The contract documents detail a Storm Sewer Lining project for the City of Dexter, Michigan, prepared by OHM Advisors. The project involves Cured-In-Place Pipe (CIPP) lining on 7 segments of storm sewer pipe throughout the city, including spot and full lining on 12-inch, 21-inch, and 24-inch pipe diameters. Sealed bids are to be received by the City Manager's office until 2:00 PM local time on May 6, 2025. The anticipated contract timeline includes a contract award on May 12, 2025, a notice to proceed on May 19, 2025, construction start date of August 4, 2025, and project completion by November 14, 2025.

The bid requires a bid security of at least 5% of the total bid amount, with payment to be made based on unit prices for specific line items such as mobilization, spot lining, full lining, and maintaining traffic. The contract includes comprehensive requirements for installation, including pre-cleaning of existing sewer lines, bypassing storm water, service connection restoration, and detailed testing and inspection protocols. Contractors must provide various insurances, including workers' compensation, comprehensive general liability, and builder's risk coverage, with specific minimum coverage amounts. The project will be funded by the City of Dexter and requires compliance with local, state, and federal regulations, including MIOSHA safety standards and Michigan Department of Transportation specifications.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DOCUMENTS

FOR

STORM SEWER LINING

CITY OF DEXTER

DEXTER, MI, 48130

OHM Advisors

34000 Plymouth Road

Livonia, Michigan 48150

0130-24-0010

April 15, 2025

TOC - 1 0130-24-0010

Storm Sewer Lining

City of Dexter

0130-24-0010

TABLE OF CONTENTS

Page No.

Bidding Requirements

Advertisement for Bid ............................................................................................................. AB-1

Instructions to Bidders ........................................................................................................... IB-1-3

Supplemental Instructions to Bidders .................................................................................. SIB-1-2

Insurance Specifications ......................................................................................................... IS-1-4

Bid Form................................................................................................................................BF-1-6

Bid Guarantee .......................................................................................................................... BG-1

Bid Bond.............................................................................................................................. BB–1-3

Statement of Qualifications .................................................................................................. SQ-1-3

Subcontractor Listing ............................................................................................................ SL-1-2

Iran Linked Business Certification ......................................................................................... IL-1-2

Contract Forms

Agreement (Contract) .......................................................................................................... AG-1-6

Performance Bond .............................................................................................................. PFB-1-4

Payment Bond .................................................................................................................... PYB-1-3

Maintenance and Guarantee Bond ....................................................................................... MG-1-2

Contractor’s Affidavit ............................................................................................................. CA-1

Contractor’s Declaration ......................................................................................................... CD-1

Sworn Statement .................................................................................................................. SW-1-2

Conditions of the Contract

General Conditions ............................................................................................................. GC-1-20

General Specifications

General Specifications .......................................................................................................... GS-1-6

Technical Specifications

Storm Sewer Construction ..................................................................................................... ST-1-8

Restoration............................................................................................................................... R-1-8

Method of Payment ................................................................................................................. MP-1

Supplemental Specifications ................................................................................................. SS-1-7

Maintaining Traffic ..................................................................................................................... 1-4

Utility Coordination .................................................................................................................... 1-2

Progress Clause

Cured In Place Pipe ................................................................................................................... 1-37

Appendices

Appendix A: Table and Maps

April 15, 2025 AB - 1 0130-24-0010

ADVERTISEMENT FOR BID

City of Dexter

April 15, 2025

Sealed Bids for Storm Sewer Lining will be received at the office of the City of Dexter until 2:00

PM local time, on May 6, 2025, by the office of the City Manager located at 3515 Broad St, Dexter, MI, 48130. The approximate quantities of major items of work involved are as follows:

CIPP Lining on 7 segments of storm sewer pipe throughout the City of Dexter. Includes spot and full lining on 12-inch, 21-inch, and 24-inch pipe diameters.

The issuing Office for the Bidding Documents is the office of the ENGINEER, Orchard, Hiltz, &

McCliment, Inc., d/b/a OHM Advisors. Bidding documents may be examined at the following locations after April 15, 2025, at 2:00 PM: OHM Advisors Online Plan Room (Download Fee may apply), ohm-advisors.com: and City of Dexter, 3515 Broad St, Dexter, MI, 48130. Neither

Owner nor ENGINEER will be responsible for full or partial sets of Bidding Documents, including Addenda if any, obtained from sources other than the Issuing Office. Bidders should direct correspondence to the ENGINEER.

Bid Security in the form of a Certified or Cashier's Check or Bid Bond for a sum no less than five percent (5%) of the amount of the Bid will be required with each Bid.

The OWNER reserves the right to accept any Bid, reject any Bid, or waive irregularities in Bids.

No Bid may be withdrawn for a period of sixty (60) calendar days after the scheduled closing time for receipt of the Bids.

No pre-bid meetings are scheduled for this project.

Justin Breyer, City Manager

05/01/00 IB - 1 0999-00-0202

INSTRUCTIONS TO BIDDERS

1. BIDS

A. Sealed Bids will be received as per Advertisement for Bids.

B. Bid Forms shall be submitted only on forms provided by the ENGINEER and shall be of the type specified in the Bid Form.

C. Bid Forms must be completed legibly in ink or by typewriter. In case of a discrepancy between the unit price and the extended amount, the unit price shown shall govern. Illegibility of any figure or word in the Bid Form may be sufficient cause for rejection of the Bid by the OWNER.

D. Bid Forms shall be enclosed in sealed envelopes marked with the name of the project and Bidder and shall be delivered to the OWNER at the place specified in the Advertisement for Bids on or before the time specified in the Advertisement for Bids.

E. Bid Forms shall be made in full conformity with all the conditions set forth in the drawings and in these specifications

2. NAME AND STATUS OF BIDDER

A. The name and legal status of Bidder, that is, as a corporation, partnership or individual, shall be stated in the Bid Form.

B. Anyone signing a Bid Form as an agent of another or others must submit with the Bid Form legal evidence of his authority to do so.

C. The place of residence of each Bidder, or the office address in the case of a firm or company, with county and state, must be given after his signature. Phone and fax numbers are also required.

3. BID SECURITY

Each Bid must be in the form requested in the Advertisement for Bid. The CONTRACTOR shall complete and sign the Bid Guarantee form (page BG-1). If a Bid Bond is requested, it must be from a Treasury Listed surety company licensed to do business in the state of Michigan in the amount as stated in the Advertisement for Bid, payable to the OWNER as a guarantee on the part of the Bidder that he will, if called upon, enter into the attached Agreement.

4. BONDS

A. CONTRACTOR will be required to furnish performance and payment bonds each equal to one-hundred percent (100%) of the Contract Sum. The bonds shall be the OWNER's guarantee of the faithful performance and payment of all the CONTRACTOR's obligations under the Agreement. These bonds shall remain in effect for the period as stated in each bond’s provisions.

B. Maintenance and Guarantee Bonds shall be required.

5. INSPECTION OF SITE

A. Before submitting a Bid Form, each Bidder shall personally inspect the site of the proposed work to arrive at a clear understanding of the conditions under which the work is to be done.

B. Each Bidder shall be held to have compared the premises with the Bid documents and to have satisfied himself as to conditions of the premises, existing construction and any other conditions

05/01/00 IB - 2 0999-00-0202

affecting the carrying out of the work before delivery of his Bid Form.

C. No allowance or extra consideration on behalf of the CONTRACTOR will subsequently be allowed by reason of error or oversight on the part of the CONTRACTOR or on account of interference by the OWNER's or other CONTRACTOR's activities.

6. TIME OF COMPLETION

Time of completion will be as stated in the Agreement.

7. EXPLANATION TO BIDDERS BY

ADDENDA

A. Neither the OWNER nor the ENGINEER will give verbal answers to inquiries regarding the meaning or intent of the Contract Documents prior to award of the Contract. Any verbal statements regarding same by any person prior to the award shall be without legal effect.

B. Explanations desired by Bidders shall be requested of the ENGINEER in writing and, if explanations are necessary, a reply will be made in the form of an addendum, a copy of which will be forwarded to each Bidder of Record whose work is affected.

C. Addenda issued to Bidders prior to date of receipt of Bid Forms shall become a part of the Contract Documents, and all Bid Forms shall include the work described in the Addenda.

D. No inquiry received within four (4) business days of the date fixed for opening of the Bids will be given consideration.

E. Failure of the ENGINEER to send, or the Bidder to receive, any such interpretations shall not relieve the

Bidder from obligation under his Bid as submitted.

F. Bidder of Record is defined as an individual, partnership or corporation having purchased a set of Bid Documents from the ENGINEER.

8. EXPERIENCE AND FINANCIAL

STATEMENT

A. It is the intention of the OWNER to award the Contract to a contractor fully capable, both financially and as regards to experience to perform and complete the work in a satisfactory manner. Each Bidder must complete the Statement of Qualifications, which follows the Bid Form. If required by the OWNER, each Bidder under consideration may be required to submit additional evidence of qualifications.

B. Each Bidder under consideration must be able to demonstrate that the Bidder has successfully completed projects of a similar nature and scope within the last two years.

9. SUBCONTRACTORS

Bidder shall submit to OWNER a list of all subcontractors and other persons and organizations (including those who are to furnish the principal items of material and equipment) proposed for those portions of work as to which such identification is so required. If requested by the OWNER, the apparent successful Bidder and any other Bidder so requested, will, within ten (10) days after the day of Bid opening, submit a Statement of Qualifications with pertinent information as to similar projects and other evidence of qualification for each such subcontractor, person and organization if requested by the OWNER.If the OWNER or ENGINEER, after due investigation, has reasonable objection to any proposed subcontractor, other person or organization, OWNER may request the apparent successful Bidder to submit an acceptable

05/01/00 IB - 3 0999-00-0202

substitute without an increase in Bid price. If the apparent successful Bidder declines to make any such substitutions, the Contract shall not be awarded to such Bidder, but his declining to make any such substitution will not constitute grounds for sacrificing his Bid Security. Any subcontractor, other person or organization so listed and to whom the OWNER or ENGINEER does not make written objection prior to signing of the Agreement will be deemed acceptable to the OWNER and ENGINEER.

10. AWARD OF CONTRACT

The OWNER reserves the right to accept any Bid, to reject any or all Bids, and to waive defects or irregularities in any Bid for any reason or no reason at all. The OWNER also reserves the right to award some, none, or all of the Contract.

11. LIQUIDATED

DAMAGES/INCENTIVES

A. If the CONTRACTOR fails to complete all the work within the time stipulated, he will be assessed liquidated damages as set forth in the Agreement.

B. If set forth in the Agreement, incentives will be paid by OWNER to CONTRACTOR at the rate specified in the Agreement, when the work is completed prior to the time specified in the Agreement.

12. TAXES

The Bidder shall include in the base Bid and shall pay all applicable federal, state and local taxes of whatever character and description.

End of Section

March 31, 2025 SIB - 1 0130-24-0010

SUPPLEMENTAL INSTRUCTIONS TO BIDDERS

These Supplemental Instructions to Bidders (SIB) amend or supplement the Instructions to

Bidders. All provisions that are not so amended or supplemented remain in full force and effect.

A. Time of Completion & Construction Schedule

Prior to the execution of the Contract, the CONTRACTOR shall submit an outline of his proposed order of work and indicate dates for completing the major items of work. Major items shall be considered to be UV CIPP Sewer Lining throughout the City of Dexter. This schedule, when approved by the OWNER, shall become part of the Contract.

A pre-construction meeting shall be arranged prior to the start of work. The CONTRACTOR shall bring a tentative schedule to the pre-construction meeting. At this time, all Contract requirements shall be reviewed.

It is anticipated that construction will begin on August 4, 2025. The CONTRACTOR shall complete the proposed work, including final tests thereof, in order to have the UV CIPP

Sewer Lining finished as of the final completion date. Final cleanup and restoration shall be finished by the project completion date, unless otherwise directed in writing by the OWNER or its ENGINEER.

Summary of anticipated dates:

Contract Award…………………………..May 12, 2025

Notice to Proceed………………...………May 19, 2025

Construction Start Date…………………..August 4, 2025

Project Completion………………………November 14, 2025

All requests for extensions of time shall be submitted in writing in accordance with Section

15 of the General Conditions. Such requests shall:

1. Detail the reason for the request.

2. Provide a realistic revised completion date.

3. Indicate any other areas that may be impacted by such an extension.

The CONTRACTOR shall request a deadline extension as soon as it has become apparent the completion date is unreasonable. In no case will a request be considered if it is submitted after the originally required completion date has passed. Property survey, description of existing site, soil contamination report, description of existing buildings, photographic report of existing conditions, hazardous materials repot site assessment, historical recording, and mapping. If information is brief it may be included here, when more extensive information must be included a statement in the SIB directs the bidder to the location of the information.

March 31, 2025 SIB - 2 0130-24-0010

B. Permits

Outside agency permits are not anticipated to be required for this project.

C. Additional Notes

A table and maps of the sections of pipe to be lined can be found in Appendix A.

The Contractor will receive the locations in both hard copy and shapefile format. It is the

Contractor's responsibility to field locate manholes and bring discrepancies between maps, digital files, and field information to the Engineer’s attention immediately.

Inspection videos have been completed and can be downloaded using the link below.

https://ohm.filegenius.com/downloadPublic/4y9am4akvm6ssjl

Please have questions in before April 28, 2025. If necessary, OHM will issue an addendum to answer questions and resolve contract document issues.

https://url.us.m.mimecastprotect.com/s/1jvgC68j8mtPOPPmfpf6c5d5_-?domain=ohm.filegenius.com

05/01/00 IS - 1 0999-00-0202

INSURANCE SPECIFICATIONS

1. LIABILITY OF CONTRACTOR

The Contractor shall take all responsibility for the work and shall provide barricades, watchmen and lights, and take all precautions for preventing injuries to persons and property on or about the work; shall bear all losses resulting to him on account of the amount or character of the work or because the nature of the ground in which the work is done is different from what was estimated or expected, or on account of weather, floods, elements or other cause; and shall assume defense of, indemnify and save harmless the party of the first part and its individual officers and agents from all claims relating to labor, equipment and materials furnished for the work, inventions, patents and patent rights used in doing the work, also to injuries to any person or property received or sustained by or from the CONTRACTOR, his agents or employees.

The mention of any specific duty or liability of the CONTRACTOR in any part of the specifications shall not be construed as a limitation or restriction upon any general liability or duty imposed upon the CONTRACTOR by the specifications.

INDEMNIFICATION - HOLD HARMLESS

AGREEMENT

The CONTRACTOR agrees to indemnify, defend, and save harmless the OWNER and ENGINEER, their consultants, agents, and employees, from and against all loss or expense (including costs and attorney's fees) by reason of liability imposed by law upon the OWNER and ENGINEER, their consultants, agents, and employees for damages to property and for damages because of bodily injury, including death at any time resulting therefrom, arising out of or in consequence of the performance of this work, whether such injuries to persons or damage to property is due, or claimed to be due, to the negligence of the CONTRACTOR, his subcontractors, the OWNER, the ENGINEER, and their consultants, agents, and employees, except only such injury or damage as shall have been occasioned by the sole negligence of the

OWNER, the ENGINEER, and their agents and/or consultants.

COMPOSITION OF THE CONTRACTOR

If the CONTRACTOR hereunder is comprised of more than one legal entity, each such entity shall be jointly and severally liable hereunder.

2. INSURANCE

2.1. Insurance Required of the CONTRACTOR:

Prior to commencement of work, the CONTRACTOR shall purchase and maintain during the term of the project such insurance as will protect him, the OWNER(s), and Orchard, Hiltz & McCliment, Inc., Consulting Engineers, from claims arising out of the work described in this Contract and performed by the CONTRACTOR, subcontractor(s) or sub-subcontractor(s) consisting of:

2.1.1. Workers' Compensation Insurance

including Employer's Liability to cover employee injuries or disease compensable under the Workers' Compensation Statutes of the states in which work is conducted under this Contract; disability benefit laws, if any;

or Federal compensation acts such as U.S. Longshoremen or Harbor Workers', Maritime Employment, or Railroad Compensation Act(s), if applicable. Self-insurance plans approved by the regulatory authorities in the state in which work on this project is performed are acceptable.

