Consolidated RFIs Bldg 104 Office Space.docx

DOCX document 17 KB Posted

Attached to
Repair of Bldg. 104 Office Space
Solicitation number
W50S9320B5015
Issued by

View the file

Other files

File Type Posted
20200325_102710.jpg JPG image
20200325_102757.jpg JPG image
20200325_102852.jpg JPG image
20200325_102336.jpg JPG image
20200325_102140.jpg JPG image
20200325_102138.jpg JPG image
20200325_102843.jpg JPG image
20200325_102201.jpg JPG image
20200325_102453.jpg JPG image
20200325_102313.jpg JPG image
20200325_102144.jpg JPG image
20200325_102437.jpg JPG image
BLDG 104 Floor Plan.pdf PDF
20200325_102433.jpg JPG image
20200325_102134.jpg JPG image
20200325_102227.jpg JPG image
20200325_102828.jpg JPG image
20200325_102820.jpg JPG image
Solicitation W50S9320B5014.pdf PDF
20200325_102341.jpg JPG image
20200325_102149.jpg JPG image
20200325_102708.jpg JPG image
20200325_102754.jpg JPG image
20200325_102723.jpg JPG image
20200325_102725.jpg JPG image
20200325_102451.jpg JPG image
20200325_102339.jpg JPG image
20200325_102444.jpg JPG image
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Repair Building 104, Office Space Government Responses to Industry Questions

1. Is the standard Bid Form?

· Standard Form 1442

2. Can you provide the as built plans or architectural plans for the office space?

· Provided

3. Can you provide photos of the roof flashings?

· Provided

4. Will you accept other paint manufacturers or we have to assume PPG as the paint manufacturer?

· No, that is the Architectural Installation Standard

5. For the interior spaces, we are to consider one (1) coat of waterproofing resisting paint and two (2) coats of paint?

· Yes

6. There are office areas that need smoke detectors. Should we consider them in our proposal?

· No

7. What’s the lighting system voltage? (120v-277v)

· 277V

8. Will you require emergency lights, (stand-alone or integrated in the new lighting system) and LED Exit signs?

· No

9. The acoustical grid replacement will be an option to the project total. Should we also consider seismic supports as a second option?

· The replacement option has to comply with new requirements like seismic support.

10. Please provide office space drawings as indicated in site visit meeting.

· Provided

11. Please clarify if door paint is included in office paint tasks.

· Yes

12. Please provide dimension and style of new kitchen cabinets.

· Dimension was available during site visit. And the same style as existing cabinet. Same amount of doors and drawers.

13. For ceiling frame removal (alternate), please provide plenum distance from frame hanging wires.

· Same height as shown on site visit for the shop area.

14. Please provide minimum roof repair area in order to have a fair competition.

· Area can be calculated from drawings provided

15. To obtain 10 years of roof warranty, complete roof area need to be treated, please confirm.

· 10-year warranty is required.