CONTRACT DATA REQUIRMENTS LIST (CDRL).pdf

PDF 120 KB Posted

Attached to
Remanufacture of B-1 Flap Slat Power Drive Unit (POU) NSN: 1650-01-152-7304, P/N NF53100-03B
Solicitation number
FA811823R0003
Issued by

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST Form Approved OMB No. 0704-0188(1 Data Item)

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Executive Services Directorate (0704-0188).

Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

B-1B / Drive Unit, Hydraulic

E. CONTRACT / PR NO.

FD20302101580

F. CONTRACTOR

1. DATA ITEM NO.

A001

2. TITLE OF DATA ITEM

Commercial Asset Visibility (CAV) Reporting

3. SUBTITLE

CFM End Item Reporting

4. AUTHORITY

DI-MGMT-81838

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

See Block 16

6. REQUIRING OFFICE

423 SCMS/GUMF

7. DD 250 REQ

DD

8. APP CODE

A

9. DIST STATEMENT

REQUIRED

N/A

10. FREQUENCY

See Block 16

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

Seee Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Fields, FrankNAME: 01 SEP 2021DATE:

THIS CDRL WILL SERVE BASIC YEAR AND ALL OPTION YEARS

NOTE: Changes to office symbols and/or e-mail addresses, when necessary shall be made by letter through the Government CO/ACO without further revision to this CDRL.

1. Block 5: Contract Reference: PWS and CAV AF Reporting Requirements Document.

2. Block 4: All reporting shall be submitted in the English Language.

3. Blocks 10, 11, 12, 13:

a. Date of first submission shall be within 24 hours following a supply or maintenance transaction, after the contract award date.

b. Contractor reporting requirements to CAV AF shall be submitted daily and/or within 24 hours of a supply or maintenance action occurrence IAW the CAV AF Reporting Requirements Document.

c. Data shall be current within 24 hours of the last End Item maintenance occurrence.

4. Blocks 7, 8, 14:

a. The contractor shall report End Item transactional data through electronic submission in CAV AF using the CAV AF website or CICA XML.

b. The contractor shall submit a DD Form 250 (Material Inspection and Receiving Report) electronically via the Internet to iRAPT (WAWF) website address: https://wawf.eb.mil, using DODAAC FA8251. MARK FOR: Address in block 14A.

c. A Letter of Transmittal shall be submitted in the month the delivery order is completed, covering all reports transmitted for that order. Submit the Letter to the following email address: paige.tourtillott@us.af.mil

COORDINATORS:

See Block 16 0 1 0

0 1 015. TOTAL

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAB

405-736-7976

H. DATE

18 NOV 2021

I. APPROVED BY

//ELECTRONICALLY SIGNED//

Tourtillott, Paige A

423 SCMS / GUMF 405-582-5278 / 852-5278

J. DATE

18-NOV-21

Page 1 of 5DD FORM 1423-1, FEB 2001 Version 2Generated by PRPS using Jasper Reports on 18 Nov 2021

PREVIOUS EDITION MAY BE USED.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

B-1B / Drive Unit, Hydraulic

E. CONTRACT / PR NO.

FD20302101580

F. CONTRACTOR

1. DATA ITEM NO.

A002

2. TITLE OF DATA ITEM

Contract Depot Maintenance (CDM) Monthly Production Report

3. SUBTITLE

CDM Production Monthly Status Report

4. AUTHORITY

DI-PSSS-81995A

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS

6. REQUIRING OFFICE

423 SCMS/GUMF

7. DD 250 REQ

LT

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

MTHLY

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Fields, FrankNAME: 01 SEP 2021DATE:

THIS CDRL WILL SERVE BASIC YEAR AND ALL OPTION YEARS

NSN : 1650-01-152-7304

P/N : NF53100-03B

NOTE: Changes to office symbols and/or e-mail addresses, when necessary shall be made by letter through the Government CO/ACO without further revision to this CDRL.

1. Block 4:

a. All reporting shall be submitted in the English Language.

b. The Contractor's CAV AF Reporting shall reflect their inventory property control management system data records which shall represent timely and accurate accountability of AF inventory assets at the physical location(s) of the contractor's repair facility (including subcontractor facilities); shop floor, bond room and/or receiving/shipping docks, etc. for each repair.

c. The Contractor shall report by contract delivery order on all applicable categories, totals and on-hand balances, providing TABLE I (DI-PSSS-81995A) for EACH repair location, including subcontractor facilities, for the contracts maintenance occurrence actions during the reporting period.

d. The Contractor shall report on production, providing TABLE I (DI-PSSS-81995A) for EACH repair location, including subcontractor facilities, for which the contractor produced assets during the reporting period.

2. Blocks 10, 11, 12, 13:

a. The reports shall be provided monthly within 5 (five) business days of the previous month's last calendar date.

b. Reports shall continue to be submitted by the contractor unless the requirement is terminated by the assigned Contracting Officer at the request of the Program Manager (PM) and the Production Management Specialist (PMS).

c. The Final Report submitted following the final reporting period on the contract shall be annotated "Final Report".

3. Block 9:

a. DISTRIBUTATION STATEMENT "D": Distribution authorized to the Department of Defense and U.S. DoD contractors only, critical technology. Other requests for this document shall be referred to 848 SCMG/EN, Tinker Air Force Base, Oklahoma. (7 January 2021)

b. EXPORT CONTROL WARNING: All technical documents/data (printed, digital/electronic) that are determined to contain export-controlled technical data, shall be marked with the following statement:

EXPORT CONTROL WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App.

2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate IAW provisions of DoD Directive 5230.25.

c. DESTRUCTION NOTICE: For classified documents, follow the procedures, in DoD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM), Section 5-705, or DoD 5200.1-R, Information Security Program Chapter VI. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.

See Block 16 0 1 0

0 1 015. TOTAL

Page 2 of 5DD FORM 1423-1, FEB 2001 Version 2Generated by PRPS using Jasper Reports on 18 Nov 2021

4. Block 7, 14: Submit the CDM Production Monthly Status Reports to the following email address:

paige.tourtillott@us.af.mil

COORDINATORS:

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAB

405-736-7976

H. DATE

18 NOV 2021

I. APPROVED BY

//ELECTRONICALLY SIGNED//

Tourtillott, Paige A

423 SCMS / GUMF 405-582-5278 / 852-5278

J. DATE

18-NOV-21

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

B-1B / Drive Unit, Hydraulic

E. CONTRACT / PR NO.

FD20302101580

F. CONTRACTOR

1. DATA ITEM NO.

A003

2. TITLE OF DATA ITEM

Government Property Inventory Report

3. SUBTITLE

Government Property Inventory Report*

4. AUTHORITY

DI-MGMT-80441D

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS Paragraph 4.3.4

6. REQUIRING OFFICE

423 SCMS/GUMF

7. DD 250 REQ

LT

8. APP CODE

A

9. DIST STATEMENT

REQUIRED

A

10. FREQUENCY

ANNLY

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Fields, FrankNAME: 02 JUN 2021DATE:

THIS CDRL WILL SERVE BASIC YEAR AND ALL OPTION YEARS

BLK 4: The data item description (DID) contains the format and content preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract.

See Data Item Description at http://quicksearch.dla.mil/ for content requirements and most current version.

BLK 7: Enter the applicable code as listed in DOD 5010.12-M, Chapter 3. (Enter LT for Letter of Transmittal if not separately priced or DD if separately priced). WAWF E-DD FORM 250 shall be required for separately priced data. E- DD FORM 250 shall be submitted to FA8524 Program Manager (PM/ and Production Management Specialist PMS EMAIL ADDRESS) for acceptance.

Block 8: Approval (written) is not required. However, the data item will be reviewed and accepted/rejected, based on its conforming to the requirements of the DID, and within the review time specified in Block 16, items 10-13.

BLK 9: "A" Approved for Public Release; distribution is unlimited.

Block 10-13: The annual physical inventory report shall be provided within seven (7) calendar days of the end of each option/ordering period for the contract. The data is representative of the Contractor's Internal Property Control System and shall be current as of the last day of the option/ordering reporting period. If requested outside of an annual cadence, the data shall be current as of the date requested.

BLK 14: EMAIL electronic Annual Physical Inventory Report to the Production Management Specialist (PMS) and Program Manager (PM). Points of Contact will be provided to the Contractor at Contract Award. Submit digital copy in Microsoft Office Excel format for all reports.

COORDINATORS:

423 SCMS/GUMF

3001 Staff Drive, Annex 4, Suite #Suite 1AD2 100B Tinker AFB, OK 73145 Email:paige.tourtillott@us.af.

mil

ATTN: PAIGE

TOURTILLOTT

0 1 0

0 1 015. TOTAL

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAB

405-736-7976

H. DATE

18 NOV 2021

I. APPROVED BY

//ELECTRONICALLY SIGNED//

Tourtillott, Paige A

423 SCMS / GUMF 405-582-5278 / 852-5278

J. DATE

18-NOV-21

Page 3 of 5DD FORM 1423-1, FEB 2001 Version 2Generated by PRPS using Jasper Reports on 18 Nov 2021

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

B-1B / Drive Unit, Hydraulic

E. CONTRACT / PR NO.

FD20302101580

F. CONTRACTOR

1. DATA ITEM NO.

A004

2. TITLE OF DATA ITEM

Production Surge Plan

3. SUBTITLE

Capability Analysis Plan (CAP)*

4. AUTHORITY

DI-MGMT-80969

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS

6. REQUIRING OFFICE

423 SCMS/GUMF

7. DD 250 REQ

LT

8. APP CODE

A

9. DIST STATEMENT

REQUIRED

A

10. FREQUENCY

See Block 16

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Fields, FrankNAME: 01 SEP 2021DATE:

THIS CDRL WILL SERVE BASIC YEAR AND ALL OPTION YEARS

In the event that the DoD experiences an unplanned spike or sudden increase in demand, due to major theater warfare or a national emergency (also known as surge, reference DFARs 217.208-70 and DFARs 252.217.7001), and invokes surge: The Contractor is willing to work to meet and sustain this demand for quantity levels above and beyond normal peacetime requirements.

Block 9: Approved for Unlimited Public and Foreign Distribution. Other requests shall be referred to 423 SCMS/GUEA.

Block 10, 11, 12, 13: The Capability Analysis Plan (CAP) shall be prepared IAW DI-MGMT-80969 and shall be submitted 30 days after the contract award.

This Plan shall include a delivery schedule showing the maximum sustainable rate of delivery for items in this contract.

This delivery schedule shall provide acceleration by month up to the maximum sustainable rate of delivery achievable within the Contractor's existing facilities, equipment, and subcontracting structure. This Plan will address the surge capacity possible at no increase to the contract prices as well as the surge capacity possible at an additional cost. Based on this Plan, a mutually agreed to increase the quantity of supplies or services called for under this contract by no more than x % percent; and the accelerate the rate of delivery may be established for this contract, at a price or cost established after contract award or to be established by negotiation.

COORDINATORS:

423 SCMS/GUMF

3001 Staff Drive, Annex 4, Suite 1AD2 100B Tinker AFB, OK 73145-3033 Attention:

paige.tourtillott@us.af.mil

0 1 0

0 1 015. TOTAL

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAB

405-736-7976

H. DATE

18 NOV 2021

I. APPROVED BY

//ELECTRONICALLY SIGNED//

Tourtillott, Paige A

423 SCMS / GUMF 405-582-5278 / 852-5278

J. DATE

18-NOV-21

Page 4 of 5DD FORM 1423-1, FEB 2001 Version 2Generated by PRPS using Jasper Reports on 18 Nov 2021

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

B-1B / Drive Unit, Hydraulic

E. CONTRACT / PR NO.

FD20302101580

F. CONTRACTOR

1. DATA ITEM NO.

A005

2. TITLE OF DATA ITEM

Counterfeit Prevention Plan

3. SUBTITLE

CPP

4. AUTHORITY

DI-MISC-81832

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS

6. REQUIRING OFFICE

423 SCMS/GUEA

7. DD 250 REQ

NO

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

See Block 16

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Zilar, Dale NNAME: 18 NOV 2021DATE:

THIS CDRL WILL SERVE BASIC YEARS AND ALL OPTION YEARS.

Blk 9: Distribution Statement D: Distribution authorized to the Department of Defense and US DOD Contractors only, critical technology. (1 August 2021) Other requests shall be referred to 848 SCMG/EN, Tinker Air Force Base, Oklahoma.

Control Warning Notice: Warning - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, USC, Sec 2751 Et Seq) or the Export Administration Act of 1979, Title 50, USC, App 240 I Et Seq, as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DOD Directive 5230.25.

DESTRUCTION NOTICE : For classified documents, follow the procedures IAW DoD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM), Section 5-705, and DoDM 5200.01 Vol 3, DoD Information Security Program: Protection of Classified Information, Enclosure 3, paragraph 17.

For unclassified, destroy by any method that will prevent disclosure of contents or reconstruction of the document IAW DoDI 5230.24 Enclosure 3, Paragraph 17.

The plan shall be delivered in electronic PDF format through the Wide Area Workflow (WAWF) system no later than 90 calendar days after contract award. (FA8118)

Contractor format acceptable unless otherwise defined by applicable Data Item Description (DID).

DID Requirements are NOT tailored.

Delivery CANNOT be deferred.

COORDINATORS:

423 SCMS/GUEA

3001 Staff Drive Tinker Air Force Base, Oklahoma 73145

0 1 0

0 1 015. TOTAL

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAB

405-736-7976

H. DATE

18 NOV 2021

I. APPROVED BY

//ELECTRONICALLY SIGNED//

Tourtillott, Paige A

423 SCMS / GUMF 405-582-5278 / 852-5278

J. DATE

18-NOV-21

Page 5 of 5DD FORM 1423-1, FEB 2001 Version 2Generated by PRPS using Jasper Reports on 18 Nov 2021

File details come from the government source that posted it. Updated .