This is a contract document package for the City of Covington, Georgia, issued by engineer Ardurra Group, Inc., for the Three Ring Access Road Culvert Improvements project. The project involves construction of a 30-foot long, 9-foot by 4-foot reinforced concrete box culvert through a perennial stream, streambank stabilization, sanitary sewer main relocation, fiber optic cable relocation, electrical utility relocation, and erosion and sedimentation control measures on an access road to the Three Ring Pump Station. Bids are solicited on a unit price basis for 18 line items including mobilization, construction stakeout, utility coordination and relocation, erosion control, clearing and grubbing, tree removal, excavation, dewatering and bypass pumping, removal of existing pipe, boulder sill wall, soil encapsulated lift, streambank stabilization, concrete box culvert installation, concrete headwalls, driveway replacement, unsuitable material excavation, soil import, and seeding and mulch. The mandatory pre-bid conference and site visit are scheduled for Thursday, November 12, 2026, at 10:00 AM EST at the Court/Council Room in Covington, Georgia, with attendance required for bid eligibility. Bids must be received by Tuesday, December 1, 2026, at 10:00 AM EST at Covington City Hall. The project has an expected duration of 120 days, and the contract is awarded to the lowest responsive, responsible bidder.

Bidding documents are available through www.ardurra.com or QuestCDN (project number 10309493) for a $22 non-refundable fee. A bid security of 5 percent of the maximum bid price is required in the form of cash, cashier's check, certified check, or bid bond; for contracts under $750,000, an irrevocable letter of credit from a bank is acceptable. Bidders must submit a Qualifications Statement demonstrating financial capacity, previous experience, state authorization to do business, contractor license information, subcontractor and supplier qualifications, safety performance data, surety information, and insurance details. The document specifies that bidders must comply with O.C.G.A. § 13-10-91 regarding E-Verify participation and O.C.G.A. § 36-91-21 regarding competition certifications. The successful bidder must execute the agreement, provide performance and payment bonds, and furnish insurance documentation within 14 days of the Notice of Award. No funding source, budget amount, or set-aside designation is specified in the contract documents.

View the file

Other files

File Type Posted
2026_10_19 Three Ring Culvert Improvements 10.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

City of Covington Project Title Page

Three Ring Access Road Culvert Improvements 00 01 01

Ardurra Project No.: 20251026.00.WK Master Updated: 05/2025

Covington Project No.: 2026-27

10/2026 Issued for Bidding

SECTION 00 01 01

CONTRACT DOCUMENTS

for

Three Ring Access Road Culvert Improvements

October 2026

Ardurra Project # 20251026.00.WK

Covington Project No. 2026-27

Prepared for:

City of Covington

2194 Emory Street NW

Covington, GA 30014

Plans and Specifications

Prepared by:

Ardurra Group, Inc.

1350 Church Street Ext NE Suite 200

Marietta, GA 30060

770-955-5574

GA License No. PEF004730

SECTION 00 01 07

SEAL PAGE

City of Covington Seal Page

Three Ring Access Road Drainage Improvements 00 01 07 - 1

Ardurra Project Number: 20251026.00.WK Master Updated: 04/2025 Covington Project No.: 2026-27

10/2026 Issued for Bidding

Specifications Prepared By:

[seal]

DIVISION 00 - PROCUREMENT AND CONTRACTING

REQUIREMENTS

All Sections

DIVISION 01 - GENERAL REQUIREMENTS

All Sections

DIVISION 02 – EXISTING CONDITIONS

All Sections

DIVISION 31 – EARTHWORK

All Sections

DIVISION 32 – EXTERIOR IMPROVEMENTS

All Sections

DIVISION 33 – UTILITIES

All Sections

COA

Firm Contact Information:

Ardurra Group, Inc.

1350 Church Street Ext.

NW, Suite 200

Marietta, GA 30060

Office: 770-955-5574

GA License No. PEF004730

END OF SECTION

10/20/2026

City of Covington Table Of Contents

Three Ring Access Road Drainage Improvements 00 01 10 - 1

Ardurra Project Number: 20251026.00.WK Master: Updated 2/2025_v1

Covington Project No.: 2026-27

10/2026 Issued for Bidding

SECTION 00 01 10

TABLE OF CONTENTS

PROCUREMENT AND CONTRACTING REQUIREMENTS GROUP

DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS

INTRODUCTORY INFORMATION

00 01 01 Project Title Page 1

00 01 07 Seal Page 2

00 01 10 Table of Contents 3

CONTRACTING REQUIREMENTS

00 11 13 Ad for Bids for Construction Contract 5

00 21 13 Instructions for Bidders 7

00 41 13 Bid Form for Construction Contract 18

00 43 13 Bid Bond (Penal Sum Form) 25

00 45 13 Qualifications Statement 27

00 45 49 Contractor’s Everify Affidavit 39

00 45 51 Contractor’s Affidavit Regarding Competition 40

00 51 00 Notice of Award 41

00 52 13 Agreement Between Owner and Contractor

For Construction Contract (Stipulated Price) 43

00 61 13.13 Performance Bond 52

00 61 13.16 Payment Bond 56

00 72 00 Standard General Conditions 60

00 73 00 Supplementary Conditions 135

DIVISION 01 – GENERAL REQUIREMENTS

01 33 00 Submittal Procedures 158

01 40 00 Quality Requirements 164

01 57 25 Temporary Stormwater Bypass Pumping 168

01 70 00 Execution and Close-out Requirements 176

01 78 31 As-Built Survey 182

01 78 39 Project Record Documents 184

FACILITY CONSTRUCTION SUBGROUP

DIVISION 31 - EARTHWORK

31 10 00 Site Clearing 188

31 23 16.26 Rock Removal 191

31 23 33 Trenching and Backfilling 197

City of Covington Table Of Contents

Three Ring Access Road Drainage Improvements 00 01 10 - 2

Ardurra Project Number: 20251026.00.WK Master: Updated 2/2025_v1

Covington Project No.: 2026-27

10/2026 Issued for Bidding

31 25 00 Erosion and Sedimentation Controls 205

31 25 14.17 Erosion Control Matting 213

31 25 37 Boulder Sill 217

31 32 01 Woven Coir Fabric 221

31 32 19.16 Geotextile Soil Stabilization 225

31 41 17 Temporary Shoring (As Required) 233

31 52 00 Cofferdam 247

31 80 17 Soil Encapsulated Lift 253

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 91 19 Landscape Grading 257

32 92 19 Seeding 261

32 93 11 Live Staking 267

DIVISION 33 – UTILITIES

33 42 13.13 Precast Reinforced Concrete Box Culvert (RCBC) 273

END OF SECTION

Ardurra Project No.: 20251026.00.WK Advertisement for Bids for Construction Contract Covington Project No.: 2026-27 00 11 13 -1 10/2026 Issued for Bidding Master: Updated 05/2025_v1

SECTION 00 11 13

ADVERTISEMENT FOR BIDS

CITY OF COVINGTON

COVINGTON, GA

THREE RING ACCESS ROAD CULVERT IMPROVEMENTS

General Notice

The City of Covington (Owner) is requesting Bids for the construction of the following Project:

Project Number: 2026-27

Bids for the construction of the Project will be received at Covington City Hall located at 2194

Emory Street N.W., Covington, GA 30014, until, Tuesday, December 1, 2026 at 10:00 AM EST local time. At that time the Bids received will be publicly opened and read.

The Project includes the following Work:

The Three Ring Access Road Culvert Improvements Project consists of approximately:

construction of a 30-foot long 9-foot by 4-foot reinforced concrete box culvert through a perennial stream; streambank stabilization; sanitary sewer main, fiber optic cable, and electrical utility relocations; and erosion and sedimentation control measures on the access road to the Three Ring Pump Station.

Bids will be received for a single prime Contract. Bids shall be on a Unit Price basis as indicated in the Bid Form. The Owner reserves the right to reject any and all bids.

The Project has an expected duration of 120 days.

Obtaining the Bidding Documents

The Issuing Office for the Bidding Documents is:

2194 Emory Street N.W.

Covington, GA 30014

Document Information: All documents are available on the Ardurra website at www.ardurra.com and by clicking the “Bid Docs” link in the upper right hand corner, or by visiting www.QuestCDN.com and using the 8-digit QuestCDN project number 10309493. There is a $22 non-refundable cost for downloading contract documents from QuestCDN.

Ardurra Project Number: 20251026.00.WK Advertisement for Bids for Construction Contract

Covington Project #: 2026-27 00 11 13 -2

10/2026 Issued for Bidding Master: Updated 05/2025_v1

Prospective Bidders must register and purchase Bidding Documents through the designated website in order to be considered an official plan holder, even if Bidding Documents are obtained from a source other than the designated website in either electronic or paper format. The designated website will be updated periodically with addenda, lists of registered plan holders, reports, and other information relevant to submitting a Bid for the Project. All official notifications, addenda, and other Bidding

Documents will be offered only through the designated website. Neither Owner nor Engineer will be responsible for Bidding Documents, including addenda, if any, obtained from sources other than the designated website.

Pre-bid Conference

An in-person, mandatory pre-bid conference for the project will be held on:

Thursday November 12, 2026 at 10:00 AM EST at the

Court/Council Room located at 2116 Stallings Street NW, Covington, GA 30014

Bids will not be accepted from Bidders that do not attend the mandatory pre-bid conference.

A mandatory, in-person site visit will immediately follow the pre-bid conference.

The deadline for submittal of any questions regarding the project is Tuesday, November 17, 2026 at

5:00 PM.

Instructions to Bidders.

For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents.

This Advertisement is issued by:

Owner: City of Covington

By: Jody Morrell

Title: Water Reclamation Manager

Date: October 24, 2026

City of Covington Instructions to Bidders for Construction Contract

Three Ring Access Road Culvert Improvements 00 21 13 -1

Ardurra Project Number: 20251026.00.WK Master: Updated 05/2025_v1 Covington Project Number: 2026-27 10/2026 Issued for Bidding

SECTION 00 21 13

INSTRUCTIONS TO BIDDERS FOR CONSTRUCTION CONTRACT

TABLE OF CONTENTS

Page

Article 1— Defined Terms

Article 2— Bidding Documents

Article 3— Qualifications of Bidders

Article 4— Pre-Bid Conference

Article 5— Site and Other Areas; Existing Site Conditions; Examination of Site; Owner’s Safety

Program; Other Work at the Site

Article 6— Bidder’s Representations and Certifications

Article 7— Interpretations and Addenda

Article 8— Bid Security

Article 9— Contract Times

Article 10— Substitute and “Or Equal” Items

Article 11— Subcontractors, Suppliers, and Others

Article 12— Preparation of Bid

Article 13— Basis of Bid

Article 14— Submittal of Bid

Article 15— Modification and Withdrawal of Bid

Article 16— Opening of Bids

Article 17— Bids to Remain Subject to Acceptance

Article 18— Evaluation of Bids and Award of Contract

Article 19— Bonds and Insurance

Article 20— Signing of Agreement

Article 21— Sales and Use Taxes

Article 22— Contracts to Be Assigned

Three Ring Access Road Culvert Improvements 00 21 13 -1

Ardurra Project Number: 20251026.00.WK Master: Updated 05/2025_v1 Covington Project Number: 2026-27 10/16/2026 Issued for Bidding

ARTICLE 1—DEFINED TERMS

1.01 Terms used in these Instructions to Bidders have the meanings indicated in the General

Conditions and Supplementary Conditions. Additional terms used in these Instructions to

Bidders have the meanings indicated below:

A. Issuing Office—The office from which the Bidding Documents are to be issued, and which registers plan holders.

ARTICLE 2—BIDDING DOCUMENTS

2.01 Bidder shall obtain a complete set of Bidding Requirements and proposed Contract Documents

(together, the Bidding Documents). See the Agreement for a list of the Contract Documents. It is Bidder’s responsibility to determine that it is using a complete set of documents in the preparation of a Bid. Bidder assumes sole responsibility for errors or misinterpretations resulting from the use of incomplete documents, by Bidder itself or by its prospective Subcontractors and

Suppliers.

2.02 Bidding Documents are made available for the sole purpose of obtaining Bids for completion of the Project and permission to download or distribution of the Bidding Documents does not confer a license or grant permission or authorization for any other use. Authorization to download documents, or other distribution, includes the right for plan holders to print documents solely for their use, and the use of their prospective Subcontractors and Suppliers, provided the plan holder pays all costs associated with printing or reproduction. Printed documents may not be re-sold under any circumstances.

2.03 Owner has established a Bidding Documents Website as indicated in the Advertisement or

Invitation to Bid. Owner requires that Bidder register as a plan holder with the Issuing Office at such website, and obtain a complete set of the Bidding Documents from such website. Bidders may rely that sets of Bidding Documents obtained from the Bidding Documents Website are complete, unless an omission is blatant. Registered plan holders will receive Addenda issued by

Owner.

2.04 Electronic Documents

A. When the Bidding Requirements indicate that electronic (digital) copies of the Bidding

Documents are available, such documents will be made available to the Bidders as

Electronic Documents in the manner specified.

1. Bidding Documents will be provided in Adobe PDF (Portable Document Format. It is the intent of the Engineer and Owner that such Electronic Documents are to be exactly representative of the paper copies of the documents. However, because the Owner and

Engineer cannot totally control the transmission and receipt of Electronic Documents nor the Contractor’s means of reproduction of such documents, the Owner and

Engineer cannot and do not guarantee that Electronic Documents and reproductions prepared from those versions are identical in every manner to the paper copies.

B. Unless otherwise stated in the Bidding Documents, the Bidder may use and rely upon complete sets of Electronic Documents of the Bidding Documents, described in

Paragraph 2.04.A above. However, Bidder assumes all risks associated with differences arising from transmission/receipt of Electronic Documents versions of Bidding Documents and reproductions prepared from those versions and, further, assumes all risks, costs, and responsibility associated with use of the Electronic Documents versions to derive

Three Ring Access Road Culvert Improvements 00 21 13 -2

Ardurra Project Number: 20251026.00.WK Master: Updated 05/2025_v1 Covington Project Number: 2026-27 10/16/2026 Issued for Bidding information that is not explicitly contained in printed paper versions of the documents, and for Bidder’s reliance upon such derived information.

C. After the Contract is awarded, the Owner may provide or direct the Engineer to provide for the use of the Contractor documents that were developed by Engineer as part of the Project design process, as Electronic Documents in native file formats.

1. Release of such documents will be solely for the convenience of the Contractor. No such document is a Contract Document.

2. Unless the Contract Documents explicitly identify that such information will be available to the Successful Bidder (Contractor), nothing herein will create an obligation on the part of the Owner or Engineer to provide or create such information, and the Contractor is not entitled to rely on the availability of such information in the preparation of its Bid or pricing of the Work. In all cases, the Contractor shall take appropriate measures to verify that any electronic/digital information provided in

Electronic Documents is appropriate and adequate for the Contractor’s specific purposes.

3. In no case will the Contractor be entitled to additional compensation or time for completion due to any differences between the actual Contract Documents and any related document in native file format.

ARTICLE 3—QUALIFICATIONS OF BIDDERS

3.01 Bidder is to submit 00 45 13, Qualifications Statement, with its Bid to demonstrate Bidder’s qualifications to perform the Work:

A. Written evidence establishing its qualifications such as financial data, previous experience, and present commitments.

B. A written statement that Bidder is authorized to do business in the state where the Project is located, or a written certification that Bidder will obtain such authority prior to the

Effective Date of the Contract.

C. Bidder’s state or other contractor license number, if applicable.

D. Subcontractor and Supplier qualification information.

E. Other required information regarding qualifications.

3.02 A Bidder’s failure to submit required qualification information within the times indicated may disqualify Bidder from receiving an award of the Contract.

3.03 No requirement in this Article 3 to submit information will prejudice the right of Owner to seek additional pertinent information regarding Bidder’s qualifications.

ARTICLE 4—PRE-BID CONFERENCE

4.01 A mandatory, in-person, pre-bid conference will be held at the time and location indicated in the Advertisement or invitation to bid. Representatives of Owner and Engineer will be present to discuss the Project. Bids will not be accepted from Bidders who do not attend the conference.

It is the Bidder’s responsibility to sign in at the pre-bid conference to verify its participation.

Bidders must sign in using the name of the organization that will be submitting a Bid. A list of

Three Ring Access Road Culvert Improvements 00 21 13 -3

Ardurra Project Number: 20251026.00.WK Master: Updated 05/2025_v1 Covington Project Number: 2026-27 10/16/2026 Issued for Bidding qualified Bidders that attended the pre-bid conference and are eligible to submit a Bid for this

Project will be issued in an Addendum.

4.02 Information presented at the pre-Bid conference does not alter the Contract Documents. Owner will issue Addenda to make any changes to the Contract Documents that result from discussions at the pre-Bid conference. Information presented, and statements made at the pre-bid conference will not be binding or legally effective unless incorporated in an Addendum.

ARTICLE 5—SITE AND OTHER AREAS; EXISTING SITE CONDITIONS; EXAMINATION

OF SITE; OWNER’S SAFETY PROGRAM; OTHER WORK AT THE SITE

5.01 Site and Other Areas

A. The Site is identified in the Bidding Documents. By definition, the Site includes rights-of-way, easements, and other lands furnished by Owner for the use of the Contractor. Any additional lands required for temporary construction facilities, construction equipment, or storage of materials and equipment, and any access needed for such additional lands, are to be obtained and paid for by Contractor.

5.02 Existing Site Conditions

A. Subsurface and Physical Conditions; Hazardous Environmental Conditions

1. The Supplementary Conditions may identify the following regarding existing conditions at or adjacent to the Site:

a. Those reports of explorations and tests of subsurface conditions at or adjacent to the Site that contain Technical Data.

b. Those drawings known to Owner of existing physical conditions at or adjacent to the Site, including those drawings depicting existing surface or subsurface structures at or adjacent to the Site (except Underground Facilities), that contain

Technical Data.

c. Reports and drawings known to Owner relating to Hazardous Environmental

Conditions that have been identified at or adjacent to the Site.

d. Technical Data contained in such reports and drawings.

2. Owner will make copies of reports and drawings referenced above available to any

Bidder on request. These reports and drawings are not part of the Contract Documents, but the Technical Data contained therein upon whose accuracy Bidder is entitled to rely, as provided in the General Conditions, has been identified and established in the

Supplementary Conditions. Bidder is responsible for any interpretation or conclusion

Bidder draws from any Technical Data or any other data, interpretations, opinions, or information contained in such reports or shown or indicated in such drawings.

3. If the Supplementary Conditions do not identify Technical Data, the default definition of Technical Data set forth in Article 1 of the General Conditions will apply.

B. Underground Facilities: Underground Facilities are shown or indicated on the Drawings, pursuant to Paragraph 5.05 of the General Conditions, and not in the drawings referred to in Paragraph 5.02.A of these Instructions to Bidders. Information and data regarding the presence or location of Underground Facilities are not intended to be categorized, identified, or defined as Technical Data.

C. No other Site-related documents are available.

Three Ring Access Road Culvert Improvements 00 21 13 -4

Ardurra Project Number: 20251026.00.WK Master: Updated 05/2025_v1 Covington Project Number: 2026-27 10/16/2026 Issued for Bidding

5.03 Site Visit and Testing by Bidders

A. Bidder is required to visit the Site and conduct a thorough visual examination of the Site and adjacent areas. During the visit the Bidder must not disturb any ongoing operations at the Site. The visit will be completed immediately following the mandatory in-person pre-bid conference.

B. Bidder is not required to conduct any subsurface testing, or exhaustive investigations of

Site conditions.

C. On request, and to the extent Owner has control over the Site, and schedule permitting, the

Owner will provide Bidder general access to the Site to conduct such additional examinations, investigations, explorations, tests, and studies as Bidder deems necessary for preparing and submitting a successful Bid. Owner will not have any obligation to grant such access if doing so is not practical because of existing operations, security or safety concerns, or restraints on Owner’s authority regarding the Site. Bidder is responsible for establishing access needed to reach specific selected test sites.

D. Bidder must comply with all applicable Laws and Regulations regarding excavation and location of utilities, obtain all permits, and comply with all terms and conditions established by Owner or by property owners or other entities controlling the Site with respect to schedule, access, existing operations, security, liability insurance, and applicable safety programs.

E. Bidder must fill all holes and clean up and restore the Site to its former condition upon completion of such explorations, investigations, tests, and studies.

5.04 Owner’s Safety Program

A. Site visits and work at the Site may be governed by an Owner safety program. If an Owner safety program exists, it will be noted in the Supplementary Conditions.

5.05 Other Work at the Site

A. Reference is made to Article 8 of the Supplementary Conditions for the identification of the general nature of other work of which Owner is aware (if any) that is to be performed at the Site by Owner or others (such as utilities and other prime contractors) and relates to the Work contemplated by these Bidding Documents. If Owner is party to a written contract for such other work, then on request, Owner will provide to each Bidder access to examine such contracts (other than portions thereof related to price and other confidential matters), if any.

ARTICLE 6—BIDDER’S REPRESENTATIONS AND CERTIFICATIONS

6.01 Express Representations and Certifications in Bid Form, Agreement

A. The Bid Form that each Bidder will submit contains express representations regarding the

Bidder’s examination of Project documentation, Site visit, and preparation of the Bid, and certifications regarding lack of collusion or fraud in connection with the Bid. Bidder should review these representations and certifications, and assure that Bidder can make the representations and certifications in good faith, before executing and submitting its Bid.

B. If Bidder is awarded the Contract, Bidder (as Contractor) will make similar express representations and certifications when it executes the Agreement.

Three Ring Access Road Culvert Improvements 00 21 13 -5

Ardurra Project Number: 20251026.00.WK Master: Updated 05/2025_v1 Covington Project Number: 2026-27 10/16/2026 Issued for Bidding

ARTICLE 7—INTERPRETATIONS AND ADDENDA

7.01 Owner on its own initiative may issue Addenda to clarify, correct, supplement, or change the

Bidding Documents.

7.02 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to

Engineer in writing. Contact information and submittal procedures for such questions are as follows:

Name: Todd Cochran, PE, CFM

Title: Watershed Group Leader

Address: 1350 Church Street Ext. NW, Suite 200, Marietta, GA 30060

Phone No.: 678.632.0040 (office) or 404-569-1695 (mobile)

Email Address: tcochran@ardurra.com

Any questions regarding the project shall be submitted through the Quest CDN Q&A Portal.

7.03 Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all registered plan holders. Questions received less than seven days prior to the date for opening of Bids may not be answered.

7.04 Only responses set forth in an Addendum will be binding. Oral and other interpretations or clarifications will be without legal effect. Responses to questions are not part of the Contract

Documents unless set forth in an Addendum that expressly modifies or supplements the

Contract Documents.

ARTICLE 8—BID SECURITY

8.01 A Bid must be accompanied by Bid security made payable to Owner in an amount of 5 percent of Bidder’s maximum Bid price (determined by adding the base bid and all alternates) and in the form of cash, a cashier’s check, certified check on an FDIC-insured bank or trust company, or a Bid bond issued by a surety meeting the requirements of Paragraph 6.01 of the General

Conditions. Such Bid bond will be issued in the form included in the Bidding Documents. If the contract price is less than $750,000, the bid bond may be provided by an irrevocable letter of credit from a bank.

8.02 The Bid security of the apparent Successful Bidder will be retained until Owner awards the contract to such Bidder, and such Bidder has executed the Contract, furnished the required

Contract security, and met the other conditions of the Notice of Award, whereupon the Bid security will be released. If the Successful Bidder fails to execute and deliver the Contract and furnish the required Contract security within 14 days after the Notice of Award, Owner may consider Bidder to be in default, annul the Notice of Award, and the Bid security of that Bidder will be forfeited, in whole in the case of a penal sum bid bond, and to the extent of Owner’s damages in the case of a damages-form bond. Such forfeiture will be Owner’s exclusive remedy if Bidder defaults.

8.03 The Bid security of other Bidders that Owner believes to have a reasonable chance of receiving the award may be retained by Owner until the earlier of 7 days after the Effective Date of the

Three Ring Access Road Culvert Improvements 00 21 13 -6

Ardurra Project Number: 20251026.00.WK Master: Updated 05/2025_v1 Covington Project Number: 2026-27 10/16/2026 Issued for Bidding

Contract or 91 days after the Bid opening, whereupon Bid security furnished by such Bidders will be released.

8.04 Bid security of other Bidders that Owner believes do not have a reasonable chance of receiving the award will be released within 7 days after the Bid opening.

ARTICLE 9—CONTRACT TIMES

9.01 The number of days within which, or the dates by which, the Work is to be (a) substantially completed and (b) ready for final payment, and (c) Milestones (if any) are to be achieved, are set forth in the Agreement.

9.02 Provisions for liquidated damages, if any, for failure to timely attain a Milestone, Substantial

Completion, or completion of the Work in readiness for final payment, are set forth in the

Agreement.

ARTICLE 10—SUBSTITUTE AND “OR EQUAL” ITEMS

10.01 The Contract for the Work, as awarded, will be on the basis of materials and equipment specified or described in the Bidding Documents, and those “or-equal” or substitute or materials and equipment subsequently approved by Engineer prior to the submittal of Bids and identified by

Addendum. No item of material or equipment will be considered by Engineer as an “or-equal” or substitute unless written request for approval has been submitted by Bidder and has been; 1) received within 10 days of the bid opening; and 2) approved by Engineer prior to the bid opening. Each such request must comply with the requirements of Paragraphs 7.05 and 7.06 of the General Conditions, and the review of the request will be governed by the principles in those paragraphs. The burden of proof of the merit of the proposed item is upon Bidder. Engineer’s decision of approval or disapproval of a proposed item will be final. If Engineer approves any such proposed item, such approval will be set forth in an Addendum issued to all registered

Bidders. Bidders cannot rely upon approvals made in any other manner.

10.02 All prices that Bidder sets forth in its Bid will be based on the presumption that the Contractor will furnish the materials and equipment specified or described in the Bidding Documents, as supplemented by Addenda. Any assumptions regarding the possibility of post-Bid approvals of

“or-equal” or substitution requests are made at Bidder’s sole risk.

ARTICLE 11—SUBCONTRACTORS, SUPPLIERS, AND OTHERS

11.01 A Bidder must be prepared to retain specific Subcontractors and Suppliers for the performance of the Work if required to do so by the Bidding Documents or in the Specifications. If a prospective Bidder objects to retaining any such Subcontractor or Supplier and the concern is not relieved by an Addendum, then the prospective Bidder should refrain from submitting a Bid.

11.02 If requested by Owner, such list must be accompanied by an experience statement with pertinent information regarding similar projects and other evidence of qualification for each such

Subcontractor or Supplier. If Owner, after due investigation, has reasonable objection to any proposed Subcontractor or Supplier, Owner may, before the Notice of Award is given, request apparent Successful Bidder to submit an acceptable substitute, in which case apparent

Successful Bidder will submit a substitute, Bidder’s Bid price will be increased (or decreased)

Three Ring Access Road Culvert Improvements 00 21 13 -7

Ardurra Project Number: 20251026.00.WK Master: Updated 05/2025_v1 Covington Project Number: 2026-27 10/16/2026 Issued for Bidding by the difference in cost occasioned by such substitution, and Owner may consider such price adjustment in evaluating Bids and making the Contract award.

11.03 If apparent Successful Bidder declines to make any such substitution, Owner may award the

Contract to the next lowest Bidder that proposes to use acceptable Subcontractors and Suppliers.

Declining to make requested substitutions will not constitute grounds for forfeiture of the Bid security of any Bidder. Any Subcontractor or Supplier, so listed and against which Owner makes no written objection prior to the giving of the Notice of Award will be deemed acceptable to Owner subject to subsequent revocation of such acceptance as provided in Paragraph 7.07 of the General Conditions.

ARTICLE 12—PREPARATION OF BID

12.01 The Bid Form is included with the Bidding Documents.

A. All blanks on the Bid Form must be completed in ink and the Bid Form signed in ink.

Erasures or alterations must be initialed in ink by the person signing the Bid Form. A Bid price must be indicated for each section, Bid item, alternate, adjustment unit price item, and unit price item listed therein.

B. If the Bid Form expressly indicates that submitting pricing on a specific alternate item is optional, and Bidder elects to not furnish pricing for such optional alternate item, then

Bidder may enter the words “No Bid” or “Not Applicable.”

12.02 If Bidder has obtained the Bidding Documents as Electronic Documents, then Bidder shall prepare its Bid on a paper copy of the Bid Form printed from the Electronic Documents version of the Bidding Documents. The printed copy of the Bid Form must be clearly legible, printed on 8½ inch by 11-inch paper and as closely identical in appearance to the Electronic Document version of the Bid Form as may be practical. The Owner reserves the right to accept Bid Forms which nominally vary in appearance from the original paper version of the Bid Form, providing that all required information and submittals are included with the Bid.

12.03 A Bid by a corporation must be executed in the corporate name by a corporate officer (whose title must appear under the signature), accompanied by evidence of authority to sign. The corporate address and state of incorporation must be shown.

12.04 A Bid by a partnership must be executed in the partnership name and signed by a partner (whose title must appear under the signature). The official address of the partnership must be shown.

12.05 A Bid by a limited liability company must be executed in the name of the firm by a member or other authorized person. The state of formation of the firm and the official address of the firm must be shown.

12.06 A Bid by an individual must show the Bidder’s name and official address.

12.07 A Bid by a joint venture must be executed by an authorized representative of each joint venturer in the manner indicated on the Bid Form. The joint venture must have been formally established prior to submittal of a Bid, and the official address of the joint venture must be shown.

12.08 All names must be printed in ink below the signatures.

12.09 The Bid must contain an acknowledgment of receipt of all Addenda, the numbers of which must be filled in on the Bid Form.

12.10 Postal and e-mail addresses and telephone number for communications regarding the Bid must be shown.

Three Ring Access Road Culvert Improvements 00 21 13 -8

Ardurra Project Number: 20251026.00.WK Master: Updated 05/2025_v1 Covington Project Number: 2026-27 10/16/2026 Issued for Bidding

12.11 The Bid must contain evidence of Bidder’s authority to do business in the state where the Project is located, or Bidder must certify in writing that it will obtain such authority within the time for acceptance of Bids and attach such certification to the Bid.

12.12 If Bidder is required to be licensed to submit a Bid or perform the Work in the state where the

Project is located, the Bid must contain evidence of Bidder’s licensure, or Bidder must certify in writing that it will obtain such licensure within the time for acceptance of Bids and attach such certification to the Bid. Bidder’s state contractor license number, if any, must also be shown on the Bid Form.

ARTICLE 13—BASIS OF BID

13.01 Unit Price

A. Bidders must submit a Bid on a unit price basis for each item of Work listed in the unit price section of the Bid Form.

B. The “Bid Price” (sometimes referred to as the extended price) for each unit price Bid item will be the product of the “Estimated Quantity”, which Owner or its representative has set forth in the Bid Form, for the item and the corresponding “Bid Unit Price” offered by the

Bidder. The total of all unit price Bid items will be the sum of these “Bid Prices”; such total will be used by Owner for Bid comparison purposes. The final quantities and Contract

Price will be determined in accordance with Paragraph 13.03 of the General Conditions.

C. Discrepancies between the multiplication of units of Work and unit prices will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum.

ARTICLE 14—SUBMITTAL OF BID

14.01 The Bidding Documents include one separate unbound copy of the Bid Form, and, if required, the Bid Bond Form. The unbound copy of the Bid Form is to be completed and submitted with the Bid security and the other documents required to be submitted under the terms of Article 2 of the Bid Form. A full copy of the bid submittal must also be supplied in PDF document format on a USB drive.

14.02 A Bid must be received no later than the date and time prescribed and at the place indicated in the Advertisement or invitation to bid and must be enclosed in a plainly marked sealed package, addressed to the attention of the “Purchase Department”, and with the Project Title and Project

Number written on the outside along with, if applicable, the designated portion of the Project for which the Bid is submitted, the name and address of Bidder, license number of the Bidder, and must be accompanied by the Bid security and other required documents. If a Bid is sent by mail or other delivery system, the sealed envelope containing the Bid must be enclosed in a separate package plainly marked on the outside with the notation “BID ENCLOSED.” A mailed

Bid must be addressed to the location designated in the Advertisement.

14.03 Bids received after the date and time prescribed for the opening of bids, or not submitted at the correct location or in the designated manner, will not be accepted and will be returned to the

Bidder unopened.

ARTICLE 15—MODIFICATION AND WITHDRAWAL OF BID

15.01 If within 48 hours after Bids are opened any Bidder files a duly signed written notice with Owner and promptly thereafter demonstrates to the Owner by clear and convincing evidence that there

Three Ring Access Road Culvert Improvements 00 21 13 -9

Ardurra Project Number: 20251026.00.WK Master: Updated 05/2025_v1 Covington Project Number: 2026-27 10/16/2026 Issued for Bidding was an error, which was not an error of judgment, but was a clerical or typographical error of inadvertent omission in the Bid, the Bidder may withdraw its Bid, and the Bid security will be returned, provided that the Bid was submitted in good faith and neither the Owner nor the other

Bidders are unduly prejudiced by the withdrawal. Thereafter, if the Work is rebid, the Bidder will be disqualified from further bidding on the Work.

ARTICLE 16—OPENING OF BIDS

16.01 Bids will be opened at the time and place indicated in the advertisement or invitation to bid and read aloud publicly. An abstract of the amounts of the base Bids and major alternates, if any, will be made available to Bidders after the opening of Bids.

ARTICLE 17—BIDS TO REMAIN SUBJECT TO ACCEPTANCE

17.01 All Bids will remain subject to acceptance for the period of time stated in the Bid Form, but

Owner may, in its sole discretion, release any Bid and return the Bid security prior to the end of this period.

ARTICLE 18—EVALUATION OF BIDS AND AWARD OF CONTRACT

18.01 Owner reserves the right to reject any or all Bids, including without limitation, nonconforming, nonresponsive, unbalanced, or conditional Bids. Owner also reserves the right to waive all minor

Bid informalities not involving price, time, or changes in the Work.

18.02 Owner will reject the Bid of any Bidder that Owner finds, after reasonable inquiry and evaluation, to not be responsible.

18.03 If Bidder purports to add terms or conditions to its Bid, takes exception to any provision of the

Bidding Documents, or attempts to alter the contents of the Contract Documents for purposes of the Bid, whether in the Bid itself or in a separate communication to Owner or Engineer, then

Owner will reject the Bid as nonresponsive.

18.04 If Owner awards the contract for the Work, such award will be to the lowest responsive, responsible bidder, whose qualifications indicate the award will be in the best interest of the

Owner and whose Bid complies with all the prescribed requirements. Notice of Award will not be given until the Owner has concluded such investigations as deemed necessary to establish the responsibility, qualifications, and financial ability of the bidders to execute the Work in accordance with the Contract Documents to the satisfaction of the Owner within the time prescribed. The Owner reserves the right to reject the Bid of any bidder who does not pass such investigation to the Owner’s satisfaction. In analyzing Bids, the Owner may take into consideration alternates and unit prices, if requested in the Bid form.

18.05 Evaluation of Bids

A. In evaluating Bids, Owner will consider whether the Bids comply with the prescribed requirements, and such alternates, unit prices, and other data, as may be requested in the

Bid Form or prior to the Notice of Award.

B. In the comparison of Bids, alternates will be evaluated in any combination that is in the best interest of the Owner. After determination of the Successful Bidder based on this comparative process and on the responsiveness, responsibility, and other factors set forth in these Instructions, the award may be made to said Successful Bidder on its base Bid and any combination of its additive alternate Bids for which Owner determines funds will be available at the time of award.

Three Ring Access Road Culvert Improvements 00 21 13 -10

Ardurra Project Number: 20251026.00.WK Master: Updated 05/2025_v1 Covington Project Number: 2026-27 10/16/2026 Issued for Bidding

C. For the determination of the apparent low Bidder when unit price bids are submitted, Bids will be compared on the basis of the total of the products of the estimated quantity of each item and unit price Bid for that item, together with any lump sum items.

18.06 In evaluating whether a Bidder is responsible, Owner will consider the qualifications of the

Bidder and may consider the qualifications and experience of Subcontractors and Suppliers proposed for those portions of the Work for which the identity of Subcontractors and Suppliers must be submitted as provided in the Bidding Documents.

18.07 Owner may conduct such investigations as Owner deems necessary to establish the responsibility, qualifications, and financial ability of Bidders and any proposed Subcontractors or Suppliers.

ARTICLE 19—BONDS AND INSURANCE

19.01 Article 6 of the General Conditions, as may be modified by the Supplementary Conditions, sets forth Owner’s requirements as to performance and payment bonds, other required bonds (if any), and insurance. When the Successful Bidder delivers the executed Agreement to Owner, it must be accompanied by required bonds and insurance documentation.

19.02 Article 8, Bid Security, of these Instructions, addresses any requirements for providing bid bonds as part of the bidding process.

ARTICLE 20—SIGNING OF AGREEMENT

20.01 When Owner issues a Notice of Award to the Successful Bidder, it will be accompanied by the unexecuted counterparts of the Agreement along with the other Contract Documents as identified in the Agreement. Within 14 days thereafter, Successful Bidder must execute and deliver the required number of counterparts of the Agreement and any bonds and insurance documentation and Contractor’s Competition Affidavits required to be delivered by the Contract

Documents to Owner. Within 14 days thereafter, Owner will deliver one fully executed counterpart of the Agreement to Successful Bidder, together with printed and electronic copies of the Contract Documents as stated in Paragraph 2.02 of the General Conditions.

ARTICLE 21—SALES AND USE TAXES

N/A

ARTICLE 22—CONTRACTS TO BE ASSIGNED

N/A

City of Covington Bid Form for Construction Contract Three Ring Access Road Culvert Improvements 00 41 13 -1 Ardurra Project No.: 20251026.00.WK Master: Updated 05/2025_v1 Covington Project No.: 2026-27 10/2026 Issued for Bidding

SECTION 00 41 13

BID FORM FOR CONSTRUCTION CONTRACT

The terms used in this Bid with initial capital letters have the meanings stated in the Instructions to Bidders, the General Conditions, and the Supplementary Conditions.

ARTICLE 1—OWNER AND BIDDER

1.01 This Bid is submitted to: City of Covington, 2194 Emory Street N.W. Covington, GA 30014.

1.02 The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with Owner in the form included in the Bidding Documents to perform all Work as specified or indicated in the Bidding Documents for the prices and within the times indicated in this Bid and in accordance with the other terms and conditions of the Bidding Documents.

ARTICLE 2—ATTACHMENTS TO THIS BID

2.01 The following documents are submitted with and made a condition of this Bid:

A. Required Bid security;

B. List of Proposed First-Tier Subcontractors;

C. List of Proposed Suppliers;

D. Evidence of authority to do business in the state of the Project; or a written covenant to obtain such authority within the time for acceptance of Bids;

E. Contractor’s license number as evidence of Bidder’s State Contractor’s License or a covenant by Bidder to obtain said license within the time for acceptance of Bids;

F. Required Bidder Qualification Statement with supporting data; and

G. Contractor E-Verify Affidavit.

ARTICLE 3—BASIS OF BID—LUMP SUM BID AND UNIT PRICES

3.01 Unit Price Bids

A. Bidder will perform the following Work at the indicated unit prices:

Item

No.

Description Unit Estimated

Quantity

Bid Unit

Price

Bid Amount

Mobilization (3 percent Maximum)

LS 1 $ $

2 Construction Stakeout LS 1 $ $

Utility Coordination and Relocation

LS 1 $ $

Erosion and Sedimentation Control

LS 1 $ $

5 Clearing and Grubbing SY 150 $ $

6 Tree Removal EA 7 $ $

7 Undercut Excavation CY 20 $ $

Dewatering and Bypass Pumping

LS 1 $ $

Three Ring Access Road Culvert Improvements 00 41 13 -2 Ardurra Project No.: 20251026.00.WK Master: Updated 05/2025_v1 Covington Project No.: 2026-27 10/2026 Issued for Bidding

Item

No.

Description Unit Estimated

Quantity

Bid Unit

Price

Bid Amount

Remove and Dispose of 30"

RCP

LF 30 $ $

Furnish and Install Boulder Sill Wall

LF 25 $ $

Furnish and Install Soil Encapsulated Lift

LF 25 $ $

Furnish and Install Streambank Stabilization

SY 30 $ $

9'W x 4'H Reinforced Concrete Box Culvert

LF 30 $ $

GDOT 2404 Concrete Headwalls

EA 2 $ $

Remove/Replace Existing Gravel Driveway

SY 158 $ $

Excavation to Remove Unsuitable Material

CY 20 $ $

17 Soil Import Volume CY 200 $ $

Temporary & Permanent Seed and Mulch

AC 0.08 $ $

Total of All Unit Price Bid Items $

B. Bidder acknowledges that:

1. Each Bid Unit Price includes an amount considered by Bidder to be adequate to cover Contractor’s overhead and profit for each separately identified item, and

2. Estimated quantities are not guaranteed and are solely for the purpose of comparison of Bids, and final payment for all Unit Price Work will be based on actual quantities, determined as provided in the Contract Documents.

ARTICLE 4—EVALUATION OF BIDS

4.01 Bids will be evaluated in accordance with Article 18 of the Instructions to Bidders.

ARTICLE 5—TIME OF COMPLETION

5.01 Bidder agrees that the Work will be substantially complete and will be completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions on or before the dates or within the number of calendar days indicated in the Agreement.

5.02 Bidder accepts the provisions of the Agreement as to liquidated damages.

ARTICLE 6—BIDDER’S ACKNOWLEDGEMENTS: ACCEPTANCE PERIOD,

INSTRUCTIONS, AND RECEIPT OF ADDENDA

6.01 Bid Acceptance Period

A. This Bid will remain subject to acceptance for 90 days after the Bid opening, or for such longer period of time that Bidder may agree to in writing upon request of Owner.

Three Ring Access Road Culvert Improvements 00 41 13 -3 Ardurra Project No.: 20251026.00.WK Master: Updated 05/2025_v1 Covington Project No.: 2026-27 10/2026 Issued for Bidding

6.02 Instructions to Bidders

A. Bidder accepts all of the terms and conditions of the Instructions to Bidders, including without limitation those dealing with the disposition of Bid security.

6.03 Receipt of Addenda

A. Bidder hereby acknowledges receipt of the following Addenda:

Addendum Number Addendum Date

ARTICLE 7—BIDDER’S REPRESENTATIONS AND CERTIFICATIONS

7.01 Bidder’s Representations

A. In submitting this Bid, Bidder represents the following:

1. Bidder has examined and carefully studied the Bidding Documents, including Addenda.

2. Bidder has visited the Site, conducted a thorough visual examination of the Site and adjacent areas, and become familiar with the general, local, and Site conditions that may affect cost, progress, and performance of the Work.

3. Bidder is familiar with all Laws and Regulations that may affect cost, progress, and performance of the Work.

4. Bidder has carefully studied the reports of explorations and tests of subsurface conditions at or adjacent to the Site and the drawings of physical conditions relating to existing surface or subsurface structures at the Site that have been identified in the Supplementary Conditions, with respect to the Technical Data in such reports and drawings.

5. Bidder has carefully studied the reports and drawings relating to Hazardous Environmental Conditions, if any, at or adjacent to the Site that have been identified in the Supplementary Conditions, with respect to Technical Data in such reports and drawings.

6. Bidder has considered the information known to Bidder itself; information commonly known to contractors doing business in the locality of the Site; information and observations obtained from visits to the Site; the Bidding Documents; and the Technical Data identified in the Supplementary Conditions or by definition, with respect to the effect of such information, observations, and Technical Data on (a) the cost, progress, and performance of the Work; (b) the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder, if selected as Contractor; and

(c) Bidder’s (Contractor’s) safety precautions and programs.

7. Based on the information and observations referred to in the preceding paragraph, Bidder agrees that no further examinations, investigations, explorations, tests, studies, or data are necessary for the performance of the Work at the Contract Price, within the Contract Times, and in accordance with the other terms and conditions of the Contract.

Three Ring Access Road Culvert Improvements 00 41 13 -4 Ardurra Project No.: 20251026.00.WK Master: Updated 05/2025_v1 Covington Project No.: 2026-27 10/2026 Issued for Bidding

8. Bidder is aware of the general nature of work to be performed by Owner and others at the Site that relates to the Work as indicated in the Bidding Documents.

9. Bidder has given Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder has discovered in the Bidding Documents, and of discrepancies between Site conditions and the Contract Documents, and the written resolution thereof by Engineer is acceptable to Contractor.

10. The Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work.

11. The submission of this Bid constitutes an incontrovertible representation by Bidder that without exception the Bid and all prices in the Bid are premised upon performing and furnishing the Work required by the Bidding Documents.

7.02 Bidder’s Certifications

A. The Bidder certifies the following:

1. This Bid is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any collusive agreement or rules of any group, association, organization, or corporation.

2. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid.

3. Bidder has not solicited or induced any individual or entity to refrain from bidding.

4. Bidder has not engaged in corrupt, fraudulent, collusive, or coercive practices in competing for the Contract. For the purposes of this Paragraph 7.02.A:

a. Corrupt practice means the offering, giving, receiving, or soliciting of anything of value likely to influence the action of a public official in the bidding process.

b. Fraudulent practice means an intentional misrepresentation of facts made (a) to influence the bidding process to the detriment of Owner, (b) to establish bid prices at artificial non-competitive levels, or (c) to deprive Owner of the benefits of free and open competition.

c. Collusive practice means a scheme or arrangement between two or more Bidders, with or without the knowledge of Owner, a purpose of which is to establish bid prices at artificial, non-competitive levels.

d. Coercive practice means harming or threatening to harm, directly or indirectly, persons or their property to influence their participation in the bidding process or affect the execution of the Contract.

Three Ring Access Road Culvert Improvements 00 41 13 -5 Ardurra Project No.: 20251026.00.WK Master: Updated 05/2025_v1 Covington Project No.: 2026-27 10/2026 Issued for Bidding

BIDDER hereby submits this Bid as set forth above:

Bidder:

(typed or printed name of organization)

By:

(individual’s signature)

Name:

(typed or printed)

Title:

Date:

If Bidder is a corporation, a partnership, or a joint venture, attach evidence of authority to sign.

Attest:

Name:

Date:

Address for giving notices:

Bidder’s Contact:

Phone:

Email:

Address:

Bidder’s Contractor License No.: (if applicable)

Three Ring Access Road Culvert Improvements 00 41 13 -6…