This is a Request for Proposals (RFP) document issued by Los Angeles County Public Works for Construction Manager at Risk (CMaR) pre-construction and construction services for the Hall of Records Seismic Retrofit project located at 320 West Temple Street, Los Angeles, California 90012. The project involves comprehensive seismic retrofitting of the existing Hall of Records building to meet current seismic safety standards. The RFP solicits qualified construction management firms to provide integrated pre-construction services including design review, cost estimating, scheduling, and constructability analysis, followed by full construction management and execution services throughout the project delivery phase. The solicitation establishes specific submission deadlines for proposals, mandatory pre-bid meetings or site visits for interested bidders to review project conditions and requirements, and anticipated award and project commencement dates. The contract term encompasses the complete pre-construction phase and the full construction duration, with the project scope including structural retrofitting, building system upgrades, and related work necessary to achieve seismic compliance.
The RFP specifies pricing requirements for both pre-construction and construction phases, with detailed cost breakdowns and potential reimbursable expenses outlined in the proposal requirements. The project is funded through Los Angeles County capital improvement funds allocated for critical facility upgrades and seismic safety compliance. Selection criteria emphasize contractor qualifications, relevant experience with similar seismic retrofit projects, project management approach, staffing plans, scheduling methodology, and proposed innovations or value engineering opportunities. The document may include provisions regarding small business participation, local hiring requirements, or other County-mandated set-asides applicable to public works projects in Los Angeles County.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COUNTY OF LOS ANGELES
DEPARTMENT OF PUBLIC WORKS
“To Enrich Lives Through Effective and Caring Service”
900 SOUTH FREMONT AVENUE
ALHAMBRA, CALIFORNIA 91803-1331
Telephone: (626) 458-5100 http://dpw.lacounty.gov
MARK PESTRELLA, Director
ADDRESS ALL CORRESPONDENCE TO:
P.O. BOX 1460
ALHAMBRA, CALIFORNIA 91802-1460
IN REPLY PLEASE
REFER TO FILE: BRC-2
September 1, 2026
REQUEST FOR PROPOSALS
CONSTRUCTION MANAGER AT RISK PRE-CONSTRUCTION AND
CONSTRUCTION SERVICES FOR THE HALL OF RECORDS SEISMIC RETROFIT
SPECS NO. 7954; C.P. NO. 8A073
RFP NUMBER: BRC0000673
The Los Angeles County (County) Public Works is requesting Construction Manager at Risk proposals from interested firms for pre-construction and construction services for the Hall of Records Seismic Retrofit located at 320 West Temple Street, Los Angeles, CA 90012.
The deadline to submit proposals is Tuesday, October 13, 2026, at 5:30 p.m.
Proposals received after the deadline will not be accepted. The Contract Analyst is Erayna Chang at (626) 300-2325 or EQChang@pw.lacounty.gov.
Optional Proposal Conference
A virtual proposal conference to answer questions concerning the project will be held on Thursday, September 10, 2026, at 1:00 p.m., via Microsoft Teams. Those who wish to attend must click the link that will be posted on the Public Works website for BRC0000673 to join. Public Works recommends attendees are registered on Public Works website at least 1 hour prior to the conference.
Optional Site Visit
County will conduct an optional site visit on Monday, September 14, 2026, at 10 a.m., at the project site to provide information regarding the project. Prime proposers are encouraged to attend.
mailto:EQChang@pw.lacounty.gov
Request for Proposals
"Do Business with Public Works" Website Mandatory Registration
You are now required to register an account on Public Works "Do Business With Public Works" website in order to view any current solicitation:
https://dpw.lacounty.gov/contracts/opportunities.aspx. Registration is only needed one time. Further you should also register as a plan holder for this specific RFP BRC0000673.
Only those firms registered as plan holders for this RFP through the Public Works website will receive automatic notification when any update to this RFP is made. Planholder information is viewable to other registered planholders. The County does not have an obligation to notify any proposers other than through the Public Works website's automatic notification system.
Doing Business with Preference Program Enterprises
The County provides many benefits for firms that are certified through the County's Local Small Business Enterprise (LSBE) Preference Program. Eligible firms, prime contractors, and subcontractors are strongly encouraged to participate and receive benefits available only to LSBE, such as price preference during solicitation process, when applicable, and the LSBE Prompt Payment Program. Prompt payment is defined as 15 calendar days after the receipt of an undisputed invoice for goods or services. Information on this program and how to obtain certification are available on the County of Los Angeles Department of Economic Opportunity website: Office of Small Business | LA County AJCC, CA https://www.ajcc.lacounty.gov/businesses/office-of-small-business.
Community Business Enterprise (CBE) Program
The County has adopted a Community Business Enterprise (CBE) Program, which includes business enterprises certified as disadvantaged business enterprises, disabled veteran-owned, minority-owned, women-owned, and lesbian, gay, bisexual, transgender, queer, and questioning-owned business types. The County has established a collective
25% participation goal for CBE certified firms for County solicitations.
For more information on obtaining certification, please visit the
Department of Economic Opportunity’s Office of Small Business at:
https://iddweb.isd.lacounty.gov/DCA_eComplaint/SmallBusinessCertifications. Eligible firms, prime contractors, and subcontractors/subconsultants are strongly encouraged to get certified.
https://dpw.lacounty.gov/contracts/opportunities.aspx https://www.ajcc.lacounty.gov/businesses/office-of-small-business https://www.ajcc.lacounty.gov/businesses/office-of-small-business https://www.ajcc.lacounty.gov/businesses/office-of-small-business https://iddweb.isd.lacounty.gov/DCA_eComplaint/SmallBusinessCertifications
Request for Proposals
Proposal Submission
Mail-in electronic proposals via Universal Serial Bus (USB) drive to Public Works Headquarters. Mail-in proposals must be received by the Cashier's Office by the deadline. Proposals shall be addressed to:
Los Angeles County Public Works Cashier's Office 900 South Fremont Avenue, Mezzanine Level Alhambra, CA 91803 Attention: Erayna Chang Construction Manager at Risk Pre-Construction and Construction Services for the Hall of Records Seismic Retrofit RFP Number: BRC0000673
Proposers may use FedEx or UPS (or other delivery service) to deliver proposals.
Proposers may submit proposals in-person to the Cashier's Office by the deadline.
Very truly yours, MARK PESTRELLA, PE
Director of Public Works
SOO KIM
Division Chief Business Relations and Contracts Division
SK:ec
FOR
CONSTRUCTION MANAGER AT RISK
PRE-CONSTRUCTION AND CONSTRUCTION SERVICES
FOR THE HALL OF RECORDS SEISMIC RETROFIT
320 WEST TEMPLE STREET
LOS ANGELES, CA 90012
SPECS 7954; C.P. 8A073
RFP NUMBER: BRC0000673
SEPTEMBER 1, 2026
LOS ANGELES COUNTY
PUBLIC WORKS
BUSINESS RELATIONS AND CONTRACTS DIVISION
900 SOUTH FREMONT AVENUE, 8TH FLOOR
ALHAMBRA, CALIFORNIA 91803
TELEPHONE (626) 300-2325
EMAIL: EQCHANG@PW.LACOUNTY.GOV
RFP Number: BRC0000673 Page 2 of 60
CONSTRUCTION MANAGER AT RISK
TABLE OF CONTENTS
1 INTRODUCTION AND OVERVIEW
1.1 General
1.2 Project Overview
1.3 Definitions
1.4 RFP Schedule
1.5 Cost of Response to Request for Proposal (RFP)
1.6 County's Ownership of Materials and Equipment
1.7 Qualifications of Proposers and Subcontractors/Subconsultants
1.8 Prohibition from Participation in Future Solicitation(s)
1.9 Contact with County Personnel and Code of Silence Period
1.10 Contract Documents and Sample Agreement
1.11 Proposal Effective Period
1.12 Examination of RFP and Site
1.13 Performance and Payment Bonds
2 SCOPE OF SERVICES
2.1 Scope of Services Overview
2.2 Project Schedule
2.3 Project Estimate
3 SELECTION PROCESS
3.1 Basis of Selection
3.2 Request for Revised Proposals
3.3 Interview
3.4 Contract Award
4 PROPOSAL SUBMISSION REQUIREMENTS
4.1 Proposal Format
4.2 Proposal and Price Submission Requirements
5 SELECTION CRITERIA
5.1 Statement of Qualifications Questionnaire Pass/Fail Requirements
5.2 Proposal Selection Criteria
RFP Number: BRC0000673 Page 3 of 60
6 RFP GENERAL CONDITIONS
6.1 General Conditions
6.2 County's Responsibilities
6.3 Compliance with RFP
6.4 Truth and Accuracy of Representations
6.5 Acceptance of Terms and Conditions
6.6 County's Changes to RFP
6.7 Modification and Withdrawal of Proposals
6.8 Consistency with Laws
6.9 Public Records Act
6.10 Protest Policy Review Process
6.11 Equals
6.12 County of Los Angeles Lobbyist Ordinance
6.13 Improper Considerations
6.14 Consideration of GAIN/GROW Program Participants for Employment
6.15 Child Support Compliance Program
6.16 Federal Earned Income Credit
6.17 Recycled Bond Paper
6.18 County Policy on Doing Business with Small Business
6.19 Indemnification and Insurance
6.20 No Payment for Services Provided Following Expiration/Termination of Agreement
6.21 Conflict of Interest
6.22 Determination of Proposer Responsibility
6.23 Proposer Debarment
6.24 County's Defaulted Property Tax Reduction Program
6.25 Compliance with Jury Service Program
6.26 Registration with the County of Los Angeles
6.27 Confidentiality and Independent Contractor Status
6.28 Contractor's Acknowledgement of County's Commitment to the Safely
Surrendered Baby Law and Notice to Employees Regarding the Safely Surrendered Baby Law
6.29 Notification to County of Pending Acquisitions/Mergers by Proposing Company
6.30 Prevailing Wage Requirements
6.31 Community Business Enterprise (CBE) Participation
6.32 Best Management Practice (BMP) Requirements
6.33 Injury and Illness Prevention Plan (IIPP) and Code of Safe Practices (CSP)
Affidavit
6.34 Request for County Program Preference Program Consideration
6.35 Required Certification/Disclosure
6.36 Subcontractor Listing Requirements
6.37 Local and Targeted Worker Hire Program
6.38 Contractor CARD Track/Monitoring Database
6.39 Time Off for Voting
6.40 Consultant Background and Security Investigations
6.41 Proposals Submitted
6.42 Mental Health Services for Critical Incidents
6.43 Local Small Business Enterprise Utilization
RFP Number: BRC0000673 Page 4 of 60
6.44 Proposer's Acknowledgement of County's Commitment to Zero Tolerance Human Trafficking
6.45 Claims
6.46 Proposer's Acknowledgement of County's Commitment to Fair Chance
Employment Hiring Practices
6.47 Default Method of Payment: Direct Deposit or Electronic Funds Transfer (EFT)
6.48 Application of Countywide Community Workforce Agreement
6.49 Disallowed Cost
6.50 Compliance with the County Policy of Equity
6.51 Integrated Pest Management (IPM) Program Compliance
6.52 Charitable Contributions Certification
6.53 Prospective Contractor List of Terminated Contracts
6.54 COVID-19 Vaccinations of County Contractor Personnel
6.55 Contractor Development and Bonding Program-intentionally omitted
6.56 Contribution and Agent Declaration
EXHIBITS
A. Statement of Qualifications Questionnaire – Pass/Fail B. Organization Information Form C. Section 00 03 00, Price Proposal Form D. Section 00 05 00, CMAR Agreement (Sample) E. Section 00 06 10, Bond for Faithful Performance (Sample) F. Section 00 06 20, Payment Bond for Labor and Materials (Sample) G. Section 00 07 00, General Conditions H. Section 00 09 12 Local and Targeted Worker Hire Program I. CMAR Scope of Services J. County of Los Angeles Performance History Reference K. Non-County of Los Angeles Performance History Reference and Evaluation
Checklist – Card (2 pages total) L. Intentionally omitted M. Countywide Community Workforce Agreement N. Feasibility Study dated January 17, 2025, prepared by Degenkolb Engineers
ATTACHMENTS (REQUIRED CERTIFICATION FORMS)
00 03 10 Best Management Practices (BMP) Requirements 00 03 11 Construction and Demolition Debris Recycling Requirements 00 03 12 Builders Risk Course of Construction Insurance Requirements 00 03 13 Local and Targeted Worker Hire Program-Mandatory Jobs Coordinator 00 03 14 Certification to Comply with Countywide Community Workforce Agreement
(CWA)
00 03 15 Cost Impact of Countywide Community Workforce Agreement 00 04 30 Subcontractor Listing and Subcontracting 00 04 35 Community Business Enterprises (CBE) Participation Form 00 04 38 Request for County Program Preference Consideration 00 04 38A Subconsultant Certification Form
RFP Number: BRC0000673 Page 5 of 60
00 04 40 Equals 00 04 50 Noncollusion Affidavit 00 04 60 Greater Avenues for Independence/General Relief Opportunity for Work
(GAIN/GROW) Participation Affidavit 00 04 65 3-Year Contracting History 00 04 70 False Claims 00 04 71 Civil Litigation History 00 04 72 Criminal Convictions 00 04 73 Debarments 00 04 74 Labor Law/Payroll Violations 00 04 75 Integrated Pest Management Program Compliance Certification 00 04 76 Charitable Contributions Certification 00 04 77 Prospective Contractor List of Terminated Contracts 00 04 79 Contribution and Agent Declaration Form 00 04 85 Contractor Employee Jury Service Program 00 04 87 Certification of Compliance-Contact with County Personnel and Compliance with
Code of Silence Period 00 04 90 CMAR's Industrial Safety Record 00 04 91 Injury & Illness Prevention Plan & Code of Safe Practices Affidavit 00 04 92 Proposer's Organization Questionnaire/Affidavit 00 04 93 Defaulted Property Tax Reduction Program 00 04 94 Avoidance of Conflict of Interest Certificate 00 04 95 Familiarity with the County Lobbyist Ordinance Certification Form 00 04 96 Proposer's EEO Certification Form 00 04 97 Compliance with Fair Chance Employment Hiring Practices Certification 00 04 98 Zero Tolerance Human Trafficking Policy Certification 00 04 99 Disallowed Cost Attestation
RFP Number: BRC0000673 Page 6 of 60
CONSTRUCTION MANAGER AT RISK
1 INTRODUCTION AND OVERVIEW
THIS IS A QUALIFICATIONS-BASED, BEST VALUE SELECTION.
THIS IS NOT A LOW BID SOLICITATION.
1.1 General
Pursuant to California Public Contract Code (PCC) Section 20146, the Los Angeles County (County) Public Works is requesting Construction Manager at Risk (CMAR) proposals from interested firms for pre-construction and construction services for the Hall of Records Seismic Retrofit (Project) located at 320 West Temple Street, Los Angeles, CA 90012. The CMAR Contractor is also referred to as the Contractor, Consultant, Proposer, or Bidder in this document.
The County's primary objective is to select a CMAR Contractor, who provides the County with the best value in terms of price and relevant high rise seismic strengthening construction experience and expertise, to work in cooperative environment based on mutual respect, interdependency, collaboration, and open communication. The proposing team must include the proposed CMAR contractor, the necessary mechanical, electrical, and plumbing (MEP) subcontractors, concrete subcontractor, concrete testing subcontractor, fiber reinforced polymer (FRP) subcontractor, steel subcontractor, welding subcontractor, masonry/stone subcontractors, and roofing subcontractor.
The successful Proposer will be selected according to the selection process described herein in Section 3 and the selection criteria described in Section 5. All interested Proposers with experience with CMAR and high-rise construction and high-rise seismic strengthening projects are invited to submit a Proposal.
The County is committed to enhancing and developing outreach programs and activities among the design, construction, and other community industries that may impact or benefit the Project, including small business involvement. As such, Proposers will be required to actively participate in any County efforts, activities and policies to foster interaction among the industry and fulfill overall outreach goals. The Proposal requires the Proposers' commitment to current County policies as well as any future policies which may be developed or implemented at a later date during the selection process.
RFP Number: BRC0000673 Page 7 of 60
1.2 Project Overview
The goal of the County is to maintain and preserve the character and design features from the original design, while improving the building’s seismic performance. The project will be completed utilizing CMAR delivery method and construction will be phased to avoid disruptions to the occupied building.
The County is in the planning phase for the voluntary seismic upgrades of the County-owned Hall of Records building in the City of Los Angeles. The existing office building is assumed to have been designed utilizing the 1958 Universal Building Code with construction completing in 1962 and is listed in the California Historical Resources . The high-rise building is comprised of a 10-Main Building and 15-story Stack Building over a 3-story concrete podium. The building’s gross square footage of approximately 343,000 square feet with a mean roof height of 176’-0”. The Main Building and Stack building are seismically separated above the first floor of the shared podium. The Main Building is framed with structural steel beams and columns with concrete shear walls. The Stack Building is composed of concrete two-way slabs, columns, and walls. The podium levels are composed of a steel beam and column framing down to the basement level which changes to concrete beams supported with concrete columns and walls. The building is founded on shallow spread footings interconnected by a concrete slab.
There is a limited area of the southeast corner that is supported by concrete piles adjacent to North Broadway.
The building houses administrative offices for various departments for the government of the County of Los Angeles. It is located at 320 West Temple Street, Los Angeles near Grand Park. Located on the south side of Temple Street between North Hill Street and North Broadway Street.
The assumption for the Project is that the seismic strengthening will mostly consist of additional concrete shear walls in the east-west direction of the Main Building;
strengthen existing walls at select locations with fiber-reinforced polymer;
strengthen select walls with shotcrete at interior; new welded steel plates at column web; replace existing Lounge Roof; localized strengthening for discontinuous walls with new steel plates; additional anchors at slab to wall connections; construction will be phased, and that the building will be occupied during construction. The assumption is that the strengthened building will meet ASCE 41 – 23 under Basic Performance Objective for Existing Buildings for a Risk Category II building, which calls for Life Safety level of structural seismic performance for a BSE-1E and a Collapse Prevention level of structural seismic performance for a BSE-2E.
Included in the scope of this project are replacing existing cracked exterior ceramic tile cladding along the exterior shear walls, repairs to building systems and all interior tenant improvements affected to provide access to structural work, including, office renovations triggered by this work, and any code-required improvements triggered by this work. Additional related work may be requested by the County at any time in conjunction with this project.
RFP Number: BRC0000673 Page 8 of 60
For additional information on the proposed seismic strengthening scope, refer to Exhibit N for feasibility study dated January 17, 2025, prepared by Degenkolb Engineers.
1.3 Definitions
Definitions are provided in Exhibit G, General Conditions, 00 07 00, to clarify the terms used in the RFP document.
1.4 RFP Schedule
A tentative schedule is provided for information purposes only:
09/01/2026 RFP issue date
09/10/2026 Optional Presubmittal Conference
09/14/2026 Optional site visit
10/13/2026 Proposal submittals due to the County
December 2026 Interview and Notification of Final Ranking of Proposers and Notice of Selection
March 2027 Award of Contract (Tentative)
April 2027 Notice To Proceed
The County reserves the right to revise this schedule at any time during the selection process.
1.5 Cost of Response to RFP
The County shall not in any way be liable or responsible for any costs incurred in connection with the preparation, submissions, or presentations made in response to this RFP, including Statement of Qualifications Questionnaire, Technical Proposal, and the Interview.
1.6 County's Ownership of Materials and Equipment
Proposer acknowledges and grants to the County, a perpetual, unlimited, royalty-free, non-exclusive, and irrevocable license for the County (including, without limitation, its employees, contractors, and agents) to use, copy, modify, and create derivative works of all processes, materials, documents, reports, and other information of all types, including computer drawings and models developed by the Proposer for the Project, that are submitted, provided, or otherwise disclosed by Proposer as a result of this solicitation process. This grant of license includes, but
RFP Number: BRC0000673 Page 9 of 60 is not limited to, rights to use any know-how disclosed or otherwise provided by Proposer or any of its subcontractors/subconsultants; rights to practice any inventions owned, controlled, or licensed by Proposer; and rights to use, copy, modify, and create derivative works based on, incorporated in, or derived from, the materials, documents, reports and other information of all types. Proposer also acknowledges that any and all associated intellectual property rights for any derivative works created by the County (including, without limitation, its employees, contractors, and agents), shall be owned by the County.
1.7 Qualifications of Proposers and Subcontractors/Subconsultants
1.7.1 The Proposer, must have a valid and active B license issued by the Contractors' State License Board. Each listed subcontractor must be appropriately licensed for the type of work proposed to be performed.
1.7.2 The Proposers shall be required to demonstrate to the County's satisfaction that, at the time of the submittal of the Proposal, the Proposer and its proposed subcontractors (whether required to be listed or not) that are known at time of Proposal submittal, possess these specialty license, experience, and certification requirements.
1.7.3 The required licenses for all Proposers and subcontractors and subconsultants shall remain valid throughout the term of the contract.
1.8 Prohibition from Participation in Future Solicitation(s):
In accordance with Board Policy No. 5.090, Contractor Independence, the County Board of Supervisors has adopted a countywide policy that prohibits any person, or any firm or any subsidiary of a firm (collectively "firm") from submitting a bid or proposal in any County solicitation process where the person or firm, assisted in the development or preparation of the solicitation document(s). A Proposer, or a Contractor or its subsidiary or Subcontractor ("Proposer/Contractor"), is prohibited from submitting a bid or proposal in a County solicitation if the Proposer/Contractor has provided advice or consultation for the solicitation. A Proposer/Contractor is also prohibited from submitting a bid or proposal in a County solicitation if the Proposer/Contractor has developed or prepared any of the solicitation materials on behalf of the County. A violation of this provision will result in the disqualification of the Contractor/Proposer from participation in the County solicitation or the termination or cancellation of any resultant County contract.
These Consultants include but are not limited to following individuals and firms:
• Destination Enterprises, Inc.
• Degenkolb Engineers
• Page & Turnbull
RFP Number: BRC0000673 Page 10 of 60
• RACAIA, Inc.
• Simon S. Wong & Associates
• Young Tai, Inc.
Proposers must not contact the firms listed above. All contacts shall be through the County's Contract Analyst listed immediately below. Contact with any firm or individuals listed in this Section (including principal, manager, or employee), during the RFP period, may be cause for immediate disqualification of the Proposer.
1.9 Contact with County Personnel and Code of Silence Period
All contact regarding this RFP or any matter relating thereto must be in writing and emailed to:
Attention Ms. Erayna Chang, Contract Analyst
E-mail: eqchang@pw.lacounty.gov
Telephone: (626) 300-2325
If it is discovered that Proposer contacted and received information from any
County personnel, other than the person specified above, regarding this solicitation, County, in its sole determination, may disqualify their proposal from further consideration. This prohibition of contacting other County personnel, unless otherwise approved in writing and directed by Contract Analyst, as of the issue date of this RFP and continuing until the date of award of Contract(s) will be referred to as the Code of Silence period.
Questions must be received 14 calendar days prior to the submittal deadline. Any questions received within 14 calendar days of the deadline may not be considered.
1.10 Contract Documents and Sample Agreement
A sample CMAR Agreement, 00 05 00, is provided by the County as part of Exhibit D, including Exhibit G, General Conditions, 00 07 00, and other contract related documents.
1.11 Proposal Effective Period
All Proposal submissions shall remain in effect for a period of 180 calendar days from the Proposal submittal date, or in the event the County issues a Request for Revised Proposal, 180 calendar days from the submittal of the Request for Revised Proposals. Proposers may withdraw their Proposals 181 calendar days after final Proposals or Revised Proposals are submitted by submitting written notice addressed to Public Works.
mailto:eqchang@pw.lacounty.gov
RFP Number: BRC0000673 Page 11 of 60
1.12 Examination of RFP and Site
Before submitting a Proposal, each Proposer is responsible to: a) examine the RFP and all attachments and exhibits thoroughly; b) visit the Site to familiarize itself with existing conditions that may in any manner affect cost, progress, or performance of the Work; and c) become familiar with Federal, State, and local laws, ordinances, rules, and regulations that may in any manner affect cost, progress, or performance of the Work. Also, Proposer is required to provide the County written notice of errors, ambiguities, or discrepancies that it discovers in or among this RFP, including any documents attached thereto, and actual Site conditions. The requirement to familiarize itself with existing conditions is limited to those conditions that are reasonably observable during the site visit. Proposers will not be required or allowed to perform testing or an extensive review of the Site and are entitled to rely on the information provided by the County for the purposes of responding to the Proposal.
As-built drawings will be provided to the CMAR Contractor after contract execution.
1.13 Performance and Payment Bonds
Section 00 07 00, General Conditions, sets forth requirements as to performance bonds and payment bonds (Refer to Exhibits E and F for samples). When the successful CMAR Contractor delivers the executed Construction Services Amendment to the County, it shall be accompanied by the required contract security at the time specified in Section 00 07 00, General Conditions.
2 SCOPE OF SERVICES
2.1 Scope of Services Overview
The CMAR Contractor shall be responsible for all Pre-Construction and Construction Services required for the completion of the Project in accordance with the Contract Documents. The full CMAR Scope of Services is contained in Exhibit I, Scope of Services.
2.2 Project Schedule
The tentative Project schedule is as follows:
• Contract Time for Pre-Construction Services is not-to-exceed 18 months from the issuance of NTP – Pre-Construction Services.
• Contract Time for Construction Services is not-to-exceed 24 months from the issuance of NTP –Construction.
RFP Number: BRC0000673 Page 12 of 60
2.3 Project Estimate
For the purposes of this solicitation, the rough estimate for the CMAR GMP is $40,000,000 and will be updated during the pre-construction phase as the design develops.
3. SELECTION PROCESS
3.1 Basis of Selection
a. The County will award the CMAR Contract on the basis of a "Best Value" selection as provided for in PCC Section 20146 and as specifically described in this solicitation.
b. This RFP is comprised of Statement of Qualifications Questionnaire (SOQ) Pass/Fail, Technical Proposal, Price Proposal, and Interview.
c. An initial pass/fail evaluation will be made for each proposal to determine whether the pass/fail requirements listed in SOQ Pass/Fail form are included in each proposal. Proposals that pass the initial pass/fail evaluation will be submitted to the Evaluation Committee for evaluation and rating.
d. The County will assemble an Evaluation Committee which will review the Technical Proposal submittals based upon the selection criteria defined in Section 5 of this RFP. Those submittals that do not meet the requirements may be deemed nonresponsive and disqualified from further consideration.
The County may utilize the services of appropriate experts to assist in the selection process.
e. After the evaluation of the Technical Proposals, the three (3) highest ranked Proposers or as appropriate and in the best interest of the County will be invited to an interview. All Proposers will be notified of the rankings and the short-list selections. In the event the County determines that less than three Proposers are short-listed, the County reserves the right to invite less than three Proposers to the interview.
f. The Interview will be conducted and scored from each Proposer who is invited to participate. Finally, Price Proposal of each Proposer who is invited to participate in the interview will be weighted as specified in Section 5, to determine the highest ranked, best value Proposal. The Evaluation Committee will then rank the Proposers based on a determination of evaluated scores.
g. Good faith negotiations will begin with the highest ranked Proposer. In the event that additional elements or changes to requirements contained in this RFP may be required, Public Works reserves the right to negotiate with the highest ranked Proposer to cause these changes to be incorporated in the work product. If a satisfactory Contract cannot be negotiated, the County may, RFP Number: BRC0000673 Page 13 of 60 at its sole discretion, begin Contract negotiations with the next highest-ranked Proposer who submitted a proposal, as determined by the County.
h. The Evaluation Committee may request clarification of any portion of the Proposal. A Proposer's response to such a request must be in writing and shall become part of the Proposer's Proposal. If the Proposer fails to respond within the time indicated in the request, the Proposer may be deemed nonresponsive and its Proposal may be disqualified from further consideration.
i. The selections will be made on the basis of qualifications, price, demonstrated competence, ability to meet County criteria, and technical response to the RFP without regard to race, creed, color, or gender.
j. The County, at its sole discretion, reserves the right to reject any and all Proposals or waive minor deficiencies, irregularities, or technicalities in any Proposal, if determined to be in the County's best interest. Public Works will make a recommendation to the Board of Supervisors regarding award of a contract to the best value Proposer.
k. Notwithstanding a recommendation of a department, agency, individual, or other, the Board of Supervisors retains the right to exercise its judgment concerning the selection of a Proposer and the terms of any resultant agreement, and to determine which Proposer best serves the interests of the County. The Board of Supervisors is the ultimate decision-making body and makes the final determinations necessary to arrive at a decision to award, or not award, a contract.
3.2 Request for Revised Proposals
a. At any time prior to contract award, the County reserves the right, at its sole discretion, to request the short-listed Proposers to provide a revised Proposal.
b. If a Request for Revised Proposals is issued by the County, any changes to the RFP, including but not limited to changes in scope and selection criteria will be issued in an addendum. Applicable portions of the scores received by Proposers in connection with their previously evaluated Proposal may, in the County's discretion, be factored into the scoring of their revised Proposals, depending on the nature and magnitude of the changes outlined in the addendum.
c. Upon conclusion of the County's evaluation of the revised Proposals, the Evaluation Committee will tally the total score for each Proposal and rank the Proposers.
RFP Number: BRC0000673 Page 14 of 60
3.3 Interview
The County reserves the right to invite up to three (3) of the high ranked Proposers or as appropriate and in the best interest of the County to interview after the evaluation of the Technical Proposal. The following instructions apply to all of the interviews:
3.3.1 The duration of the interview shall be 90 minutes.
3.3.2 The Proposer and its team will have an opportunity to provide a presentation that can last a maximum of 45 minutes to explain its Proposal, including but not limited to its work plan, and to demonstrate how the Proposer and its team will meet and/or exceed the Project expectations.
3.3.3 The County will reserve the last 45 minutes of the interview to ask questions of the Proposer.
3.3.4 Presentations shall be in the following format:
a. Team Organization
i. Key Personnel
ii. Subconsultants and Subcontractors
b. Approach
i. Pre-Construction Services
1. Collaboration with A/E and early integration of team
2. Identification of supplemental investigations
3. Risk mitigation
4. Scheduling
5. Cost control/management
a. Open book pricing
b. GMP
ii. Construction Services
1. Phasing Sequence
2. Site Logistics
3. Schedule
c. Cost control within GMP
3.3.5. Proposers will be expected to provide their own equipment for the presentation, if applicable.
3.3.6 Proposers should have, at minimum, the following Key Team Members participate in the interview, as defined under the RFP Section 4.2.1, Tab 6:
a. Project Executive
b. Project Manager
RFP Number: BRC0000673 Page 15 of 60
c. General Construction Superintendent
d. Preconstruction Manager (if different from Project Manager)/Cost
Manager/Lead Estimator
e. Lead Scheduler
3.3.7 County reserves the right to make changes to the above requirements and request additional information before and during the interview.
3.4 Contract Award
a. If the County determines to award a Contract, it shall be awarded to the responsive and responsible Proposer whose Proposal is determined to have offered the best value, with preference applied to businesses that are certified by the County for various preference programs set forth in Section 5.2.4. The Board of Supervisors reserves the right to reject any or all Proposals or to waive in the public interest technical or inconsequential errors or discrepancies in the Proposals submitted.
b. The Board shall have the right to delay the award of the Contract for 180 calendar days after the submittal of Proposals and/or the submittal of the Revised Proposal, whichever occurs later, unless otherwise agreed to by the County and Proposers. Proposers may withdraw their Proposals 181 calendar days after final Proposals or Revised Proposals are submitted by submitting written notice addressed to Public Works.
c. When the Board of Supervisors has formally awarded the CMAR Agreement, the County will execute the contract and issue the fully executed contract to the CMAR Contractor followed by a Notice to Proceed for Pre-Construction Services.
d. Upon notification from Public Works, the selected Proposer will be required to email within fourteen (14) calendar days of issuance of NTP to the offices of Public Works certificate(s) issued by the insurance carrier(s) and one signed and notarized copy of the CMAR Agreement.
e. The County has not made the determination on whether the proposed Project is categorically exempt from the California Environmental Quality Act
(CEQA).
4. PROPOSAL SUBMISSION REQUIREMENTS
The responses to the SOQ Pass/Fail, Technical Proposal, and Price Proposal must be made according to the requirements set forth in this Section, both for content and for sequence. Noncompliance with these requirements or the inclusion of conditions, limitations, or misrepresentations, may be cause for rejection of the Proposal. Responses shall be addressed and delivered to:
RFP Number: BRC0000673 Page 16 of 60
Los Angeles County Public Works, Cashier's Office 900 South Fremont Avenue, Mezzanine Level Alhambra, California 91803-1331 Contract Analyst: Ms. Erayna Chang Project Name: Construction Manager at Risk Pre-Construction and
Construction Services for the Hall of Records Seismic Retrofit
Submissions must be received by the specified submittal date. Submissions received after the deadline will not be accepted.
4.1 Proposal Format
Proposals in response to the RFP must be submitted in the format as described below:
a. All Proposals must be submitted in minimum 8.5" x 11" format. Proposals may contain up to two pages in 11" x 17" format, but such pages are limited to the proposed schedule and graphic materials.
b. Submit via flash drive, an electronic file of the Proposal in text searchable PDF format. The Proposal will include electronic bookmarks for each tab of the Proposal and for each section within a tab.
c. Also, submit the following documents on the same flash drive but in a separate
PDF file clearly titled as follows:
• Price Proposal
• Financial Statement
• Proposer's and subconsultants' and subcontractors' Contribution and Agent Declaration (00 04 79) forms
4.2 The content of the Proposal must be organized and tabbed as identified in Section
4.2.1 below.
4.2.1 Responses to the Proposal shall be comprised of the sections divided by tabs as described below (clearly labelled tabs are recommended).
Technical Proposals comprise of Tabs 4 through 8.
Tab 1 – Cover Letter Tab 2 – Table of Contents Tab 3 – SOQ Questionnaire – Pass/Fail Tab 4 – Organization Information Form Tab 5 – Proposer's Experience and Performance History References Tab 6 – Team Organization and Personnel Qualifications Tab 7 – Proposed Approach and Schedule Tab 8 – Countywide CWA Compliance and Local and Targeted Worker
RFP Number: BRC0000673 Page 17 of 60
Hiring Program Tab 9 – Price Proposal
Tab 1 - Cover Letter
The cover letter shall provide a brief introduction of the Proposer and include:
• The name and address of the organization submitting the Proposal;
• Whether the proposing firm is a sole proprietorship, partnership, corporation, or joint venture;
• The name, address, telephone number, and e-mail address of the contact person who will be authorized to make representations for the organization;
• A statement affirming the Proposer's sound financial capability. In addition to the statement, attach the following to the Cover Letter:
A. If Proposer is a Corporation or Limited Liability Company:
The Proposer shall submit the following documentation with the Proposal:
1. A copy of a "Certificate of Good Standing" with the state of incorporation/organization.
2. A conformed copy of the most recent "Statement of Information" as filed with the California Secretary of State listing corporate officers or members and managers.
B. If Proposer is a Limited Partnership:
The Proposer shall submit a conforming copy of the Certificate of Limited Partnership or Application for Registration of Foreign Limited Partnership as filed with the California Secretary of State, and any amendments.
Tab 2 - Table of Contents
Table of Contents shall include an outline of the Proposal, identified by sequential page number and tab titles as described in this Section.
Tab 3 - SOQ Questionnaire – Pass/Fail
Complete all requested information in SOQ Questionnaire - Pass/Fail and provide all documents requested in the Questionnaire, including signing and dating all of the required forms and certifications.
The SOQ Questionnaire - Pass/Fail is comprised as described below. Only those Proposals which are deemed responsive to the SOQ Questionnaire - Pass/Fail will be forwarded to Evaluation Committee for evaluation and review of the Technical Proposal.
RFP Number: BRC0000673 Page 18 of 60
A. Section 1: Addresses the essential requirements for qualifications necessary to meet the minimum baseline qualifications for CMAR work as set forth by the County.
B. Section 2a: Proposer must include signed copies of all County required certifications necessary to provide services to the County. Proposer shall complete and submit the following certifications and forms with its Proposal.
Except for the Contractor Employee Jury Service Program (Section 00 04 85) and Contribution and Agent Declaration (Section 00 04 79), these forms are required only from the Proposer. The Contractor Employee Jury Service Program (Section 00 04 85) and Contribution and Agent Declaration (Section 00 04 79) must be completed and signed by the Proposer and its subconsultants and subcontractors:
1. Certification to Comply with Countywide Community Workforce
Agreement (CWA) (Section 00 03 14)
2. Subcontractor Listing and Subcontracting (Section 00 04 30)
3. Request for County Program Preference Consideration (Section 00 04 38)
4. Subconsultant Certification Form (Section 00 04 38A)
5. Non-collusion Affidavit (Section 00 04 50)
6. Greater Avenues for Independence/General Relief Opportunity for Work (GAIN/GROW) Participation Affidavit (Section 00 04 60)
7. 3-Year Contracting History (Section 00 04 65)
8. False Claims (Section 00 04 70)
9. Civil Litigation History (Section 00 04 71)
10. Criminal Convictions (Section 00 04 72)
11. Debarments (Section 00 04 73)
12. Labor Law/Payroll Violations (Section 00 04 74)
13. Integrated Pest Management Program Compliance Certification (Section 00 04 75)
14. Charitable Contributions Certification (Section 00 04 76)
15. Prospective Contractor List of Terminated Contracts (Section 00 04 77)
16. Contribution and Agent Declaration (Section 00 04 79)
Also submit Proposer's and subconsultants' and subcontractors' 00 04 79 forms as a separate, standalone PDF file
17. Contractor Employee Jury Service Program (Section 00 04 85)
18. Certification of Compliance-Contact with County Personnel and Compliance with Code of Silence Period (Section 00 04 87)
19. Proposer's Industrial Safety Record (Section 00 04 90)
20. Injury & Illness Prevention Plan & Code of Safe Practices Affidavit (Section 00 04 91)
RFP Number: BRC0000673 Page 19 of 60
21. Proposer's Organization Questionnaire/Affidavit (Section 00 04 92)
22. Defaulted Property Tax Reduction Program (Section 00 04 93)
23. Avoidance of Conflict of Interest Certificate (Section 00 04 94)
24. Familiarity with the County Lobbyist Ordinance Certification (Section 00 04 95)
25. Proposer's EEO Certification Form (Section 00 04 96)
26. Compliance with Fair Chance Employment Hiring Practices Certification (Section 00 04 97)
27. Zero Tolerance Human Trafficking Policy Certification (Section 00 04 98)
28. Disallowed Cost Attestation (Section 00 04 99)
Section 2b: Proposer shall affirm that it has reviewed the following County forms and agrees to complete, sign, and attach all forms listed below as part of the GMP Proposal at the time of GMP Proposal submission:
1. Best Management Practices Requirements (Section 00 03 10)
2. Construction and Demolition Debris Recycling Requirements (00 03 11)
3. Builder's Risk Course Construction Insurance Requirements (00 03 12)
4. Local and Targeted Worker Hire Program-Mandatory Jobs Coordinator
(Section 00 03 13)
5. Cost Impact of Countywide Community Workforce Agreement (Section
00 03 15)
6. An updated Subcontractor Listing and Subcontracting (Section 00 04 30)
7. Community Business Enterprise (CBE) Participation Form (Section 00
04 35)
8. Equals (Section 00 04 40)
C. Section 3 - Certification to Comply with Countywide Community Workforce
Agreement - Proposer must certify the CMAR Contractor and all of its subcontractors agree to be become a party to and accept the terms of the Countywide Community Workforce Agreement. Proposer will be immediately disqualified as nonresponsive if this Section is not completed and signed.
D. Section 4 - Acceptance of Terms and Conditions - Proposer shall include a statement affirming the Proposer's acknowledgement and acceptance of, and a willingness to comply with all of the terms, conditions, and criteria contained in this RFP, including Indemnification and Insurance requirements, and any attachments and exhibits herein. Any and all parts of the submitted Proposal may become a part of any subsequent Contract between the selected Proposer and the County.
E. Section 5 – Community Business Enterprise (CBE) Good Faith Effort
Documentation – Submit documentation of Proposer's good faith efforts to meet the CBE participation goal specified in Section 6.31 of this RFP.
RFP Number: BRC0000673 Page 20 of 60
F. Section 6 - Oath of Truthfulness - Proposer must declare under penalty of perjury under the laws of the State of California that the information provided in the entire Proposal including the SOQ Questionnaire – Pass/Fail submittal is correct.
Tab 4 - Organization Information Form
This Section is a form to be completed by the Proposer covering History, Organizational Performance, Compliance with Civil and Criminal Laws, and Occupational Safety and Health Laws and Other Labor Legislation Safety.
Certain questions in this Section are only intended to obtain information from the Proposer and will be reviewed accordingly. Certain questions will be scored according to the point scale following each question as noted in the Informational Form.
Tab 5 – Proposer's Experience and Performance History References
A. This Section provides the Proposer the opportunity to demonstrate its experience and expertise in the construction of projects of similar delivery method, size, scope, type, and complexity.
To be considered a project of similar delivery method, size, scope, type, and complexity, the project must have as many as possible if not all of the following characteristics:
1. Project is currently in construction or completed within the last fifteen (15) years
2. Project of a similar budget (minimum $30 million in construction cost) that included preferably all, and if not, some of the following:
a. Projects that utilized a CMAR, or an integrated delivery method that require close strong coordination and integration of the design and construction professionals and early involvement of the construction professionals during design.
b. Projects are seismic retrofit projects.
c. Projects are high rises.
d. Major seismic strengthening project.
e. Major construction at metropolitan urban congested site.
f. Renovation project of a high-rise structure that required significant level of move management for major renovation to minimize interruption of the staffing and operations of the facility, including large public assembly areas during construction.
RFP Number: BRC0000673 Page 21 of 60
g. Project that required input from multiple, diverse stakeholders as well as creativity in the inclusion of the input received from stakeholders into the design.
h. Project that included creative solutions to complex phasing of occupied buildings and public spaces.
The Proposer shall submit a total of three projects, which best represent its overall success in delivery of projects of similar delivery method, size, scope, type, and complexity. The projects should also be selected to highlight the Proposer's ability to deliver CMAR projects, coordinate between the general contractor and the design professionals in a team atmosphere, and show an ability and expertise in coordination of sub-trade contractors. This paragraph applies to whether a Proposer is submitting as a single entity or as a Joint Venture.
For each project submitted provide:
a) The project name, location/address, owner name, original contract amount*, final contract amount*, and completion date (if not yet complete, indicate status) and a narrative describing how the project is similar in scope and complexity to this Project (as outlined a-h above).
*The original contract amount may be escalated to current value utilizing annual rates of escalation of three percent. These rates of escalation shall be applied to the contract value from the date of contract award. If these amounts are price-escalated to current value, Proposer shall show escalation computations.
b) Owner reference information including name, title, organization, and contact information for the project owner's representative.
c) A narrative describing the project delivery method and the role of the Proposer in the delivery of the project include key personnel involved in the project.
d) A narrative describing how the Proposer's experience and lessons learned from the project will contribute to the successful delivery of this Project with budget and schedule certainty.
B. Reference:
For each project presented pursuant to Tab 5, Paragraph A above, the
Proposer shall obtain a reference on the applicable forms provided. Any reference received for projects not listed in Tab 5 Item A will not be scored. Information on the reference form will not be used to evaluate
Item A, a through d, above.
References for County of Los Angeles projects shall be submitted using
Exhibit J. County reference forms must be completed in full, signed by
RFP Number: BRC0000673 Page 22 of 60
County personnel representing the reference and must be included in this section of the proposal.
References for Non-County of Los Angeles projects shall be submitted using
Exhibit K. For Non-County references, the reference must also complete the
EVALUATION CHECKLIST – CARD, page 2 of Exhibit K. These
Performance History Reference forms must be completed in full, signed by personnel representing the reference who is currently employed by the organization/firm, and included in this section of the proposal.
The County reserves the right to make the final determination on which personnel will complete a reference submitted for a County project.
Questions not answered and left blank shall receive zero points.
Unsigned and incomplete Performance History Reference forms in Proposals will not be scored. Public Works may contact references for any reason during the solicitation process; however Public Works will not contact these references to conduct the survey.
Late Performance History Reference forms will not be scored.
All completed Performance History Forms and EVALUATION CHECKLIST – CARD for Non-County of Los Angeles projects belong in "Tab 5B. Reference" of the Technical Proposal with the same proposal deadline.
Tab 6 - Team Organization and Personnel Qualifications
It is the intention of this Project that the CMAR team will include a general contractor in a lead role and will also include the necessary mechanical, electrical, and plumbing (MEP) subcontractors, concrete subcontractor, concrete testing subcontractor, fiber reinforced polymer (FRP) subcontractor, steel subcontractor, welding subcontractor, masonry/stone subcontractors, and roofing subcontractor.
A. Organizational chart:
1. Provide an organizational chart of Proposer's team member-firms, including the necessary mechanical, electrical, and plumbing (MEP) subcontractors, concrete subcontractor, concrete testing subcontractor, fiber reinforced polymer (FRP) subcontractor, steel subcontractor, welding subcontractor, masonry/stone subcontractors, and roofing subcontractor.
Provide key personnel from each firm.
2. Provide any other subconsultant/subcontractor that will be on Proposer's team during Pre-Construction Phase. Provide key personnel from each firm.
RFP Number: BRC0000673 Page 23 of 60