Contract - W911SG26CA034_KO Signed.pdf
PDF 6 MB Posted
- Attached to
- Dishwasher Replacement B20626
- Solicitation number
- W911SG-26-C-A034
About this file
This is a signed fixed-price construction contract awarded by the U.S. Army Corps of Engineers to remove and replace a commercial dishwasher, food tray accumulator, and water heat booster at Dining Facility Building 20626 at Fort Bliss, Texas. The contract number is W911SG26CA034, with a firm fixed price of $369,846.50. The work scope includes incidental interior painting, ceiling and floor repairs, and mechanical, plumbing, and electrical work necessary to install equipment with capacity meeting or exceeding existing units. The contract is a 100% service-disabled veteran-owned small business (SDVOSB) set-aside under NAICS 238210 with a small business size standard of $19 million. The estimated construction magnitude is between $250,000 and $500,000.
The period of performance is 180 calendar days from the Notice to Proceed, with liquidated damages of $1,717.14 per calendar day for delays. Performance and payment bonds are required. The contractor must provide a superintendent at all times during work performance, which is designated as a key position that cannot be subcontracted. All work must be performed simultaneously, and the facility will remain operational as a dining facility during construction, requiring 14-day advance notice for dishwasher and tray accumulator demolition or utility outages. The contract incorporates numerous FAR and DFARS clauses, including Buy American requirements for construction materials, Davis-Bacon prevailing wage standards applicable to Texas El Paso County, and security requirements for the Fort Bliss installation. Progress payments will be made monthly through the Wide Area Workflow (WAWF) system, with invoices submitted to the designated DoDAAC W583FE.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(See ).
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair) IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR
INFORMATION CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
SOLICITATION
1. SOLICITATION NUMBER
5. REQUISITION/PURCHASE REQUEST NUMBER
CODE
6. PROJECT NUMBER
8. ADDRESS OFFER TO
4. CONTRACT NUMBER
7. ISSUED BY
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
11. The contractor shall begin performance within
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and
b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than
STANDARD FORM 1442 (REV. 12/2022)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
is, is not required.
local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.
calendar days and complete it within calendar days after receiving
a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
12b. CALENDAR DAYS
2. TYPE OF SOLICITATION
SEALED BID (IFB)
INVITATION FOR BID
NEGOTIATED (RFP)
REQUEST FOR PROPOSAL
3. DATE ISSUED PAGE OF PAGES
AWARD (To be completed by Government)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
OFFER (Must be fully completed by offeror)
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT
NUMBER
DATE
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
CODE FACILITY CODE
15. TELEPHONE NUMBER (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14.)
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
21. ITEMS ACCEPTED:
22. AMOUNT
26. ADMINISTERED BY
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31c. DATE
STANDARD FORM 1442 (REV. 12/2022) BACK
31b. UNITED STATES OF AMERICA
BY
31a. NAME OF CONTRACTING OFFICER (Type or print)
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30b. SIGNATURE 30c. DATE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.) Contractor agrees to furnish
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
23. ACCOUNTING AND APPROPRIATION DATA
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED STATES
CODE AT
27. PAYMENT WILL BE MADE BY
10 U.S.C. 3204(a) ( ) 41 U.S.C. 3304(a) ( )
20b. SIGNATURE 20c. OFFER DATE
Patrick.Ferguson Line
Patrick.Ferguson Line
Section 00 00 00 - Procurement and Contracting Requirements
Remove and Replace Dishwasher DFAC at Bldg. 20626Instrument Name:
Scope of project includes the removal and replacement of the existing Contract Description:
commercial dishwasher, food tray accumulator, and water heat booster which are past their lifecycle at the existing Dining Facility, building 20626. The Contractor shall provide a new commercial dishwasher, food tray accumulator, and water heat booster, and all associated components with a capacity that meets or exceeds the existing units. Incidental work to include interior paint, ceiling and floor repair, mechanical, plumbing, and electrical work. The Contractor shall provide all work, labor, materials, related fees, and related services for construction requested herein until completion and acceptance of the entire work, except for any completed unit of work which may have been accepted under the contract, by the Government in a professional and collaborative environment to sustain mission requirements. Construction services and finished products shall be delivered on schedule, safely, and compliant with regulatory codes and standards. Contractor to review the attached Environmental Review Form for specific environmental comments about this project. PERFORMANCE AND PAYMENT BONDS ARE
REQUIRED. THIS IS A 100% COMPETITIVE SET-A SIDE FOR SMALL BUSINESS. NAICS
238210 WITH A SMALL BUSINESS SIZE STANDARD OF $19 MILLION. THE ESTIMATED
MAGNITUDE OF CONSTRUCTION FOR THIS PROJECT IS BETWEEN $250,000. AND
$500,000. THE AWARDEE OF THIS CONTRACT WILL BE REQUIRED TO PROVIDE A
SUPERINTENDENT AT ALL TIMES WORK IS BEING PERFORMED ON THE PROJECT (SEE
CLAUSE AT FAR 52.236-6). THE SUPERINTENDENT IS CONSIDERED A KEY POSITION. THIS
POSITION SHALL NOT BE SUBCONTRACTED AND MUST WORK DIRECTLY FOR THE
PRIME CONTRACTOR. ALL WORK SHALL BE PERFORMED SIMULTANEOUSLY .
RESULTING CONTRACT WILL BE FRIM FIXED PRICED (FFP).
North American Industry Classification System (NAICS) : 238210 Header only - Purchase Requisition Number : W583FE0012429143
SCOPE OF PROJECT INCLUDES THE REMOVAL AND REPLACEMENT OF THE EXISTING
COMMERCIAL DISHWASHER, FOOD TRAY ACCUMULATOR, AND WATER HEAT BOOSTER
WHICH ARE PAST THEIR LIFECYCLE AT THE EXISTING DINING FACILITY, BUILDING 20626.
THE CONTRACTOR SHALL PROVIDE A NEW COMMERCIAL DISHWASHER, FOOD TRAY
ACCUMULATOR, AND WATER HEAT BOOSTER, AND ALL ASSOCIATED COMPONENTS
WITH A CAPACITY THAT MEETS OR EXCEEDS THE EXISTING UNITS. INCIDENTAL WORK
TO INCLUDE INTERIOR PAINT, CEILING AND FLOOR REPAIR, MECHANICAL, PLUMBING,
AND ELECTRICAL WORK. THE CONTRACTOR SHALL PROVIDE ALL WORK, LABOR,
MATERIALS, RELATED FEES, AND RELATED SERVICES FOR CONSTRUCTION
REQUESTED HEREIN UNTIL COMPLETION AND ACCEPTANCE OF THE ENTIRE WORK,
EXCEPT FOR ANY COMPLETED UNIT OF WORK WHICH MAY HAVE BEEN ACCEPTED
UNDER THE CONTRACT, BY THE GOVERNMENT IN A PROFESSIONAL AND
W911SG26CA034
COLLABORATIVE ENVIRONMENT TO SUSTAIN MISSION REQUIREMENTS.
CONSTRUCTION SERVICES AND FINISHED PRODUCTS SHALL BE DELIVERED ON
SCHEDULE, SAFELY, AND COMPLIANT WITH REGULATORY CODES AND STANDARDS.
CONTRACTOR TO REVIEW THE ATTACHED ENVIRONMENTAL REVIEW FORM FOR
SPECIFIC ENVIRONMENTAL COMMENTS ABOUT THIS PROJECT.
PERFORMANCE AND PAYMENT BONDS ARE REQUIRED.
THIS IS A 100% COMPETITIVE SET-A SIDE FOR SERVICE-DISABLED VETERAN OWNED
SMALL BUSINESS.
NAICS 238210 WITH A SMALL BUSINESS SIZE STANDARD OF $19 MILLION.
THE ESTIMATED MAGNITUDE OF CONSTRUCTION FOR THIS PROJECT IS BETWEEN
$250,000. AND $500,000.
THE AWARDEE OF THIS CONTRACT WILL BE REQUIRED TO PROVIDE A
SUPERINTENDENT AT ALL TIMES WORK IS BEING PERFORMED ON THE PROJECT (SEE
CLAUSE AT FAR 52.236-6). THE SUPERINTENDENT IS CONSIDERED A KEY POSITION. THIS
POSITION SHALL NOT BE SUBCONTRACTED AND MUST WORK DIRECTLY FOR THE
PRIME CONTRACTOR. ALL WORK SHALL BE PERFORMED SIMULTANEOUSLY .
RESULTING CONTRACT WILL BE FRIM FIXED PRICED (FFP).
*** END OF NARRATIVE ***
Section 00 10 00 - Solicitation, Contract Line Item Number (CLIN) Schedule
Additional Information/Notes
Item Supplies/Service Quanti ty
Unit Unit Price Amount
0001 Product Service Description:
REMOVE AND REPLACE
DISHWASHER DFAC 20626
Product Service Code: Z2FD
North American Industry Classification System (NAICS):
238210
Pricing Arrangement: Firm Fixed Price
ACRN: AA
PR Number:
W583FE0012429143PR Line Item Number: 0001
1 Job USD 369,846.50
Firm Price
USD
369,846.50 Funded Amount
USD
369,846.50
Section 00 72 00 - General Conditions
FAR Clauses Incorporated by Reference
Number Title Effective Date
Alternate Deviation
Variation Effective Date
52.202-1 Definitions. 2020-06
52.203-3 Gratuities. 1984-04
52.203-6 Restrictions on Subcontractor Sales to the Government.
