Contractor Entrance Requirements.docx

DOCX document 14 KB Posted

Attached to
FEMA_Region1_Furniture_Partitions
Solicitation number
FEMA_Region1_Furniture_Partitions
Issued by

View the file

Other files

File Type Posted
Desk Barriers SOO.docx DOCX document
Past Experience Questionnaire-Region 1.doc DOC document
DBA Wage Determination 202001.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SITE VISIT REQUIREMENTS

1) Each contractor shall be limited to two representatives.

2) All contractors shall maintain social distances while on or in the facility.

3) Each contractor shall have and ware facial covering when in the facility.

4) The contractor/contractors shall be split into groups of 4 for the walk-through.

5) Temperature Checks will be taken before entering the facility.

6) If you have any of the following you will be denied entry into the facility.

- Temperature over 100.4 degrees

- You feel ill.

- You or a household member are awaiting COVID-19 test results.

- You or a household member tested POSTIVE for COVID-19.

- Are you taking any pain killers for headaches, etc.

7) Vendors must bring their own pens/pads if applicable

8) All contractors will be responsible for supplying their own PPE (Masks - mandatory) and will not be provided these items by the government. No vendor can enter the facility without proper protective equipment.

File details come from the government source that posted it. Updated .