Construction Management RFP (1).pdf
PDF 291 KB Posted
- Attached to
- Construction Project Management Services
- Solicitation number
- 26-001
- Issued by
- Clackamas County, Garibaldi City, Oregon
About this file
This is a Request for Proposal (RFP) issued by Gladstone School District #115 in Oregon for Construction Project Management Services. The District seeks qualified construction project management firms to provide comprehensive project management services for capital construction projects following the passage of a $55.3 million bond in November 2026, supplemented by $10.2 million in matching State of Oregon funds. The scope includes managing projects addressing failing school buildings and facility preservation (roof repairs, plumbing updates, HVAC upgrades, electrical system updates, siding upgrades, windows, boilers, and playground/athletic facility improvements) and safe, secure, accessible schools initiatives (fire alarm systems, secure entryways, emergency alert systems, security cameras, lockdown systems, access controls, and asbestos/mold abatement). Services required encompass pre-design and construction services, design phase management, bid and award administration, construction phase activities, and reporting services. A mandatory pre-proposal meeting is scheduled for December 9, 2026 at 12:00 p.m. PST at the District Office in Gladstone, Oregon. Sealed proposals are due by 2:00 p.m. PST on December 23, 2026. The anticipated timeline includes initial proposal evaluation from December 23, 2026 through January 6, 2027, possible interviews on January 13, 2027, notice of intent to award on January 13, 2027, deadline for filing protests on January 20, 2027, and expected Board approval on February 10, 2027. The contract term is not explicitly specified but encompasses all phases from pre-bond planning through design, construction, and project closeout.
Proposals shall include five copies (one designated original) plus one flash drive with electronic copy, limited to 25 pages with 11-point font and single-line spacing, excluding cover letters, tables of contents, resumes, and appendices. Proposers must submit a rate schedule for all personnel potentially assigned to projects, which will serve as the basis for fee negotiations. The selection committee will evaluate proposals based on firm experience (30 points), project manager experience (30 points), approach to program management (30 points), fee structure (10 points), and interviews if conducted (up to 50 points). Mandatory qualifications include successful experience managing K-12 construction projects on occupied campuses within the last five years, understanding of local ordinances and statutes for Oregon public projects with at least five years of demonstrated experience, and successful experience with Progressive Design Build, CM/GC, and Design Bid Build delivery methods. The District anticipates the selected firm will provide personnel in-district a minimum of one day per week during the construction phase and will maintain professional liability insurance. No set-asides are indicated. The District reserves the right to reject any proposal not in compliance with prescribed public procedures and to cancel the contract upon written notice if the provider fails to meet District needs. Contact for inquiries is Leif Palmer, Facilities Manager, at 503.650.2579 or palmerl@gladstone.k12.or.us.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GLADSTONE SCHOOL DISTRICT #115
REQUEST FOR PROPOSAL FOR CONSTRUCTION PROJECT
MANAGEMENT SERVICES
Date Due: December 23, 2026 Time Due: 2:00PM P.S.T.
LABELING INFORMATION and DELIVERY LOCATION:
Construction Project Management Services Proposal Single Point of Contact: Leif Palmer, Facilities Manager
Gladstone School District #115 17789 Webster Rd
Gladstone, OR 97027
RFP-26-001
CONSTRUCTION PROJECT MANAGEMENT SERVICES
REQUEST FOR PROPOSALS
Construction Project Management Services
The Gladstone School District is seeking proposals from qualified construction project management firms interested in providing project management services to assist staff in implementing upcoming capital construction projects. In November in 2026, Gladstone School District passed a $55.3 Million Dollar Bond and is set to receive an additional $10.2 Million in matching funds from the State of Oregon. To maximize project delivery efficiency and value, the program looks to utilize Progressive Design Build, CM/GC, or Design Bid Build managed projects. As well as the use of Cooperative Procurement Agreements and ETO Incentives when applicable. The selected project management firm will represent and promote the District's interests throughout all phases of the work, developing and maintaining a cooperative team approach with the community, central management staff, and all other parties involved in the construction process.
Anticipated Timeline/Deadlines (subject to change).
Activity Date
Issuance of Request for Proposal Nov 23, 2026
Pre-Proposal Meeting (Mandatory) 12:00pm Dec 9, 2026
Questions Due Date 3:00pm Dec 11, 2026
Deadline for Addenda Dec 16, 2026
Deadline for Submission of Proposal 2:00pm Dec 23, 2026
Initial Evaluation of Proposals December 23, 2026 - January 6, 2027
Notification of Possible Interviews January 6, 2027
Interviews (If Required) 9:30am - 2:00pm Jan 13, 2027
Notice of Intent to Award Jan 13, 2027
Deadline for Filing Protest of Award Jan 20, 2027
Expected Board Approval Feb 10, 2027
Scope of Projects:
Fix Failing School Buildings & Preserve Facilities:
● New or repaired roofs
● Plumbing updates
● HVAC system upgrades and controls
● Electrical system updates
● Siding upgrades
● New windows
● New boilers
● Updates to playgrounds and athletic facilities including turf fields, track repairs and lighting
Safe, Secure, Accessible Schools:
● New fire alarm systems
● Secure entryways
● Emergency alert systems
● New/upgraded security cameras
● New security alarms and lockdown systems
● Updated building access controls and door hardware
● Asbestos and mold abatement
The District will want the Project Manager to provide recommendations on the appropriate project timeline that encompasses design, bidding, construction, and closeout. A copy of the Gladstone School District Long Range Facilities Plan and Facility Assessment is available upon request from the District.
Services required:
● Pre-Design and Construction Services including budget and schedule development, development of management plans, cost estimates of renovations, repairs and maintenance when requested and program management implementation.
● Design Phase Services including architect and consultant selection, facilitate and manage the design phase including independent cost estimates at the end of each design phase.
● Bid and Award Phase administration.
● Construction Phase Activities including conducting construction meetings, on-site observations, interface with contractors, analyze change orders, quality control assurances, assist in monitoring budget to actual costs and project close-out documentation.
● Reporting services, such as reporting to the Superintendent, School Board, and Bond Oversight Committee.
Experience needed for successful management:
● Successful experience managing design, construction and closeout of K-12 facilities in the last 5 years.
● The Project Manager designated for the project must have successful experience in managing K-12 construction projects on occupied campuses.
● At least five years of demonstrated experience and understanding of local ordinances and statues for public projects in the state of Oregon.
● Successful Experience with Progressive Design Build, CM/GC, and Design Bid Build managed projects.
● Proven experience collaborating with the Energy Trust of Oregon to maximize incentive rebates.
Request for proposal, questions, and/or clarifications are to be directed to:
Leif Palmer Facilities Manager
Gladstone School District 17789 Webster Rd
Gladstone, OR 97027 503.650.2579 palmerl@gladstone.k12.or.us Sealed proposals shall be received by 2:00pm PST on 12/23/26 mailto:palmerl@gladstone.k12.or.us
ANNOUNCEMENT OF REQUEST FOR PROPOSALS
The Gladstone School District is requesting Proposals to select an Owners Project Manager to provide Program, Project, and Construction Management Services for renovations and upgrades at all District locations.
Sealed Proposal Responses must be received at the Gladstone School District Office located at: 17789 Webster Rd, Gladstone, OR 97027 by 2:00pm PST on December 23, 2026.
A mandatory Pre-Proposal meeting will begin at the District Office at 12:00pm PST, December 9, 2026
The District reserves the right to reject any proposal response not in compliance with all prescribed public procedures and requirements and to waive informalities in this proposal response process.
The Request for Proposals (RFP) may be obtained from Oregonbuys.gov
Inquiries and questions can also be submitted by contacting Leif Palmer, Facilities Manager, Gladstone School District at palmerl@gladstone.k12.or.us
Leif Palmer Facilities Manager
Gladstone School District #115 Published: Oregon Buys
Daily Journal of Commerce http://oregonbuys.gov
1. Proposal Format
1.1. Contact Person: All contact and questions regarding this Request for
Proposal should be directed to Leif Palmer, hereafter referred to as “Facilities Manager”, by phone: 503.650.2579, Address: 17789 Webster Rd Gladstone, OR 97027or by email at palmerl@gladstone.k12.or.us
1.2. Mandatory Pre-Proposal Meeting: All interested parties must attend a mandatory Pre-Proposal Meeting Project Orientation beginning at the District Office located at: 17789 Webster Rd, Gladstone, OR 97027 at 12:00pm, December 9th, 2026. Only those respondents who have attended the meeting RFP responses will be evaluated; others will be returned unopened. Subrogation of attendance is not allowed to firms who did not attend.
1.3. Addenda: If needed, written clarifications to this RFP will be made in writing and sent to all proposers in the form of an addendum. An addendum will be e-mailed to all known proposers of record as recorded in the Superintendent’s office. Only those representations made via written addenda shall be binding upon the District.
1.4. Proposal Due Date: The Gladstone School District #115 (“District”) will receive sealed proposals at the District Office, 17789 Webster Rd Gladstone, OR 97027 until 2:00 P.M., P.S.T., December 23th, 2026 for Construction Project Management Services as described in the accompanying documents. All proposals must be received at the District Office no later than the date and time specified on the request for proposals. The District will not be responsible for proposals delivered by Proposer, Postal Department, or any other means to any location other than the District Office.
1.5. Submission: All proposals shall be sealed and addressed as follows:
Construction Project Management Services Proposal
Attention: Leif Palmer Gladstone School District #115
17789 Webster Rd Gladstone, OR 97027 mailto:palmerl@gladstone.k12.or.us
In addition, the name and address of the proposer must appear on the outside of said envelope.
The proposal sheet of these specifications shall be signed with ink as follows:
(1) In the case of an individual proposer, by such individual proposer.
(2) In the case of a partnership, the name of the partnership must appear on such proposal and it shall be signed in the name of such partnership by at least one partner. In addition to such signature, the names of all partners shall be stated in the proposal.
(3) In the case of a corporation, the corporate name shall be subscribed by the president or other managing officer, and there shall be set forth under the signature of such officer the name of the office he or she holds or the capacity in which he acts for such corporation.
1.6. Quantity: Proposers shall provide seven (5) copies of their proposal and all attachments. One must be designated “original” and contain all required signatures.
One flash drive with electronic copy must also be included.
1.7. Page Limitations: Proposals shall be limited to 25 pages with 11 point font, single line spacing. Page count doesn’t include cover letter, table of contents, page dividers, resumes, and appendixes.
1.8. Withdrawal of Proposal: Proposers are to submit proposals that are accurate, complete and contain all terms and conditions that they feel are necessary. If after submitting a proposal, the proposer finds changes are necessary, the proposer may change or withdraw their proposal any time up to the time of the proposal opening.
However, after the opening, the proposal may not be changed or altered in any way. If accepted, a proposal is considered non-cancelable and the proposer will be expected to honor a binding contract. If for any reason the proposer does not perform, the District can be expected to take whatever action it believes appropriate, including but not limited to, the removal of that proposer’s name from future bid lists.
No proposer may withdraw his proposal after the hour set for the opening thereof or before award of the Contract, unless said award is delayed for a period exceeding ninety (90) days.
An award of the contract to any proposer shall not constitute a rejection of any other proposal.
1.9. Prohibition of Alterations: Proposals that are incomplete or conditioned, or that contain any erasures, alterations, or that contain irregularities of any kind, or that are not in conformity with the law may be rejected.
1.10. Incurred Costs: The District is not liable for any costs incurred by providers in the preparation and presentation of their proposals. Proposals should be prepared simply and economically, providing a straightforward, concise description of provider capabilities to satisfy the requirements of the proposal.
Special bindings, colored displays, promotional materials, etc., are not desired.
Emphasis should be on completeness and clarity of content.
The District is not responsible for any costs of any proposers incurred while submitting Proposal, and all proposers who respond to solicitations do so solely at their own expense.
1.11. Equal Employment Compliance Requirements: By submitting this proposal, the proposer certifies conformance to the applicable Federal Acts, Executive Orders and Oregon Statutes and Regulations concerning Affirmative Action toward equal employment opportunities. All information and reports that are required by the Federal or Oregon Governments having responsibilities for the enforcement of such laws shall be supplied to the District upon request, for purposes of investigation to ascertain compliance with such acts, regulations and orders. The Gladstone School District #115 is an equal opportunity employer.
Women and minority businesses are encouraged to apply for this contract.
1.12. Transfer or Assignment: Neither this contract nor any interest therein shall be transferred to any other party or parties, and in case of such transfer, the District may refuse to carry out this contract, either with the transferor or the transferee. All rights of action for any breach of this contract by a successful proposer are reserved to the District. No officer of said District, nor any person employed in its service, is, or shall be, permitted any share or part of this contract or any benefit which may arise here from. The successful proposer further agrees to make payment promptly as due, to all persons supplying labor or material for the implementation of the work provided for herein. The successful proposer shall not permit any lien or claims to be filed or prosecuted against the District for or on account of any labor or material furnished aforesaid.
1.13 Protest of Specifications: Any protest of a specification herein contained must be in writing and must indicate in detail the reason(s) for the protest and a suggested change in wording or specifications that would remedy the cause for protest. All protests must be received at the District Office of the Gladstone School District (same name and address as the proposals) by 3:00pm December 11th, 2026. All complaints received prior to said time will be reviewed and acknowledged.
Those complaints deemed by the Superintendent to have merit will be given consideration and, where applicable, a change in specifications or a delay in the opening may be granted by the submission of an Addendum, issued by the district, to those of record holding specifications.
Those complaints not deemed by the Superintendent worthy of changing said specifications or delaying said opening will be given consideration, and the individual or company will be notified as to the reason. Said complainant may then wish to appeal to the School District Board of Directors, as Public Contracting Review Board to review the complaint and make a final decision.
Written appeals to the Public Contracting Review Board must be received within 9 calendar days of the advertisement.
Should vendors feel that any specification limits competition, they are encouraged to follow through with their “Protest of Specifications” as outlined.
1.14. Disclosure of Intent: No employee or elected official of the District may own more than 5% of a business that is submitting a proposal on any awards with the District unless it is fully disclosed in the proposal documents.
1.15. Contract Provisions: The contract must provide that the district, and its duly authorized representatives shall have access to the Contractor’s books, documents, papers and records directly pertinent to the contract for the purpose of making audit, examination, excerpts and transcripts. The contract must also include a provision indicating that subcontracts for any of the work scheduled under the contract may not be entered into without prior written approval from the District.
2. Proposal Requirements: The submitter proposal shall include a readily identifiable response to each of the following:
2.1. Cover Letter: Include cover letter, signed by a duly authorized agent of the company/individual, expressing the firm’s or individual’s overview, office location, service area, number of staff, and interest and understanding of the program.
2.2. Firm Information:
2.2.1. Describe your firm’s relevant experience as a construction project manager on K-12 educational projects or other public projects within the region. Provide a reference contact person and phone number for every school project (over $10,000,000) the firm has completed in the last five years.
2.2.2. Describe the coverage level and provider of your professional liability insurance.
2.3. Project Manager:
2.3.1. Identify the specific personnel, to whom responsibility for the
District’s project will be assigned, including individual name(s), title(s), role(s), and relevant experience. Identify the lead project manager and provide three reference contact persons and phone numbers. Discuss other simultaneous project assignments these staff are involved with, their duration and commitment requirements as a percentage of time of the named staff. Including resumes in the appendix, will not be included in RFP page count.
2.3.2. If proposing more than one person for the program, provide an organizational chart of project team hierarchy and briefly describe each person(s) role in the program and their commitment as a percentage of their time to the District’s program. Including resumes in the appendix, will not be included in RFP page count.
2.4. Program Approach:
2.4.1. Describe your firm’s philosophy of service as the District’s representative.
2.4.2. Describe your firm’s approach to effective project communications, collaborative team management, and the project manager’s role as the District’s representative to coordinate services of the architect and work of the contractor towards accomplishment of project goals of the District.
2.4.3. Describe your firm’s approach/methodology to effectively manage the District’s expectations and the program’s budget, schedule and quality of work.
2.4.4. Describe what special services, systems or qualifications your firm has that would benefit the District in carrying out this program.
2.4.5. Provide a proposed schedule detailing aspects of the project and when they will be completed, including possible summer work.
Additionally, please include a sample advertisement, scoring, and selection of design professionals, surveyor, geotechnical, etc.
(Schedule and advertisement to be added in appendix and not included in RFP page count.)
2.4.6. Describe your firm’s process for managing and reporting the project budget. Include with your proposal a sample project budget report.
(Sample budget to be added in appendix and not included in RFP page count.)
2.5. Fee Structure: Provide rate schedule for personnel who may be assigned tasks and ultimately billed to these projects. Include position description and billing rates of all personnel identified in proposal. The unit rates provided shall be the basis for fee negotiations with the successful firm.
3. Selection Process:
3.1. Selection Committee:
3.1.1. The proposals shall be subjectively evaluated by the Committee with points assigned based upon desirable features. Those proposals submitted that do not meet mandatory requirements outlined in Instruction to Bidders and Specifications will not be rated.
The Selection Committee may consist of:
Superintendent
Director of Finance Facilities Manager
Other persons as deemed necessary by the Superintendent
The role of the Evaluation Committee shall include a complete review of all documents submitted and may include conferring with selected clients of the proposing firm(s). It may also involve meeting with those firms selected to review their proposals. The District will make the final decision on hiring a construction project management firm or firms.
Selection Committee members may not be contacted or solicited by any firm or individual submitting proposals during the proposal solicitation and review process. Violations of this requirement may result in disbarment from the selection process.
3.1.2. Criteria: All proposals from qualified firms that provide all the minimum required qualifications will be evaluated on the following criteria.
A: Firm: Demonstrated recent successful experience in K-12 school construction project or other similar public project management by the proposing firm. (30 points)
B: Project Manager: Demonstrated recent successful experience in construction project management by the proposed lead project manager. (30 points)
C: Approach to Program: Knowledge and understanding of the required services as shown through the Proposal. Ability to effectively manage budgets, schedules and quality on behalf of the District. Ability to represent District’s interests in all phases of pre- and post-bond services. (30 points)
D: Fee structure: (10 points)
E: Interviews: The District, through the Selection Committee, if they deem necessary may at their sole discretion invite one or more proposers to present their proposal, in person, to the committee. Interviews will be scored on thoroughness of preparation and fit with district needs.
(50 points)
3.1.3. Contract and Insurance Coverage: Within ten (10) business days after receipt of notice of proposal award, the proposer to whom the contract is awarded, shall draft and submit a written contract for District review and approval. Consultant shall make any and all changes mutually agreed to by the District and consultant. Upon mutual consent to the agreement, consultant shall furnish a certificate of insurance acceptable to the District.
3.1.4. Protest of the Award: Protest of the award of the project to any particular contractor shall be presented to the Superintendent in writing within seven (7) calendar days of the notice of intent to award of the contract.
Such protests shall explicitly state the reason for the protest and explain how the protesting party has been prejudiced. No protest against the award of the contract shall be considered after the deadline established for submitting such protest. The time for submitting such protests shall commence to run upon contractor’s receipt of notice from the District as to the award of the contract.
Unless earlier receipt is established, receipt of notice of award of the contract shall be deemed to have occurred no later than three
(3) days following the mailing of written notice to contractor addressed to contractor’s address as stated in contractor’s proposal. Upon receipt of any such complaint, the Superintendent shall consider same and may hold in abeyance the completion of final contract documents until consideration of the protest and issuance of any determination on the protest, which may include, a denial thereof, a re-opening of the proposal process, or any other appropriate remedy as the circumstances may suggest.
3.1.5. Reservations: The Gladstone School District #115 herein expressly reserves the following rights.
A: To negotiate separately with any source whatsoever in any manner necessary to serve the best interest of the District. The district does not intend to award a contract solely on the basis of any response made to this request for proposals or in any way to pay for information solicited or obtained. The information obtained will be used in determining what seems to best serve the interest of the District.
B: To make or conduct any investigation or inquiry deemed appropriate to confirm or deny representations made in the proposals.
C: To reject any or all proposals as permitted by Oregon Statute or Administrative Rule and to waive informalities in proposals.
D: To consider the competency and responsibility of proposers and of their proposed subcontractors in making the award.
E: In the event any proposer or proposers to whom the contract is awarded shall default in executing said formal contract or in furnishing satisfactory insurance coverage within the time and in the manner hereinafter specified, the district may award the contract to another proposer or proposers.
F: In the event only one proposal is received, the District may, at its election, return the proposal unopened.
G: To make the award based on its best judgment as to which proposal best meets the District’s expectations of a program of the highest quality and innovation.
H: To make such changes or corrections in plans, specifications, or quantities, as it may deem necessary or desirable prior to the proposal opening. Proposers will be notified of such changes in writing by addenda mailed to the address on file in the Superintendent’s Office.
J: To cancel the contract upon written notice at any time the District, in its sole judgment, determines that the provider is not meeting the needs of the District.
3.1.6. Disclosure: Proposals will be considered confidential materials and will not be made a part of the public record until after the evaluation process is completed. Said files including the evaluation report will then be available for public review.
3.1.7. General: The contracted project manager would work under the direction of the Superintendent and/or their designee and report to the Superintendent, School Board and Bond Oversite Committee.
The contracted project manager would be involved in all phases of the project work from pre-bond Planning through design, construction and project closeout. In addition, the construction project management firm will provide technical, clerical and managerial staff assistance to the Superintendent for the specific tasks described hereunder for each assigned project in the capital construction program.
4. General Services:
4.1. Act as owner’s representative during all phases of project on behalf of the
District;
4.2. Generate and distribute throughout all phases management information reports detailing project progress, schedule and monthly project budget status updates;
4.3. Report on a regular basis (minimum monthly) and/or as otherwise requested by Superintendent, to the Board of Directors and Bond Steering Committee
4.4. Attend public meetings as a representative of the District;
4.5. Establish, under the direction of the Superintendent, an in-district capital construction office, including maintenance of related records, documentation, design data, drawings, correspondence, etc., pertaining to the program;
4.6. Serve as the District’s representative in all matters with regulative authorities including but not limited to: Bureau of Labor and Industries, local/county building authorities, Division of State Lands, State/Local Fire Marshal, Building Inspector(s) and OR-OSHA;
4.7. Provide regular presentations/tours to interested parties as requested by the Superintendent.
5. Design Phase Activities:
5.1. Assist Architect/Engineer with development of General/Supplemental
Specifications (Divisions 0 & 1).
5.2. Prepare and implement procedures for administration of the design and construction contracts by both the Architect/Engineer and District (project specifications manual including accounting and reporting requirements).
5.3. Establish and implement cost monitoring, saving and control procedures.
Review and provide recommendations and approval on all payment applications associated with the bond program.
5.4. Monitor design progress for conformance to the master schedule milestones, and update the master schedule as required.
5.5. Review all design documents and construction documents for compliance with District objectives and design standards. Provide written commentary and resolve all inconsistency based on District design standards and objectives.
5.6. Review of estimates prepared by independent consultants for compliance with budget parameters. In the event of any apparent cost overrun, immediately notify the district of the circumstances and develop corrective action to be taken.
5.7. Coordinate periodic design review meetings, ensuring appropriate user and/or public participation.
5.8. Verify proper coordination of separate construction contracts, if any, and incorporation of District-furnished materials, equipment and furniture into general contracts.
5.9. Coordinate review of project constructability based on completed construction documents. Coordinate specifications for owner-furnished materials that are complete and ready for competitive bid, in compliance with State of Oregon Purchasing Policies and District Purchasing Procedures.
5.10. Provide owner with various construction options and implement methods selected by owner that may involve cost savings, accelerated construction or other benefits to the owner.
5.11. The District does not expect the proposer to establish an “office presence” in the district during the Design Phase.
6. Bid and Award Phase Activities:
6.1. If an alternative contracting method is selected for use by the District, develop and administer the selection process for the General Contractor.
6.2. Assist the architect/engineer in preparation of the bid advertisement, and issue of the bid documents and addenda.
6.3. With the District and/or architect/engineer, conduct all Pre-Bid Conferences.
6.4. With the District, receive and evaluate the bids/proposals, and make recommendations regarding contract award.
6.5. Coordinate the issue of the appropriate form of contract, notice-of-award, and notice-to-proceed to the contractor(s).
7. Construction Phase Activities:
7.1. Conduct the Pre-Construction conference with assistance from architect/ engineer.
7.2. Conduct weekly site progress meetings, and prepare and distribute meeting minutes.
7.3. Coordinate, evaluate, recommend and expedite the processing of contractor change order proposals and time extension requests.
7.4. Evaluate and recommend District action regarding changes to construction schedule.
7.5. Conduct on-site observation of work in progress for compliance with the contract documents. Recommend corrective action for work found not in compliance, and monitor contractor response. Site observation visits shall be conducted as often as required for project manager to effectively manage and document the progress of construction and to effectively and efficiently resolve outstanding issues.
7.6. Coordinate the work of District held contracts.
7.7. Analyze contractor claims, if any, and recommend District action.
7.8. Assist in contract substantial completion and close-out activities.
7.9. Coordinate District occupancy of completed facilities.
7.10. Receive contract close-out documentation, and with the architect/engineer recommend final acceptance to the District.
7.11. Advise District and coordinate building commissioning activities for all new building construction.
7.12. Assist District in application for possible energy savings, rebates, or funding from State and utility companies’ programs.
7.13. The District anticipates the proposer will provide personnel in the district a minimum of one day a week during the Construction Phase.
8. Closeout / Warranty Activities:
8.1. Develop a warranty management process for the District to utilize throughout the 1 year warranty period.
8.2. Facilitate the 11 month warranty walk through with the Contractor, Architect, and District.
8.3. Manage completion of any warranty items noted from the 11 month walk.
File details come from the government source that posted it. Updated .