Contractor Cost Breakdown Form.xls
XLS spreadsheet 185 KB Posted
- Solicitation number
- W15QKN-20-R-5068
About this file
This document outlines requirements for the installation of snow melting systems and gate operators at multiple federal sites in Pennsylvania. The Army Contracting Command - New Jersey is seeking capability statements from small businesses for installing snow melting systems for automatic gates in Conneaut Lake, Farrell, and New Castle, Pennsylvania, as well as gate operators and a snow melting system in Fairview, Pennsylvania. Interested vendors must submit capability statements by email including company information, point of contact, certifications, and business size. The anticipated contract type is firm-fixed-price for 90 days following notice to proceed. The North American Industry Classification System code for this work is 238210.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SOW-Install snow melting system for gates 3 PA Locations - CSS 12285.docx | DOCX document | |
| PA209-Fairview-A2-CSS 12277-Pics-Gate Operator and Snow Melt.pptx | PPTX presentation | |
| SOW-Fairview-PA209-Gate Operator and Snow Melt-CSS 12277.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet2
| ID | Sort | Type | Description (to include labor,equipment, material type and grade) | Quantity | Unit Measure | Labor in Manhours | Equipment | Material | Total Cost | ||||||||
| Crew (skill set) | Labor Hours | Total Hrs | City Cost Index | Unit Cost* | Total Labor Cost* | Unit Cost | Total Equipment Cost | City Cost Index | Unit Cost | Total Material Cost | |||||||
| Totals | |||||||||||||||||
| GENERAL CONTRACTOR | |||||||||||||||||
| OVERHEAD | $ - 0 | ||||||||||||||||
| $ - 0 | |||||||||||||||||
| PROFIT | $ - 0 | ||||||||||||||||
| $ - 0 | |||||||||||||||||
| BOND | $ - 0 | ||||||||||||||||
| G & A | $ - 0 | ||||||||||||||||
| GRAND TOTAL | $ - 0 | ||||||||||||||||
| Unit Cost* | Cost for one labor hour of the specified crew | ||||||||||||||||
| Total Labor Cost* | "=Unit Cost x Total Hours" |
File details come from the government source that posted it. Updated .