2.1.2. A Comprehensive General Liability

policy to cover bodily injury to persons other than employees and for damage to tangible property including loss of use thereof, including the following exposures:

A. All premises and operations.

B. Explosion, collapse and underground damage.

05/01/00 IS - 2 0999-00-0202

C. Contractor's Protective coverage for independent contractors or subcontractors employed by him.

D. Contractual Liability for the obligation assumed in the Indemnification or Hold Harmless agreement found under Part l of this Section.

E. The usual Personal Injury Liability endorsement with no exclusions pertaining to employment.

F. Products and Completed Operations coverage. This coverage shall extend through the contract guarantee period.

2.1.3. A Comprehensive Automobile

Liability policy to cover bodily injury and property damage arising out of the ownership, maintenance or use of any motor vehicle, including owned, non-owned and hired vehicles. In light of the standard policy provisions concerning

(a) loading and unloading, and b) definitions pertaining to motor vehicles licensed for road use vs. unlicensed or self-propelled construction equipment, it is strongly recommended that Comprehensive General Liability and Comprehensive Auto Liability be written by the same insurance carrier, though not necessarily in one policy.

2.1.4. CONTRACTOR will purchase for

the OWNER an Owner's Protective Liability policy to protect the OWNER;

the ENGINEER (Orchard, Hiltz & McCliment, Inc.); their consultants, agents, employees and such public corporations in whose jurisdiction the work is located for their contingent liability for work performed by the CONTRACTOR, the subcontractor(s) or the sub-subcontractor(s) under this Contract.

2.1.5. CONTRACTOR shall purchase a

Builder's Risk-Installation Floater in a form acceptable to the OWNER covering property of the project for the full cost of replacement as of the time of any loss which shall include, as named insureds, (a) the CONTRACTOR, (b) all subcontractors, (c) all sub-subcontractors, (d) the OWNER, and Orchard, Hiltz & McCliment, Inc., Consulting Engineers, as their respective interests may prove to be at the time of loss, covering insurable property which is the subject of this Contract, whether in place, stored at the job site, stored elsewhere, or in transit at the risk of the insured(s). Coverage shall be effected on an "All Risk" form, including but not limited to the perils of fire, wind, collapse, vandalism, theft and earthquake, with exclusions normal to the cover. The CONTRACTOR may arrange for such deductibles as he deems to be within his ability to self-assume, but he will be held solely responsible for the amount of such deductible and for any co-insurance penalties. Any insured loss shall be adjusted with the OWNER and CONTRACTOR and paid to the OWNER and CONTRACTOR as Trustee for the other insureds.

2.1.6. Umbrella or Excess Liability

The OWNER or its representative may, for certain projects, require limits higher than those stated in paragraph. 2.2 that follows. CONTRACTOR is granted the option of arranging coverage under a single policy for the full limit required or by a combination of underlying policies with the balance provided by an Excess or Umbrella Liability policy equal to the total limit(s) requested. Umbrella or Excess policy wording shall be at least as broad as the primary or underlying policy(ies) and shall apply both to the CONTRACTOR’s general liability and to his automobile liability insurance.

2.1.7. Railroad Protective Liability

Where such an exposure exists, the CONTRACTOR will provide coverage in the use of each railroad company having jurisdiction over rights-of-way across which work under the Contract is to be performed. The form of policy and limits

05/01/00 IS - 3 0999-00-0202

of liability shall be determined by the railroad company(ies) involved.

2.2. Limits of Liability

The required limits of liability for insurance coverages requested in Section 2.1 shall be not less than the following:

2.2.1. Worker's Compensation

Coverage A Compensation Statutory Coverage B Employer's Liability $100,000

2.2.2. Comprehensive General Liability

Bodily Injury - Each Occurrence $500,000 Bodily Injury - Aggregate (Completed Operations) $500,000 Property Damage - Each Occurrence $100,000 Property Damage - Aggregate $500,000 or combined single limit $1,000,000

2.2.3. Comprehensive Automobile

Liability

Bodily Injury $500,000 Property Damage $200,000 or combined single limit $1,000,000

2.2.4. Owner's Protective

Bodily Injury- Each Occurrence $1,000,000 Property Damage- Each Occurrence $250,000 Property Damage- Aggregate $500,000 or combined single limit $1,500,000

2.2.5. Builder's Risk-Installation Floater

Cost to replace at time of loss

2.2.6. Umbrella or Excess Liability

$2,000,000

2.3. Insurance - Other Requirements

2.3.1. Notice of Cancellation or Intent Not

to Renew

Policies will be endorsed to provide that at least thirty (30) days written notice shall be given to the OWNER and the ENGINEER of cancellation or of intent not to renew.

2.3.2. Evidence of Coverage

Prior to the commencement of work, the CONTRACTOR shall furnish to the OWNER, Certificates of Insurance in force on the Owner's Form of Certificate provided. Other forms of certificate are acceptable only if (1) they include all items prescribed in the Owner's Form of Certificate, including agreement to cancellation provisions outlined in Paragraph 2.3.1 above, and (2) they have the written approval of the OWNER and ENGINEER. The OWNER reserves the right to request complete copies of the policies if deemed necessary to ascertain details of coverage not provided by the certificates. Such policy copies shall be "Originally Signed Copies," and so designated.

