Construction Management Services - City of Pomona Sustainable Multimodal Improvement Project (SMIP) - Transit Improvement Project.pdf

PDF 153 KB Posted

Attached to
Ongoing Pipeline Replacement
Solicitation number
26-21
Issued by
Los Angeles County, California

About this file

This is a Request for Proposal (RFP) document issued by the San Gabriel Valley Council of Governments (SGVCOG) on behalf of the City of Pomona for construction management services related to the Sustainable Multimodal Improvement Project (SMIP) Phase 1 Transit Improvement Program, specifically the Metro Gold Line First/Last Mile Improvements Project located in Los Angeles County, California. The RFP seeks a qualified proposer to manage construction activities for improvements that may include pedestrian crossing enhancements, ADA accessibility improvements, bulb-outs and curb extensions, signal modifications, bicycle crossing improvements, lighting enhancements, and signing and striping improvements. Proposals must be submitted electronically through the PlanetBids Vendor Portal by August 19, 2026, at 5:00 PM (PDT). An online question and answer period is available, with a deadline of August 5, 2026, at 5:00 PM (PDT). No pre-bid meeting is scheduled. The contract will be awarded on a lump sum basis to the best qualified proposer.

The RFP requires proposers to submit a Level of Effort (LOE) and a cost proposal as part of their response. No bid bond, payment bond, or performance bond requirements are specified at the percentages listed (all at 0.00%). The estimated bid value, project duration, start date, and other financial details are not disclosed in the available documentation. Proposers should direct inquiries and submit bids to Yovanni Viramontes at SGVCOG's Contracts & Procurement Department located at 1333 Mayflower Avenue, Suite 360, Monrovia, California 91016, or contact him at 626-373-2486 or yviramontes@sgvcog.org. Detailed scope of services are referenced in Appendices B and C of the full RFP document.

View the file

Other files

File Type Posted
Ongoing Pipeline Replacement.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

San Gabriel Valley Council of Governments

Opportunity Detail

Bid Bond

Pre-Bid Meeting Information

Online Q&A

Contact Information

CONSTRUCTION MANAGEMENT SERVICES FOR THE CITY OF POMONA SUSTAI

Title CONSTRUCTION MANAGEMENT SERVICES FOR THE CITY OF POMONA SUSTAINABLE MULTIMODAL IMPROVEMENT

PROJECT (SMIP)- TRANSIT IMPROVEMENT PROJECT

Invitation # 26-21 Posting Date 07/22/2026 6:19 PM (PDT)

Project Stage Bidding Bid Due Date 08/19/2026 5:00 PM (PDT)

Response Format Electronic

Type RFP (Request for Proposal) Response Types Response File

Level of Effort (LOE) (required) Cost Proposal (required)

Type of Award Lump Sum Categories 237310 - Highway, Street, and Bridge Construction

237990 - Other Heavy and Civil Engineering Construction 541330 - Engineering Services 541611 - Administrative Management and General Management Consulting Services

541990 - All Other Professional, Scientific, and Technical Services

Department Contracts & Procurement Address 1333 Mayflower Ave.

Suite 360 Monrovia, California 91016

County Los Angeles

Bid Valid Liquidated Damages Estimated Bid Value Start/Delivery Date

Project Duration

Bid Bond 0.00% Payment Bond 0.00%

Performance Bond 0.00%

Pre-Bid Meeting No

Online Q&A Yes Q&A Deadline 08/05/2026 5:00 PM (PDT)

Contact Info Yovanni Viramontes 626-373-2486 yviramontes@sgvcog.org

Bids to Yovanni Viramontes Owner's Agent

8/2/26, 4:35 PM PlanetBids Vendor Portal https://vendors.planetbids.com/portal/15588/bo/bo-detail/144296#bidInformation 1/2

Description

Search & Bid on Thousands of Contracts

Scope of Services This RFP is intended to procure professional services for the management of construction activities (CM) for the City of Pomona SMIP Phase 1 Project – Transit Improvement Program – Metro Gold Line First/Last Mile Improvements Project. It is SGVCOG’s intent to select the best qualified Proposer and award the CM contract under this RFP. See Appendix B & C for detailed scope of services.

Other Details Improvements may include:

• Pedestrian crossing enhancements

• ADA accessibility Improvements

• Bulb-outs and curb extensions

• Signal Modifications

• Bicycle crossing improvements

• Lighting enhancements

• Signing and Striping improvements; and Other safety-related improvements

Notes Special Notices

Local Programs & Policies www.vendorline.com

8/2/26, 4:35 PM PlanetBids Vendor Portal https://vendors.planetbids.com/portal/15588/bo/bo-detail/144296#bidInformation 2/2 https://vendor.planetbids.com/

File details come from the government source that posted it. Updated .