Contract for Bidding Purposes Summary
This is a bidding document for a construction project in Texas involving excavation, fill placement, and storm water infrastructure development to serve the Bellamina Phase Two detention facility. The project encompasses excavation of approximately 196,000 cubic yards of material and placement of approximately 2,000 linear feet of storm sewer pipe ranging from 24-inch to 60-inch reinforced concrete pipe (RCP), including installation of an outlet control structure within the detention basin. The document establishes the framework for competitive bidding and contract award, with specific requirements for bidder qualifications, bid submission procedures, and project specifications that contractors must adhere to when preparing their proposals for this infrastructure improvement initiative.
The bidding document outlines the terms and conditions under which qualified contractors may submit proposals for the project execution. It includes detailed specifications for materials, construction methodology, and quality standards required for the excavation and storm water system installation. The contract specifies contractual obligations, insurance requirements, bonding provisions, and performance standards that successful bidders must maintain throughout project completion. Additional requirements address site conditions, drainage considerations, and coordination protocols necessary for implementing the detention basin infrastructure within the designated project area.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DOCUMENTS AND
TECHNICAL SPECIFICATIONS
Proposed Excavation, Fill Placement and Storm Water Facilities to Serve Bellamina Phase Two Detention
WALLER COUNTY MUNICIPAL UTILITY DISTRICT NO. 59
Project #:23-048-102-DST
Odyssey Engineering Group, LLC.
2500 Tanglewilde Street, Suite 300
Houston, Texas 77063
TBPELS F-17637 & 10195040
September 2026
Owner:
Engineer:
Waller County Municipal Utility District No. 59
8/27/26
WALLER COUNTY MUNICIPAL UTILITY DISTRICT NO. 59
PROPOSED EXCAVATION, FILL PLACEMENT AND STORM WATER FACILITIES TO SERVE
BELLAMINA PHASE TWO DETENTION
TABLE OF CONTENTS
INVITATION TO BIDDERS
INSTRUCTION TO BIDDERS
DEFINITION OF TERMS
ACKNOWLEDGEMENT OF BIDDERS
BID PROPOSAL
CONTRACT
GENERAL CONDITIONS TO THE CONTRACT
ATTACHMENT A – INSURANCE REQUIREMENTS
ATTACHMENT B – MINIMUM WAGE RATE SCALE
ADDENDUM TO THE GENERAL CONDITIONS OF THE CONTRACT
SPECIAL CONDITIONS OF THE CONTRACT PART A – PROJECT INFORMATION
SPECIAL CONDITIONS OF THE CONTRACT PART B – DEVELOPER AGREEMENT
TEXAS SALES USE AND TAX EXEMPTION CERTIFICATE
PAYMENT BOND
PERFORMANCE BOND
MAINTENANCE BOND
W-9 FORM
TECHNICAL SPECIFICATIONS
GEOTECHNICAL REPORT
SAMPLE FORMS:
AFFIDAVIT OF BILLS PAID
WAIVER AND RELEASE OF LIEN UPON PARTIAL AND FINAL PAYMENT
LETTER OF GUARANTOR
REQUEST FOR ADDITIONAL TIME
BLANK TCEQ NOTICE OF INTENT AND NOTICE OF TERMINATION FORM
Projects/2023/23-048-102/Project/Construction/DST/2. Contract Documents/Original Documents/003_ Invitation to Bidders Electronic and Paper Bids Electronic Signatures Option and.docx
WALLER COUNTY
MUNICIPAL UTILITY DISTRICT NO.59 Dates: August 26, 2026 and September 2, 2026
INVITATION TO BIDDERS
Sealed Bids addressed to Odyssey Engineering Group, LLC, Attention: President, Board of Directors of
Waller County Municipal Utility District No. 59, will be received electronically using the CivCast USA website (www.CivCastUSA.com)or at the office of Odyssey Engineering Group, LLC, 2500 Tanglewilde
Street, Suite 300, Houston, Texas 77063 until 10:00 a.m. Local Time, September 17, 2026, and then publicly opened and read at the office of Odyssey Engineering Group, LLC, 2500 Tanglewilde Street, Suite
300, Houston, Texas 77063 for the following project:
Waller County Municipal Utility District No. 59, Waller County, Texas
Proposed Excavation, Fill Placement and Storm Water Facilities to Serve
Bellamina Phase Two Detention
Odyssey Project No.: 23-048-102-DST
In addition to the opening of sealed Bids at the address above, you may view the public opening of sealed
Bids via Microsoft Teams. To join via Microsoft Teams, follow the instructions that will be uploaded to
CivCast.
Scope of Work of the Contract Documents includes the following: Project includes excavation of approximately 196,000 cubic yards and placement of approximately 2,000 linear feet of storm sewer ranging from 24-Inch to 60-Inch RCP, including an outlet control structure within the detention basin.
The above-described construction will be performed in accordance with plans and specifications and any addenda thereto which may be issued prior to the opening of bids. Plans, specifications and bid documents may be viewed and downloaded free of charge or the option to purchase hard copies on the CivCastUSA Website (www.CivCastUSA.com): search 23-048-102-DST. Bidders must register on this website to view and/or download specifications, plans, soils report, and environmental reports for this
Project.
Bids received after the closing time will be returned unopened. A NON-MANDATORY pre-bid conference will be held remotely via Microsoft Teams or in-person on September 9, 2026, at 10:00 a.m.
Local Time, at the offices of Odyssey Engineering Group, LLC, 2500 Tanglewilde Street, Suite 300, Houston, Texas 77063. Instructions for call-in and for remote meetings are available at www.CivCastUSA.com.
Each Bid must be accompanied by a Bid bond or a certified or cashier’s check, acceptable to the Owner, in an amount not less than two percent (2%) of the total amount Bid, as a guarantee that the successful bidder will enter into the Contract Documents and execute the Bonds on the forms provided and provide the required insurance certificates and Bonds within seven (7) days after the date Contract Documents are received by the successful bidder. If a certified or cashier’s check is provided, the successful bidder shall deliver, at the bid opening address, the original certified or cashier’s check within one (1) business day of receipt of the bid opening.
A bidder submitting electronic Bids must submit its Bid and Bid Securities in compliance with Owner’s
Order Adopting Section 49.2731 Electronic Bidding Rules and all electronic Bids and Bid Securities must be submitted through www.civcast.com. Bidder must register on this website to submit a Bid and Bid
Security and there is no charge to submit Bids and Bid Securities on this website.
http://www.civcastusa.com/
Projects/2023/23-048-102/Project/Construction/DST/2. Contract Documents/Original Documents/003_ Invitation to Bidders Electronic and Paper Bids Electronic Signatures Option and.docx
By submitting a Bid, bidder acknowledges and agrees that the Contract Documents may be accepted, executed or agreed to through the use of an Electronic Signature, as defined by and in accordance with
Owner’s Electronic Signature Rules for Construction Contracts, if adopted by the District.
The Owner reserves the right to reject any or all Bids and to waive all defects and irregularities in bidding or bidding process except the time for submitting a Bid. The successful bidder, if any, will be the responsible bidder, which in the Board’s judgment will be most advantageous to the District and result in the best and most economical completion of the Project.
The requirements of Subchapter J, Chapter 552, Government Code, may apply to this Bid and the bidder agrees that the Contract Documents can be terminated if the bidder knowingly or intentionally fails to comply with a requirement of that subchapter.
MUNICIPAL UTILITY DISTRICT NO. 59 INSTRUCTIONS TO BIDDERS
1109700 Instructions to Bidders September 2023
INSTRUCTIONS TO BIDDERS
1. PREPARATION OF BIDS. Unless otherwise directed in the Invitation to Bidders, each Bid must be submitted on the bid forms provided or on photocopies of the forms, in conformity with the requirements of the Invitation to Bidders, these Instructions to Bidders (“Instructions”), and the instructions printed on the bid form. In addition, if submitting a paper Bid, the Bid must be submitted in duplicate.
All blanks on the bid form must be completed and no change shall be made to the bid form or any other of the Contract Documents. All amounts must be in figures, with amounts extended and totaled. If minimum unit prices have been established for certain items, the minimum unit prices will be shown on the bid form. See Paragraph 8 of these Instructions. If the bidder chooses not to bid on optional items (if any), “No Bid” must be entered in the bid space. Any Bid may be rejected if it contains any omission, erasure, alteration, addition, irregularity of any kind, or items not called for; if it does not submit prices for each of the items in the bid form; if it is not signed by the bidder;
if it is unbalanced; or if it in any manner, fails to conform to the conditions of the Invitation to Bidders and these Instructions. An “unbalanced” Bid means a Bid containing unit prices that are significantly less than cost for some items and significantly more than cost for others. This may be evidenced by submission of unit price Bid items where the cost is significantly higher/lower than the cost of the same Bid items submitted by other Bidders on the same Project.
The bidder must sign its Bid. If the Bid is made by a partnership or corporation, the name and address of the partnership or corporation must be shown together with the names and addresses of the partners or officers. If the Bid is made by an individual, it must be executed by that person; if made by a partnership, it must be executed by one of the partners (and if by a limited partnership, then executed by the general partner); or if made by a corporation, it must be executed in the corporate name by the president or a vice-president (or other corporate officer accompanied by evidence of authority to sign) and the corporate seal must be affixed and attested by the secretary or assistant secretary of the corporation. The corporate address and state of incorporation shall be shown below the signature.
When applicable, evidence of authority to conduct business as an out-of-state corporation in the State of Texas must be provided in accordance with the paragraph entitled QUALIFICATION OF BIDDERS. State contractor license number, if any, must also be shown.
The Bid and the Bid Security must be sealed and must identify the contents (i.e., Bid or Bid Security), the bidder’s name, and the job name and number, and be addressed to the Owner as prescribed in the Invitation to Bidders.
2. CONTRACT DOCUMENTS. The Contract Documents are complementary and must be read together as a whole; what is called for by one is binding as if called for by all.
Bidders desiring further information or further interpretation of any part of the Contract Documents are hereby obligated to submit a written request online to the www.CivcastUSA.com system for such information to Engineer not less than two (2) calendar days before the Bid opening. If appropriate, answers to these requests will be given, in writing, to all bidders as addenda to the Contract Documents, and when each addendum is issued it becomes a part of the Contract Documents. No explanation or interpretation of the Contract Documents, other than written addenda, is binding.
Should a bidder find discrepancies or errors in or omissions from the Contract Documents or should the bidder be in doubt as to any meaning, the bidder is hereby obligated to notify Engineer in writing. It is the responsibility of each bidder to determine if it has received all addenda, complete files of which will be maintained at the Engineer’s office and the office designated to receive the Bids, if any.
Each bidder must inform itself fully of the construction and labor conditions under which the Work will be performed and will be presumed to have inspected the Site and to have read and to be thoroughly familiar with the Contract Documents. Failure to do so will not relieve the successful bidder of its obligation to furnish all materials and labor necessary to carry out the requirements of the Contract Documents and to complete the Work for the consideration in its Bid.
3. PRE-BID CONFERENCE. A pre-bid conference among Owner, Engineer, prospective bidders, and others will be held to discuss the scope of the Work and to answer questions concerning the Work. No addendum will be issued at this conference, but an addendum will be issued afterwards, if necessary, to answer questions. The pre-bid conference will be held at the place and time stated in the Invitation to Bidders or as modified by written addenda.
4. BID SECURITY. Each Bid must be accompanied by a bid bond or a certified or cashier’s check, acceptable to the Owner, in an amount not less than two (2) percent of the total amount bid (the “Bid Security”), as a guarantee that the successful bidder will enter into the Contract and execute the required Bonds on the forms provided and provide the required insurance certificates and Bonds within seven (7) days after the date Contract Documents are received by the successful bidder. Bid Securities will be returned to all but the three (3) most qualified, responsible bidders within three (3) days after opening of Bids, and the latter’s Bid Securities will be returned after complete execution of the Contract Documents. If the successful bidder does not enter into the Contract after notice of award, then the bidder’s Bid Security will be forfeited and will be retained by Owner. If the award of the Contract to the successful bidder is canceled or not executed for any reason, the Owner may accept the next lowest bid and proceed with the next-lowest qualified bidder.
5. BONDS. The successful bidder must furnish a performance bond and a payment bond each in the sum of 100 percent (100%) of the Contract Price. The successful bidder must also provide a one-year (1) Maintenance Bond for one hundred (100) percent of the cost of the construction of the improvements that will be owned by WALLER COUNTY MUNICIPAL UTILITY DISTRICT NO. 59. The Bonds must be in the form prescribed by the Contract Documents except as required otherwise by Laws and Regulations. The Bonds must be from a surety company holding a permit from the State of Texas to act as surety. Unless otherwise specified, the cost of proving Bonds must be included in the bidder’s total Bid amount. The surety company must have a minimum Best Key Rating of “B+” or better. The surety company, the agency and agent issuing the Bonds must be authorized to issue Bonds in Texas in an amount equal to the total Contract Price and such authorization must be recorded in the files of the Texas Department of Insurance. The person executing the Bonds must be a licensed Texas local recording agent and such licensing must be recorded in the files of the Texas Department of Insurance. All Bonds signed by an agent must be accompanied by a certified copy of the agent’s authority to act. The Bonds must be executed by a duly appointed representative of the surety company licensed by the State of Texas as a General Lines Agent and such licensing must be recorded in the files of the Texas Department of Insurance. If the surety company does not have such a rating due to the length of time it has existed, the surety company must be eligible to participate in the surety bond guarantee program of the Small Business Administration and must be an approved surety listed in the current U.S. Department of Treasury Circular 570, and must meet all of the rules and regulations of the Treasury Department with respect to performance and payment bonds for federal jobs, including specifically the rules related to underwriting limitation.
For contracts over $100,000, the surety must also hold a certificate of authority from the United States Secretary of Treasury to qualify as a surety on obligations permitted or required under federal law, or have obtained reinsurance for any liability in excess of $1,000,000 from a reinsurer that is authorized and admitted as a reinsurer in the State of Texas and is the holder of a certificate of authority from the United States Secretary of Treasury to qualify as a surety or reinsurer on obligations permitted or required under federal law. If bidder’s proposed surety company, agency or agents do not meet the requirements herein, then Owner may refrain from considering the bidder for Contract award and Owner may require bidder to forfeit its Bid Security.
It is further agreed that the successful bidder will execute the Bonds required for the satisfactory performance of the Work, the fulfillment of any guarantees required, and the prompt payment to all persons supplying labor and materials in the prosecution of the Work, in accordance with the Contract Documents and on the forms provided for this purpose. It is agreed that this Contract is not in effect until the required Bonds are furnished and approved by Owner. Upon increase of the Contract Price authorized by Change Order, Contractor must immediately provide revised Bonds for such increased Contract Price. Contractor’s failure to provide compliant Bonds may be grounds for immediate termination regardless of whether the Contractor has started the Work on the Project.
If the surety on any Bond furnished by Contractor is declared bankrupt or becomes insolvent or its right to do business is terminated in any state where any part of the Project is located or it ceases to meet the requirements herein Contractor must promptly notify Owner; Developer, if there is a Special Conditions of the Contract Part B; and Engineer and must, within ten (10) calendar days after the event giving rise to such notification, provide another Bond and surety to fulfill the required obligations.
6. DELIVERY OF BIDS. It is each bidder’s responsibility to deliver its Bid and Bid Security as stated in the Invitation to Bidders before the closing time. The fact that a Bid and a Bid Security were dispatched will not be considered. The Bid and Bid Security must be timely delivered to be considered.
7. “OR EQUAL” SUBMISSIONS. Where materials or equipment are specified by a trade or brand name, it is not the intention of the Owner to discriminate against an equal product of another manufacturer, but to set a definite standard of quality or performance. In preparing its proposal, each bidder is expected to include in its base Bid the cost of the item so specified. However, in certain Technical Specification sections, manufacturers are listed followed by “or equal”. In certain other Technical Specification sections, manufacturers are listed with “or equal” not included. In those items where “or equal” is not included, it is hereby added and understood to be included, even though not specifically stated in each Technical Specification. If a bidder chooses to submit a suggested “or equal” product in lieu of a product by one of the named manufacturers, Owner will evaluate the item to determine if it is an “equal”. The bidder is responsible for providing all data required to evaluate an item submitted as a suggested “or equal.” Owner’s decision on whether a suggested manufacturer is an “equal” is final. No claims for additional cost or time delay, etc. will be accepted if a suggested manufacturer is submitted by bidder as an “equal” and Owner decides the item is not “equal”.
Bidder must submit its list of suggested “or equal” items at time of Bid submission. No additional suggested “or equal” items will be considered after bid opening.
8. MINIMUM UNIT PRICE ITEMS. If the approximate quantity and a minimum unit price have been established for items in the bid form, the bidder may not bid a unit price less than the minimum value; however, it may bid an amount greater than the minimum unit price. If no entry is made in the spaces provided, the minimum unit prices shown apply.
9. EXTRA UNIT PRICE ITEMS. Extra Unit Price Items are included to facilitate payment for changes and alterations that may be required to complete the Work. The Work, as provided by the Contract Documents, is described in bid items other than Extra Unit Price Items. When additional Work covered by Extra Unit Price Items is performed, payment will be based on the quantity constructed and the unit prices entered in the Bid.
10. TIME FOR COMPLETION. Contractor will not be allowed time extensions (i) due to inclement weather except for Force Majeure events as defined under Section 1.01 of the General Conditions of the Contract; (ii) due to non-availability of equipment or material, when the principal units of Work and tasks on the critical path are not in progress or are not delayed by the event of delay, interference, disruption, or hindrance; (iii) when at least seven (7) hours of available working time remain out of the working day; (iv) while materials are drying and it is possible for the Contractor to enclose the area and use drying devices; (v) when an event of delay, interference, disruption, or hindrance occurs on a day other than a working day or other day when the Contractor had not originally planned to work; (vi) when an event of delay, interference, disruption, or hindrance occurs after the expiration of the Contract Time; (vii) to the extent the Contractor could have anticipated or alleviated the impact of the event of delay, interference, disruption, or hindrance through reasonable efforts; (viii) when events of concurrent delay overlap the claimed delay; and/or (ix) when an extension of time is precluded by any provision of the Contract Documents.