2020-06
52.203-7 Anti-Kickback Procedures. 2020-06
52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity.
2014-05
52.203-10 Price or Fee Adjustment for Illegal or Improper Activity.
2014-05
52.203-12 Limitation on Payments to Influence Certain Federal Transactions.
2020-06
52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements.
2017-01
52.204-13 System for Award Management- Maintenance. (Deviation 2026- O0038)
2026-02
52.204-19 Incorporation by Reference of Representations and Certifications.
2014-12
52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded. (Deviation 2026- O0038)
2026-02
52.209-10 Prohibition on Contracting With Inverted Domestic Corporations.
(Deviation 2026-O0038)
2026-02
52.211-13 Time Extensions. 2000-09
52.212-4 Terms and Conditions- Commercial Products and Commercial Services. (Deviation 2026-O0038)
2026-02
52.215-8 Order of Precedence-Uniform Contract Format. (Deviation 2026-O0038)
2026-02
52.219-6 Notice of Total Small Business Set-Aside. (Deviation 2026- O0038)
2026-02
52.219-27 Notice of Set-Aside for, or Sole- Source Award to, Service- Disabled Veteran-Owned Small Business (SDVOSB) Concerns Eligible Under the SDVOSB Program. (Deviation 2026-O0038)
2026-02
52.219-33 Nonmanufacturer Rule.
(Deviation 2026-O0038)
2026-02
52.222-50 Combating Trafficking in Persons. (Deviation 2026-O0038)
2026-02
52.222-55 Minimum Wages for Contractor Workers Under Executive Order 14026. (Deviation 2026-O0038)
2026-02
52.222-90 Addressing DEI Discrimination by Federal Contractors.
(Deviation 2026-O0040, Revision 1)
2026-04
52.226-7 Drug-Free Workplace. 2024-05
52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving.
2024-05
52.228-2 Additional Bond Security. 1997-10
52.228-11 Individual Surety-Pledge of Assets.
2021-02
52.228-12 Prospective Subcontractor Requests for Bonds.
2022-12
52.228-14 Irrevocable Letter of Credit. 2014-11
52.228-15 Performance and Payment Bonds-Construction.
2020-06
52.229-12 Tax on Certain Foreign Procurements. (Deviation 2026- O0038)
2026-02
52.232-8 Discounts for Prompt Payment. 2002-02
52.232-17 Interest. 2014-05
52.232-23 Assignment of Claims. 2014-05
52.232-27 Prompt Payment for Construction Contracts.
2017-01
52.232-33 Payment by Electronic Funds Transfer-System for Award Management.
2018-10
52.232-40 Providing Accelerated Payments to Small Business Subcontractors.
2023-03
52.233-1 Disputes. (Deviation 2026- O0038)
2026-02
52.233-3 Protest after Award. (Deviation 2026-O0038)
2026-02
52.233-4 Applicable Law for Breach of Contract Claim. (Deviation 2026- O0038)
2026-02
52.236-2 Differing Site Conditions.
(Deviation 2026-O0038)
2026-02
52.236-3 Site Investigation and Conditions Affecting the Work. (Deviation 2026-O0038)
2026-02
52.236-5 Material and Workmanship.
(Deviation 2026-O0038)
2026-02
52.236-6 Superintendence by the Contractor. (Deviation 2026- O0038)
2026-02
52.236-7 Permits and Responsibilities.
(Deviation 2026-O0038)
2026-02
52.236-8 Other Contracts. (Deviation 2026- O0038)
2026-02
52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, 2026-02 and Improvements. (Deviation 2026-O0038)
52.236-10 Operations and Storage Areas.
(Deviation 2026-O0038)
2026-02
52.236-11 Use and Possession Prior to Completion. (Deviation 2026- O0038)
2026-02
52.236-12 Cleaning Up. (Deviation 2026- O0038)
2026-02
52.236-13 Accident Prevention. (Deviation 2026-O0038)
2026-02
52.236-15 Schedules for Construction Contracts. (Deviation 2026- O0038)
2026-02
52.236-21 Specifications and Drawings for Construction. (Deviation 2026- O0038)
2026-02
52.240-91 Security Prohibitions and Exclusions. (Deviation 2026- O0038)
2026-02
52.242-13 Bankruptcy. 1995-07
52.242-14 Suspension of Work. 1984-04
52.243-4 Changes. (Deviation 2026- O0038)
2026-02
52.244-6 Subcontracts for Commercial Products and Commercial Services. (Deviation 2026-O0038)
2026-04
52.246-12 Inspection of Construction. 1996-08
52.246-13 Inspection-Dismantling, Demolition, or Removal of Improvements.
