurance0.000.00
Labor and Material Bonds (2.5%)0.00
TOTAL DIRECT COSTS WITH BONDS0.000.00$0.00
0.000.00$0.00
Overhead (20%)0.20.000.00
Subtotal0.000.000.00$0.00
Profit (10%)0.10.000.00$0.00
TOTAL0.000.00$0.00
0.000.00$0.00
0.000.00$0.00

0.00 $0.00 image1.emf