Contractor Affidavit
66 KB Posted
- Attached to
- Waterline & Underground Heat Loop Ware SP
- Solicitation number
- GDC-22-WARE-SP-014
- Issued by
- Georgia
About this file
Contractor Affidavit Summary
This is a Contractor Affidavit document related to the Georgia Department of Corrections' solicitation for professional engineering and architectural services for the Waterline & Underground Heat Loop Replacement Project at Ware State Prison (GDC-22-WARE-SP-014) located at 3620 North Harris Road, Waycross, Georgia 31503. The project encompasses the replacement of the existing water main and underground heating loop serving dormitory housing and administrative buildings within the security fence perimeter. The scope of design services includes preparation of schematic design and design development documents, construction documents, bidding assistance, and construction contract administration. Interested registered engineers and architects should monitor the Georgia procurement registry for projected updates and availability of the Notice to Design Professionals.
The affidavit document serves as a formal declaration from the contractor regarding their qualifications, compliance, and commitment to fulfilling the contract obligations. Specific pricing terms, set-asides, incumbent information, funding sources, and contract duration details should be referenced in the associated Notice to Design Professionals and procurement documentation available through the Georgia procurement registry for comprehensive bid evaluation criteria and award procedures.
Other files
| File | Type | Posted |
|---|---|---|
| Award Information | — | |
| Notice to Design Professionals | — |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .