ATTACHMENT 3 – REQUEST FOR CLARIFICATION
9. Within a one-page summary, clearly shows an explanation of how environmental challenges will be mitigated to ensure the following preservation work items remain on schedule. Specifically, technical capability proposal addresses precipitation and humidity in consideration of the dock location and typical climate during the performance period.
a. Work Item 4: U/W Body, Preserve “100%”
b. Work Item 5: Hull Plating Freeboard, Preserve “100%”
c. Work Item 7: Tanks (MP Fuel Service), Preserve “100%”
cd. Work Item 89: Tanks (Ballast), Preserve “100%”
Neither list fully agrees with Work Item list as identified in Specification. In particular
Work Item Specification FAR 52.212-1 section list FAR 52.212-2 section list
WI 3
Hull Plating (U/W Body), Inspect Hull Plating Freeboard, Preserve Partial Not listed
WI 4 U/W Body, Preserve “100%” Not listed U/W Body, Preserve
“100%”
WI 5
Hull Plating Freeboard, Preserve “100%” Not listed
Hull Plating Freeboard, Preserve “100%”
WI 7
Tanks (Ballast), Clean and
Inspect Not listed
Tanks (MP Fuel Service), Preserve “100%”
WI 9
Transducer Well Deck, Preserve Not listed
Tanks (Ballast), Preserve “100%”
WI 20 Boiler, Annual Maintenance Rudders, Preserve 100
Percent Not listed
WI 23
Impressed Current Cathodic Protection System Anodes and Reference Cells, Inspection and
Anode Renewal
Chain Locker, Preserve, 100 Percent
Not listed
WI 24 A-Frames, Annual Inspection Tanks, Grey Water Holding, Preserve 100 Percent Not listed
WI 26
04 Deck Crane (Port) TB 100- 55, Annual Inspect and Test
Decks, Helicopter Operating Areas, Preserve
Not listed
WI 52
No Work Item 52 in
Specification U/W Body, Preserve (Partial
– Condition A) Not listed
Please clarify work items to be addressed in the summary of environmental mitigations.
In addition, please note Contractor has not received answers to previous 11 requests for clarification.
RESPONSE:
The instructions to offerors has been updated with correct work item lists.