Contractor Cost Breakdown Form.xls
XLS spreadsheet 185 KB Posted
- Solicitation number
- W15QKN-20-R-5068
About this file
This notice provides details for an upcoming federal contract solicitation seeking installation services. The U.S. Army Contracting Command-NJ will issue a solicitation for the Installation of Snow Melting Systems for Automatic Gates at locations in Conneaut Lake, Farrell, and New Castle, Pennsylvania, as well as Fairview, Pennsylvania. The solicitation will be a total small business set-aside and result in a single firm fixed price contract, with the potential for multiple awards. Interested parties must monitor www.beta.sam.gov for the issuance of the solicitation. The response deadline and period of performance will be stated within the solicitation. The NAICS code for this opportunity is 238210. All inquiries should be directed to the points of contact specified in the notice.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Davis Bacon WD PA20200049 7-24-20 (Conneaut Lake).docx | DOCX document | |
| SOW-Install snow melting system for gates 3 PA Locations - CSS 12285.docx | DOCX document | |
| Davis Bacon WD PA20200097 7-24-20 (Farrell).docx | DOCX document | |
| SOW-Fairview-PA209-Gate Operator and Snow Melt-CSS 12277.docx | DOCX document | |
| PA209-Fairview-A2-CSS 12277-Pics-Gate Operator and Snow Melt.pptx | PPTX presentation | |
| Davis Bacon WD PA20200058 7-24-20 (New Castle).docx | DOCX document | |
| Davis Bacon WD PA20200088 7-24-20 (Fairview).docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet2
| ID | Sort | Type | Description (to include labor,equipment, material type and grade) | Quantity | Unit Measure | Labor in Manhours | Equipment | Material | Total Cost | ||||||||
| Crew (skill set) | Labor Hours | Total Hrs | City Cost Index | Unit Cost* | Total Labor Cost* | Unit Cost | Total Equipment Cost | City Cost Index | Unit Cost | Total Material Cost | |||||||
| Totals | |||||||||||||||||
| GENERAL CONTRACTOR | |||||||||||||||||
| OVERHEAD | $ - 0 | ||||||||||||||||
| $ - 0 | |||||||||||||||||
| PROFIT | $ - 0 | ||||||||||||||||
| $ - 0 | |||||||||||||||||
| BOND | $ - 0 | ||||||||||||||||
| G & A | $ - 0 | ||||||||||||||||
| GRAND TOTAL | $ - 0 | ||||||||||||||||
| Unit Cost* | Cost for one labor hour of the specified crew | ||||||||||||||||
| Total Labor Cost* | "=Unit Cost x Total Hours" |
File details come from the government source that posted it. Updated .