05/01/00 IS - 4 0999-00-0202

A. Insurance Required for the

CONTRACTOR

i. Workers' Compensation and Employers' Liability Comprehensive General Liability, including:

a. All premises and operations.

b. Explosion, collapse, and underground damage.

c. Contractors' Protective.

d. Contractual Liability for obligations assumed in the Indemnification-Hold Harmless agreement of this contract.

e. Personal Injury Liability.

f. Products and Completed Operations.

ii. Comprehensive Automobile Liability, including owned, non-owned, and hired vehicles.

iii. Umbrella or Excess Liability.

B. Insurance Required for the OWNER

Owners' Protective Liability which names as insured(s) the OWNER; the ENGINEER, Orchard, Hiltz & McCliment, Inc.; their consultants, agents, employees and such public corporations in whose jurisdiction the work is located.

C. Insurance Required for the CONTRACTOR and the OWNER

Builders Risk-Installation Floater which names as insured(s) the OWNER; the ENGINEER, Orchard, Hiltz & McCliment, Inc.; their consultants, agents and employees; the CONTRACTOR and all subcontractors.

2.3.3. Qualification of Insurers

In order to determine the financial strength and reputation of insurance carriers, all companies providing coverages required shall be licensed or approved by the Office of Financial and Insurance Services of the State of Michigan. The company shall also have a financial rating not lower than X and a policyholder's service rating no lower than A as listed in A.M. Best's Key Rating Guide, current edition.

Companies with ratings lower than A:X will be acceptable only upon the written consent of the OWNER

BF - 1 0130-24-0010

BID FORM

City of Dexter

THIS BID IS SUBMITTED TO:

City of Dexter 3515 Broad St

Dexter, MI, 48130

The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with OWNER in the form included in the Bidding Documents to perform all Work as specified or indicated in the Bidding Documents for the prices and within the times indicated in this Bid and in accordance with the other terms and conditions of the Bidding Documents.

Bidder accepts all of the terms and conditions of the Advertisement to Bid, Instructions to Bidders and Supplemental Instructions to Bidders.

In submitting this Bid, Bidder represents, as set forth in the Agreement, that:

A. Bidder has examined and carefully studied the Bidding Documents, the other related data identified in the Bidding Documents, and the following Addenda, receipt of all which is hereby acknowledged.

Addenda No. Addenda Date Signature

B. Bidder has visited the site and become familiar with and is satisfied as to the general, local and Site conditions that may affect cost, progress, and performance of the Work.

C. Bidder is familiar with and is satisfied as to all federal, state and local Laws and Regulations that may affect cost, progress and performance of the Work.

D. Bidder has carefully studied all: (1) reports of explorations and tests of subsurface conditions at or contiguous to the site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the site (except underground facilities) which have been identified in the Supplemental Instructions to Bidders, and (2) reports and drawings of a hazardous environmental condition, if any, which has been identified in the Supplemental Instructions to Bidders.

E. Bidder has obtained and carefully studied (or assumes responsibility for having done so) all additional or supplementary examinations, investigations, explorations, tests, studies and data concerning conditions (surface, subsurface and underground facilities) at or contiguous to the site which may affect cost, progress, or performance of the Work or which relate to any aspect of the means, methods, techniques, sequences, and procedures of construction to be

BF - 2 0130-24-0010

employed by Bidder, including applying the specific means, methods, techniques, sequences, and procedures of construction expressly required by the Bidding Documents to be employed by Bidder, and safety precautions and programs incident thereto.

F. Bidder does not consider that any further examinations, investigations, exploration, tests, studies, or data are necessary for the determination of this Bid for performance of the Work at the price(s) bid and within the times and in accordance with the other terms and conditions of the Bidding Documents.

G. Bidder is aware of the general nature of work to be performed by OWNER and others at the Site that relates to the Work as indicated in the Bidding Documents.

H. Bidder has correlated the information known to Bidder, information and observations obtained from visits to the Site, reports and drawings identified in the Bidding Documents, and all additional examinations, investigations, explorations, tests, studies, and data with the Bidding Documents.

I. Bidder has given ENGINEER written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder has discovered in the Bidding Documents, and the written resolution thereof by ENGINEER is acceptable to Bidder.

J. The Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance of the Work for which this Bid is submitted.

Bidder further represents that this Bid is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any agreement or rules of any group, association, organization or corporation; Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid; Bidder has not solicited or induced any individual or entity to refrain from bidding; and Bidder has not sought by collusion to obtain for itself any advantage over any other Bidder or over OWNER.

Bidder will complete the Work in accordance with the Contract Documents for the following price(s):

Unit

Item Description Price Amount

1 Mobilization, 10% Max 1.00 LSUM $ $

2 8' Spot Lining, 24" 2.00 Ea $ $

3 Full Lining 21" 441.00 Ft $ $

4 Full Lining, 12" 318.00 Ft $ $

5 Maintaining Traffic 1.00 LSUM $ $

Total Bid Amount (Items 1-5 incl.): $

BID FORM for

Quantity

BF-4 0130-19-0020

Storm Sewer Lining

City of Dexter, Washtenaw County, State of Michigan

OHM Job Number: 0130-24-0010

Estimated

BF - 3 0130-24-0010

BF - 4 0130-24-0010

Bidder acknowledges that estimated quantities are not guaranteed, and are solely for the purpose of comparison of Bids, and final payment for all unit price bid items will be based on actual quantities constructed in accordance with the Contract Documents.

Bidder agrees that the Work will be completed and ready for final payment in accordance with the General Conditions on or before November 14, 2025.

Bidder accepts the provisions of the Agreement as to liquidated damages in the event of failure to complete the Work within the times specified above, which shall be stated in the Agreement.

