Construction Cost Breakdown Form.xls

XLS spreadsheet 58 KB Posted

Attached to
Repair Loading Dock Concrete & Install New Handrail - Parkersburg, WV046
Solicitation number
W15QKN-26-Q-A171
Issued by

About this file

This is a Construction Cost Breakdown Form template designed for federal contracting, specifically for construction and repair projects. The form provides a structured spreadsheet format for contractors to itemize and calculate project costs across multiple cost categories. Contractors are required to detail each line item by identifying the type of work (labor, equipment, and materials), specifying quantities and units of measure, and calculating associated costs. The form includes designated columns for labor hours and crew skill sets, equipment costs with city cost indices, material costs, and unit costs. Below the line-item details, the template includes overhead calculation fields for General Contractor Overhead, Profit, Bond, and General and Administrative (G&A) expenses, culminating in a Grand Total cost figure.

This particular form is associated with solicitation W15QKN-26-Q-A171, issued by the Army Contracting Command - Rock Island at Fort Dix on behalf of the 99th Readiness Division - Region C09 for repair of loading dock concrete and installation of a new handrail at PFC Roy M. Reynolds USARC (BMA# 102-1) located at 4603 Camden Avenue, Parkersburg, WV 26101. Contractors responding to this solicitation must use this cost breakdown form to submit pricing in compliance with the associated Statement of Work (SOW) and all applicable local, state, and federal regulations. The form serves as the official pricing submission template for this Army construction project.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet2

IDSortTypeDescription (to include labor,equipment, material type and grade)QuantityUnit MeasureLabor in ManhoursEquipmentMaterialTotal Cost
Crew (skill set)Labor HoursTotal HrsCity Cost IndexUnit Cost*Total Labor Cost*Unit CostTotal Equipment CostCity Cost IndexUnit CostTotal Material Cost
Totals
GENERAL CONTRACTOR
OVERHEAD$ - 0
$ - 0
PROFIT$ - 0
$ - 0
BOND$ - 0
G & A$ - 0
GRAND TOTAL$ - 0
Unit Cost*Cost for one labor hour of the specified crew
Total Labor Cost*"=Unit Cost x Total Hours"