Copy of Bid Form (Soil Removal Project-Foundry-Radford-EDA-11.10.24).xlsx
XLSX spreadsheet 15 KB Posted
- Attached to
- City of Radford is seeking bids for Contaminated Soil Removal on a previous Foundry site.
- Solicitation number
- 81544
- Issued by
- Richmond County, Virginia
About this file
This document is a Bid Form for a soil excavation project at the former Radford Foundry site in Radford, Virginia. The project is being solicited by the City of Radford. The scope of work includes mobilization, installation of soil erosion and sediment control measures, excavation and disposal of non-hazardous and RCRA characteristically hazardous soils, procurement and placement of fill soils, seeding and stabilization, and removal of soil erosion and sediment control measures. The quantities include 40 tons of non-hazardous soil and 375 tons of RCRA characteristically hazardous soil for excavation and disposal, as well as 1,315 tons of fill soil and 3,600 square yards of seeding and stabilization.
The Bid Form requires the bidder to provide unit pricing for each of the scope items. The total price bid is to be provided at the bottom of the form. No other details are provided regarding the solicitation process, such as response dates, award dates, or contract term.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Bid Form |
| Exposure Area B Soil Excavation |
| Former Radford Foundry |
| Radford, VA |
| Bidder Name: |
| Bidder Address: |
Date:
| BID FORM | ||||||||
| Item | Description | Quantity | Unit | Unit | ||||
| Price | Total | |||||||
| Price | General Scope of Work | |||||||
| 1 | Mobilization | 1 | each | $ - 0 | Project setup; HASP preparation; training; permittin;, submittals; mobilization/demobilization of equipment, materials and cre;, soil sampling and analyses; coordination with the City on final areas and volumes of excavation; excavation area layout; equipment and personnel decontamination including decontamination water and water disposal. | |||
| 2 | Installation of Soil Erosion and Sediment Control Measures | 1 | each | $ - 0 | Installation and maintenance of silt fence, silt sock and construction entrance, stormwater management | |||
| 3 | Non-hazardous Soil Excavation, Transportation and Disposal | |||||||
| 3a | Excavate, load and transport to disposal facility | 40 | Ton | $ - 0 | Means and methods to safely excavate soils identified for removal to the lines and grades established, loading onto licensed/permitted trucks, truck bed liners as required, soil conditioning as reqiuired for acceptable transport, manifests or bills of lading for each load transported off-site. Copies of all minfiests/bills of labding to be maintained on site and copies provided to the City. | |||
| 3b | Disposal costs | 40 | Ton | $ - 0 | Disposal approvals and disposal of non-hazardous waste soils and incidental materials (e.g., PPE) at permitted and City-approved Sub-title D facility. Submittal of certified weigh tickets and Certificates of Disposal/Destruction to the City for each load of soil transported off-site. | |||
| 4 | RCRA Characterisitically Hazardous Soil Excavation, Transportation and Disposal | |||||||
| 4a | Excavate, load and transport to disposal facility | 375 | Ton | $ - 0 | Means and methods to safely excavate soils identified for removal to the lines and grades established, loading onto licensed/permitted trucks, truck bed liners as required, soil conditioning as reqiuired for acceptable transport, VADEQ manifests for each load transported off-site. Copies of all minfiests/bills of labding to be maintained on site and copies provided to the City. | |||
| 4b | Disposal costs | 375 | Ton | $ - 0 | Disposal approvals and disposal of RCRA Characterisitically Hazardous Waste soils and incidental materials (e.g., PPE) at permitted and City-approved Sub-title C facility. Submittal of certified weigh tickets and Certificates of Disposal/Destruction to the City for each load of soil transported off-site. | |||
| 5 | Soil Approval, Procurement, Delivery, Placement, Grading and Tracking in (~415 tons to fill excavation void and ~900 tons for protective soil cover) | 1,315 | Ton | $ - 0 | Approval of acceptable source of soil, procurement, delivery, placment, grading and tracking in. Submittal of certified weigh tickets to the City. | |||
| 6 | Seeding and Stabilization | 3,600 | SY | $ - 0 | Procurement, delivery, application, stabilization and watering (as necessary to establish growth) of acceptable seeding mixture and rate of application | |||
| 7 | Removal of Soil Erosion and Sediment Control Measures | 1 | each | $ - 0 | Removal and off-site disposal of soil erosion and sediment controls, final site restoration |
Total Price Bid: $ - 0
| Notes: |
| 1 |
File details come from the government source that posted it. Updated .