COP_Fiber_layout.pdf

PDF 17 KB Posted

Attached to
Data Center Move
Solicitation number
2023-RFP-190
Issued by
Allegheny County, Philadelphia City, Pennsylvania

About this file

The document is a network infrastructure diagram depicting the connectivity between various sites and network components for the City of Pittsburgh's data center move project. The diagram illustrates a complex network topology involving multiple internet service providers (ISPs) including Comcast, Verizon, and DQE, with interconnections between key locations such as CORE CCB, EOC, PHQ, DR (Disaster Recovery), and remote sites. The diagram shows redundant network paths using different colored lines (blue and red) and includes connections from Comcast iNET, Verizon iNET, and Internet remote sites.

The network layout suggests a robust, multi-provider infrastructure with redundant connectivity to ensure high availability and resilience. The diagram indicates the use of CWDM (Coarse Wavelength Division Multiplexing) technology and multiple connection points between different network nodes, which implies a sophisticated approach to network design for the data center migration. The presence of multiple ISPs and interconnected sites suggests a comprehensive network strategy that prioritizes reliability, performance, and potential failover capabilities for the City of Pittsburgh's infrastructure.

View the file

Other files

File Type Posted
Data_Center_Move_(Addendum_#1_Revision).pdf PDF
Routers_and_Firewalls.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CORE

CCB

EOC DR

PHQ

Comcast iNET

Verizon iNET

INTERNET

(ISP:DQE)

Comcast

Remote

Sites

Internet

Remote

Sites

Verizon

Remote

Sites

DQEC

2931d89e-c4ac-46e1-a34c-8c8af28d0d7a.vsd
Page-1

File details come from the government source that posted it. Updated .