Construction_RFQ.pdf

PDF 1 MB Posted

Attached to
GAOA CUSTER GALLATIN NATIONAL FOREST - Roofing Replacement Projects Federal contract opportunity
Solicitation number
1240LU22Q0013
Issued by
Department of Agriculture Forest Service R1-Northern Region

View the file

Other files for this federal contract opportunity

Other files attached to GAOA CUSTER GALLATIN NATIONAL FOREST - Roofing Replacement Projects, newest first.
File Type Posted
1240LU22Q0013.pdf PDF
Wage Det..pdf PDF
Preservation Specifications.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FIGURE 1 VICINITY MAP

Basin Station Cabin from West Yellowstone

FIGURE 1A BASIN STATION AERIAL IMAGE

BASIN STATION

CABIN

HEBGEN LAKE RANGER

STATION OFFICE

WEST YELLOWSTONE

BASIN STATION

CABIN

FIGURE 2 VICINITY MAP

Big Creek Cabin from Livingston

FIGURE 2A BIG CREEK AERIAL IMAGE

BIG CREEK

CABIN

YELLOWSTONE RANGER

STATION OFFICE

LIVINGSTON, MT

BIG CREEK

CABIN

FIGURE 3 BASIN CABIN WEST VIEW

FIGURE 4 BASIN CABIN EAST VIEW

FIGURE 5 BIG CREEK CABIN PORCHES (FRONT AND BACK)

FIGURE 6 BIG CREEK CABIN ROOF VIEW

SECTION B – SERVICES AND PRICES

Basin Station Cabin and Big Creek Cabin Roof Replacement

B- 1 - SCHEDULE OF ITEMS

*Roof measurements are approximate for bidding purposes. Actual measurements to be field verified by Contractor prior to ordering materials and starting work.

BASIN STATION CABIN

Pay Item

Number Description

Method of

Measurem ent

Pay

Unit

Estimated

Quantity Unit Price Total Price

01000a Mobilization LUMP

SUM

LSQ 1

01100a Demolition and Disposal

LUMP

073129.1a Ice and Water Underlayment

CQ SF 1000

073129.2a New Cedar Roofing CQ SF 1000

Basin Sub Total

BIG CREEK CABIN

Pay Item Number Description

Method of Measurem ent Pay Unit

Estimated Quantity Unit Price Total Price

01000b Mobilization LUMP

0110b Demolition and Disposal

LUMP

073129.1b Ice and Water Underlayment

CQ SF 2100

073129.2b New Cedar Roofing CQ SF 2100

Big Creek Sub Total

TOTAL PRICE

B- 2 - BASIS OF AWARD: One contract will be awarded to the responsive and responsible quote offering the best value to the Government. The quote must quote on all items. Only unit prices to the nearest $0.01 will be accepted. Where extended unit prices do not agree with totals or subtotals shown by the quote, the unit price governs except as provided under Federal Acquisition Regulations (FAR) 14.406, Mistakes in Bids.

Contractor’s Name

Signature

SECTION C - DESCRIPTION AND SPECIFICATIONS

C.1 PROJECT DESCRIPTION AND LOCATION

C.1.1 Intent of Contract – The intent of the contract is to provide for the completion of the work described below. The precise details of performing the work are not stipulated, except as considered essential for the successful completion of the work. Furnish all labor, material, equipment, tools, transportation, and supplies necessary to complete the work according to the contract.

C1.2 Scope of Contract. The intent of the contract is to provide a complete project as described in the contract. Unless otherwise provided, furnish all labor, materials, equipment, tools, transportation, and supplies to perform all work required to complete the project. The contractor shall be responsible for all building measurements to determine necessary quantities and sizes of material to be supplied. The building measurement is for bidding purposes only.

Work shall consist of removing and disposing of the existing cedar shingle roof system and furnishing and installing a new cedar shingle roof shingle system on the Basin Station Cabin, and Big Creek Cabin. Contractor shall be responsible for compliance with OSHA requirements to ensure the safety of those near the work zone.

BASIN STATION CABIN

ITEM 01000a, Mobilization: Work shall consist of preparatory work and operations, including those necessary to the movement of personnel, equipment, supplies, and incidentals to the project site; and for other work and operations that must be performed or costs incurred prior to beginning work on the various items on the project site.

ITEM 01100a, Demolition: The Contractor shall remove all roofing material to the sheathing.

Dispose of all material off Government property. Give COR 48 hours’ notice to inspect the sheathing, chimney flashing, and general condition of the roof. Contractor shall inform the COR if any materials are damaged or in need of replacement before the new roof system is put on. All nails, staples and any protruding objects will be removed as part of demolition.

*Do not damage lead flashing on masonry chimney during demolition. Retain flashing in place for new roof and step flashing installation.

*Carefully remove, retain, protect, and re-install metal ridge cap and ends on completed roof.

ITEM 073129.1a, Ice and Water Underlayment: The work shall consist of furnishing and installing new ice and water shield underlayment as specified in section 073129 of the specifications on the Basin Station Cabin.

ITEM 073129.2a, Roof Installation: The work shall consist of installing new cedar roof shingle system (Government furnished shingles) as specified in section 073129 of the specifications on the Basin Station Cabin. Integration with chimney flashing, reinstallation of ridge cap, and all other work associated with a complete, professional roof installation is included in this pay item.

BIG CREEK CABIN

ITEM 01000b, Mobilization: Work shall consist of preparatory work and operations, including those necessary to the movement of personnel, equipment, supplies, and incidentals to the project site; and for other work and operations that must be performed or costs incurred prior to beginning work on the various items on the project site.

ITEM 01100b, Demolition: The Contractor shall remove all roofing material to the sheathing.

Dispose of all material off Government property. Give COR 48 hours’ notice to inspect the sheathing, chimney flashing, and general condition of the roof. Contractor shall inform the COR if any materials are damaged or in need of replacement before the new roof system is put on. All nails, staples and any protruding objects will be removed as part of demolition.

*Do not damage lead flashing on masonry chimney during demolition. Retain lead flashing in place for new roof and step flashing installation. Install new metal chimney pipe flashing.

*Carefully remove, retain, protect, and re-install metal ridge cap and ends on completed roof.

ITEM 073129.1b, Ice and Water Underlayment: The work shall consist of furnishing and installing new ice and water shield underlayment as specified in section 073129 of the specifications on the Big Creek Cabin.

ITEM 073129.2b, Roof Installation: The work shall consist of furnishing and installing new cedar roof shingle system (Government furnished shingles) as specified in section 073129 of the specifications on the Big Creek Cabin. Integration with chimney flashing, reinstallation of ridge cap, and all other work associated with a complete, professional roof installation is included in this pay item.

*Both front and rear porches are included in this contract. Roof areas are approximately:

- 1428 SF for the main cabin

- 264 SF for the rear porch shed roof

- 390 SF for the front porch gabled roof

- TOTAL: 2082 SF = 21 SQ

C.1.3 Project Location –

- Basin Station Cabin: This project is located on the Hebgen Lake Ranger District of the Custer Gallatin National Forest near West Yellowstone, Montana.

- Big Creek Cabin: This project is located on the Yellowstone Ranger District of the Custer Gallatin National Forest south of Livingston, Montana.

C.1.4 Price Range –$25,000 - $100,000

C.1.5 Pre-bid Tour - No pre-bid tour of the project will be conducted.

Prospective bidders wishing to visit the sites on their own may obtain information by contacting Zac Hiedeman at the Forest Service Office, Custer Gallatin National Forest, Bozeman, Montana, telephone (406) 946-2866.

C.1.6 Start Work - It is estimated that work will begin in Summer 2022. Contractor shall notify CO of proposed schedule 30 days prior to start of work.

C.1.7 Period of Performance –Contract to be completed in 60 calendar days from Notice to Proceed. Work to be completed in 14 calendar days, per site. Contractor should take mountain weather into account when planning start dates of work. Work shall be complete by July 31, 2022.

C.1.8 Government Furnished Materials – 24” Cedar shingles stocked at Forest Service shop in

Bozeman, MT. Contractor shall be responsible for hauling to project sites. Forklift is available at shop site for loading shingles. Contractor is responsible for unloading at project site.

C.1.9 Submittals- The contractor shall submit a Work Schedule within 14 days of Contract Award.

Contractor shall submit Fall Protection Plan and Safety Plan 14 days prior to starting work.

Submit material techincal data and installation instructions prior to ordering (ice and water underlayment, nails, flashing, ridgecaps if needed).

C.1.10 Disturbances –No work shall be permitted on weekends or Federal Holidays, unless agreed to in writing in advance.

C.1.11 Staging Area - The Contractor shall coordinate with the COR on a staging area location. The

Contractor shall operate all equipment and store, transport, and handle materials in a manner that will not damage the existing roads, parking lots, and landscaping.

C.1.13 Potable Water- No potable or running water is available on site.

C.1.14 Wastewater Facilities – The Contractor may use the outhouses on site. The Contractor shall be responsible for cleaning and/repairing the restroom if necessary, as a result of the Contractor’s operations.

BASIN STATION CABIN: There is an outhouse replacement contract at a similar time as this contract. Schedule coordination between outhouse replacement contractor and roofing contractor may be organized by Roofing contractor to ensure outhouse access, or a rental outhouse may be necessary.

C.1.15 Electrical – No electrical service at either site.

C.2 – CLEANUP AND DISPOSAL

C.2.1 Cleanup and Disposal – The Contractor shall be responsible for solid waste disposal. The

Contractor shall at all times keep the area in a clean, neat, and orderly condition. Construction related debris, including but not limited to used motor oil, oil cans, grease cartridges and refuse shall be removed promptly from the site and disposed of in a lawful manner off National Forest System lands. Fees for the use of landfills or transfer stations shall be paid for by the Contractor if there is a charge.

Contractor shall be required to sweep the site with a magnetic tool powerful enough to pick up nails and staples from the ground as a result of roof tear off and roofing work.

C.3 – SECURITY AND PROTECTION

C.3.1 Security and Protection – Security is the responsibility of the Contractor. The Contractor shall be responsible for protecting all equipment and supplies for use on the project and stored on the site. The Contractor shall be responsible for all costs required to provide such protection.

The Contractor shall complete sequences of construction activity in order to prevent damage to equipment, material, and articles incorporated into the work covered by this contract.

C-4 – OTHER RELATED DOCUMENTS AND DRAWINGS

C4.1 The following CSI formatted specifications are part of this solicitation and any resulting contract.

Section Description 01000 Mobilization 01025 Measurement and Payment 01400 Quality Control and Quantity Measurement

073129 Wood Shingles

C4.2 The following Figures are part of this solicitation and any resulting contract.

Figure Description 1, 1A Basin Station Vicinity Map, Aerial Image 2, 2A Big Creek Cabin Vicinity Map, Aerial Image

3 Photo – Basin, East View 4 Photo – Basin, West View 5 Photos – Big Creek Cabin Porches 6 Photo – Big Creek Cabin 7 Shingle Label Example

SECTION 01000

MOBILIZATION

PART I: GENERAL

1.1 SUMMARY

A. Section Includes: Preparatory work and operations, including those necessary to the movement of personnel, equipment, supplies and incidentals to the project site; and for other work and operations which must be performed, or costs incurred prior to beginning work on the various items on the project site. This specification does not include moves between project sites.

PART II: PRODUCTS

(There are no applicable requirements.)

PART III: EXECUTION

(There are no applicable requirements.)

PART IV: MEASUREMENT AND PAYMENT

4.1 METHOD OF MEASUREMENT:

A. Units: Progress payments will be made as follows:

1. When 5% of the original Contract amount is earned from other bid items, 50% of the amount bid for mobilization or 5% of the original Contract amount, whichever is lesser, will be paid.

2. When 10% of the original Contract amount is earned from other bid items, 100% of the amount bid for mobilization or 10% of the original Contract amount, whichever is lesser, will be paid.

3. Upon completion of work for the project, payment of the amount bid for mobilization in excess of 10% of the original Contract amount will be paid.

4. The total sum of all payments shall not exceed the original Contract amount bid for mobilization, regardless of the fact that the Contractor may have shut down the work on the project or moved equipment away from the project and then back again.

4.2 BASIS OF PAYMENT:

Payment: No direct payment for moves between project sites will be made. The Contractor shall include consideration for moves between project sites in the bid price for other items of the Contract. Prices and payment will be full compensation for the work described in this section. Payment will be made under:

Pay Item Pay Unit

(01000) Mobilization. . . . . . . . . . . . . . . . . Lump Sum

END OF SECTION

SECTION 01025

MEASUREMENT AND PAYMENT

PART I - GENERAL

1.1 Measurement and Payment - Measurement and payment for contract work will be made only for and under those pay items included in the SCHEDULE OF ITEMS. All other work and materials will be considered as included in the payment for items shown.

When more than one class, size, or thickness is specified in the SCHEDULE OF ITEMS for any pay item, suffixes will be added to the item number to differentiate between items to be bid.

1.2 Determination of Quantities - The following methods of measurement are used to determine contract quantities for payment.

For individual construction items, longitudinal and lateral measurements for area computations will be made horizontally or corrected to horizontal measurement unless otherwise specified.

Measurements for seeding, mulching, geotextiles, netting, erosion control blankets, and sodding will be along slope lines.

Structures will be measured according to neat lines SHOWN ON THE DRAWINGS or as altered by the COR in writing to fit field conditions.

For standard manufactured items, such as fence, wire, plates, rolled shapes, pipe conduits, etc., identified by gauge, weight, section dimensions, etc., such identification shall be considered the nominal weights or dimensions. Unless controlled by tolerances in cited specifications, manufacturer's tolerances will be accepted.

1.3 Units of Measurement - Payment will be by units defined and determined according to U.S.

Standard measure as follows:

A. Acre – Make longitudinal and transverse measurements for area computations horizontally.

B. Cubic Yard - A measurement computed by one of the following methods:

1. Excavation, Embankment, or Borrow - The measurement computed by the average end area method from measurements made longitudinally along a centerline or reference line.

2. Material in Place or Stockpile - The measurement computed with dimensions of the in-place material.

3. Material in the Delivery Vehicle - The measurement computed using measurements of material in the hauling vehicles at the point of delivery.

Vehicles shall be loaded to at least their water level capacity. Leveling of the loads may be required when vehicles arrive at the delivery point.

C. Cubic Yard Mile - A combination of linear and volumetric measurement meaning the movement of a cubic yard of material 1 mile.

D. Each - One complete unit, which may consist of one or more parts.

E. Gallon – The quantity may be measured by any of the following methods:

1. Measured volume container.

2. Metered volume. Use an approved metering system

3. Commercially packaged volumes.

F. Hour – Measurement will be for the actual number of hours ordered and performed by the Contractor.

G. Linear Foot – Measure from end to end, parallel to the base or foundation being measured, or horizontal.

H. MFBM - One thousand board feet measure based on nominal widths, thickness, and extreme usable length of each piece of lumber or timber actually incorporated in the job.

I. Mile – Measure horizontal along the centerline of each roadway, approach road, or ramp.

J. Pound – If sacked or packaged material is furnished, the net weight as packed by the manufacturer may be used.

K. Square Foot - Measure on a plane parallel to the surface being measured or horizontal.

L. Square Yard – Measure on a plane parallel to the surface being measured or horizontal.

M. Station - One hundred linear feet measured horizontally.

N. Station Yard - A combination of linear and volumetric measurement meaning the movement of a cubic yard of material one station.

O. Thousand Gallons Mile - A combination of linear and volumetric measurement meaning the movement of 1,000 gallons of material 1 mile.

P. Ton - Short ton consisting of 2,000 pounds.

Q. Ton Mile - A combination of linear and weight measurement meaning the movement of

1 ton of material 1 mile.

1.4 Methods of Measurement - One of the following methods of measurement for determining final payment is DESIGNATED on the SCHEDULE OF ITEMS for each pay item:

A. Contract Quantities (CQ) AND Design Quantities (DQ) - These quantities denote the final number of units to be paid for under the terms of the contract. They are based upon the original design data available prior to advertising the project. Original design data include the preliminary survey information, design assumptions, calculations, drawings, and the presentation in the contract. Changes in the number of units SHOWN in the SCHEDULE OF ITEMS may be authorized under any of the following conditions:

1. As a result of changes in the work authorized by the Contracting Officer.

2. As a result of the Contracting Officer determining that errors exist in the original design data used to determine designed quantities that cause a pay item to change by more than 15 percent.

3. As a result of the Contractor submitting to the Contracting Officer a written request showing evidence of errors in the original design data used to determine design quantities that cause a pay item total to change by more than 15%. The evidence must be verifiable and consist of calculations, drawings, or other data that show how the designed quantity is believed to be in error.

B. Staked Quantities (SQ) - These quantities are determined from staked measurements prior to construction.

C. Actual Quantities (AQ) - These quantities are determined from measurements of completed work.

D. Vehicle Quantities (VQ) - These quantities are measured or weighed in hauling vehicles.

E. Lump Sum Quantities (LSQ) - These quantities denote one complete unit of work as required by or described in the contract, including necessary materials, equipment, and labor to complete the job. They will not be measured.

PART II - PRODUCTS (Not Applicable)

PART III - EXECUTION (Not Applicable)

SECTION 01400

QUALITY CONTROL AND QUANTITY MEASUREMENT

PART I - GENERAL

1.1 Scope - This work shall consist of providing quality control in conformance with the Inspection of Construction provisions of this contract to ensure compliance with the drawings, specifications, and provisions of the contract, and measuring the quantities of completed work in conformance with the provisions of the applicable specifications. The Contractor shall provide all personnel, equipment, tests, and reports necessary to meet the requirements of this specification.

1.2 Measurement and Payment - No separate payment will be made for the work included under this section. Payment for this work is considered incidental to other items of work.

PART II - PRODUCTS (Not Applicable)

PART III – EXECUTION (Not Applicable)

SECTION 073129

WOOD SHINGLES

PART 1 – GENERAL

1.1 DESCRIPTION OF WORK

A. Provide labor, equipment, and materials to reroof Basin Station Cabin and Big Creek Cabin. Work shall consist of stripping off the old shingles and underlayment (if existing) and disposing of the material in an approved dump site, repairing or replacing sheathing if needed, installing new cedar shingles with underlayment, installing roof anchors, and all other necessary work to deliver a complete, sound, professional, weathertight roofing system.

B. Buildings are Forest Service owned and are listed on or considered eligible for listing on the National Register of Historic Places. Therefore, all work shall adhere to guidance from the Secretary of Interior’s Standards for Rehabilitation of Historic Buildings.

1.2 SUBMITTALS

A. Submit technical product data, installation instructions, and recommendations from shingle manufacturer, the Cedar Shake and Shingle Bureau, and any other relevant installation information, including data that materials comply with requirements.

B. Submit technical product data, installation instructions for ice and water shield.

1.3 DELIVERY, STORAGE, AND HANDLING

A. Deliver materials in manufacturer’s unopened bundles, rolls, or containers with labels intact. All materials must be new, unexpired, and in good condition.

B. Store materials to avoid water damage and store rolled goods on end. Comply with manufacturer’s recommendations for job-site storage and protection.

1.4 UNKNOWN FINDS

A. As with all historic buildings, some construction elements, conditions, material types, artifacts, and archaeological materials, features, and/or artifacts may be hidden upon initial inspection. If previously hidden elements, conditions, material types, artifacts, and/or archaeological materials, features, and/or artifacts are revealed, cease work in the immediate and/or affected area(s) and contact the Forest Service COR and/or Inspector immediately. No work is to be performed outside the scope of this contract.

1.5 JOB CONDITIONS

A. All other areas of the structure, vegetation, and grounds are to be fully protected from the impacts of this work. Do not damage surrounding building fabric, elements, or structure in any way. Do not attach, nail, or staple any item(s) to the structure unless it is directly related to the roof work and approved by the COR.

B. If vegetation or trees are in the way of scaffolding, ladders, and/or equipment, consult with the COR regarding the vegetation or trees before cutting and pruning.

C. Be aware of constantly changing weather conditions and the potential impact to the structure and ongoing work. If work should be rescheduled or redirected due to weather conditions, consult with the COR. Keep all work areas dry and free of construction debris and snow, ice, and water. Protect all work and all areas of the structure from the effects of precipitation and weather. The contractor is responsible for any and all damage that may occur due to their negligence or failure to protect the structure. If removing structural elements of the facility (e.g. sheathing), consider the effects of worker loading, wind loading, etc. and sequence work appropriately.

D. Complete daily cleanup of the job site. Where demolition work creates debris, including in the interior of the building, clean this debris up promptly. Where the opening of previously closed spaces uncovers objectionable material, provide cleanup of up to 1 five gallon bucket per square of roofing. Follow all related CDC and OSHA guidelines.

E. Proceed with installation work only after substrate construction and penetrating work have been completed.

F. Proceed with installation work only when weather conditions are in compliance with manufacturer’s recommendations and when substrate is completely dry.

G. Provide temporary barriers to keep the public at a safe distance away from the project.

PART 2 – PRODUCTS

2.1 WOOD SHINGLES

A. Shingles must be Western Red Cedar, Number One Grade, edge grain, heartwood, and certified by the Cedar Shake and Shingle Bureau. Shingles shall conform with CSSB-97. The Bureau’s website can be found at: http://www.cedarbureau.org/.

B. Upon delivery, shingles will be inspected for the CSSB label.

a. Blue Label American Certified shingles are not acceptable

C. Shingle type

a. 24 inch, also called Royals

D. Shingle weather exposure: Use the existing exposure found on the historic building.

Shingle exposure is usually 7 1/2 inches for 24 inch shingles

2.2 NAILS

http://www.cedarbureau.org/

A. For roof: hot-dipped zinc-coated box nails which shall be long enough to penetrate into sheathing half to three-quarters of the way. Do not fully penetrate the sheathing.

Nails for 24 inch shingles may range from 3d to 8d, depending on the size and thickness of the shingles. Follow shingle manufacturers guidelines when selecting nail weight.

B. For hips and ridges: hot-dipped zinc-coated box nails which shall be long enough to penetrate into sheathing half to three-quarters of the way. Do not penetrate the sheathing. Nails may range from 4d to 8d.

2.3 ICE BARRIER

A. Self-adhering rubberized roofing membrane, Grace Ice and Water Shield for non-metal roofs, or equal.

2.4 SHEATHING

A. Match existing – use one of the following

a. ¾ inch rough sawn or dimensional lumber. Use select grade kiln-dried fir or larch lumber.

b. 1 x 6 shiplap lumber. Use select grade kiln-dried fir or larch lumber.

c. 1 x 8 shiplap lumber. Use select grade kiln-dried fir or larch lumber.

2.5 FLASHING

A. Galvanized steel flashing

a. 30 gauge for sheet or rolled flashing used as step, apron, cap, and counterflashing.

b. 26, 28, or 30 gauge valley flashing, either V or W shaped to match existing.

B. Rubber boot flashing

a. Only to be used on vent pipes. May be supplemented with galvanized steel flashing.

C. Lead flashing

a. If lead flashing is found, consult with the COR regarding its reuse.

i. If the flashing is in good condition, reuse if practicable in place of galvanized or rubber boot flashing.

ii. Follow all appropriate OSHA and CDC guidelines when working with lead.

2.6 RIDGECAP

A. The ridge cap shall match existing.

B. Ridge cap

a. BASIN STATION CABIN: Shingle – Shingle ridge caps are to be constructed on site or with pre-manufactured units that match the new roof.

a. BIG CREEK CABIN: Metal – The intent of this Contract is to Reuse the existing ridge cap. If replacement is necessary, notify the CO. If replacing, match the new ridge cap to the existing with 26, 28, or 30 gauge galvanized steel metal.

i. Metal ridge caps may or may not have end caps. If the existing ridge cap has end caps or the historic photos show end caps, replace in kind.

If the existing end caps are in good condition, reuse the existing.

Otherwise, match the new end caps to the existing with 26, 28, 30, or 32 gauge galvanized steel.

2.7 ROOF ANCHORS

A. Permanent single D-ring roof anchors, stainless steel or powder-coated steel.

a. Must meet OSHA and ANSI Z359.1-07 requirements.

b. Acceptable Manufacturers

i. Miller by Honeywell RA41

ii. Guardian Fall Protection 00500 Single D

iii. Guardian Pitch Pro 10540 in Black

c. May be used by roof installer as part of a Fall Protection Plan

2.8 DRIP EDGE

A. No metal or other drip edge is to be installed.

2.9 GUTTERS

A. If gutters and/or downspouts are existing on the building, remove, inspect, and replace as needed. Use only galvanized half round gutter and matching downspouts, 24 or 26 gauge in 5 or 6 diameter or match existing diameter. Install according to manufacturer’s direction.

B. Do not install modern or “K” gutters.

3.0 DECORATIVE ELEMENTS

A. If decorative elements occur, replace in-kind. Decorative elements can include:

a. Double coursing. If this is present, it is usually a double course of shingles every fourth course. Replace in-kind to match the original.

i. Basin Station Cabin utilizes Double Coursing every 5th row.

PART 3 – EXECUTION

3.1 GENERAL

A. Clean substrate of any projections and substances detrimental to roofing work.

B. Remove all nails, screws, staples, etc. Do not pound nails, staples, etc. into the sheathing or pound flat. All nails, screws, staples, etc., must be removed. Use a magnet to pick up all nails, screws, staples, flashing, etc. from the ground.

C. Coordinate installation of shingles with flashing and other adjoining work to ensure proper sequencing.

D. Do not install shingle roofing until all vent stacks and other penetrations through roofing have been installed and are securely fastened against movement.

E. Hand-nailing the shingles is preferred; however, pneumatic and/or battery tools are acceptable provided the air pressure and/or tool pressure is checked hourly to ensure the nails are driven flush with the surface of the shingle. Nails must not be left proud, nor must they be driven below the surface of the shingle.

F. Personnel working on the roof are not allowed to wear spiked or cleated shoes in order to prevent damage to the shingles. Soft-soled shoes only.

G. If the contractor uses a harness and/or safety rigging to conduct roof work, the contractor must supply a Fall Protection Plan that complies with applicable OSHA standards. The Forest Service COR and/or the Inspector may provide their own harness and/or safety rigging that also complies to these standards.

H. Adjust exposure if necessary when about midway between eave and ridge so that coursing will appear uniform. Ensure that the coursing is even within the last 3 courses of the ridge cap.

I. Do not use broken shingles. Do not use shingles less than 4 inches in width. Do not use shingles over 10 inches in width. Shingles over 10 inches may be cut or cleanly split down to the appropriate width.

J. Install flashing around projections through roof as required to make a watertight structure.

3.2 ROOF APPLICATION

A. Replace sheathing that has experienced excessive rot/decay. Any sheathing boards that have rot pockets that penetrate through the board, are more than 3 inches in size, or affect more than 25 percent of the board must be replaced in kind. Boards may be fully replaced, replaced between joists, or several roof joists depending on the severity of rot.

1. Mark sheathing to be replaced with a grease pencil, chalk, or other non-permanent method.

2. Allow COR to observe sheathing marked for replacement prior to any removal

3. Boards marked for removal can be plunge cut and/or removed by pulling the nails. Do not damage adjacent boards.

4. The maximum amount of sheathing to be removed at a time is limited to 25% of the roof deck or as specified by the COR.

B. In addition to details indicated, comply with installation details and recommendations of the Reroofing with Wood Shakes and Reroofing with Wood Shingles sections from “Dovetails and Broadaxes: Hands-on Log Cabin Preservation, found at http://fsweb.mtdc.wo.fs.fed.us/pubs/pdfpubs/pdf15232802/Part08-Pages-165- 196.pdf. Shake information starts on page 187, shingle information starts on page 181.

1. Install ice and water shield over the entire roof in lieu of felt underlayment.

Install according to manufacturer’s recommendations. If installing on a warm or hot day, ensure that the underlayment is not damaged by workers during the install.

2. Use hot-dipped zinc-coated box nails which shall be long enough to penetrate into sheathing half to three-quarters of the way. Do not fully penetrate the sheathing. Nails may range from 3d to 8d. Note that nail penetration only acceptable on the starter courses, other sheathing nail penetration is not acceptable.

3. Use triple coverage roof construction, with a triple starter course. Please see the Reroofing with Wood Shakes and Reroofing with Wood Shingles sections from “Dovetails and Broadaxes: Hands-on Log Cabin Preservation, found at http://fsweb.mtdc.wo.fs.fed.us/pubs/pdfpubs/pdf15232802/Part08-Pages-165- 196.pdf. Shingle information starts on page 181.

4. Install roof with 1 inch overhang on rake edge and 1 ½ inches on eave edge unless specified otherwise.

5. Install shingles, beginning at lower end with a triple layer starter course, projecting shingles 1 ½ inches beyond sheathing. Space adjoining shingles ¼ inch to 3/8 inch apart, nailing each shingle with two nails spaced ¾ to 1 inch from edge of shingle and 1 ¼ to 2 inches above exposure line of subsequent courses. Stagger edge joints a minimum of 1 ½ inches in succeeding courses.

Do not stack joints. Ensure no stacked joints in the course being laid and the two courses below (triple coverage roof). Install shingles to provide weather exposure as indicated. Cut and fit shingles at ridges and edges to provide maximum weather protection.

6. Lay with butts as straight as practicable considering the texture of the shingles.

7. Use two nails per shingle at least 1 inch from edge and about 1 inch or 2 inches above the butt line of the following course. Ensure that the heads of http://fsweb.mtdc.wo.fs.fed.us/pubs/pdfpubs/pdf15232802/Part08-Pages-165-196.pdf http://fsweb.mtdc.wo.fs.fed.us/pubs/pdfpubs/pdf15232802/Part08-Pages-165-196.pdf http://fsweb.mtdc.wo.fs.fed.us/pubs/pdfpubs/pdf15232802/Part08-Pages-165-196.pdf each nail remain on the surface of the shingle - do not pound the nail head into the shingle. Do not use waffle-head hammers, only smooth head hammers.

8. Do not use broken shingles. Do not use shingles less than 4 inches in width.

Do not use shingles over 10 inches in width. Shingles over 10 inches may be cut or cleanly split down to the appropriate width.

9. Ensure that nails are set flush with the surface of the shingle. Do not over or under drive nails.

a. Hand-nailing the shingles is preferred; however, pneumatic and/or battery tools are acceptable provided the air pressure and/or tool pressure is checked hourly to ensure the nails are driven flush with the surface of the shingles. Nails must not be left proud, nor must they be driven below the surface of the shingle.

b. Nails must penetrate at least halfway through the thickness of the sheathing but must not penetrate completely through the sheathing except for the starter courses.

c. Ensure that nail heads are not exposed (no “shiners” are allowed).

d. Use only smooth-faced hammers.

C. Flashing

1. If applicable, remove and re-install the existing metal ridge or hip caps.

Metal hip caps damaged from removal shall be replaced at contractor’s expense.

2. Install metal flashing and vent flashing as needed and in accordance with details and recommendations of the Reroofing with Wood Shingles section from “Dovetails and Broadaxes: Hands-on Log Cabin Preservation, found at http://fsweb.mtdc.wo.fs.fed.us/pubs/pdfpubs/pdf15232802/Part08-Pages-165- 196.pdf, starting on page 169.

3. Install step flashing as needed along dormers, chimneys, etc. as needed and in accordance with details and recommendations of the Reroofing with Wood Shingles section from “Dovetails and Broadaxes: Hands-on Log Cabin Preservation, found at http://fsweb.mtdc.wo.fs.fed.us/pubs/pdfpubs/pdf15232802/Part08-Pages-165- 196.pdf, starting on page 169.

4. Replace valley flashing in accordance with details and recommendations of the Reroofing with Wood Shingles section from “Dovetails and Broadaxes:

Hands-on Log Cabin Preservation, found at http://fsweb.mtdc.wo.fs.fed.us/pubs/pdfpubs/pdf15232802/Part08-Pages-165- 196.pdf, starting on page 175. Valleys should have 4 to 8 inches of exposed metal in the middle and extend 8 to 12 inches beyond the centerline of the valley.

D. Roof Anchors http://fsweb.mtdc.wo.fs.fed.us/pubs/pdfpubs/pdf15232802/Part08-Pages-165-196.pdf http://fsweb.mtdc.wo.fs.fed.us/pubs/pdfpubs/pdf15232802/Part08-Pages-165-196.pdf http://fsweb.mtdc.wo.fs.fed.us/pubs/pdfpubs/pdf15232802/Part08-Pages-165-196.pdf

1. Permanent roof anchors are to be installed in several locations in the roof face. The contractor is to create a permanent roof anchorage plan prior to commencing roof work and coordinate the plan with the COR.

a. Roof anchors are to be set into a joist or purlin according to the manufacturer’s directions, using appropriate fasteners.

b. For an L-4 lookout roof, 8 roof anchors are to be set in the roof.

Four anchors are to be set 6 to 12 inches from the eave edge, in the center of each hip roof. An additional four anchors are to be set 6 to 12 inches below the peak in the center of each hip roof.

c. For a gable roof, set anchors so that a person can climb to the peak of the roof, move along the peak, and reach all eaves. For example, anchors may be set in a line up the roof face and along the peak: Set the first anchor 6 to 12 inches from the eave edge and continue up the roof face with anchors set 6 to 8 feet apart until reaching the peak; then set anchors 6 to 8 feet apart 6 to 12 inches below the ridge cap for the length of the ridge cap. If the roof face is large enough, repeat the roof face anchor line in two or three places.

E. Ridge caps

1. BASIN STATION CABIN: Shingle ridge caps are to be constructed on site or with pre-manufactured units that match the new roof. The ridge cap shingles must be 1 inch wider than the exposure. Create or purchase ridge cap shingles and install them in accordance with details and recommendations of the Reroofing with Wood Shingles section from “Dovetails and Broadaxes:

Hands-on Log Cabin Preservation, found at http://fsweb.mtdc.wo.fs.fed.us/pubs/pdfpubs/pdf15232802/Part08-Pages-165- 196.pdf, starting on page 192.

3. BIG CREEK CABIN: Metal ridge caps may be reused if they are in good condition. If the ridge caps must be replaced, replace in kind. If end caps are or were present, re-install to match original.

SECTION D--PACKAGING AND MARKING

D-1 PACKING AND MARKING

All shipments of materials, equipment and/or supplies shall be addressed to the Contractor and not to the Government.

D-2 PROJECT LABELING FOR OFFICIAL CORRESPONDENCE

The Government singularly identifies each project with a contract number at time of award. The contract number is a unique identifier to purposely and permanently represent an awarded project. The Government issued contract number is to be referenced on all official communication starting upon notice of award.

SECTION E--INSPECTION AND ACCEPTANCE

E.1 CLAUSES

52.246-12 Inspection of Construction (AUG 1996)

SECTION F--DELIVERIES OR PERFORMANCE

F.1 CLAUSES

52.211-13 Time Extensions (SEP 2000) 52.211-18 Variation in Estimated Quantity (APR 1984) 52.242-14 Suspension of Work (APR 1984)

SECTION G--CONTRACT ADMINISTRATION DATA

G.1 CLAUSES

G.2 OTHER REQUIREMENTS

Post Award Conference (NOV 1996)

A post award conference with the successful offeror is required. It will be scheduled and held within 60 days after the date of contract award. The conference will be held via telephone.

SECTION H--SPECIAL CONTRACT REQUIREMENTS

H.1 CLAUSES

H.2 OTHER REQUIREMENTS

USE OF PREMISES

(a) Before any camp, quarry, borrow pit, storage, detour, or bypass site, other than shown on the drawings, is opened or operated on USDA land or lands administered by the USDA, the Contractor shall obtain written permission from the Contracting Officer. A camp is interpreted to include a campsite or trailer parking area of any employee working on the project for the Contractor.

(b) Unless excepted elsewhere in the contract, the Contractor shall (i) provide and maintain sanitation facilities for the work force at the site and (ii) dispose of solid waste in accordance with applicable Federal, State and local regulations.

ARCHAEOLOGICAL OR HISTORIC SITES

If a previously unidentified archaeological or historic site(s) is encountered, the Contractor shall discontinue work in the general area of the site(s) and notify the Contracting Officer immediately.

CONTROL OF EROSION, SEDIMENTATION, AND POLLUTION

(a) Operations shall be scheduled and conducted to minimize erosion of soils and to prevent silting and muddying of streams, rivers, irrigation systems, and impoundments (lakes, reservoirs, etc.).

(b) Pollutants such as fuels, lubricants, bitumens, raw sewage, and other harmful materials shall not be discharged on the ground; into or nearby rivers, streams, or impoundments; or into natural or man-made channels. Wash water or waste from concrete or aggregate operations shall not be allowed to enter live streams prior to treatment by filtration, settling, or other means sufficient to reduce the sediment content to not more than that of the stream into which it is discharged.

(c) Mechanized equipment shall not be operated in flowing streams without written approval by the Contracting Officer.

INSURANCE COVERAGE

Pursuant to FAR clause 52.228-5, Insurance-Work on a Government Installation, the Contractor will be required to present evidence to show, as a minimum, the amounts of insurance coverage indicated below:

(a) Workers Compensation and Employer's Liability. The Contractor is required to comply with applicable Federal and State workers' compensation and occupational disease statutes. If occupational diseases are not compensable under those statutes, they shall be covered under the employer's liability section of the insurance policy, except when contract operations are so commingled with a Contractor's commercial operations that it would not be practical to require this coverage. Employer's liability coverage of at least $100,000 shall be required, except in States with exclusive or monopolistic funds that do not permit worker's compensation to be written by private carriers.

(b) General Liability. (1) The Contractor shall have bodily injury liability coverage written on a comprehensive form of policy of at least $500,000 per occurrence. (2) The Contractor shall have property damage liability insurance shall be required in the amount of ____*___ per occurrence.

(c) Automobile Liability. The Contractor shall have automobile liability insurance written on a comprehensive form of policy. The policy shall provide for bodily injury and property damage liability covering the operation of all automobiles used in connection with performing the contract. Policies covering automobiles operated in the United States shall provide coverage of at least $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage or loss.

(d) Aircraft Public and Passenger Liability. When aircraft are used in connection with performing the contract, the Contractor shall have aircraft public and passenger liability insurance. Coverage shall be at least $200,000 per person and $500,000 per occurrence for bodily injury, other than passenger injury. Coverage for passenger injury shall be at least $200,000 multiplied by the number of seats or passengers, whichever is greater.

PART II--CONTRACT CLAUSES

SECTION I--CONTRACT CLAUSES

I.1 CLAUSES

52.252-2 Clauses Incorporated by Reference (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

Federal Acquisition Regulation (FAR) Clauses:

https://www.acquisition.gov/browse/index/far (FAR clauses begin with 52) Department of Agriculture Acquisition Regulation (AGAR) Clauses:

https://www.acquisition.gov/agar (AGAR clauses begin with 452) Deviations to clauses may be viewed at:

https://www.dm.usda.gov/procurement/policy/FARClassDeviations.htm

52.203-7 Anti-Kickback Procedures (JUN 2020) 52.203-12 Limitation on Payments to Influence Certain Federal Transactions (JUN 2020) 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or

Statements (JAN 2017) 52.204-2 Security Requirements (MAR 2021) Alternate II (APR 1984) 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (JUN

2020) 52.204-13 System for Award Management Maintenance (OCT 2018) 52.204-18 Commercial and Government Entity Code Maintenance (AUG 2020) 52.204-19 Incorporation by Reference of Representations and Certifications (DEC 2014) 52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or

Provided by Kaspersky Lab and Other Covered Entities (NOV 2021) 52.204-25 Prohibition on Contracting for Certain Telecommunications and Video

Surveillance Services or Equipment (NOV 2021) 52.209-6 Protecting the Government's Interest when Subcontracting with Contractors

Debarred, Suspended, or Proposed for Debarment (NOV 2021) 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (NOV 2015) 52.215-8 Order of Precedence—Uniform Contract Format (OCT 1997) 52.219-6 Notice of Total Small Business Set-Aside (NOV 2020) 52.219-14 Limitations on Subcontracting (SEP 2021)

[Contracting Officer check as appropriate.] ☐ By the end of the base term of the contract and then by the end of each subsequent option period; or ☐ By the end of the performance period for each order issued under the contract.

52.219-28 Post Award Small Business Program Rerepresentation (SEP 2021) 52.222-3 Convict Labor (JUN 2003) https://www.acquisition.gov/browse/index/far https://www.acquisition.gov/agar

52.222-4 Contract Work Hours and Safety Standards -- Overtime Compensation (MAY 2018)

52.222-6 Construction Wage Rate Requirement (AUG 2018) 52.222-7 Withholding of Funds (MAY 2014) 52.222-8 Payrolls and Basic Records (JUL 2021) 52.222-9 Apprentices and Trainees (JUL 2005) 52.222-10 Compliance with Copeland Act Requirements (FEB 1988) 52.222-11 Subcontracts (Labor Standards) (MAY 2014) 52.222-12 Contract Termination - Debarment (MAY 2014) 52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations

(MAY 2014)

52.222-14 Disputes Concerning Labor Standards (FEB 1988) 52.222-15 Certification of Eligibility (MAY 2014) 52.222-21 Prohibition of Segregated Facilities (APR 2015) 52.222-26 Equal Opportunity (APR 2016) 52.222-27 Affirmative Action Compliance Requirements for Construction (APR 2015) 52.222-30 Construction Wage Rate Requirements-Price Adjustment (None or Separately

Specified Pricing Method) (AUG 2018) 52.222-35 Equal Opportunity for Veterans (JUN 2020) 52.222-36 Equal Opportunity for Workers with Disabilities (JUN 2020) 52.222-37 Employment Reports on Veterans (JUN 2020) 52.222-50 Combating Trafficking in Persons (NOV 2021) 52.222-54 Employment Eligibility Verification (NOV 2021) 52.222-55 Minimum Wages for Contractor Workers under Executive Order 14026 (JAN

2022) 52.222-62 Paid Sick Leave under Executive Order 13706 (JAN 2022) 52.223-2 Affirmative Procurement of Biobased Products under Service and Construction

Contracts (SEP 2013) 52.223-3 Hazardous Material Identification and Material Safety Data Alt 1 (FEB 2021) 52.223-5 Pollution Prevention and Right-to-Know Information (MAY 2011) 52.223-11 Ozone-Depleting Substances and High Global Warming Potential

Hydrofluorocarbons (Jun 2016) 52.223-12 Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air

Conditioners (JUN 2016) 52.223-15 Energy Efficiency in Energy Consuming Products (MAY 2020) 52.223-17 Affirmative Procurement of EPA-designated Items in Service and Construction

Contracts (AUG 2018) 52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving (JUN

2020) 52.223-20 Aerosols (Jun 2016) 52.223-21 Foams. (Jun 2016) 52.225-13 Restrictions on Certain Foreign Purchases (FEB 2021) 52.226-1 Utilization of Indian Organizations and Indian-Owned Economic Enterprises

(June 2000) 52.227-1 Authorization and Consent (JUN 2020)

52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement (JUN 2020) 52.227-4 Patent Indemnity -- Construction Contracts (DEC 2007) 52.228-2 Additional Bond Security (OCT 1997) 52.228-5 Insurance – Work on a Government Installation (JAN 1997) 52.228-12 Prospective Subcontractor Requests for Bonds (MAY 2014) 52.228-14 Irrevocable Letter of Credit (NOV 2014) 52.232-5 Payments under Fixed-Price Construction Contracts (MAY 2014) 52.232-17 Interest (MAY 2014) 52.232-23 Assignment of Claims (MAY 2014) 52.232-27 Prompt Payment for Construction Contracts (JAN 2017) 52.232-33 Payment by Electronic Funds Transfer – System for Award Management (OCT

2018) 52.232-39 Unenforceability of Unauthorized Obligations (JUN 2013) 52.233-1 Disputes (MAY 2014) Alt 1 (DEC 1991) 52.233-3 Protest after Award (AUG 1996) 52.233-4 Applicable Law for Breach of Contract Claim (OCT 2004) 52.236-2 Differing Site Conditions (APR 1984) 52.236-3 Site Investigation and Conditions Affecting the Work (APR 1984) 52.236-5 Material and Workmanship (APR 1984) 52.236-6 Superintendence by the Contractor (APR 1984) 52.236-7 Permits and Responsibilities (NOV 1991) 52.236-8 Other Contracts (APR 1984) 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and

Improvements (APR 1984) 52.236-10 Operations and Storage Areas (APR 1984) 52.236-11 Use and Possession Prior to Completion (APR 1984) 52.236-12 Cleaning Up (APR 1984) 52.236-13 Accident Prevention (NOV 1991)

Alternate I (NOV 1991) 52.236-14 Availability and Use of Utility Services (APR 1984) 52.236-16 Quantity Surveys (APR 1984)

Alternate 1 (APR 1984) 52.236-17 Layout of Work (APR 1984) 52.236-21 Specifications and Drawings for Construction (FEB 1997)

Alternate I (APR 1984) Alternate II (APR 1984)

52.243-5 Changes and Changed Conditions (APR 1984) 52.244-6 Subcontracts for Commercial Products and Commercial Services (JAN 2022)

(DEVIATION APR 2020)

52.245-1 Government Property (SEP 2021) - Alt 1 (APR 2012) 52.245-9 Use and Charges (APR 2012) 52.246-21 Warranty of Construction (MAR 1994)

Alternate I (MAR 1994) 52.248-3 Value Engineering – Construction (OCT 2020)

52.249-1 Termination for Convenience of the Government (Fixed-Price) (Short Form)

(APR 1984)

Alternate I (SEP 1996)

52.249-10 Default (Fixed-Price Construction) (APR 1984) Alternate I (APR 1984)

52.253-1 Computer Generated Forms (JAN 1991)

52.225-9 Buy American Act-Construction Materials (NOV 2021)

(a) Definitions. As used in this clause-

Commercially available off-the-shelf (COTS) item-

(1) Means any item of supply (including construction material) that is-

(i) A commercial product (as defined in paragraph (1) of the definition of “commercial product” at Federal Acquisition Regulation (FAR) 2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace;

and

(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.

"Construction material" means an article, material, or supply brought to the construction site by…