Consolidated RFIs Bldg 104 Office Space.docx
DOCX document 17 KB Posted
- Attached to
- Repair of Bldg. 104 Office Space
- Solicitation number
- W50S9320B5015
- Issued by
-
Department of the Army National Guard
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 20200325_102710.jpg | JPG image | |
| 20200325_102757.jpg | JPG image | |
| 20200325_102852.jpg | JPG image | |
| 20200325_102336.jpg | JPG image | |
| 20200325_102140.jpg | JPG image | |
| 20200325_102138.jpg | JPG image | |
| 20200325_102843.jpg | JPG image | |
| 20200325_102201.jpg | JPG image | |
| 20200325_102453.jpg | JPG image | |
| 20200325_102313.jpg | JPG image | |
| 20200325_102144.jpg | JPG image | |
| 20200325_102437.jpg | JPG image | |
| BLDG 104 Floor Plan.pdf | ||
| 20200325_102433.jpg | JPG image | |
| 20200325_102134.jpg | JPG image | |
| 20200325_102227.jpg | JPG image | |
| 20200325_102828.jpg | JPG image | |
| 20200325_102820.jpg | JPG image | |
| Solicitation W50S9320B5014.pdf | ||
| 20200325_102341.jpg | JPG image | |
| 20200325_102149.jpg | JPG image | |
| 20200325_102708.jpg | JPG image | |
| 20200325_102754.jpg | JPG image | |
| 20200325_102723.jpg | JPG image | |
| 20200325_102725.jpg | JPG image | |
| 20200325_102451.jpg | JPG image | |
| 20200325_102339.jpg | JPG image | |
| 20200325_102444.jpg | JPG image |
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Repair Building 104, Office Space Government Responses to Industry Questions
1. Is the standard Bid Form?
· Standard Form 1442
2. Can you provide the as built plans or architectural plans for the office space?
· Provided
3. Can you provide photos of the roof flashings?
· Provided
4. Will you accept other paint manufacturers or we have to assume PPG as the paint manufacturer?
· No, that is the Architectural Installation Standard
5. For the interior spaces, we are to consider one (1) coat of waterproofing resisting paint and two (2) coats of paint?
· Yes
6. There are office areas that need smoke detectors. Should we consider them in our proposal?
· No
7. What’s the lighting system voltage? (120v-277v)
· 277V
8. Will you require emergency lights, (stand-alone or integrated in the new lighting system) and LED Exit signs?
· No
9. The acoustical grid replacement will be an option to the project total. Should we also consider seismic supports as a second option?
· The replacement option has to comply with new requirements like seismic support.
10. Please provide office space drawings as indicated in site visit meeting.
· Provided
11. Please clarify if door paint is included in office paint tasks.
· Yes
12. Please provide dimension and style of new kitchen cabinets.
· Dimension was available during site visit. And the same style as existing cabinet. Same amount of doors and drawers.
13. For ceiling frame removal (alternate), please provide plenum distance from frame hanging wires.
· Same height as shown on site visit for the shop area.
14. Please provide minimum roof repair area in order to have a fair competition.
· Area can be calculated from drawings provided
15. To obtain 10 years of roof warranty, complete roof area need to be treated, please confirm.
· 10-year warranty is required.