11. QUALIFICATION OF BIDDERS. The apparent most qualified, responsible bidder must submit to Owner, within five (5) calendar days of notification of award of the Contract, either (i) a fully completed contractor’s statement of qualification or (ii) a written statement that the most recently submitted contractor’s statement of qualification is accurate, which statement of qualification must be considered in the award of the Contract. Failure to accurately complete the contractor’s statement of qualification or to timely submit the statement of qualification will, at Owner’s option, disqualify the bidder from consideration in the award of the Contract. The form of the Contractor’s statement of qualification is available from the Engineer. Owner may reject, at Owner’s sole discretion, a bidder’s statement of qualification if the bidder’s statement of qualification is not on the form provided. Evidence of out-of-state incorporation to conduct business in the state in which the Work is to be performed, along with state contractor license number, must also be provided and is a consideration in the award of the Contract.
12. MODIFICATION AND WITHDRAWAL OF BIDS. Bids may be modified or withdrawn by an appropriate document duly executed (in the manner that a Bid must be executed) and delivered in the same manner as Bids were submitted at any time prior to the opening of Bids. If, within twenty-four (24) hours after Bids are opened, any bidder files a duly signed, written notice with Owner and promptly thereafter demonstrates to the reasonable satisfaction of Owner that there was a material and substantial mistake in the preparation of its Bid despite the exercise of ordinary care, that bidder may withdraw its Bid and the Bid Security will be returned.
13. HOUSE BILL 1295. Provision of Texas Ethics Commission Form 1295 (“TEC Form 1295”) pursuant to Texas Government Code § 2252.908 (the “Interested Party Disclosure Act” or the “Act”): Unless bidder is exempt from such requirements pursuant to Texas Government Code
Section 2252.908(c)(4), the Owner may not award the Contract to a bidder unless the bidder has provided to the Owner a completed and signed TEC Form 1295 which has been assigned a certificate number by the Texas Ethics Commission (the “TEC”). Pursuant to the rules prescribed by the TEC, the TEC Form 1295 must be completed online through the TEC’s website, assigned a certificate number, printed, signed, and provided to the Owner. For purposes of completing the TEC Form 1295, the entity’s name is WALLER COUNTY MUNICIPAL UTILITY DISTRICT NO. 59, the contract ID number is 23-048-102-DST and the description of goods and services is PROPOSED
EXCAVATION, FILL PLACEMENT AND STORM WATER FACILITIES TO SERVE BELLAMINA PHASE
TWO DETENTION. Neither the Owner nor its consultants have the ability to verify all of Contractor’s information included in a TEC Form 1295, and neither have an obligation nor undertake responsibility for advising any bidder with respect to the proper completion of the TEC Form 1295. ALL BIDDERS MUST SUBMIT THEIR TEC FORM 1295 WITH THEIR BID.
14. AWARD OF CONTRACT. Owner reserves the right to reject any or all Bids, including without limitation the right to reject any or all nonconforming, non-responsive, unbalanced or conditional Bids and to reject the Bid of any bidder if Owner believes that it would not be in the best interest of the Project to make award to that bidder, whether because the Bid is not responsive or the bidder is unqualified or of doubtful financial ability or fails to meet any other pertinent standard or criteria of Owner. Owner also reserves the right to waive all informalities and defects in bidding, except time of submitting a Bid. Discrepancies between the multiplication of units and unit prices in a Bid will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum if the correct sum is evident from the face of the Bid.
In evaluating Bids, Owner will consider, among other things, the qualifications of bidders, whether the Bids comply with the prescribed requirements, and such substitutions, alternates, unit prices and other data, as may be requested in the bid form or prior to the notice of award. Alternate bid items will not be considered unless requested in the bid form.
Owner may consider the qualifications and experience of subcontractors, suppliers, and other persons and organizations proposed for the Work. Owner also may consider the operating costs, maintenance requirements, performance data and guarantees of major items of materials and equipment proposed for incorporation in the Work.
Owner may conduct such investigations as Owner deems necessary to assist in the evaluation of any Bid and to establish the responsibility, qualifications and financial ability of bidders, proposed subcontractors, suppliers and other persons and organizations to perform and furnish the Work in accordance with the Contract Documents, to Owner’s satisfaction.
BY SUBMITTING A BID, EACH BIDDER AUTHORIZES OWNER TO PERFORM ALL INVESTIGATIONS
INTO THE BIDDER’S BACKGROUND, CAPABILITIES, PRIOR EXPERIENCE, AND OTHER FACTORS
PERTAINING TO BIDDER’S PERFORMANCE OF THE WORK, AS OWNER DEEMS NECESSARY IN ITS
SOLE DISCRETION, AND FOR THAT PURPOSE, SUBMISSION OF A BID ACTS AS BIDDER’S SPECIFIC
AUTHORIZATION TO PERSONS AND ENTITIES CONTACTED BY OWNER IN CONNECTION WITH
SUCH INVESTIGATIONS TO PROVIDE OWNER WITH THE INFORMATION REQUESTED BY OWNER
AND TO DISCUSS AND EXPRESS OPINIONS CONCERNING BIDDER. FURTHER, BY SUBMISSION OF
A BID, BIDDER AGREES TO FULLY AND FOREVER WAIVE AND RELEASE ANY CLAIM (KNOWN OR
UNKNOWN) IT HAS OR MAY HAVE AGAINST THE OWNER, ENGINEER, DEVELOPER AND THEIR
RESPECTIVE ATTORNEYS, EMPLOYEES, CONSULTANTS, REPRESENTATIVES, AND AGENTS (“THE
EVALUATING PARTIES”) ARISING OUT OF OR IN CONNECTION WITH THE: (1) ADMINISTRATION, EVALUATION, OR RECOMMENDATION (OR LACK THEREOF) OF ANY BID; (2) WAIVER OF ANY
REQUIREMENTS UNDER THE BID DOCUMENTS OR THE CONTRACT DOCUMENTS; AND (3)
ACCEPTANCE OR REJECTION OF ANY BIDS AND AWARD OF THE CONTRACT.
Owner reserves the right to award the Bid, at Owner’s discretion, based on the amount of the total base bid (without including “Extra Unit Price Items” or “alternate” bid items) or on the amount of the total amount bid (including “Extra Unit Price Items” or “alternate” bid items), or based on any other combination, means or method determined appropriate by Owner.
If the Contract is to be awarded, it will be awarded to the responsible bidder whose evaluation by Owner indicates that the award will be most advantageous to the Owner and result in the best and most economical completion of the Work.
If the Contract is to be awarded, Owner will give the successful bidder a notice of award within sixty (60) days after the day of the Bid opening. All bidders must honor their Contract Price on their bid form, if the Contract is awarded within the timeframe provided herein. A Notice to Proceed will be issued within a reasonable period after the Contract Documents are fully executed.
Within seven (7) calendar days of receipt from the Owner of the notice of award, the successful bidder must submit to the Engineer the payment and performance bonds and all information or other items necessary to complete the Contract Documents, including the required insurance, anticipated construction schedule, and Contractor’s safety program. See SAFETY under Section
5.20 of the General Conditions of the Contract. The successful bidder must return the fully executed Contract Documents to Engineer within seven (7) calendar days of receipt, or Owner may at its sole discretion disqualify the Bid and accept another Bid and the bidder must, at Owner’s option, forfeit its Bid Security.
15. TAXES, LICENSES AND FEES. Certain taxes, licenses, fees, and other similar items are part of the cost of the Work, and it is bidder’s responsibility to familiarize itself with these costs and to observe and comply with the Laws and Regulations relating to same. The prices, sums, rates, and other charges set forth in the bidder’s Bid must cover and include all such costs. Owner is exempt from Texas sales and use taxes pursuant to Texas Tax Code § 151.309 as a political subdivision of the State of Texas. Owner shall provide Contractor, if requested by Contractor in writing, with a completed Texas Sales and Use Tax Exemption Certification as evidence of the applicability of such exemption, as limited by applicable statute. In addition, Contractor, and all subcontractors to Contractor (i) must not include any provision for Texas sales and use taxes with respect to such exempt items in any Bid or the Contract Price, and (ii) must pass on to the Owner cost savings due to the exempt status of such exempt items. Contractor’s contracts with all subcontractors to Contractor must include the foregoing provision regarding the exemption from Texas sales and use taxes. Contractor must pay taxes on items that are not exempt.
16. NUMBER OF SIGNED SETS OF DOCUMENTS. The Contract Documents will be prepared in at least three (3) original sets for signature, one (1) for delivery to the successful bidder. Owner will furnish the successful bidder up to six (6) sets of Plans and Technical Specifications free of charge, and additional sets may be obtained from Engineer at Engineer’s reproduction rates.
17. ELECTRONIC COUNTERPARTS; FORM OF BONDS TO BE PROVIDED TO OWNER. The Contract Documents may be executed and delivered in any number of counterparts, each of which so executed and delivered will be deemed to be an original and all of which will constitute one and the same instrument. Electronic Signatures, as defined by and in accordance with the Owner’s https://www.lawinsider.com/clause/counterparts-and-electronic-signatures
Order Adopting Electronic Signature Rules for Construction Contracts, will be deemed original signatures for purposes of the Contract Documents and all matters related thereto, with such Electronic Signatures having the same legal effect as physical, wet-ink signatures. Owner; Engineer;
Contractor; and Developer, if there is a Special Conditions of the Contract Part B, agree that the Contract Documents may be accepted, executed, or agreed to using an Electronic Signature. Any document accepted, executed, or agreed to in conformity with such Order is binding on Owner, Engineer, Contractor, and Developer, if applicable, the same as if it were physically executed, and Owner, Engineer, Contractor, and Developer, if applicable, each hereby consent to the use of any third-party electronic signature capture service provider that may be chosen by Owner or Engineer.
Notwithstanding the foregoing, all Bonds must be provided to Owner either as a physical, wet-ink original, or in the form of a certified and complete copy of such Bond, which may be provided to Owner in electronic form, such as a .pdf file.
18. INSURANCE. See section entitled “INSURANCE REQUIREMENTS” attached to and incorporated into the General Conditions of the Contract as Attachment A to the General Conditions of the Contract and Special Conditions of the Contract Part B, if attached.
19. SOILS REPORT. If a soils investigation has been made for this Project, the soils report and log of borings is available for bidder’s information only. The report is not a warranty of subsurface conditions, nor is it a part of the Contract Documents. Bidders are expected to examine the Site and such reports and then decide for themselves the soils or conditions that may be encountered.
Owner, Engineer, and Developer, if applicable, disclaim any responsibility for the accuracy, true location and extent of the surface and subsurface investigations that have been prepared by others.
Owner, Engineer, and Developer, if applicable, further disclaim responsibility for interpretation of that data by bidder, e.g., projecting soil-bearing values, rock profiles, soil stability and the presence, level and extent of underground water or other underground facilities or utilities.
20. LABOR CLASSIFICATION AND MINIMUM WAGE SCALE.
(A) General: Chapter 2258 of the Texas Government Code provides that any political subdivision of the State of Texas shall determine the general prevailing wage rate received by the classes of workers employed on projects similar to this Project and shall specify in the call for bids and in the Contract Documents the minimum wage rates which must be paid for each type of worker. This statute further provides that the Contractor or subcontractors must pay, as penalty to Owner, Sixty Dollars ($60.00) for each worker employed for each calendar day or part of the day that the worker is paid less than the wage rates stipulated in the Contract. Owner is authorized to withhold from the Contractor the amount of this penalty from any payment due under the Contract Documents.
The statute likewise requires that the Contractor and subcontractors keep an accurate record of the names and occupations of all persons employed by them on the construction of the Project and to show the actual per diem wages paid to each worker. These records are open to the inspection of Owner.
(B) The minimum wage rates that apply to this Contract are specified in Attachment B to the General Conditions of the Contract. Contractor and subcontractors must review and ascertain such wage rates and pay at least such minimum rates.
21. ECONOMIC DISINCENTIVES. The Contractor and the Owner agree that time is of the essence of this Contract. The Contractor and the Owner agree that a breach of this Contract by failure to complete the Work in the specified time will cause harm to the Owner.
Therefore, the Contractor and the Owner agree that for each and every calendar day the Work or any portion thereof shall remain uncompleted after the expiration of the time limit(s) set in the Contract, or as extended under the provisions of these General Conditions (including, without limitation, due to a delay caused by Contractor’s failure to comply with the Contract Documents or due to Owner’s termination of Contractor for default under the Contract Documents), Contractor shall be liable to Owner for economic disincentives under Section 49.271(e) of Texas Water Code, in the amount of “NONE” for each such calendar day.
The Owner shall have the option to deduct and withhold said amount from any monies that the Owner owes the Contractor or its sureties or to recover such amount from the Contractor or the sureties on the Contractor’s bond.
MUNICIPAL UTILITY DISTRICT NO. 59 DEFINITION OF TERMS
III
DEFINITION OF TERMS
Wherever in these specifications or in the contract or bond, the following terms or pronouns in place of them are used, the intent and meaning shall be interpreted as follows:
1. INSPECTOR: The authorized representative of the Engineer assigned to supervise and inspect any or all parts of the work and the materials to be used therein.
2. BIDDER: An individual, firm or corporation submitting a proposal.
3. SUPERINTENDENT: The authorized representative of the Contractor.
4. SURETY: The corporate body, which is bound with the Contractor for the faithful performance of the work, covered by the contract.
5. LABORATORY: Any recognized testing laboratory approved by the Owner and
Engineer.
6. PROPOSAL: The offer of the bidder, made out on the prescribed forms, giving prices for performing the work described in the plans and specifications.
7. PROPOSAL GUARANTY: The security designated in the proposal and furnished by the bidder as a guaranty that the bidder will enter into a contract if awarded the work.
8. A.S.T.M.: American Society for Testing Materials
9. A.A.S.H.T.O.: American Association of State Highway and Traffic Officials.
10. SCREEN AND SIEVES: As defined by the A.S.T.M.
11. A.W.W.A.: American Water Works Association.
12. O.S.H.A.: Occupational Safety and Health Administration.
WALLER COUNY
MUNICIPAL UTILITY DISTRICT_NO. 59 ACKNOWLEDGEMENT OF BIDDERS
ACKNOWLEDGEMENT OF BIDDERS
The Contractor acknowledges that they have carefully read and reviewed the Bidding Documents, Construction Plans, General Conditions, Special Conditions, Technical Specifications and other documents identified within the Bidding Documents. The Contractor agrees to complete the work described by the construction plans and these Bidding Documents and commits, upon Award of the Contract, to enter into the Agreement and provide the requesting documents as presented and described herein.
Further, the Contractor acknowledges and agrees that time is of the essence for this contract and a failure to perform, as described within the General and Special Conditions, could result in the Owner assessing liquidated damages, the nature of which are described within the General and Special Conditions of the Bidding Documents. In addition, Contractor acknowledges Subchapter J, Chapter 552, Government Code, which may apply to this contract and agrees to its terms.
Contractor acknowledges the following Addendum:
Pre-bid Agenda_________ Addendum No._________ Addendum No._________
Addendum No._________ Addendum No._________ Addendum No._________
By signing below, the Contractor indicates that they submit the enclosed bid form for the following project:
PROPOSED EXCAVATION, FILL PLACEMENT AND STORM WATER FACILITIES
TO SERVE BELLAMINA PHASE TWO DETENTION
BIDDER INFORMATION
Firm
Address
City, State, Zip
Phone Number & Email Address
Name - Printed
Signature
Attest Signature
SURETY INFORMATION
Firm
Address
City, State, Zip
Phone Number & Email Address
Seal, if Corporation
BID PROPOSAL
ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT
A1. Heavy Clearing and Grubbing, Including Root
Raking, Removal and Disposal of Trees, Brush, Debris, Fences, Rubbish, and All Other
Objectionable Material per Plans and
Specifications (Final Acceptance of Clearing and Grubbing is as Determined by Engineer)
AC 7.5 $____________ $____________
A2. Light Clearing and Grubbing, Including Root
Raking, Removal and Disposal of Trees, Brush, Debris, Fences, Rubbish, and All Other
Objectionable Material per Plans and
Specifications (Final Acceptance of Clearing and Grubbing is as Determined by Engineer)
AC 67 $____________ $____________
A3. Clean and Demuck Existing Swale LF 1,415 $____________ $____________
A4. Removal and Disposal of Existing Hog Wire
Fence
LF 4,419 $____________ $____________
A5. Removal and Disposal of Existing Chain Link
Fence
LF 1,335 $____________ $____________
A6. Remove & Dispose Gate & Post EA 1 $____________ $____________
A7. Remove & Dispose of Existing Driveway &
Culverts
EA 1 $____________ $____________
A8. Drain & Demuck Existing Pond and Dispose of
Unsuitable Fill Material Offsite
LS 1 $____________ $____________
TOTAL CLEARING, GRUBBING, AND SITE PREPARATION : $____________________
TO SERVE BELLAMINA PHASE TWO DETENTION
WALLER COUNTY
MUNICIPAL UTILITY DISTRICT NO. 59
PROPOSED EXCAVATION, FILL PLACEMENT AND STORM WATER FACILITIES
BID PROPOSAL
CLEARING, GRUBBING, AND SITE PREPARATION
https://odysseyeg.sharepoint.com/sites/Projects/2023/23-048-102/Project/Construction/DST/2. Contract Documents/Bid Proposal/007b_Bid
Proposal_23-048-102.xlsx 8/27/2026
B1. Proposed Swale per Plans LF 9,455 $____________ $____________
B2. Regrade Existing Roadside Ditch Per Plans LF 1,715 $____________ $____________
B3. 60-Inch, CLIII R/G, Reinforced Concrete Pipe
(RCP) Storm Sewer, All Depths, Complete in
Place per Plans
LF 183 $____________ $____________
B4. 48-Inch, CLIII R/G, Reinforced Concrete Pipe
(RCP) Storm Sewer, All Depths, Complete in
Place per Plans
LF 505 $____________ $____________
B5. 42-Inch, CLIII R/G, Reinforced Concrete Pipe
(RCP) Storm Sewer, All Depths, Complete in
Place per Plans
LF 107 $____________ $____________
B6. 30-Inch, CLIII R/G, Reinforced Concrete Pipe
(RCP) Storm Sewer, All Depths, Complete in
Place per Plans
LF 973 $____________ $____________
B7. 24-Inch, CLIII R/G, Reinforced Concrete Pipe
(RCP) Storm Sewer, All Depths, Complete in
Place per Plans
LF 956 $____________ $____________
B8. 24-Inch, CLIII R/G, Reinforced Concrete Pipe
(RCPP Storm Sewer, All Depths, Trenchless
Installation, Complete in Place per Plans
LF 30 $____________ $____________
B9. Outlet Control Structure Including but not
Limited to Ballast, Weirs, Walls, Top, Manhole
Ring & Cover
LF 30 $____________ $____________
B10. Storm Junction Box 2 with 4 - Type "A" Inlet
Top, Complete in Place per Plans
EA 1 $____________ $____________
B11. Standard Type "C" Manhole (24-Inch to 42-
Inch), Including Final Rim Adjustment, Complete in Place per Plans
EA 5 $____________ $____________
STORMWATER COLLECTION SYSTEM
WALLER COUNTY
MUNICIPAL UTILITY DISTRICT NO. 59
PROPOSED EXCAVATION, FILL PLACEMENT AND STORM WATER FACILITIES
TO SERVE BELLAMINA PHASE TWO DETENTION
BID PROPOSAL
https://odysseyeg.sharepoint.com/sites/Projects/2023/23-048-102/Project/Construction/DST/2. Contract Documents/Bid Proposal/007b_Bid Proposal_23-048-
102.xlsx 8/27/2026
STORMWATER COLLECTION SYSTEM
WALLER COUNTY
MUNICIPAL UTILITY DISTRICT NO. 59
PROPOSED EXCAVATION, FILL PLACEMENT AND STORM WATER FACILITIES
TO SERVE BELLAMINA PHASE TWO DETENTION
BID PROPOSAL
B12. Standard Type "C" Manhole (48-Inch to 72-
Inch) with Type "E" Inlet Top, Complete in Place per Plans
EA 2 $____________ $____________
B13. Standard Type "C" Manhole (24-Inch to 42-
Inch) with Type "E" Inlet Top, Complete in Place per Plans
EA 1 $____________ $____________
B14. Reinforced Concrete Slope Paving, Complete in
Place per Plans
SY 1,650 $____________ $____________
B15. 8-Inch Thick Brick Plug in 60-Inch Storm Sewer, Complete in Place per Plans
EA 1 $____________ $____________
B16. 8-Inch Thick Brick Plug in 48-Inch Storm Sewer, Complete in Place per Plans
EA 1 $____________ $____________
B17. 8-Inch Thick Brick Plug in 24-Inch Storm Sewer, Complete in Place per Plans
EA 1 $____________ $____________
B18. Connection to Existing 30-Inch Storm Sewer
Stub Out, Including Removal and Disposal of
Existing 8-Inch Thick Brick Plug, Complete in
Place per Plans
EA 1 $____________ $____________
B19. Trench Safety LF 2,724 $____________ $____________ https://odysseyeg.sharepoint.com/sites/Projects/2023/23-048-102/Project/Construction/DST/2. Contract Documents/Bid Proposal/007b_Bid Proposal_23-048-
STORMWATER COLLECTION SYSTEM
WALLER COUNTY
MUNICIPAL UTILITY DISTRICT NO. 59
PROPOSED EXCAVATION, FILL PLACEMENT AND STORM WATER FACILITIES
TO SERVE BELLAMINA PHASE TWO DETENTION
BID PROPOSAL
B20. Trench Dewatering (Means and Methods to be
Determined by Contractor)
LF 130 $____________ $____________
B21. Traffic Control on Hoover Lane as per Details on
Sheet 24
LS 1 $____________ $____________
G1. 60-Inch Polypropylene Pipe (PPP) Storm Sewer, All Depths, Complete in Place per Plans (In lieu of B3)
LF 183 $____________ $____________
G2. 48-Inch Polypropylene Pipe (PPP) Storm Sewer, All Depths, Complete in Place per Plans (In lieu of B4)
LF 505 $____________ $____________
G3. 42-Inch Polypropylene Pipe (PPP) Storm Sewer, All Depths, Complete in Place per Plans (In lieu of B5)
LF 107 $____________ $____________
G4. 30-Inch Polypropylene Pipe (PPP) Storm Sewer, All Depths, Complete in Place per Plans (In lieu of B6)
LF 973 $____________ $____________
G5. 24-Inch Polypropylene Pipe (PPP) Storm Sewer, All Depths, Complete in Place per Plans (In lieu of B7)
LF 956 $____________ $____________
G6. 24-Inch Polypropylene Pipe (PPP) Storm
Sewer, All Depths, Trenchless Installation, Complete in Place per Plans (In lieu of B8)
LF 30 $____________ $____________
TOTAL STORMWATER COLLECTION SYSTEM : $____________________
Alternate Bid Items - Storm Water Collection System
TOTAL ALTERNATE BID ITEMS- STORMWATER COLLECTION SYSTEM: $____________________
https://odysseyeg.sharepoint.com/sites/Projects/2023/23-048-102/Project/Construction/DST/2. Contract Documents/Bid Proposal/007b_Bid Proposal_23-048-
C1. Scarify or Strip Spoil Site AC 57.0 $____________ $____________
C2. Detention and Amenity Basin Excavation On-
Site Disposal per Plans, Including Spreading and Compaction, and Approximately 3,400 CY of Utility Spoils (Contractor to Verify
Quantities Prior to Bidding, No Adjustment to
Payment Will be Made Based on Variance of
Final Quantities)
CY 168,670 $____________ $____________
C3. Site Excavation On-Site Disposal per Plans, Including Spreading and Compaction
(Contractor to Verify Quantities Prior to
Bidding, No Adjustment to Payment Will be
Made Based on Variance of Final Quantities)
CY 30,730 $____________ $____________
C4. Proof Roll Spoil Site AC 57.0 $____________ $____________
C5. Backslope Swale LF 3,850 $____________ $____________
C6. Backslope Interceptor Structure, Complete in
Place per Plans Including 24-Inch CGMP, Upstream & Downstream Slope Paving
EA 7 $____________ $____________
C7. Turf Establishment of Detention Side Slopes and Maintenance Berm (Contractor is
Responsible for Achieving a Minimum of 80%
Stabilization such that Notice of Termination can be Submitted to the TCEQ. Contractor is
Responsible for All Maintenance, Including but
Not Limited to Watering, Mowing, Reseeding, and/or Overseeding at Direction of Engineer
Until Project Acceptance)
AC 9.5 $____________ $____________
DETENTION BASIN
WALLER COUNTY
MUNICIPAL UTILITY DISTRICT NO. 59
PROPOSED EXCAVATION, FILL PLACEMENT AND STORM WATER FACILITIES
TO SERVE BELLAMINA PHASE TWO DETENTION
BID PROPOSAL
https://odysseyeg.sharepoint.com/sites/Projects/2023/23-048-102/Project/Construction/DST/2. Contract Documents/Bid Proposal/007b_Bid
DETENTION BASIN
WALLER COUNTY
MUNICIPAL UTILITY DISTRICT NO. 59
PROPOSED EXCAVATION, FILL PLACEMENT AND STORM WATER FACILITIES
TO SERVE BELLAMINA PHASE TWO DETENTION
BID PROPOSAL
C8. Concrete Weir, Complete in Place per Plans SY 575 $____________ $____________
C9. Pumping of Stormwater Runoff During
Construction, at Direction of Engineer
LS 1 $____________ $____________
C10. Dewatering as Necessary for Excavation, at
Direction of Engineer
LS 1 $____________ $____________
H1. Detention and Amenity Basin Excavation Off-
Site Disposal
CY 168,670 $____________ $____________
TOTAL DETENTION BASIN : $____________________
Alternate Bid Items - Detention Basin
TOTAL ALTERNATE BID ITEMS - DETENTION BASIN: $____________________
https://odysseyeg.sharepoint.com/sites/Projects/2023/23-048-102/Project/Construction/DST/2. Contract Documents/Bid Proposal/007b_Bid
D1. Over-Excavation of Lake Bottom and Side
Slopes for 2-Foot & 4-Foot Thick Clay Liner, Including Hauling Off-Site and Disposing of
Legally
CY 18,550 $____________ $____________
D2. Scarify Lake Bottom and Side Slopes (to be
Performed after Over-Excavation and Before
Installation of 2-Foot & 4-Foot Thick Clay
Liner)
SY 29,300 $____________ $____________
D3. Installation of 2-Foot Thick Clay Liner per
Geotechnical Recommendation, Including but
Not Limited to Placement in Lifts of 8-Inches or Less and Compacted to 95% of the ASTM
D698 Maximum Dry Density at a Moisture
Content within 3% Above Optimum. Cohesive
Soils Shall be Free of Debris, Roots, Vegetation, Organic Matter and/or Other Unsuitable
Material. Clay Shall Have a Liquid Limit of 60 or Less, a Plasticity Index Between 20 and 50, and a Hydraulic Conductivity of 1 x 10-6 cm/sec or Less When Compacted to 95%
CY 18,260 $____________ $____________
WALLER COUNTY
MUNICIPAL UTILITY DISTRICT NO. 59
PROPOSED EXCAVATION, FILL PLACEMENT AND STORM WATER FACILITIES
TO SERVE BELLAMINA PHASE TWO DETENTION
BID PROPOSAL
AMENITY LAKE
https://odysseyeg.sharepoint.com/sites/Projects/2023/23-048-102/Project/Construction/DST/2. Contract Documents/Bid Proposal/007b_Bid
MUNICIPAL UTILITY DISTRICT NO. 59
PROPOSED EXCAVATION, FILL PLACEMENT AND STORM WATER FACILITIES
TO SERVE BELLAMINA PHASE TWO DETENTION
BID PROPOSAL
AMENITY LAKE
D4. Installation of 4-Foot Thick Clay Liner per
Geotechnical Recommendation, Including but
Not Limited to Placement in Lifts of 8-Inches or Less and Compacted to 95% of the ASTM
D698 Maximum Dry Density at a Moisture
Content within 3% Above Optimum. Cohesive
Soils Shall be Free of Debris, Roots, Vegetation, Organic Matter and/or Other Unsuitable
Material. Clay Shall Have a Liquid Limit of 60 or Less, a Plasticity Index Between 20 and 50, and a Hydraulic Conductivity of 1 x 10-6 cm/sec or Less When Compacted to 95%
CY 185 $____________ $____________
TOTAL AMENITY LAKE : $____________________
https://odysseyeg.sharepoint.com/sites/Projects/2023/23-048-102/Project/Construction/DST/2. Contract Documents/Bid Proposal/007b_Bid
E1. Stormwater Pollution Prevention Plan, Including but Not Limited to Development and
Implementation of SWPPP, Performing Project
Site Inspections, Completing Inspection
Reports, Filing Notices, Posting Permits and
Notices, etc. per TCEQ Requirements
LS 1 $____________ $____________
E2. Stabilized Construction Access, Including
Installation, Maintenance, and Removal
EA 1 $____________ $____________
E3. Concrete Truck Washout Area, Including
Installation, Maintenance, and Removal
EA 1 $____________ $____________
E4. Stage Two Inlet Protection Barrier, Including
Installation, Maintenance, and Removal
EA 14 $____________ $____________
E5. Backslope Interceptor Inlet Protection Barrier, Including Installation, Maintenance, and
Removal
EA 7 $____________ $____________
E6. Storm Sewer Type "A" Inlet Protection Barrier, Including Installation, Maintenance, and
Removal
EA 4 $____________ $____________
E7. Storm Sewer Type "E" Inlet Protection Barrier, Including Installation, Maintenance, and
Removal
EA 3 $____________ $____________
E8. Reinforced Filter Fabric, Including Installation, Maintenance, and Removal
LF 7,650 $____________ $____________
WALLER COUNTY
MUNICIPAL UTILITY DISTRICT NO. 59
PROPOSED EXCAVATION, FILL PLACEMENT AND STORM WATER FACILITIES
TO SERVE BELLAMINA PHASE TWO DETENTION
BID PROPOSAL
STORMWATER POLLUTION PREVENTION PLAN
https://odysseyeg.sharepoint.com/sites/Projects/2023/23-048-102/Project/Construction/DST/2. Contract Documents/Bid Proposal/007b_Bid
MUNICIPAL UTILITY DISTRICT NO. 59
PROPOSED EXCAVATION, FILL PLACEMENT AND STORM WATER FACILITIES
TO SERVE BELLAMINA PHASE TWO DETENTION
BID PROPOSAL
STORMWATER POLLUTION PREVENTION PLAN
E9. Street Cleaning, per SWPPP Requirements and at Direction of Engineer
LS 1 $____________ $____________
E10. Dry Application…