The following documents are attached to and made a condition of this Bid:

• Bid Guarantee (circle one): Certified or Cashier's Check or Bid Bond

• Statement of Qualifications

• Subcontractor Listing

• Legal Status of Bidder

SUBMITTED on , 20

State Contractor License No. . (If applicable)

If Bidder is:

An Individual

Name (typed or printed):

By: (SEAL)

(Individual’s signature)

Doing business as:

Business address:

Phone No.: FAX No.:

BF - 5 0130-24-0010

A Partnership

Partnership Name: (SEAL)

By:

(Signature of general partner – attach evidence of authority to sign)

Name (typed or printed):

A Corporation

Corporation Name: (SEAL)

State of Incorporation:

Type (General Business, Professional, Service, Limited Liability):

By:

(Signature – attach evidence of authority to sign)

Name (typed or printed):

Title:

Attest: (CORPORATE SEAL)

(Signature of Corporate Secretary)

Date of Qualification to do business is:

BF - 6 0130-24-0010

A Joint Venture

Joint Venture Name: (SEAL)

By:

(Signature of joint venture partner – attach evidence of authority to sign)

Name (typed or printed):

Title:

Joint Venture Name: (SEAL)

By:

(Signature of joint venture partner – attach evidence of authority to sign)

Name (typed or printed):

Phone and FAX Number, and Address for receipt of official communications.

(Each joint venturer must sign. The manner of signing for each individual, partnership, and corporation that is a party to the joint venture should be in the manner indicated above).

05/01/00 BG - 1 0999-00-0202

BID GUARANTEE

The undersigned attaches bid security in the form of a BID BOND / CERTIFIED CHECK / CASHIER’S CHECK (Circle one) in the amount of _________________________________ Dollars ($_______________).

The undersigned agrees, if awarded the Contract, to deliver the executed Agreement and bonds and furnish evidence of insurance within fourteen (14) business days after the date of the Notice of Award. And to complete the proposed work within the time specified in the Bid Form.

If the Bid is accepted by the OWNER, and the undersigned shall fail to enter into the Agreement as aforesaid and to furnish the required surety bonds within fourteen (14) business days after Notice of Award, the Bid Bond in the amount of $__________________________ accompanying this Bid shall be considered due and payable to the OWNER.

If the undersigned enters into the Agreement in accordance with this Bid or if his Bid is rejected, then the accompanying Bid Guarantee shall be voided.

In submitting this Bid, it is understood that the right is reserved by the OWNER to reject any or all bids, to waive irregularities and/or formalities and, in general, to make award in any manner deemed by it, in its sole discretion, to be in the best interest of the OWNER.

SIGNED AND SEALED THIS DAY OF , 20

Authorized Signature of Bidder:

(TITLE)

(SEAL)

BB - 1 0130-24-0010

BID BOND

BIDDER (Name and Address):

SURETY (Name and Address of Principal Place of Business):

OWNER (Name and Address):

3515 Broad St

Dexter, MI, 48130

BID

BID DUE DATE: May 6, 2025

PROJECT (Brief Description Including Location):

CIPP Lining on 7 segments of storm sewer pipe throughout the City of Dexter. Includes spot and full lining on 12-inch, 21-inch, and 24-inch pipe diameters.

BB - 2 0130-24-0010

BOND

BOND NUMBER:

DATE (Not later than Bid due date):

PENAL SUM:

(Words) (Figures)

IN WITNESS WHEREOF, Surety and Bidder, intending to be legally bound hereby, subject to the terms printed on the reverse side hereof, do each cause this Bid Bond to be duly executed on its behalf by its authorized officer, agent, or representative.

BIDDER SURETY

(Seal) (Seal)

Bidder’s Name and Corporate Seal Surety’s Name and Corporate Seal

Signature and Title Signature and Title

(Attach Power of Attorney)

Attest:

Attest:

Signature and Title Signature and Title

05/01/00 BB - 3 0999-00-0202

1. Bidder and Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors and assigns to pay to OWNER upon default of Bidder the penal sum set forth on the face of this Bond.

2. Default of Bidder shall occur upon the failure of Bidder to deliver within the time required by the Bidding Documents (or any extension thereof agreed to in writing by OWNER) the executed Agreement required by the Bidding Documents and any performance and payment bonds required by the Bidding Document.

3. This obligation shall be null and void if:

3.1. OWNER accepts Bidder’s Bid and Bidder

delivers within the time required by the Bidding Documents (or any extension thereof agreed to in writing by OWNER) the executed Agreement required by the Bidding Documents and any performance and payment Bonds required by the Bidding Documents, or

3.2. All Bids are rejected by OWNER, or

3.3. OWNER fails to issue a Notice of Award

to Bidder within the time specified in the Bidding Documents (or any extension thereof agreed to in writing by Bidder and, if applicable, consented to by Surety when required by paragraph 5 hereof).

4. Payment under this Bond will be due and payable upon default by Bidder and within 30 calendar days after receipt by Bidder and Surety of written notice of default from OWNER, which notice will be given with reasonable promptness, identifying this Bond and the Project and including a statement of the amount due.

5. Surety waives notice of and any and all defenses based on or arising out of any time extension to issue Notice of Award agreed to in writing by OWNER and Bidder, provided that the total time of issuing Notice of Award including extensions shall not in the aggregate exceed 120 days from Bid due date without Surety’s written consent.

6. No suit or action shall be commenced under this Bond prior to 30 calendar days after the notice of default required in paragraph 4 above is received by Bidder and Surety and in no case later than one year after Bid due date.

