Construction Sources Sought Response Form.pdf

PDF 161 KB Posted

Attached to
Nashville District Bank Stabilization MATOC Federal contract opportunity
Solicitation number
W912P522R0001
Issued by
Department of the Army Corps of Engineers Engineering District Nashville

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. Name of Firm: Click or tap here to enter text.

2. Address of Firm: Click or tap here to enter text.

3. Point of Contract: Click or tap here to enter text.

4. Phone Number and E-Mail Address: Click or tap here to enter text.

5. Unique Entity Identifier (formerly known as DUNS): Click or tap here to enter text.

6. CAGE: Click or tap here to enter text.

7. Socio-Economic Status:

☐Large Business ☐Small Business ☐SBA Certified 8(a)

☐HubZone ☐Service-Disabled Veteran-Owned Small Business

☐Women-Owned Small Business ☐Economically Disadvantaged Women-Owned Small Business

8. Is your firm interested/capable of performing a Design-Build MATOC, Design-Bid-Build (conventional) MATOC or both?

☐Design-Build ☐Design-Bid-Build (conventional) ☐Both D-B and D-B-B

9. If interested/capable in Design-Build, describe your firm’s capability to execute full design and designer of record responsibilities on design build repair/construction projects, or address relationships with design firm that can perform full design services.

Click or tap here to enter text.

10. In which of the following states are you capable of performing in?

☐Kentucky

☐Tennessee

☐Alabama

☐Virginia

☐Any other states not listed? ___________________

Additional information/comments: Click or tap here to enter text.

11. Indicate the type of work your firm is capable of performing.

☐Working on/around locks and dams ☐Channel improvement

☐Bridge Construction/Repairs ☐Architectural

☐Site work ☐Utility installation/replacement

☐Paving ☐Instrumentation

☐Landscaping geotechnical work ☐Security systems and fencing

☐Bank stabilization ☐All of the above

12. Describe the type of work your firm typically performs in-house.

13. Describe the type of work your firm typically subcontracts out.

14. Indicate how many task orders and the approximate size of those task orders (in dollars) your firm can manage simultaneously.

15. Indicate bonding capability (construction bonding level per contract and aggregate construction bonding level, both expressed in dollars).

16. Indicate the firm’s floating plant capabilities:

☐My Firm currently owns a floating plant.

☐My Firm will rent a floating plant during this 5-year MATOC period.

☐My Firm currently does not own a floating plant, but plans on renting until a floating plant can be purchased within this 5-year MATOC period.

17. Any additional information your firm wants USACE Nashville District to consider in their acquisition planning.

File details come from the government source that posted it. Updated .