This file is an Excel-based Independent Government Estimate (IGE) for a construction repair project at Maxwell Air Force Base. The project involves repairing steam damage to Building 1154, with work spanning multiple construction divisions including site work, finishes, mechanical systems, and electrical systems. Specific repair activities include replacing ceiling tiles, removing damaged sheetrock, cleaning carpet, repairing cove base, and performing flue vent repairs. The estimate template breaks down potential costs into material, labor, overhead, and profit categories, though all line items are currently populated with $0.00, suggesting this is a blank template for cost estimation. The project is being solicited by the 42d Contracting Squadron under solicitation number FA330025R0035, with the Department of the Air Force Air Education and Training Command as the sponsoring agency. The repair work is located at Maxwell Air Force Base in Alabama and aims to restore functionality to the damaged building infrastructure.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Total
CONSTRUCTION COST ESTIMATE BREAKDOWN
| CONTRACTOR | DATE | ADDRESS | ||||||
| 400 Cannon Street Maxwell Air Force Base Alabama | ||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||
| REPAIR STEAM DAMAGE | $0.00 | |||||||
| LOCATION (Work to be performed) | PROJECT NUMBER/WORK ORDER | WORK LOCATION | ||||||
| 1154 MAXWELL | PNQS 25 0034 | 1154 MAXWELL | ||||||
| ITEM | UNIT OF MEASURE | QUANTITY | MATERIAL/EQUIP. COSTS | LABOR RATES | OTHER | |||
| UNIT | AVERAGE | DIRECT | LINE | |||||
| TOTAL | RATE | TOTAL | COSTS | TOTAL | ||||
| DIVISION 1 (General Requirements) | ||||||||
| SUPERINTENDENT | WEEK | $0.00 | $0.00 | $0.00 | ||||
| DUMP CONTANER | EA | $0.00 | $0.00 | $0.00 | ||||
| $0.00 | $0.00 | $0.00 | ||||||
| DIVISION 2 (Site Work) | ||||||||
| $0.00 | $0.00 | $0.00 | ||||||
| DEMO CLASS ROOM | SF | $0.00 | $0.00 | $0.00 | ||||
| DIVISION 3 (CONCRETE | ||||||||
| DIVISION 4 (MASONRY) | ||||||||
| $0.00 | $0.00 | $0.00 | ||||||
| DIVISION 5 (METAL) | ||||||||
| $0.00 | $0.00 | $0.00 | ||||||
| DIVISION 6 (WOOD AND PLASTICS) | ||||||||
| $0.00 | $0.00 | $0.00 | ||||||
| DIVISION 7 (THERMAL AND MOISTURE PROTECTION) | ||||||||
| SPRAY FOAM | SF | $0.00 | $0.00 | $0.00 | ||||
| CIMR | SF | $0.00 | $0.00 | $0.00 | ||||
| DIVISION 8 (DOORS AND WINDOWS) | ||||||||
| $0.00 | $0.00 | $0.00 | ||||||
| DIVISION 9 (FINISHES) | ||||||||
| Replace Ceiling Tiles | SF | $0.00 | $0.00 | $0.00 | ||||
| Remove Damage Sheetrock | SF | $0.00 | $0.00 | $0.00 | ||||
| $0.00 | $0.00 | $0.00 | ||||||
| DIVISION 10 (SPECIALTIES) | $0.00 | |||||||
| CLEAN CARPET | SF | $0.00 | $0.00 | $0.00 | ||||
| Repair Cove Base | LF | $0.00 | $0.00 | $0.00 | ||||
| DIVISION 11 (EQUIPMENT) | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | ||||||
| DIVISION 12 (FURNISHINGS) | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | ||||||
| DIVISION 13 (SPECIAL CONSTRUCTION) | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | ||||||
| DIVISION 14 (CONVEYING SYSTEMS) | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | ||||||
| DIVISION 15 (MECHANICAL) | $0.00 | |||||||
| Flue Vent Repair | FT | $0.00 | $0.00 | |||||
| Mechanical OH&P | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | ||||||
| DIVISION 16 (ELECTRICAL/FIRE SYSTEM/COMMUNICATIONS) | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| $0.00 | $0.00 | $0.00 | ||||||
| Material Costs | $0.00 | $0.00 | ||||||
| Tax on Materials | 10% | $0.00 | $0.00 | |||||
| TOTAL MATERIAL COST | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | ||||||
| Labor Cost | $0.00 | $0.00 | ||||||
| Insurance & Tax on Labor | 20% | $0.00 | $0.00 | |||||
| TOTAL LABOR COST | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | ||||||
| Total Other Direct Costs | $0.00 | $0.00 | $0.00 | |||||
| Total Material, Labor, Tax & Insurance | $0.00 | $0.00 |
| TOTAL DIRECT COSTS | $0.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | $0.00 | |||
| Overhead | 10% | $0.00 | $0.00 | $0.00 | |
| Subtotal | $0.00 | $0.00 | $0.00 | $0.00 | |
| Profit | 10% | $0.00 | $0.00 | $0.00 | |
| Sub Total | $0.00 | $0.00 | |||
| TOTAL | $0.00 | $0.00 | $0.00 | ||
| Bonds | 2.5% | $0.00 | $0.00 | ||
| TOTAL | $0.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 |