1996-08
52.249-2 Termination for Convenience of the Government (Fixed-Price).
2012-04
52.249-10 Default (Fixed-Price Construction).
1984-04
DFARS Clauses Incorporated by Reference
Number Title Effective Date
Alternate Deviation
Variation Effective Date
252.201-7000 Contracting Officer's Representative.
1991-12
252.203-7000 Requirements Relating to Compensation of Former DoD Officials.
2011-09
252.203-7002 Requirement to Inform Employees of Whistleblower Rights.
2022-12
252.204-7003 Control of Government Personnel Work Product.
1992-04
252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting.
2024-05
252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services.
2023-01
252.209-7004 Subcontracting with Firms that are Owned or Controlled by the Government of a Country that is a State Sponsor of Terrorism.
2019-05
252.222-7002 Compliance with Local Labor Laws (Overseas).
1997-06
252.223-7006 Prohibition on Storage, Treatment, and Disposal of Toxic or Hazardous Materials.
2014-09
252.223-7008 Prohibition of Hexavalent Chromium.
2023-01
252.225-7005 Identification of Expenditures in the United States.
2005-06
252.225-7012 Preference for Certain Domestic Commodities.
2022-04
252.225-7048 Export-Controlled Items. 2013-06
252.225-7056 Prohibition Regarding Business Operations with the Maduro Regime.
2023-01
252.225-7060 Prohibition on Certain Procurements from the Xinjiang Uyghur Autonomous Region.
2023-06
252.232-7003 Electronic Submission of Payment Requests and Receiving Reports.
2018-12
252.232-7004 DoD Progress Payment Rates. 2014-10
252.232-7010 Levies on Contract Payments. 2006-12
252.233-7001 Choice of Law (Overseas). 1997-06
252.236-7000 Modification Proposals--Price Breakdown.
1991-12
252.243-7001 Pricing of Contract Modifications. 1991-12
252.243-7002 Requests for Equitable Adjustment.
2022-12
252.247-7023 Transportation of Supplies by Sea.
2024-10
FAR Clauses Incorporated by Full Text
Date
Alternate Deviation
Variation Effective Date
52.211-12 Liquidated Damages- Construction.
2000-09
Liquidated Damages-Construction (Sept 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of for $1,717.14 each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
(End of clause)
52.225-9 Buy American-Construction Materials. (Deviation 2026- O0038)
2026-02
Buy American-Construction Materials (Feb 2026) (Deviation 2026-O0038)
(a) . As used in this clause-Definitions
Commercially available off-the-shelf (COTS) item-
(1) Means any item of supply (including construction material) that is-
(i) A commercial product (as defined in paragraph (1) of the definition of "commercial product" at Federal Acquisition Regulation (FAR) 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.
"Construction material" means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies.
However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
Cost of components means-
(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
Critical component means a component that is mined, produced, or manufactured in the United States and deemed critical to the U.S. supply chain. The list of critical components is at FAR 25.105.
Critical item means a domestic construction material or domestic end product that is deemed critical to U.S. supply chain resiliency. The list of critical items is at FAR 25.105.
Domestic construction material means-
(1) For construction material that does not consist wholly or predominantly of iron or steel or a combination of both-
(i) An unmanufactured construction material mined or produced in the United States; or
(ii) A construction material manufactured in the United States, if-
(A) The cost of its components mined, produced, or manufactured in the United States exceeds 60 percent of the cost of all its components, except that the percentage will be 65 percent for items delivered in calendar years 2024 through 2028 and 75 percent for items delivered starting in calendar year 2029. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic. Components of unknown origin are treated as foreign; or
(B) The construction material is a COTS item; or
(2) For construction material that consists wholly or predominantly of iron or steel or a combination of both, a construction material manufactured in the United States if the cost of foreign iron and steel constitutes less than 5 percent of the cost of all components used in such construction material. The cost of foreign iron and steel includes but is not limited to the cost of foreign iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the construction material and a good faith estimate of the cost of all foreign iron or steel components excluding COTS fasteners. Iron or steel components of unknown origin are treated as foreign. If the construction material contains multiple components, the cost of all the materials used in such construction material is calculated in accordance with the definition of "cost of components".
Fastener means a hardware device that mechanically joins or affixes two or more objects together. Examples of fasteners are nuts, bolts, pins, rivets, nails, clips, and screws.
Foreign construction material means a construction material other than a domestic construction material.
Foreign iron and steel means iron or steel products not produced in the United States.
Produced in the United States means that all manufacturing processes of the iron or steel must take place in the United States, from the initial melting stage through the application of coatings, except metallurgical processes involving refinement of steel additives. The origin of the elements of the iron or steel is not relevant to the determination of whether it is domestic or foreign.
Predominantly of iron or steel or a combination of both means that the cost of the iron and steel content exceeds 50 percent of the total cost of all its components. The cost of iron and steel is the cost of the iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the product and a good faith estimate of the cost of iron or steel components excluding COTS fasteners.
Steel means an alloy that includes at least 50 percent iron, between 0.02 and 2 percent carbon, and may include other elements.
"United States" means the 50 States, the District of Columbia, and outlying areas.
(b) Domestic preference.
(1) This clause implements 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the domestic content test of the Buy American statute is waived for construction material that is a COTS item, except that for construction material that consists wholly or predominantly of iron or steel or a combination of both, the domestic content test is applied only to the iron and steel content of the construction materials, excluding COTS fasteners. The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.
(2) This requirement does not apply to information technology that is a commercial product or to the construction materials or components listed by the Government as follows:
NONE
(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that-
(i) The cost of domestic construction material would be unreasonable.
(A) For domestic construction material that is not a critical item or does not contain critical .components
(1) The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 20 percent;
(2) For construction material that is not a COTS item and does not consist wholly or predominantly of iron or steel or a combination of both, if the cost of a particular domestic construction material is determined to be unreasonable or there is no domestic offer received, and the low offer is for foreign construction material that is manufactured in the United States and does not exceed 55 percent domestic content, the Contracting Officer will treat the lowest offer of foreign construction material that exceeds 55 percent domestic content as a domestic offer and determine whether the cost of that offer is unreasonable by applying the evaluation factor listed in paragraph (b)(3)(i)(A) of this clause.(1)
(3) The procedures in paragraph (b)(3)(i)(A) of this clause will no longer apply as of January (2) 1, 2030.
(B) .For domestic construction material that is a critical item or contains critical components
(1) The cost of a particular domestic construction material that is a critical item or contains critical components, subject to the requirements of the Buy American statute, is unreasonable when the cost of such material exceeds the cost of foreign material by more than 20 percent plus the additional preference factor identified for the critical item or construction material containing critical components listed at FAR 25.105.
(2) For construction material that does not consist wholly or predominantly of iron or steel or a combination of both, if the cost of a particular domestic construction material is determined to be unreasonable or there is no domestic offer received, and the low offer is for foreign construction material that does not exceed 55 percent domestic content, the Contracting Officer will treat the lowest foreign offer of construction material that is manufactured in the United States and exceeds 55 percent domestic content as a domestic offer, and determine whether the cost of that offer is unreasonable by applying the evaluation factor listed in paragraph (b)(3) (i)(B) of this clause.(1)
(3) The procedures in paragraph (b)(3)(i)(B) of this clause will no longer apply as of January (2) 1, 2030.
(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or
(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.
(c) Request for determination of inapplicability of the Buy American statute.
(1)
(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)
(3) of this clause shall include adequate information for Government evaluation of the request, including-
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Price;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.
(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).
(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.
(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.
(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute or Balance of Payments Program.
(d) . To permit evaluation of requests under paragraph (c) of this clause based on Data unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:
Foreign and Domestic Construction Materials Price Comparison
Construction material description Unit of measure Quantity Price (dollars)*
Item 1:
Foreign construction material.
Domestic construction material.
Item 2:
Foreign construction material.
Domestic construction material.
[* Include all delivery costs to the construction site and any applicable duty (whether or not a ].duty-free entry certificate is issued)
[List name, address, telephone number, and contact for suppliers surveyed. Attach copy of ]response; if oral, attach summary.
[ ]Include other applicable supporting information.
(End of clause)
52.228-13 Alternative Payment Protections. 2000-07
Alternative Payment Protections (July 2000)
(a) The Contractor shall submit one of the following payment protections:
(b) The amount of the payment protection shall be 100 percent of the contract price.
(c) The submission of the payment protection is required within ____ days of contract award.
(d) The payment protection shall provide protection for the full contract performance period plus a one-year period.
(e) Except for escrow agreements and payment bonds, which provide their own protection procedures, the Contracting Officer is authorized to access funds under the payment protection when it has been alleged in writing by a supplier of labor or material that a nonpayment has occurred, and to withhold such funds pending resolution by administrative or judicial proceedings or mutual agreement of the parties.
(f) When a tripartite escrow agreement is used, the Contractor shall utilize only suppliers of labor and material that signed the escrow agreement.
52.232-5 Payments under Fixed-Price Construction Contracts.
2014-05
Payments under Fixed-Price Construction Contracts (May 2014)
(a) Payment of price. The Government shall pay the Contractor the contract price as provided in this contract.
(b) Progress payments. The Government shall make progress payments monthly as the work proceeds, or at more frequent intervals as determined by the Contracting Officer, on estimates of work accomplished which meets the standards of quality established under the contract, as approved by the Contracting Officer.
(1) The Contractor's request for progress payments shall include the following substantiation:
(i) An itemization of the amounts requested, related to the various elements of work required by the contract covered by the payment requested.
(ii) A listing of the amount included for work performed by each subcontractor under the contract.
(iii) A listing of the total amount of each subcontract under the contract.
(iv) A listing of the amounts previously paid to each such subcontractor under the contract.
(v) Additional supporting data in a form and detail required by the Contracting Officer.
(2) In the preparation of estimates, the Contracting Officer may authorize material delivered on the site and preparatory work done to be taken into consideration. Material delivered to the Contractor at locations other than the site also may be taken into consideration if-
(i) Consideration is specifically authorized by this contract; and
(ii) The Contractor furnishes satisfactory evidence that it has acquired title to such material and that the material will be used to perform this contract.
(c) Contractor certification. Along with each request for progress payments, the Contractor shall furnish the following certification, or payment shall not be made: (However, if the Contractor elects to delete paragraph (c)(4) from the certification, the certification is still acceptable.)
I hereby certify, to the best of my knowledge and belief, that-
(1) The amounts requested are only for performance in accordance with the specifications, terms, and conditions of the contract;
(2) All payments due to subcontractors and suppliers from previous payments received under the contract have been made, and timely payments will be made from the proceeds of the payment covered by this certification, in accordance with subcontract agreements and the requirements of Chapter 39 of Title 31, United States Code;
(3) This request for progress payments does not include any amounts which the prime contractor intends to withhold or retain from a subcontractor or supplier in accordance with the terms and conditions of the subcontract; and
(4) This certification is not to be construed as final acceptance of a subcontractor's performance.
____ (Name)
____ (Title)
____ (Date)
(d) Refund of unearned amounts. If the Contractor, after making a certified request for progress payments, discovers that a portion or all of such request constitutes a payment for performance by the Contractor that fails to conform to the specifications, terms, and conditions of this contract (hereinafter referred to as the "unearned amount"), the Contractor shall-
(1) Notify the Contracting Officer of such performance deficiency; and
(2) Be obligated to pay the Government an amount (computed by the Contracting Officer in the manner provided in paragraph (j) of this clause) equal to interest on the unearned amount from the 8th day after the date of receipt of the unearned amount until-
(i) The date the Contractor notifies the Contracting Officer that the performance deficiency has been corrected; or
(ii) The date the Contractor reduces the amount of any subsequent certified request for progress payments by an amount equal to the unearned amount.
(e) Retainage. If the Contracting Officer finds that satisfactory progress was achieved during any period for which a progress payment is to be made, the Contracting Officer shall authorize payment to be made in full. However, if satisfactory progress has not been made, the Contracting Officer may retain a maximum of 10 percent of the amount of the payment until satisfactory progress is achieved. When the work is substantially complete, the Contracting Officer may retain from previously withheld funds and future progress payments that amount the Contracting Officer considers adequate for protection of the Government and shall release to the Contractor all the remaining withheld funds. Also, on completion and acceptance of each separate building, public work, or other division of the contract, for which the price is stated separately in the contract, payment shall be made for the completed work without retention of a percentage.
(f) Title, liability, and reservation of rights. All material and work covered by progress payments made shall, at the time of payment, become the sole property of the Government, but this shall not be construed as-
(1) Relieving the Contractor from the sole responsibility for all material and work upon which payments have been made or the restoration of any damaged work; or
(2) Waiving the right of the Government to require the fulfillment of all of the terms of the contract.
(g) Reimbursement for bond premiums. In making these progress payments, the Government shall, upon request, reimburse the Contractor for the amount of premiums paid for performance and payment bonds (including coinsurance and reinsurance agreements, when applicable) after the Contractor has furnished evidence of full payment to the surety. The retainage provisions in paragraph (e) of this clause shall not apply to that portion of progress payments attributable to bond premiums.
(h) Final payment. The Government shall pay the amount due the Contractor under this contract after-
(1) Completion and acceptance of all work;
(2) Presentation of a properly executed voucher; and
(3) Presentation of release of all claims against the Government arising by virtue of this contract, other than claims, in stated amounts, that the Contractor has specifically excepted from the operation of the release. A release may also be required of the assignee if the Contractor's claim to amounts payable under this contract has been assigned under the Assignment of Claims Act of1940 ( 31 U.S.C.3727 and 41 U.S.C. 6305).
(i) Limitation because of undefinitized work. Notwithstanding any provision of this contract, progress payments shall not exceed 80 percent on work accomplished on undefinitized contract actions. A "contract action" is any action resulting in a contract, as defined in FAR subpart 2.1, including contract modifications for additional supplies or services, but not including contract modifications that are within the scope and under the terms of the contract, such as contract modifications issued pursuant to the Changes clause, or funding and other administrative changes.
(j) Interest computation on unearned amounts. In accordance with 31 U.S.C. 3903(c)(1), the amount payable under paragraph (d)(2) of this clause shall be-
(1) Computed at the rate of average bond equivalent rates of 91-day Treasury bills auctioned at the most recent auction of such bills prior to the date the Contractor receives the unearned amount; and
(2) Deducted from the next available payment to the Contractor.
52.252-2 Clauses Incorporated by Reference.
1998-02
Clauses Incorporated By Reference (Feb 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
https://acquisition.gov
52.252-4 Alterations in Contract. 1984-04
Alterations in Contract (Apr 1984)
Portions of this contract are altered as follows:
NONE ____ ____
52.252-6 Authorized Deviations in Clauses. 2020-11
Authorized Deviations in Clauses (Nov 2020)
The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR (a) Chapter 1) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the clause.
The use in this solicitation or contract of any (48 (b) Defense Federal Acquisition Regulation CFR ) clause with an authorized deviation is indicated by the addition of 48 CFR Chapter 2 "(DEVIATION)" after the name of the regulation.
DFARS Clauses Incorporated by Full Text
Date
Alternate Deviation
Variation Effective Date
252.236-7001 Contract Drawings and Specifications.
2000-08
CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)
(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.
(b) The Contractor shall-
(1) Check all drawings furnished immediately upon receipt;
(2) Compare all drawings and verify the figures before laying out the work;
(3) Promptly notify the Contracting Officer of any discrepancies;
(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and
(5) Reproduce and print contract drawings and specifications as needed.
(c) In general--
(1) Large-scale drawings shall govern small-scale drawings; and
(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.
(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.
(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:
Title File Drawing No.
As-Built Drawings B20626 N/A N/A
Construction Sign N/A N/A
Roofing Structural Details ____ ____
Section 00 73 00 - Supplementary Conditions
Overall Contract Inspection/Acceptance Locations
Overall Contract Delivery Period
0001 1 JobQuantity
Address and POC Service Performance Site DoDAAC: W583FE
ACRN LOA Total Amount
AA ^^^021^2026^2026^^2020^000^^254^D^132^^^
^^^^021001^A60RA^^M.0167414.1^^6100.2540
^^132078QRPA^
USD 369,846.50
Line Item R/MIPR - PR Line Item# CIN Amount
CLIN 0001 W583FE0012429143 - 0001 USD 369,846.50
DFARS Clauses Incorporated by Full Text
Number Title Effective Date
Alternate Deviation
Variation Effective Date
252.232-7006 Wide Area WorkFlow Payment Instructions.
2023-01
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)
(a) As used in this clause- Definitions.
"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.
"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.
"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(b) The WAWF system provides the method to electronically process Electronic invoicing.
vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) To access WAWF, the Contractor shall- WAWF access.
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) The Contractor should follow the training instructions of the WAWF WAWF training.
Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the WAWF home page at https://wawf.eb.mil/
(e) Document submissions may be via web WAWF methods of document submission.
entry, Electronic Data Interchange, or File Transfer Protocol.
(f) The Contractor shall use the following information when WAWF payment instructions.
submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:
(1) The Contractor shall submit payment requests using the following Document type.
document type(s):
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items-
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.
CONSTRUCTION INVOICE
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial financing, submit a commercial financing request.
(2) ) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
(3) The Contractor shall use the information in the Routing Data Document routing.
Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF
Pay Official DoDAAC
HQ0490
Issue By DoDAAC
W911SG
W911SG
Admin DoDAAC
Inspect By DoDAAC
W583FE
Ship To Code
W583FE
Ship From Code
Mark For Code
Service Approver (DoDAAC)
W583FE
Service Acceptor (DoDAAC)
W583FE
Accept at Other DoDAAC
LPO DoDAAC
DCAA Auditor DoDAAC
Other DoDAAC(s)
(4) The Contractor shall ensure a payment request includes Payment request.
documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.
(5) The Contractor shall ensure a receiving report meets the Receiving report.
requirements of DFARS Appendix F.
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.