7. Any suit or action under this Bond shall be commenced only in a court of competent jurisdiction located in the state in which the Project is located.

8. Notices required hereunder shall be in writing and sent to Bidder and Surety at their respective addresses shown on the face of this Bond. Such notices may be sent by personal delivery, commercial courier or by United States Registered or Certified Mail, return receipt requested, postage pre-paid, and shall be deemed to be effective upon receipt by the party concerned.

9. Surety shall cause to be attached to this Bond a current and effective Power of Attorney evidencing the authority of the officer, agent or representative who executed this Bond on behalf of Surety to execute, seal and deliver such Bond and bind the Surety thereby.

10. This Bond is intended to conform to all applicable statutory requirements. Any applicable requirement of any applicable statute that has been omitted from this Bond shall be deemed to be included herein as if set forth at length. If any provision of this Bond conflicts with any applicable statute, then the provision of said statute shall govern and the remainder of this Bond that is not in conflict therewith shall continue in full force and effect.

11. The term “Bid” as used herein includes a Bid, offer or proposal as applicable.

05/01/00 SQ - 1 0999-00-0202

STATEMENT OF QUALIFICATIONS

Bidder must answer all questions. If more space is needed to complete a question, attach a separate sheet. Bidder may submit any additional information.

Name:

Address: Phone:

Number of years operating under your present name:

Bonding Capacity:

Bonding Company: Phone:

Prequalified by MDOT to bid on projects of this magnitude and type of work

(circle one) YES NO Prequalification Number:

General nature of work performed by your company:

Background and experience of the principal members of your organization including officers:

Major equipment available for this contract:

05/01/00 SQ - 2 0999-00-0202

CURRENT PROJECTS:

Project Project Project

Name:

Owner:

Contact Person:

Phone:

Contract Amount:

Completion Date:

% Complete:

COMPLETED PROJECTS:

Project Project Project

Name:

Owner:

Contact Person:

Phone:

Contract Amount:

Date Completed:

Additional information that may be pertinent to demonstrate your ability to complete this project.

05/01/00 SQ - 3 0999-00-0202

Has your company defaulted on a contract?

If yes, where and why?

I hereby certify that the above answers are correct and true.

Name

Signature

Title

Number of additional sheets attached:

05/01/00 SL - 1 0999-00-0202

SUBCONTRACTOR LISTING

Bidder submits to use the following subcontractors for performance of the work in accordance with Article 9 of the Instructions to Bidders.

Note to Bidder: List all work you propose to sublet on this Contract. Include each subcontractors name, address, phone, fax and e-mail address. Also include a description of work to be performed by subcontractor. For example: restoration, landscaping, lighting, signage, bore and jack, etc. List approximate dollar value of the subcontract.

NAME, ADDRESS & PHONE NO. OF

SUBCONTRACTOR

DESCRIPTION OF

WORK

APPROXIMATE

DOLLAR VALUE

OF SUBCONTRACT

Phone:

FAX:

E-mail

05/01/00 SL - 2 0999-00-0202

IL - 1

IRAN LINKED BUSINESS CERTIFICATION

Pursuant to Michigan Public Act 517 of 2012, any Bidder that submits a bid on a request for proposal with City of Dexter shall certify that Bidder is not an Iran linked business. An Iran linked business is not eligible to submit a bid on a request for proposal with City of Dexter. See attached definitions regarding this certification.

The undersigned Bidder does hereby certify, pursuant to Michigan Public Act 517 of 2012, that:

Bidder is not a person engaging in investment activities in the energy sector of Iran, including a person that provides oil or liquefied natural gas tankers, or products used to construct or maintain pipelines used to transport oil or liquefied natural gas, for the energy sector of Iran, or

Bidder is not a financial institution that extends credit to another person if that person will use the credit to engage in investment activities in the energy sector of Iran.

Date:

Its:

Subscribed and sworn to before me, a Notary Public on this day of , .

Notary Public

County, Michigan

My Commission Expires:

IL - 2

DEFINITIONS

(A) “Energy sector of Iran” means activities to develop petroleum or natural gas resources or nuclear power in Iran.

(B) “Investment” means 1 or more of the following:

i. A commitment or contribution of funds or property.

ii. A loan or other extension of credit.

iii. The entry into or renewal of a contract for goods or services.

(C) “Investment activity” means 1 or more of the following:

i. A person who has an investment of $20,000,000.00 or more in the energy sector of Iran.

ii. A financial institution that exceeds $20,000,000.00 or more in credit to another person, for 45 days or more, if that person will use the credit for investment in the energy sector of Iran.

(D) “Iran” means any agency or instrumentality of Iran.

(E) “Iran linked business” means either of the following:

i. A person engaging in investment activities in the energy sector of Iran, including a person that provides oil or liquefied natural gas tankers or products used to construct or maintain pipelines used to transport oil or liquefied natural gas for the energy sector of Iran.

ii. A financial institution that extends credit to another person, if that person will use the credit to engage in investment activities in the energy sector of Iran.

(F) “Person” means any of the following:

i. An individual, corporation, company, limited liability company, business association, partnership, society, trust, or any other nongovernmental entity, organization, or group.

ii. Any governmental entity or instrumentality of a government, including a multilateral development institution, as defined in section 1701(c) (3) of the international financial institutional act, 22 USC 262r(c) (3).

iii. Any successor, subunit, parent company, or subsidiary of, or company under common ownership or control with, any entity described in subparagraph (i) or (ii).

(G) “Public entity” means this state or an agency or authority of this state, school district, community college district, intermediate school district, city, village, township, county, public authority, or public airport authority.

AG - 1 0130-24-0010

AGREEMENT

This AGREEMENT is by and between City of Dexter (hereinafter called OWNER) and _________________________________________ (hereinafter called CONTRACTOR).

ARTICLE 1 WORK

1.01 CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents. The Work is generally described as follows:

CIPP Lining on 7 segments of storm sewer pipe throughout the City of Dexter. Includes spot and full lining on 12-inch, 21-inch, and 24-inch pipe diameters.

ARTICLE 2 THE PROJECT

2.01 The Project for which the Work under the Contract Documents may be the whole or only a part is generally described as follows:

Storm Sewer Lining

ARTICLE 3 ENGINEER

3.01 The Project has been designed by Orchard Hiltz & McCliment, Inc. who is hereinafter called ENGINEER and who is to act as OWNER's representative, assume all duties and responsibilities, and have the rights and authority assigned to ENGINEER in the Contract Documents in connection with the completion of the Work in accordance with the Contract Documents.

ARTICLE 4 CONTRACT TIMES

4.01 Time is of the Essence

A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness for final payment as stated in the Contract Documents are of the essence of the Contract.

4.02 Dates for Substantial Completion and Final Payment

A. The Work will be completed and ready for final payment on or before November 14, 2025.

4.03 Liquidated Damages

A. CONTRACTOR and OWNER recognize that time is of the essence of this Agreement and that OWNER will suffer financial loss if the Work is not completed within the times specified in paragraph 4.02 above, plus any extensions thereof allowed in accordance with Article 15 of the General Conditions. The parties also recognize the delays, expense, and difficulties involved in proving in a legal or arbitration proceeding the actual loss suffered by OWNER if the Work is not completed on time. Accordingly, instead of requiring any such proof, OWNER and CONTRACTOR agree that as liquidated damages for delay (but not as a penalty), CONTRACTOR shall pay OWNER for each day that expires after the time specified in paragraph 4.02 for Substantial Completion until the Work is substantially complete. After Substantial Completion, if CONTRACTOR shall neglect, refuse, or fail to complete the remaining Work within the Contract Time or any proper extension thereof granted by OWNER, CONTRACTOR shall pay OWNER $800.00/day for each day that expires after the time specified in paragraph 4.02 for completion and readiness for final payment until the Work is completed and ready for final payment.

AG - 2 0130-24-0010

ARTICLE 5 CONTRACT PRICE

5.01 OWNER shall pay CONTRACTOR for completion of the Work in accordance with the Contract Documents an amount in current funds equal to the sum of the amounts determined pursuant to paragraph 5.01.A below:

A. For all Unit Price Work, an amount equal to the sum of the established unit price for each separately identified item of Unit Price Work multiplied by the measured quantity of that item as indicated in the Bid Form (Bid Form to be inserted here at the time the Agreement is to be signed.):

AG - 3 0130-24-0010

As provided in Article 13 of the General Conditions, estimated quantities are not guaranteed, and determinations of actual quantities and classifications are to be made by ENGINEER as provided in Article 23 of the General Conditions.

ARTICLE 6 PAYMENT PROCEDURES

6.01 Submittal and Processing of Payments

CONTRACTOR shall be paid in accordance with Article 14 of the General Conditions.

ARTICLE 7 CONTRACTOR'S REPRESENTATIONS

7.01 In order to induce OWNER to enter into this Agreement CONTRACTOR makes the following representations:

CONTRACTOR has examined and carefully studied the Contract Documents and the other related data identified in the Bidding Documents.

CONTRACTOR has visited the site and become familiar with and is satisfied as to the general, local and site conditions that may affect cost, progress, and performance of the Work.

CONTRACTOR is familiar with and is satisfied as to all federal, state, and local Laws and Regulations that may affect cost, progress, and performance of the Work.

CONTRACTOR has carefully studied all: (1) reports of explorations and tests of subsurface conditions at or contiguous to the site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the site (except underground facilities) which have been identified in the Supplemental Instructions to Bidders and (2) reports and drawings of a hazardous environmental condition, if any, at the site which has been identified in the Supplemental Instructions to Bidders.

CONTRACTOR has obtained and carefully studied (or assumes responsibility for having done

so) all additional or supplementary examinations, investigations, explorations, tests, studies, and data concerning conditions (surface, subsurface, and underground facilities) at or contiguous to the site which may affect cost, progress, or performance of the Work or which relate to any aspect of the means, methods, techniques, sequences and procedures of construction to be employed by CONTRACTOR, including applying the specific means, methods, techniques, sequences, and procedures of construction, if any, expressly required by the Contract Documents to be employed by CONTRACTOR, and safety precautions and programs incident thereto.

CONTRACTOR does not consider that any further examinations, investigations, exploration, tests, studies, or data are necessary for the performance of the Work at the Contract Price, within the Contract Times, and in accordance with the other terms and conditions of the Contract Documents.

CONTRACTOR is aware of the general nature of work to be performed by OWNER and others at the Site that relates to the Work as indicated in the Contract Documents.

CONTRACTOR has correlated the information known to CONTRACTOR, information and observations obtained from visits to the site, reports and drawings identified in the Contract Documents, and all additional examinations, investigations, explorations, tests, studies, and data with the Contract Documents.

CONTRACTOR has given ENGINEER written notice of all conflicts, errors, ambiguities, or discrepancies that CONTRACTOR has discovered in the Contract Documents, and the written…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .