This Invitation to Bid is issued by the Atchison County Commission for the construction of Atchison County Bridge #3570016, a replacement project for the X Avenue Bridge located in Missouri. The proposed work includes demolition of an existing bridge and construction of a new 153-foot three-span spread box beam bridge, along with installation of guardrail, riprap, and permanent erosion control measures, with any other incidental work performed in accordance with the contract plans and specifications. Sealed bids must be received at the Atchison County Commission office located at 400 S Washington Street, P.O. Box 280, Rock Port, MO 64482, by 10:00 A.M. local time on July 16, 2026, at which time bids will be publicly opened and read. All bidders must purchase plans and specifications through Great River Engineering at 417-886-7171 for a non-refundable fee of $75.00 and must be on the plan holder list to be eligible to bid. The contractor questionnaire must be on file seven days prior to bid opening, and all bidders must be on MoDOT's Qualified Contractor List per Section 102.2 of the Missouri Standard Specifications for Highway Construction, 2026, First Edition.

A certified cashier's check or bid bond equal to 5% of the bid amount must accompany each proposal. The contract requires payment of prevailing wage rates as determined by both the Missouri Department of Labor and Industrial Relations and the United States Department of Labor, with the contractor required to pay the higher of the two applicable rates. The applicable state wage rates are detailed in Annual Wage Order 33, and federal Davis-Bacon wage rates are those posted on the tenth day before the bid opening date and available at sam.gov. Contractors and subcontractors must provide a 10-Hour OSHA construction safety program or an approved equivalent to on-site employees within 60 days of beginning work. The DBE goal for this project is 0%, and no second-tier subcontracting is allowed. The Atchison County Commission reserves the right to reject any or all bids and will award the project to the lowest, responsive, responsible bidder.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATCHISON COUNTY COMMISSION

BRO-R003001

INVITATION TO BID

INVITATION TO BID

X AVENUE BRIDGE REPLACEMENT

Sealed bids for the Proposal for the Construction of Atchison County Bridge #3570016 BRO-R003001 Replacement will be received at: Atchison County Commission, 400 S Washington Street, P.O. Box 280, Rock Port, MO 64482, , until 10:00 o’clock A.M. (Prevailing Local Time) on the 16th day of July 2026, at the office of the Atchison County Courthouse, and at that time will be publicly opened and read. All bids shall be submitted as a Hard Copy.

The proposed work includes:

Demolition of an existing bridge and the construction of a new 153-ft three span spread box beam bridge.

Guardrail, riprap and permanent erosion control will be installed along with any other incidental work in accordance with plans and specifications.

A digital copy of the plans and specifications may be purchased through the office of Great River Engineering (GRE), at 417-886-7171 upon payment of $75.00, which is not refundable. All bidders must purchase plans through Great River Engineering and be on the planholder list in order to bid the project.

This contract requires payment of the prevailing hourly rate of wages for each craft or type of work required to execute the contract as determined by the Missouri Department of Labor and Industrial Relations, and requires adherence to a schedule of minimum wages as determined by the United States Department of Labor. For work performed anywhere on this project, the contractor and the contractor’s subcontractors shall pay the higher of these two applicable wage rates. The applicable state wage rates for this contract are detailed in “Annual Wage Order 33”, that is attached to this bidding document. The applicable federal wage rates for this contract are the effective Davis-Bacon federal wage rates posted the tenth day before the bid opening date and can be found at:

https://sam.gov/content/wage-determinations. These supplemental bidding documents have important legal consequences. It shall be conclusively presumed that they are in the bidder's possession, and they have been reviewed and used by the bidder in the preparation of any bid submitted on this project.

The Atchison County Commission hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, businesses owned and controlled by socially and economically disadvantaged individuals will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, religion, creed, sex, age, ancestry, or national origin in consideration for an award.

All bidders must be on MoDOT’s Qualified Contractor List per Section 102.2 of the Missouri Standard

Specifications for Highway Construction, 2026, First Edition including all revisions. The contractor questionnaire must be on file 7 days prior to bid opening.

Contractors and sub-contractors who sign a contract to work on public works projects shall provide a 10-Hour OSHA construction safety program, or similar program approved by the Department of Labor and Industrial Relations, to be completed by their on-site employees within sixty (60) days of beginning work on the construction project.

A certified cashier’s check or a bid bond in the amount of 5% shall be submitted with each proposal.

The Atchison County Commission reserves the right to reject any or all bids.

The project will be awarded to the lowest, responsive, responsible bidder.

The DBE Goal for this project is 0%.