Acceptor: Candice Reyes at candice.v.reyes.civ@army.mil
Contracting Specialist: Jarrett Gillium at jarrett.m.gillium.mil@army.mil
Contracting Officer: Flor Sanchez at flor.f.sanchez.civ@army.mil
(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.
mailto://candice.v.reyes.civ@army.mil mailto://jarrett.m.gillium.mil@army.mil mailto://flor.f.sanchez.civ@army.mil
Section 01 00 00 - General Requirements
"General Decision Number: TX20260245 05/18/2026
State: Texas
Construction Types: Building
Counties: Texas Counties of
El Paso
Modification Number Publication Date
0 01/02/2026
1 05/18/2026
BOIL0074-003 01/01/2025
Rates Fringes
BOILERMAKER.........................................$ 33.17 24.92
ELEC0583-001 01/01/2025
Rates Fringes
ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING AND
INSTALLATION OF ALARMS/HVAC TEMPERATURE CONTROLS)...$ 29.50 9.39
ENGI0178-005 06/01/2020
Rates Fringes
POWER EQUIPMENT OPERATOR ((3) HYDRAULIC CRANES 59
TONS AND UNDER).....................................$ 32.35 13.10
POWER EQUIPMENT OPERATOR ((1) TOWER CRANE)..........$ 32.85 13.10
IRON0084-011 06/01/2024
Rates Fringes
IRONWORKER: ORNAMENTAL..............................$ 28.26 8.13
PLUM0412-001 01/02/2024
Rates Fringes
PLUMBER (INCLUDING HVAC PIPE INSTALLATION)..........$ 40.74 15.35
SFTX0669-002 04/01/2025
Rates Fringes
SPRINKLER FITTER (FIRE SPRINKLERS)..................$ 38.57 24.47
SUTX2014-021 07/21/2014
Rates Fringes
TRUCK DRIVER: WATER TRUCK..........................$ 12.00 4.11
TRUCK DRIVER: SEMI-TRAILER TRUCK...................$ 12.50 0.00
TRUCK DRIVER: FLATBED TRUCK........................$ 19.65 8.57
TRUCK DRIVER: DUMP TRUCK...........................$ 12.39 1.18
TILE SETTER.........................................$ 12.02 0.00
TILE FINISHER.......................................$ 11.22 0.00
SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION.$ 21.13 6.53
SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY)....$ 23.56 3.60
ROOFER..............................................$ 11.42 0.00
PIPEFITTER, EXCLUDES HVAC PIPE INSTALLATION.........$ 18.15 0.98
PAINTER: BRUSH, ROLLER, AND SPRAY...................$ 12.50 0.00
OPERATOR: ROLLER...................................$ 12.70 0.00
OPERATOR: PAVER (ASPHALT, AGGREGATE, AND
CONCRETE)...........................................$ 16.03 0.00
OPERATOR: MECHANIC.................................$ 17.00 0.00
OPERATOR: LOADER...................................$ 12.87 0.70
OPERATOR: GRADER/BLADE.............................$ 19.50 1.05
OPERATOR: FORKLIFT.................................$ 14.83 0.00
OPERATOR: DRILL....................................$ 16.22 0.34
OPERATOR: BULLDOZER................................$ 18.29 1.31
OPERATOR: BOBCAT/SKID STEER/SKID LOADER............$ 13.93 0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE...............$ 14.43 0.74
LABORER: LANDSCAPE AND IRRIGATION...................$ 10.00 0.00
LABORER: ROOF TEAROFF..............................$ 10.06 0.00
LABORER: PIPELAYER.................................$ 11.00 3.47
LABORER: MASON TENDER - CEMENT/CONCRETE............$ 10.82 0.96
LABORER: MASON TENDER - BRICK......................$ 12.50 2.30
LABORER: DRILLER...................................$ 14.12 1.01
LABORER: COMMON OR GENERAL.........................$ 9.30 0.00
IRONWORKER, STRUCTURAL..............................$ 15.37 4.34
IRONWORKER, REINFORCING.............................$ 15.60 0.00
INSULATOR - MECHANICAL (DUCT, PIPE & MECHANICAL
SYSTEM INSULATION)..................................$ 16.91 0.00
GLAZIER.............................................$ 15.86 1.00
FORM WORKER.........................................$ 12.57 1.03
FLOOR LAYER: VINYL FLOORING........................$ 12.87 0.00
FLOOR LAYER: CARPET................................$ 12.81 0.00
FENCE ERECTOR.......................................$ 9.93 1.83
ELECTRICIAN (LOW VOLTAGE WIRING ONLY)...............$ 15.38 2.92
ELECTRICIAN (HVAC/TEMPERATURE CONTROLS INSTALLATION
ONLY)...............................................$ 19.09 6.45
ELECTRICIAN (ALARM INSTALLATION ONLY)...............$ 15.38 2.92
DRYWALL HANGER AND METAL STUD INSTALLER.............$ 12.81 0.00
CEMENT MASON/CONCRETE FINISHER......................$ 13.02 0.00
CARPENTER, EXCLUDES DRYWALL FINISHING/TAPING,
DRYWALL HANGING, FORM WORK AND METAL STUD
INSTALLATION........................................$ 13.51 3.29
CARPENTER (DRYWALL FINISHING/TAPING ONLY)...........$ 12.81 0.00
BRICKLAYER..........................................$ 16.17 0.00
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the
Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.
Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to
Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .