Contractor Cost Breakdown.xlsx

XLSX spreadsheet 29 KB Posted

Attached to
Railing Installation Danbury, CT (CT018) Federal contract opportunity
Solicitation number
W15QKN25QA108
Issued by
Department of the Army Materiel Command Contracting Command Picatinny Arsenal

About this file

The file is a Contractor Cost Breakdown spreadsheet for a small business set-aside construction project (Solicitation W15QKN25QA108) involving railing installation at a site in Danbury, CT. The spreadsheet provides a template for detailed cost analysis, including categories for labor hours, equipment, and materials, with columns for quantity, unit measures, unit costs, and total costs across different labor categories.

The associated federal contract opportunity is issued by the Department of the Army Materiel Command Contracting Command at Picatinny Arsenal, targeting maintenance and construction of office buildings under NAICS code 236220. The project requires a contractor to provide all necessary resources including labor, equipment, tools, materials, supervision, and transportation to complete railing installation, with a size standard of $45,000,000. This is a 100% small business set-aside opportunity, emphasizing support for smaller contracting firms in completing specific construction requirements for the 99th Readiness Division.

View the file

Other files for this federal contract opportunity

Other files attached to Railing Installation Danbury, CT (CT018), newest first.
File Type Posted
CT018-Danbury-B08-CSS 96519-SOW-Install Railing.pdf PDF
DBA WD CT20250020 Mod 8 Dated 06 June 2025.pdf PDF
Solicitation - W15QKN25QA108 Released.pdf PDF
CT018-Danbury-B08-CSS 96519-Drawing-Install Railing.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

IDSortTypeDescription (to include how requirement is going to be completed)QuantityUnit MeasureLabor in ManhoursQuantityUnit MeasureEquipmentQuantityUnit MeasureMaterialTotal Cost
Labor Category (CREW SKILLSET)Labor HoursTotal HrsCity Cost IndexUnit Cost*Total Labor Cost*Equipment BreakoutUnit CostTotal Equipment CostCity Cost IndexUnit CostTotal Material Cost

Totals

CO-EFFICIENT $ - 0

BONDING (IF APPLICABLE) $ - 0

GRAND TOTAL $ - 0

Unit Cost*Cost for one labor hour of the specified crewCost for one labor hour of the specified crewCost for one labor hour of the specified crew
Total Labor Cost*"=Unit Cost x Total Hours""=Unit Cost x Total Hours""=Unit Cost x Total Hours"

File details come from the government source that posted it. Updated .