Conservation Department - Equipment Barn Renovations Scope of Work.pdf
PDF 2 MB Posted
- Solicitation number
- BD-27-1800-TOL01-TOL01-134117
- Issued by
- Middlesex County, Massachusetts
About this file
This is a Scope of Work and Prevailing Wage Schedule for the Town of Lincoln, Massachusetts Conservation Department, soliciting qualified contractors for roof replacement and exterior repairs to the department's equipment barn located at 64 Sandy Pond Road in Lincoln, Massachusetts. The project scope includes replacement of approximately 10 squares of roof, replacement of damaged facia boards and crown molding, and replacement of broken glass windowpanes. Contractors must provide labor and materials for general structural repairs and exterior envelope maintenance, including debris disposal. A mandatory site visit will be held on Wednesday, October 7, 2026, from 9:00 a.m. to 10:00 a.m. Questions regarding the scope of work must be submitted via email to Ryan Brown, Land Manager, by Thursday, October 8, 2026, at 5:00 p.m. Written responses are due by 4:30 p.m. on Wednesday, October 21, 2026, submitted electronically to the same contact. The Town will make an award to the lowest responsible and responsive bidder within seven business days of bid acceptance. The contract term begins on the date of signing and must be completed by December 31, 2026.
Contractors must comply with Massachusetts prevailing wage rates and reporting requirements as specified in the prevailing wage schedule provided. All qualified contractors must possess appropriate licensing required by 781 CMR, provide at least three references for similar work completed within the past five years, and enter into a contract using the Town of Lincoln sample contract terms. Contractors must certify that all employees have completed at least ten hours of OSHA-approved training. A 50 percent payment bond is required if the contract value exceeds $25,000. Prevailing wage rates vary by trade classification and effective date, ranging from approximately $37 per hour for certain classifications to over $123 per hour for skilled trades such as plumbers and gasfitters. The schedule includes detailed wage rates for carpenters, roofers, laborers, electricians, and numerous other trade classifications, with effective dates throughout 2026 and 2027. The Town reserves the right to reject any or all bids and may reassign the contract to another firm if the awarded vendor fails to perform during the contract period.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TOWN OF LINCOLN
CONSERVATION DEPARTMENT
TOWN OF LINCOLN
16 Lincoln Road
Lincoln, MA 01773 Phone: 781-259-2600
Town of Lincoln Scope of Work
Conservation Department Equipment Barn Renovation 2026
The Town of Lincoln’s Conservation Department is soliciting written responses from qualified contractors for roof replacement and exterior repairs to the Conservation Department’s equipment barn located at 64 Sandy Pond Rd in Lincoln, MA 01773. Contractors shall provide labor and materials for general structural repairs and exterior envelope maintenance, and provide disposal of debris generated during the course of work. Prevailing wages apply and are included in the bid specifications.
A site visit will be held on Wednesday October 7th, 2026 from 9:00am to 10:00am at the Conservation Department’s equipment barn located at 64 Sandy Pond Rd in Lincoln, MA 01773. Attendance at this walk-through is strongly encouraged to ensure you understand the scope of the work.
Questions pertaining to the scope of work can be submitted via email to Ryan Brown, Land Manager at conservation@lincolnma.gov no later than Thursday, October 8th, 2026 at 5:00pm.
Written responses are due by 4:30pm on Wednesday October 21st, 2026 and should be submitted electronically to Ryan Brown, Land Manager at conservation@lincolnma.gov.
The Town will make an award to the lowest responsible and responsive bidder within seven (7) business days of the acceptance of the bids. The lowest bidder will be determined by the total contract price.
The Town reserves the right to reject any or all bids if it were in the Town's interest to do so. The Town also reserve the right to waive any informalities.
All written responses must comply with the following conditions:
1. Contractors must possess all appropriate licensing necessary to obtain required permits as required by
781 CMR.
2. Contractors must be able to provide at least three references for similar work within the past 5 years.
3. Contractors must be able to enter into a contract with the Town of Lincoln, as detailed in Attachment A
– SAMPLE TOWN OF LINCOLN CONTRACT.
4. Contractors must comply with Massachusetts prevailing wage rates and reporting requirements, as provided in Attachment B – PREVAILING WAGE RATES.
5. Contractors must agree to provide a 50% payment bond if contract value exceeds $25,000.
mailto:conservation@lincolnma.gov mailto:conservation@lincolnma.gov
TOWN OF LINCOLN
16 Lincoln Road
6. Pursuant to M.G.L. c30, §39S, contractors must certify under penalties of perjury that, to the best of their knowledge and belief, all employees employed on the worksite, or in work subject to this response, have successfully completed at least ten hours of OSHA-approved training.
7. The Town will make an award to the lowest responsible and responsive contractor. The responsive contractor will be the one who meets all requirements and submits all required information to the Town. The responsible contractor will also be subject to reference checks.
8. This contract shall be in effect from the date of signing and must be completed not later than
December 31, 2026, unless otherwise agreed upon by the Town.
9. The Town reserves the right to reassign the contract to another firm should the vendor awarded the contract fail to carry out the contract at any time during the contracting period.
Work Specifications
The Town of Lincoln Conservation Department is seeking written responses for the following repairs to the Department’s equipment barn located at 64 Sandy Pond Rd in Lincoln, MA 01773.
• Replacement of approximately 10 squares of roof
• Replacement of damaged facia boards, crown molding, etc.
• Replacement of broken glass windowpane
TOWN OF LINCOLN
16 Lincoln Road
TOWN OF LINCOLN
16 Lincoln Road
TOWN OF LINCOLN
16 Lincoln Road
TOWN OF LINCOLN
16 Lincoln Road
TOWN OF LINCOLN
16 Lincoln Road
TOWN OF LINCOLN
16 Lincoln Road
TOWN OF LINCOLN
16 Lincoln Road
ATTACHMENT A – SAMPLE TOWN CONTRACT
TOWN OF LINCOLN, MASSACHUSETTS AGREEMENT
THIS AGREEMENT made this __________by and between the Town of Lincoln, a municipal corporation duly organized under the laws of Massachusetts and having a usual place of business at 16 Lincoln Road, Lincoln, Massachusetts, hereinafter referred to as the “TOWN”, and ________________________ hereinafter referred to as the “CONTRACTOR”.
WITNESSETH:
WHEREAS, the TOWN invited the submission of proposals for the Conservation Department Equipment Barn Renovation 2026, hereinafter “the Project”; and
WHEREAS, the CONTRACTOR submitted a Proposal to perform the work required to complete the Project, and the TOWN has decided to award the contract therefore to the CONTRACTOR.
NOW, THEREFORE, the TOWN and the CONTRACTOR agree as follows:
1. CONTRACT DOCUMENTS. The Contract Documents consist of this Agreement, the Scope of Work, and the CONTRACTOR’s response. The Contract Documents constitute the entire Agreement between the parties concerning the work, and all are as fully a part of this Agreement as if attached hereto.
2. THE WORK. The Work consists of delivering the Water Department Property Renovations, as outlined within the Town of Lincoln Invitation to Bid and as further defined in the contractor proposal.
3. TERM OF CONTRACT. This Agreement shall be in effect from date of signing and shall expire on December
31, 2026, unless extended by written agreement of both parties, or unless terminated earlier pursuant to the terms hereof.
4. COMPENSATION. The TOWN shall pay, as full compensation for items and/or services furnished and delivered in carrying out this Agreement. Bid Price is _________________.
5. PAYMENT OF COMPENSATION. The TOWN shall make payments within thirty (30) days after its receipt of
Invoice. Invoices shall be submitted at the end of each key deliverables phase as follows: Invoices will be submitted upon completion of the project.
6. LIABILITY OF THE TOWN. The TOWN’s liability hereunder shall be to make all payments when they shall become due, and the TOWN shall be under no further obligation or liability. Nothing in this Agreement shall be construed to render the TOWN or any elected or appointed official or employee of the TOWN, or their successors in office, personally liable for any obligation under this Agreement.
7. INDEPENDENT CONTRACTOR. The CONTRACTOR acknowledges and agrees that it is acting as an independent CONTRACTOR for all work and services rendered pursuant to this Agreement and shall not be considered an employee or agent of the TOWN for any purpose.
TOWN OF LINCOLN
16 Lincoln Road
8. INDEMNIFICATION. The CONTRACTOR shall indemnify, defend, and hold the TOWN harmless from and against any and all claims, demands, liabilities, actions, causes of actions, costs and expenses, including attorney’s fees, arising out of the CONTRACTOR's breach of this Agreement or the negligence or misconduct of the CONTRACTOR, or the CONTRACTOR's agents or employees.
9. INSURANCE.
a. The CONTRACTOR shall obtain and maintain during the term of this Agreement the insurance coverage in companies licensed to do business in the Commonwealth of Massachusetts, and acceptable to the TOWN, as outlined in the Specification for Goods and Services.
b. All policies shall identify the TOWN as an additional insured (except Workers' Compensation) and shall provide that the TOWN shall receive written notification at least 30 days prior to the effective date of any amendment or cancellation. Certificates evidencing all such coverages shall be provided to the TOWN upon the execution of this Agreement. Each such certificate shall specifically refer to this Agreement and shall state that such insurance is as required by this Agreement. Failure to provide or to continue in force such insurance shall be deemed a material breach of this Agreement and shall be grounds for immediate termination.
10. ASSIGNMENT. The CONTRACTOR shall not assign, sublet, or otherwise transfer this Agreement, in whole or in part, without the prior written consent of the TOWN, and shall not assign any of the moneys payable under this Agreement, except by and with the written consent of the TOWN.
11. TERMINATION.
a. Termination for Cause. If at any time during the term of this Agreement the TOWN determines that the CONTRACTOR has breached the terms of this Agreement by negligently or incompetently performing the work, or any part thereof, or by failing to perform the work in a timely fashion, or by failing to perform the work to the satisfaction of the TOWN, or by not complying with the direction of the TOWN or its agents, or by otherwise failing to perform this Agreement in accordance with all of its terms and provisions, the TOWN shall notify the CONTRACTOR in writing stating therein the nature of the alleged breach and directing the CONTRACTOR to cure such breach within ten (10) days. The CONTRACTOR specifically agrees that it shall indemnify and hold the TOWN harmless from any loss, damage, cost, charge, expense or claim arising out of our resulting from such breach regardless of its knowledge or authorization of the actions resulting in the breach. If the CONTRACTOR fails to cure said breach within ten (10) days, the TOWN may, at its election at any time after the expiration of said ten (10) days, terminate this Agreement by giving written notice thereof to the CONTRACTOR specifying the effective date of the termination. Upon receipt of said notice, the CONTRACTOR shall cease to incur additional expenses in connection with this Agreement. Upon the date specified in said notice, this Agreement shall terminate. Such termination shall not prejudice or waive any rights or action which the TOWN may have against the CONTRACTOR up to the date of such termination, and the CONTRACTOR shall be liable to the TOWN for any amount which it may be required to pay in excess of the compensation provided herein in order to complete the work specified herein in a timely manner. Upon such termination, the
TOWN OF LINCOLN
16 Lincoln Road
CONTRACTOR shall be entitled to compensation for all satisfactory work completed prior to the termination date, as determined by the TOWN.
b. Termination for Convenience. The TOWN may terminate this Agreement at any time for convenience by providing the CONTRACTOR written notice specifying therein the termination date which shall not be sooner than ten days from the issuance of said notice. Upon receipt of said notice, the CONTRACTOR shall cease to incur additional expenses in connection with this Agreement. Upon such termination, the CONTRACTOR shall be entitled to compensation for all satisfactory work completed prior to the termination date, as determined by the TOWN, such payment not to exceed the fair value of the services provided hereunder.
12. INSPECTION AND REPORTS. The TOWN shall have the right at any time to inspect the work of the CONTRACTOR, including the right to enter upon any property owned or occupied by CONTRACTOR, whether situated within or beyond the limits of the TOWN. Whenever requested, CONTRACTOR shall immediately furnish to the TOWN full and complete written reports of his operation under this Contract in such detail and with such information as the TOWN may request.
13. SUCCESSOR AND ASSIGNS. This Agreement is binding upon the parties hereto, their successors, assigns and legal representatives. Neither the TOWN nor the CONTRACTOR shall assign or transfer any interest in the Agreement without the written consent of the other.
14. COMPLIANCE WITH LAWS. The CONTRACTOR shall comply with all Federal, State, and local laws, rules, regulations and orders applicable to the work provided pursuant to this Agreement, such provisions being incorporated herein by reference, and shall be responsible for obtaining all necessary licenses, permits, and approvals required for the performance of such work.
15. NOTICE. Any and all notices, or other communications required or permitted under this Agreement, shall be in writing and delivered by hand or mailed postage prepaid, return receipt requested, by registered or certified mail or by other reputable delivery service, to the parties at the addresses set forth on Page 1 or furnished from time to time in writing hereafter by one party to the other party. Any such notice or correspondence shall be deemed given when so delivered by hand, if so mailed, when deposited with the U.S. Postal Service or, if sent by private overnight or other delivery service, when deposited with such delivery service.
16. SEVERABILITY. If any term or condition of this Agreement or any application thereof shall to any extent be held invalid, illegal, or unenforceable by the court of competent jurisdiction, the validity, legality, and enforceability of the remaining terms and conditions of this Agreement shall not be deemed affected thereby unless one or both parties would be substantially or materially prejudiced.
17. GOVERNING LAW. This Agreement shall be governed by, construed, and enforced in accordance with the laws of the Commonwealth of Massachusetts and the CONTRACTOR submits to the jurisdiction of any of its appropriate courts for the adjudication of disputes arising out of this Agreement.
18. ENTIRE AGREEMENT. This Agreement, including all documents incorporated herein by reference, constitutes the entire integrated agreement between the parties with respect to the matters described. This Agreement
TOWN OF LINCOLN
16 Lincoln Road supersedes all prior agreements, negotiations, and representations, either written or oral, and it shall not be modified or amended except by a written document executed by the parties hereto.
IN WITNESS WHEREOF, the parties hereto have executed this Agreement on the day and year first above written.
I certify that an appropriation TOWN OF LINCOLN, MA is available in the amount of this Contract.
Town Accountant Asst. Town Administrator
CONTRACTOR:
(Signature)
(Name and Title)
TOWN OF LINCOLN
16 Lincoln Road
Lincoln, MA 01773
Attachment B Prevailing Wage Rates
THE COMMONWEALTH OF MASSACHUSETTS
EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT
DEPARTMENT OF LABOR STANDARDS
Prevailing Wage Rates
MAURA HEALEY
Governor
KIM DRISCOLL
Lt. Governor
As determined by the Director under the provisions of the Massachusetts General Laws, Chapter 149, Sections 26 to 27H
LAUREN JONES
Secretary
MICHAEL FLANAGAN
Director
Awarding Authority: Lincoln City/Town: LINCOLN
Wage Request No: 20260930213626 Job Location: 64 Sandy Pond Road, Lincoln, MA 01773
Description of Work: Roof replacement and exterior repairs to the Conservation Department equipment barn located at 64 Sandy Pond Road, Lincoln, MA 01773.
Contract Number: 20260930
§§ 26-27D Construction Project
This Prevailing Wage Schedule establishes the minimum wage rates that employees on this public works construction project must be paid. The project’s Wage Request Number is listed above and on all pages of this Schedule. This schedule applies only to this specific project.
Awarding Authority Responsibilities Contractor Responsibilities
You must include this Prevailing Wage Schedule (PWS) or an appropriate reference to it in all advertisements and calls for bids.
The PWS must be incorporated in its entirety into all contracts for this project (G.L. c. 149, § 27).
The wage rates on this PWS will remain in effect for the duration of the project. Exception: You must request an updated schedule for any multi-year construction project no later than 2 weeks before the project’s yearly anniversary date.
For CM AT RISK projects, the anniversary date is the earlier of the signing date of: (a) the GMP Amendment; or (b) the first amendment to permit procurement of construction services.
For all other construction projects, the anniversary date is the date the contract was signed by the Awarding Authority and the General
Contractor.
You must also request an updated PWS if you have not opened bids or selected a contractor within 90 days of the date of issuance on this PWS.
For CM AT RISK projects, the earlier of (a) the signing date of the
GMP Amendment; or (b) the bid for the first construction scope of work must be within 90 days of the date of issuance on this Schedule.
You must provide any updated PWS to all contractors working on the project, including general and sub-contractors.
You must keep the contractors’ weekly certified payroll records and
Statements of Compliance on file for 3 years.
Awarding authorities have other prevailing wage responsibilities not listed above. Learn more at: [Prevailing wage: for awarding authorities |
Mass.gov] and G.L. c. 149, §§ 26-27D.
You must pay all employees who perform construction work on this project at least the wage rate listed on this PWS. Warning! If you do not follow this requirement, you can face civil fines, criminal charges, or private lawsuits.
You must post this PWS at the worksite where it can be easily seen. (G.L.
c. 149, § 27)
You must file weekly payroll reports and a Statement of Compliance with the awarding authority (not DLS). You can file payroll reports by mail or email and must keep them on file for 3 years. Each weekly payroll report must include each employees’ name, address, occupational classification(s), hours worked, and wages paid. Find a sample report at:
mass.gov/dols/pw.
You cannot pay any employees at the apprentice rates listed on this PWS unless they are registered with the Massachusetts Division of Apprentice
Standards (DAS). Qualifying apprentices must be paid at the applicable step rate and must carry their apprentice ID card during all work hours on the project. Apprentices not registered with DAS must be paid at the listed journeyworker’s rate, even if they are registered with a different federal/state public agency or private entity. For every week in which apprentice rates are paid, a copy of each apprentice's apprentice ID card issued by DAS shall be attached to the certified payroll records.
If you don’t know what classification or rate applies to the work being performed, you must ask DLS; paying the wrong rate subjects you to enforcement.
Please contact DLS if you have any questions about the Prevailing Wage
Schedule: (617) 626-6953 or DLS.Feedback@mass.gov
Employees who are not paid the wage listed on the Prevailing Wage Schedule (PWS) may file a complaint with the Attorney General’s Fair Labor Division: www.mass.gov/ago/fld; (617) 727-3465.
Page 1 of 31Wage Request Number: 20260930213626Issue Date: 10/02/2026 https://www.mass.gov/info-details/prevailing-wage-for-awarding-authorities https://www.mass.gov/info-details/prevailing-wage-for-awarding-authorities mailto:DLS.Feedback@mass.gov https://www.mass.gov/ago/fld
Construction
Classification Effective Date Base Wage Health Pension Annuity Supplemental
Unemployment Total Rate
6/1/2026 $41.95 $16.17 $21.78 $0.00 $0.00 $79.90
12/1/2026 $41.95 $16.17 $23.52 $0.00 $0.00 $81.64
(2 AXLE) DRIVER - EQUIPMENT
TEAMSTERS JOINT COUNCIL NO. 10
TEAMSTERS JOINT COUNCIL NO. 10 ZONE B
1/1/2027 $41.95 $16.77 $23.52 $0.00 $0.00 $82.24
6/1/2026 $42.02 $16.17 $21.78 $0.00 $0.00 $79.97
12/1/2026 $42.02 $16.17 $23.52 $0.00 $0.00 $81.71
(3 AXLE) DRIVER - EQUIPMENT
TEAMSTERS JOINT COUNCIL NO. 10
TEAMSTERS JOINT COUNCIL NO. 10 ZONE B
1/1/2027 $42.02 $16.77 $23.52 $0.00 $0.00 $82.31
6/1/2026 $42.14 $16.17 $21.78 $0.00 $0.00 $80.09
12/1/2026 $42.14 $16.17 $23.52 $0.00 $0.00 $81.83
(4 & 5 AXLE) DRIVER - EQUIPMENT
TEAMSTERS JOINT COUNCIL NO. 10
TEAMSTERS JOINT COUNCIL NO. 10 ZONE B
1/1/2027 $42.14 $16.77 $23.52 $0.00 $0.00 $82.43
ADS/SUBMERSIBLE PILOT
PILE DRIVER LOCAL 56
PILE DRIVER LOCAL 56 (ZONE 1)
1/1/2024 $117.16 $10.08 $11.62 $12.67 $0.00 $151.53
For apprentice rates see "Apprentice- PILE DRIVER"
6/1/2026 $42.41 $10.90 $9.75 $9.11 $0.00 $72.17
12/1/2026 $43.85 $10.90 $9.75 $9.11 $0.00 $73.61
6/1/2027 $45.30 $10.90 $9.75 $9.11 $0.00 $75.06
12/1/2027 $46.75 $10.90 $9.75 $9.11 $0.00 $76.51
6/1/2028 $48.25 $10.90 $9.75 $9.11 $0.00 $78.01
AIR TRACK OPERATOR
LABORERS
LABORERS - ZONE 2
12/1/2028 $49.75 $10.90 $9.75 $9.11 $0.00 $79.51
For apprentice rates see "Apprentice- LABORER"
6/1/2026 $42.41 $10.90 $9.75 $9.21 $0.00 $72.27AIR TRACK OPERATOR (HEAVY & HIGHWAY)
LABORERS
LABORERS - ZONE 2 (HEAVY & HIGHWAY)
12/1/2026 $43.85 $10.90 $9.75 $9.21 $0.00 $73.71
For apprentice rates see "Apprentice- LABORER (Heavy and Highway)
ASBESTOS REMOVER - PIPE / MECH. EQUIPT.
HEAT & FROST INSULATORS LOCAL 6
HEAT & FROST INSULATORS LOCAL 6 (BOSTON)
12/1/2025 $44.80 $14.50 $4.30 $6.75 $0.00 $70.35
6/1/2026 $41.91 $10.90 $9.75 $9.11 $0.00 $71.67
12/1/2026 $43.35 $10.90 $9.75 $9.11 $0.00 $73.11
6/1/2027 $44.80 $10.90 $9.75 $9.11 $0.00 $74.56
12/1/2027 $46.25 $10.90 $9.75 $9.11 $0.00 $76.01
6/1/2028 $47.75 $10.90 $9.75 $9.11 $0.00 $77.51
ASPHALT RAKER
LABORERS
LABORERS - ZONE 2
12/1/2028 $49.25 $10.90 $9.75 $9.11 $0.00 $79.01
For apprentice rates see "Apprentice- LABORER"
6/1/2026 $41.91 $10.90 $9.75 $9.21 $0.00 $71.77ASPHALT RAKER (HEAVY & HIGHWAY)
LABORERS
LABORERS - ZONE 2 (HEAVY & HIGHWAY)
12/1/2026 $43.35 $10.90 $9.75 $9.21 $0.00 $73.21
For apprentice rates see "Apprentice- LABORER (Heavy and Highway)
6/1/2026 $59.38 $17.05 $13.35 $3.25 $0.00 $93.03ASPHALT/CONCRETE/CRUSHER PLANT-ON SITE
OPERATING ENGINEERS LOCAL 4
OPERATING ENGINEERS LOCAL 4
12/1/2026 $60.83 $17.05 $13.35 $3.25 $0.00 $94.48
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
Page 2 of 31Wage Request Number: 20260930213626Issue Date: 10/02/2026
Supplemental
Unemployment Total Rate
6/1/2026 $59.38 $17.05 $13.35 $3.25 $0.00 $93.03BACKHOE/FRONT-END LOADER
OPERATING ENGINEERS LOCAL 4
OPERATING ENGINEERS LOCAL 4
12/1/2026 $60.83 $17.05 $13.35 $3.25 $0.00 $94.48
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
6/1/2026 $41.91 $10.90 $9.75 $9.11 $0.00 $71.67
12/1/2026 $43.35 $10.90 $9.75 $9.11 $0.00 $73.11
6/1/2027 $44.80 $10.90 $9.75 $9.11 $0.00 $74.56
12/1/2027 $46.25 $10.90 $9.75 $9.11 $0.00 $76.01
6/1/2028 $47.75 $10.90 $9.75 $9.11 $0.00 $77.51
BARCO-TYPE JUMPING TAMPER
LABORERS
LABORERS - ZONE 2
12/1/2028 $49.25 $10.90 $9.75 $9.11 $0.00 $79.01
For apprentice rates see "Apprentice- LABORER"
6/1/2026 $42.41 $10.90 $9.75 $9.11 $0.00 $72.17
12/1/2026 $43.85 $10.90 $9.75 $9.11 $0.00 $73.61
6/1/2027 $45.30 $10.90 $9.75 $9.11 $0.00 $75.06
12/1/2027 $46.75 $10.90 $9.75 $9.11 $0.00 $76.51
6/1/2028 $48.25 $10.90 $9.75 $9.11 $0.00 $78.01
BLOCK PAVER, RAMMER / CURB SETTER
LABORERS
LABORERS - ZONE 2
12/1/2028 $49.75 $10.90 $9.75 $9.11 $0.00 $79.51
For apprentice rates see "Apprentice- LABORER"
6/1/2026 $42.41 $10.90 $9.75 $9.21 $0.00 $72.27BLOCK PAVER, RAMMER / CURB SETTER (HEAVY &
HIGHWAY)
LABORERS
LABORERS - ZONE 2 (HEAVY & HIGHWAY)
12/1/2026 $43.85 $10.90 $9.75 $9.21 $0.00 $73.71
For apprentice rates see "Apprentice- LABORER (Heavy and Highway)
BOILER MAKER
BOILERMAKERS LOCAL 29
BOILERMAKERS LOCAL 29
1/1/2024 $48.12 $7.07 $14.60 $6.00 $0.00 $75.79
8/1/2026 $70.15 $12.84 $15.57 $8.02 $0.00 $106.58BRICK/STONE/ARTIFICIAL MASONRY (INCL. MASONRY
WATERPROOFING)
BRICKLAYERS LOCAL 3
BRICKLAYERS LOCAL 3 (WALTHAM)
2/1/2027 $71.55 $12.84 $15.57 $8.02 $0.00 $107.98
Apprentice: BOILER MAKER
Effective Date: 1/1/2024
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 65.00 $31.28 $7.07 $9.32 $3.90 $0.00 $51.57
2 65.00 $31.28 $7.07 $9.32 $3.90 $0.00 $51.57
3 70.00 $33.68 $7.07 $10.03 $4.20 $0.00 $54.98
4 75.00 $36.09 $7.07 $10.74 $4.50 $0.00 $58.40
5 80.00 $38.50 $7.07 $11.45 $4.80 $0.00 $61.82
6 85.00 $40.90 $7.07 $12.18 $5.10 $0.00 $65.25
7 90.00 $43.31 $7.07 $12.88 $5.40 $0.00 $68.66
8 95.00 $45.71 $7.07 $13.62 $5.70 $0.00 $72.10
Apprentice to Journeyworker Ratio: 1:4
Page 3 of 31Wage Request Number: 20260930213626Issue Date: 10/02/2026
Supplemental
Unemployment Total Rate
6/1/2026 $58.70 $17.05 $13.35 $3.25 $0.00 $92.35BULLDOZER/GRADER/SCRAPER
OPERATING ENGINEERS LOCAL 4
OPERATING ENGINEERS LOCAL 4
12/1/2026 $60.14 $17.05 $13.35 $3.25 $0.00 $93.79
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
6/1/2026 $50.40 $10.90 $9.75 $9.80 $0.00 $80.85CAISSON & UNDERPINNING BOTTOM MAN
LABORERS
LABORERS - FOUNDATION AND MARINE
12/1/2026 $51.90 $10.90 $9.75 $9.80 $0.00 $82.35
For apprentice rates see "Apprentice- LABORER"
6/1/2026 $49.25 $10.90 $9.75 $9.80 $0.00 $79.70CAISSON & UNDERPINNING LABORER
LABORERS
LABORERS - FOUNDATION AND MARINE
12/1/2026 $50.75 $10.90 $9.75 $9.80 $0.00 $81.20
For apprentice rates see "Apprentice- LABORER"
6/1/2026 $49.58 $10.90 $9.75 $9.80 $0.00 $80.03CAISSON & UNDERPINNING TOP MAN
LABORERS
LABORERS - FOUNDATION AND MARINE
12/1/2026 $51.08 $10.90 $9.75 $9.80 $0.00 $81.53
For apprentice rates see "Apprentice- LABORER"
6/1/2026 $41.91 $10.90 $9.75 $9.11 $0.00 $71.67
12/1/2026 $43.35 $10.90 $9.75 $9.11 $0.00 $73.11
6/1/2027 $44.80 $10.90 $9.75 $9.11 $0.00 $74.56
12/1/2027 $46.25 $10.90 $9.75 $9.11 $0.00 $76.01
6/1/2028 $47.75 $10.90 $9.75 $9.11 $0.00 $77.51
CARBIDE CORE DRILL OPERATOR
LABORERS
LABORERS - ZONE 2
12/1/2028 $49.25 $10.90 $9.75 $9.11 $0.00 $79.01
For apprentice rates see "Apprentice- LABORER"
Apprentice: BRICK/STONE/ARTIFICIAL MASONRY (INCL. MASONRY WATERPROOFING)
Effective Date: 8/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 50.00 $35.08 $12.84 $15.57 $8.02 $0.00 $71.51
2 60.00 $42.09 $12.84 $15.57 $8.02 $0.00 $78.52
3 70.00 $49.11 $12.84 $15.57 $8.02 $0.00 $85.54
4 80.00 $56.12 $12.84 $15.57 $8.02 $0.00 $92.55
5 90.00 $63.14 $12.84 $15.57 $8.02 $0.00 $99.57
Apprentice: BRICK/STONE/ARTIFICIAL MASONRY (INCL. MASONRY WATERPROOFING)
Effective Date: 2/1/2027
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 50.00 $35.78 $12.84 $15.57 $8.02 $0.00 $72.21
2 60.00 $42.93 $12.84 $15.57 $8.02 $0.00 $79.36
3 70.00 $50.09 $12.84 $15.57 $8.02 $0.00 $86.52
4 80.00 $57.24 $12.84 $15.57 $8.02 $0.00 $93.67
5 90.00 $64.40 $12.84 $15.57 $8.02 $0.00 $100.83
Apprentice to Journeyworker Ratio: 1:5
Page 4 of 31Wage Request Number: 20260930213626Issue Date: 10/02/2026
Supplemental
Unemployment Total Rate
9/1/2026 $52.10 $11.08 $11.47 $8.50 $0.00 $83.15CARPENTER
CARPENTERS
CARPENTERS -ZONE 2 (Eastern Massachusetts) 3/1/2027 $53.35 $11.08 $11.47 $8.50 $0.00 $84.40
CARPENTER WOOD FRAME
CARPENTERS
CARPENTERS-ZONE 3 (Wood Frame)
10/1/2026 $28.47 $7.38 $4.47 $1.00 $0.00 $41.32
All Aspects of New Wood Frame Work
Apprentice: CARPENTER
Effective Date: 9/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 45.00 $23.45 $11.08 $0.00 $1.73 $0.00 $36.26
2 45.00 $23.45 $11.08 $0.00 $1.73 $0.00 $36.26
3 55.00 $28.66 $11.08 $0.00 $3.40 $0.00 $43.14
4 55.00 $28.66 $11.08 $0.00 $3.40 $0.00 $43.14
5 70.00 $36.47 $11.08 $11.41 $5.10 $0.00 $64.06
6 70.00 $36.47 $11.08 $11.41 $5.10 $0.00 $64.06
7 80.00 $41.68 $11.08 $11.44 $6.80 $0.00 $71.00
8 80.00 $41.68 $11.08 $11.44 $6.80 $0.00 $71.00
Apprentice: CARPENTER
Effective Date: 3/1/2027
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 45.00 $24.01 $11.08 $0.00 $1.73 $0.00 $36.82
2 45.00 $24.01 $11.08 $0.00 $1.73 $0.00 $36.82
3 55.00 $29.34 $11.08 $0.00 $3.40 $0.00 $43.82
4 55.00 $29.34 $11.08 $0.00 $3.40 $0.00 $43.82
5 70.00 $37.35 $11.08 $11.41 $5.10 $0.00 $64.94
6 70.00 $37.35 $11.08 $11.41 $5.10 $0.00 $64.94
7 80.00 $42.68 $11.08 $11.44 $6.80 $0.00 $72.00
8 80.00 $42.68 $11.08 $11.44 $6.80 $0.00 $72.00
Apprentice to Journeyworker Ratio: 1:5
Apprentice: CARPENTER WOOD FRAME
Effective Date: 10/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 60.00 $17.08 $7.38 $0.00 $0.00 $0.00 $24.46
2 60.00 $17.08 $7.38 $0.00 $0.00 $0.00 $24.46
3 65.00 $18.51 $7.38 $0.00 $1.00 $0.00 $26.89
4 70.00 $19.93 $7.38 $0.00 $1.00 $0.00 $28.31
5 75.00 $21.35 $7.38 $3.80 $1.00 $0.00 $33.53
6 80.00 $22.78 $7.38 $3.80 $1.00 $0.00 $34.96
Page 5 of 31Wage Request Number: 20260930213626Issue Date: 10/02/2026
Supplemental
Unemployment Total Rate
7/1/2026 $54.49 $13.35 $16.43 $7.78 $1.80 $93.85
1/1/2027 $55.94 $13.35 $16.43 $7.78 $1.80 $95.30
7/1/2027 $57.29 $13.35 $16.43 $7.78 $1.80 $96.65
CEMENT MASONRY/PLASTERING
PLASTERERS AND CEMENT MASONS LOCAL 534
Plasterers and Cement Masons - Zone 1
1/1/2028 $58.64 $13.35 $16.43 $7.78 $1.80 $98.00
6/1/2026 $41.91 $10.90 $9.75 $9.11 $0.00 $71.67
12/1/2026 $43.35 $10.90 $9.75 $9.11 $0.00 $73.11
6/1/2027 $44.80 $10.90 $9.75 $9.11 $0.00 $74.56
12/1/2027 $46.25 $10.90 $9.75 $9.11 $0.00 $76.01
6/1/2028 $47.75 $10.90 $9.75 $9.11 $0.00 $77.51
CHAIN SAW OPERATOR
LABORERS
LABORERS - ZONE 2
12/1/2028 $49.25 $10.90 $9.75 $9.11 $0.00 $79.01
For apprentice rates see "Apprentice- LABORER"
Apprentice: CARPENTER WOOD FRAME
Effective Date: 10/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
7 85.00 $24.20 $7.38 $3.80 $1.00 $0.00 $36.38
8 90.00 $25.62 $7.38 $3.80 $1.00 $0.00 $37.80
Apprentice to Journeyworker Ratio: 1:5
Apprentice: CEMENT MASONRY/PLASTERING
Effective Date: 7/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 50.00 $27.25 $13.35 $16.43 $0.00 $0.00 $57.03
2 60.00 $32.69 $13.35 $16.43 $7.78 $1.80 $72.05
3 65.00 $35.42 $13.35 $16.43 $7.78 $1.80 $74.78
4 70.00 $38.14 $13.35 $16.43 $7.78 $1.80 $77.50
5 75.00 $40.87 $13.35 $16.43 $7.78 $1.80 $80.23
6 80.00 $43.59 $13.35 $16.43 $7.78 $1.80 $82.95
7 90.00 $49.04 $13.35 $16.43 $7.78 $0.00 $86.60
Apprentice: CEMENT MASONRY/PLASTERING
Effective Date: 1/1/2027
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 50.00 $27.97 $13.35 $16.43 $0.00 $0.00 $57.75
2 60.00 $33.56 $13.35 $16.43 $7.78 $1.80 $72.92
3 65.00 $36.36 $13.35 $16.43 $7.78 $1.80 $75.72
4 70.00 $39.16 $13.35 $16.43 $7.78 $1.80 $78.52
5 75.00 $41.96 $13.35 $16.43 $7.78 $1.80 $81.32
6 80.00 $44.75 $13.35 $16.43 $7.78 $1.80 $84.11
7 90.00 $50.35 $13.35 $16.43 $0.00 $0.00 $80.13
Page 6 of 31Wage Request Number: 20260930213626Issue Date: 10/02/2026
Supplemental
Unemployment Total Rate
6/1/2026 $60.61 $17.05 $13.35 $3.25 $0.00 $94.26CLAM SHELLS/SLURRY BUCKETS/HEADING MACHINES
OPERATING ENGINEERS LOCAL 4
OPERATING ENGINEERS LOCAL 4
12/1/2026 $62.09 $17.05 $13.35 $3.25 $0.00 $95.74
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
6/1/2026 $37.63 $17.05 $13.35 $3.25 $0.00 $71.28COMPRESSOR OPERATOR
OPERATING ENGINEERS LOCAL 4
OPERATING ENGINEERS LOCAL 4
12/1/2026 $38.58 $17.05 $13.35 $3.25 $0.00 $72.23
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
DELEADER (BRIDGE)
PAINTERS LOCAL 35
PAINTERS LOCAL 35 - ZONE 2
1/1/2026 $59.56 $10.35 $12.00 $12.60 $0.00 $94.51
6/1/2026 $49.30 $10.90 $9.75 $9.65 $0.00 $79.60
12/7/2026 $50.80 $10.90 $9.75 $9.65 $0.00 $81.10
6/7/2027 $52.40 $10.90 $9.75 $9.65 $0.00 $82.70
12/6/2027 $54.00 $10.90 $9.75 $9.65 $0.00 $84.30
6/5/2028 $55.68 $10.90 $9.75 $9.65 $0.00 $85.98
DEMO: ADZEMAN
LABORERS
LABORERS - ZONE 2
12/4/2028 $57.35 $10.90 $9.75 $9.65 $0.00 $87.65
For apprentice rates see "Apprentice- LABORER"
6/1/2026 $50.30 $10.90 $9.75 $9.65 $0.00 $80.60
12/7/2026 $51.80 $10.90 $9.75 $9.65 $0.00 $82.10
6/7/2027 $53.40 $10.90 $9.75 $9.65 $0.00 $83.70
12/6/2027 $55.00 $10.90 $9.75 $9.65 $0.00 $85.30
6/5/2028 $56.68 $10.90 $9.75 $9.65 $0.00 $86.98
DEMO: BACKHOE/LOADER/HAMMER OPERATOR
LABORERS
LABORERS - ZONE 2
12/4/2028 $58.35 $10.90 $9.75 $9.65 $0.00 $88.65
For apprentice rates see "Apprentice- LABORER"
6/1/2026 $50.05 $10.90 $9.75 $9.65 $0.00 $80.35
12/7/2026 $51.55 $10.90 $9.75 $9.65 $0.00 $81.85
6/7/2027 $53.15 $10.90 $9.75 $9.65 $0.00 $83.45
12/6/2027 $54.75 $10.90 $9.75 $9.65 $0.00 $85.05
6/5/2028 $56.43 $10.90 $9.75 $9.65 $0.00 $86.73
DEMO: BURNERS
LABORERS
LABORERS - ZONE 2
12/4/2028 $58.10 $10.90 $9.75 $9.65 $0.00 $88.40
Apprentice: DELEADER (BRIDGE)
Effective Date: 1/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 50.00 $29.78 $10.35 $0.00 $0.00 $0.00 $40.13
2 55.00 $32.76 $10.35 $0.00 $6.93 $0.00 $50.04
3 60.00 $35.74 $10.35 $0.00 $7.56 $0.00 $53.65
4 65.00 $38.71 $10.35 $0.00 $8.19 $0.00 $57.25
5 70.00 $41.69 $10.35 $12.00 $8.82 $0.00 $72.86
6 75.00 $44.67 $10.35 $12.00 $9.45 $0.00 $76.47
7 80.00 $47.65 $10.35 $12.00 $10.08 $0.00 $80.08
8 90.00 $53.60 $10.35 $12.00 $11.34 $0.00 $87.29
Apprentice to Journeyworker Ratio: 1:1
Page 7 of 31Wage Request Number: 20260930213626Issue Date: 10/02/2026
Supplemental
Unemployment Total Rate
For apprentice rates see "Apprentice- LABORER"
6/1/2026 $50.30 $10.90 $9.75 $9.65 $0.00 $80.60
12/7/2026 $51.80 $10.90 $9.75 $9.65 $0.00 $82.10
6/7/2027 $53.40 $10.90 $9.75 $9.65 $0.00 $83.70
12/6/2027 $55.00 $10.90 $9.75 $9.65 $0.00 $85.30
6/5/2028 $56.68 $10.90 $9.75 $9.65 $0.00 $86.98
DEMO: CONCRETE CUTTER/SAWYER
LABORERS
LABORERS - ZONE 2
12/4/2028 $58.35 $10.90 $9.75 $9.65 $0.00 $88.65
For apprentice rates see "Apprentice- LABORER"
6/1/2026 $50.05 $10.90 $9.75 $9.65 $0.00 $80.35
12/7/2026 $51.55 $10.90 $9.75 $9.65 $0.00 $81.85
6/7/2027 $53.15 $10.90 $9.75 $9.65 $0.00 $83.45
12/6/2027 $54.75 $10.90 $9.75 $9.65 $0.00 $85.05
6/5/2028 $56.43 $10.90 $9.75 $9.65 $0.00 $86.73
DEMO: JACKHAMMER OPERATOR
LABORERS
LABORERS - ZONE 2
12/4/2028 $58.10 $10.90 $9.75 $9.65 $0.00 $88.40
For apprentice rates see "Apprentice- LABORER"
6/1/2026 $49.30 $10.90 $9.75 $9.65 $0.00 $79.60
12/7/2026 $50.80 $10.90 $9.75 $9.65 $0.00 $81.10
6/7/2027 $52.40 $10.90 $9.75 $9.65 $0.00 $82.70
12/6/2027 $54.00 $10.90 $9.75 $9.65 $0.00 $84.30
6/5/2028 $55.68 $10.90 $9.75 $9.65 $0.00 $85.98
DEMO: WRECKING LABORER
LABORERS
LABORERS - ZONE 2
12/4/2028 $57.35 $10.90 $9.75 $9.65 $0.00 $87.65
For apprentice rates see "Apprentice- LABORER"
6/1/2026 $58.70 $17.05 $13.35 $3.25 $0.00 $92.35DIRECTIONAL DRILL MACHINE OPERATOR
OPERATING ENGINEERS LOCAL 4
OPERATING ENGINEERS LOCAL 4
12/1/2026 $60.14 $17.05 $13.35 $3.25 $0.00 $93.79
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
DIVER
PILE DRIVER LOCAL 56
PILE DRIVER LOCAL 56 (ZONE 1)
8/1/2024 $78.11 $10.08 $11.62 $10.04 $0.00 $109.85 as of 8-1-24, Apprentices with diving licenses begin at second year. % of Diver wage 70/80/90 2A $69.83, 3A $91.79,4A $102.14 Total Rate
DIVER TENDER
PILE DRIVER LOCAL 56
PILE DRIVER LOCAL 56 (ZONE 1)
8/1/2024 $55.79 $10.08 $11.62 $12.67 $0.00 $90.16 as of 8-1-24, Apprentices with diving licenses begin at second year. % of Piledriver wage 70/80/90 2A $54.20, 3A $73.93,4A $82.05 Total Rate
DIVER TENDER (EFFLUENT)
PILE DRIVER LOCAL 56
PILE DRIVER LOCAL 56 (ZONE 1)
8/1/2024 $83.69 $10.08 $11.62 $12.67 $0.00 $118.06
For apprentice rates see "Apprentice- PILE DRIVER"
DIVER/SLURRY (EFFLUENT)
PILE DRIVER LOCAL 56
PILE DRIVER LOCAL 56 (ZONE 1)
8/1/2024 $117.16 $10.08 $11.62 $12.67 $0.00 $151.53
For apprentice rates see "Apprentice- PILE DRIVER"
DRAWBRIDGE OPERATOR (Construction)
DRAWBRIDGE - SEIU LOCAL 888
7/1/2020 $26.77 $6.67 $3.93 $0.00 $0.16 $37.53
Page 8 of 31Wage Request Number: 20260930213626Issue Date: 10/02/2026
Supplemental
Unemployment Total Rate
DRAWBRIDGE - SEIU LOCAL 888
9/1/2026 $68.78 $13.00 $14.69 $9.00 $0.00 $105.47
3/1/2027 $69.97 $13.00 $14.73 $9.00 $0.00 $106.70
9/1/2027 $71.88 $13.00 $14.79 $9.00 $0.00 $108.67
ELECTRICIAN
ELECTRICIANS LOCAL 103
ELECTRICIANS LOCAL 103
3/1/2028 $73.08 $13.00 $14.82 $9.00 $0.00 $109.90
1/1/2026 $77.26 $16.38 $11.06 $10.70 $0.00 $115.40ELEVATOR CONSTRUCTOR
ELEVATOR CONSTRUCTORS LOCAL 4
ELEVATOR CONSTRUCTORS LOCAL 4
1/1/2027 $80.55 $16.48 $11.16 $11.00 $0.00 $119.19
Apprentice: ELECTRICIAN
Effective Date: 9/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 40.00 $27.51 $13.00 $0.83 $0.00 $0.00 $41.34
2 40.00 $27.51 $13.00 $0.83 $0.00 $0.00 $41.34
3 45.00 $30.95 $13.00 $13.56 $4.05 $0.00 $61.56
4 45.00 $30.95 $13.00 $13.56 $4.05 $0.00 $61.56
5 50.00 $34.39 $13.00 $13.66 $4.50 $0.00 $65.55
6 55.00 $37.83 $13.00 $13.76 $4.95 $0.00 $69.54
7 60.00 $41.27 $13.00 $13.87 $5.40 $0.00 $73.54
8 65.00 $44.71 $13.00 $13.97 $5.85 $0.00 $77.53
9 70.00 $48.15 $13.00 $14.07 $6.30 $0.00 $81.52
10 75.00 $51.59 $13.00 $14.18 $6.75 $0.00 $85.52
Apprentice: ELECTRICIAN
Effective Date: 3/1/2027
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 40.00 $27.99 $13.00 $0.84 $0.00 $0.00 $41.83
2 40.00 $27.99 $13.00 $0.84 $0.00 $0.00 $41.83
3 45.00 $31.49 $13.00 $13.57 $4.05 $0.00 $62.11
4 45.00 $31.49 $13.00 $13.57 $4.05 $0.00 $62.11
5 50.00 $34.99 $13.00 $13.68 $4.50 $0.00 $66.17
6 55.00 $38.48 $13.00 $13.78 $4.95 $0.00 $70.21
7 60.00 $41.98 $13.00 $13.89 $5.40 $0.00 $74.27
8 65.00 $45.48 $13.00 $13.99 $5.85 $0.00 $78.32
9 70.00 $48.98 $13.00 $14.10 $6.30 $0.00 $82.38
10 75.00 $52.48 $13.00 $14.20 $6.75 $0.00 $86.43
Apprentice Notes
Apprentice to Journeyworker Ratio: 2:3
Page 9 of 31Wage Request Number: 20260930213626Issue Date: 10/02/2026
Supplemental
Unemployment Total Rate
1/1/2026 $54.08 $16.38 $11.06 $10.07 $0.00 $91.59ELEVATOR CONSTRUCTOR HELPER
ELEVATOR CONSTRUCTORS LOCAL 4
ELEVATOR CONSTRUCTORS LOCAL 4
1/1/2027 $56.39 $16.48 $11.16 $11.00 $0.00 $95.03
For apprentice rates see "Apprentice - ELEVATOR CONSTRUCTOR"
6/1/2026 $41.91 $10.90 $9.75 $9.21 $0.00 $71.77FENCE & GUARD RAIL ERECTOR (HEAVY & HIGHWAY)
LABORERS
LABORERS - ZONE 2 (HEAVY & HIGHWAY)
12/1/2026 $43.35 $10.90 $9.75 $9.21 $0.00 $73.21
For apprentice rates see "Apprentice- LABORER (Heavy and Highway)
5/1/2026 $54.40 $16.55 $13.35 $3.25 $0.00 $87.55
11/1/2026 $55.69 $16.55 $13.35 $3.25 $0.00 $88.84
FIELD ENG.INST.PERSON-BLDG,SITE,HVY/HWY
OPERATING ENGINEERS LOCAL 4
OPERATING ENGINEERS LOCAL 4
5/1/2027 $57.12 $16.55 $13.35 $3.25 $0.00 $90.27
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
5/1/2026 $56.02 $16.55 $13.35 $3.25 $0.00 $89.17
11/1/2026 $57.32 $16.55 $13.35 $3.25 $0.00 $90.47
FIELD ENG.PARTY CHIEF-BLDG,SITE,HVY/HWY
OPERATING ENGINEERS LOCAL 4
OPERATING ENGINEERS LOCAL 4
5/1/2027 $58.77 $16.55 $13.35 $3.25 $0.00 $91.92
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
5/1/2026 $26.28 $16.55 $13.35 $3.25 $0.00 $59.43
11/1/2026 $27.04 $16.55 $13.35 $3.25 $0.00 $60.19
FIELD ENG.ROD PERSON-BLDG,SITE,HVY/HWY
OPERATING ENGINEERS LOCAL 4
OPERATING ENGINEERS LOCAL 4
5/1/2027 $27.89 $16.55 $13.35 $3.25 $0.00 $61.04
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
9/1/2026 $68.78 $13.00 $14.69 $9.00 $0.00 $105.47FIRE ALARM INSTALLER
Apprentice: ELEVATOR CONSTRUCTOR
Effective Date: 1/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 50.00 $38.63 $0.00 $0.00 $0.00 $0.00 $38.63
2 55.00 $42.49 $16.38 $11.06 $10.70 $0.00 $80.63
3 65.00 $50.22 $16.38 $11.06 $10.70 $0.00 $88.36
4 70.00 $54.08 $16.38 $11.06 $10.70 $0.00 $92.22
5 80.00 $61.81 $16.38 $11.06 $10.70 $0.00 $99.95
Apprentice: ELEVATOR CONSTRUCTOR
Effective Date: 1/1/2027
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 50.00 $40.28 $0.00 $0.00 $0.00 $0.00 $40.28
2 55.00 $44.30 $16.48 $11.16 $11.00 $0.00 $82.94
3 65.00 $52.36 $16.48 $11.16 $11.00 $0.00 $91.00
4 70.00 $56.39 $16.48 $11.16 $11.00 $0.00 $95.03
5 80.00 $64.44 $16.48 $11.16 $11.00 $0.00 $103.08
Page 10 of 31Wage Request Number: 20260930213626Issue Date: 10/02/2026
Supplemental
Unemployment Total Rate
3/1/2027 $69.97 $13.00 $14.73 $9.00 $0.00 $106.70
9/1/2027 $71.88 $13.00 $14.79 $9.00 $0.00 $108.67
ELECTRICIANS LOCAL 103
ELECTRICIANS LOCAL 103
3/1/2028 $73.08 $13.00 $14.82 $9.00 $0.00 $109.90
For apprentice rates see "Apprentice- ELECTRICIAN"
9/1/2026 $55.02 $13.00 $14.28 $7.20 $0.00 $89.50
3/1/2027 $55.98 $13.00 $14.31 $7.20 $0.00 $90.49
9/1/2027 $57.50 $13.00 $14.36 $7.20 $0.00 $92.06
FIRE ALARM REPAIR / MAINTENANCE
/ COMMISSIONING
ELECTRICIANS LOCAL 103
ELECTRICIANS LOCAL 103
3/1/2028 $58.46 $13.00 $14.38 $7.20 $0.00 $93.04
For apprentice rates see "Apprentice- TELECOMMUNICATIONS TECHNICIAN"
6/1/2026 $47.55 $17.05 $13.35 $3.25 $0.00 $81.20FIREMAN (ASST. ENGINEER)
OPERATING ENGINEERS LOCAL 4
OPERATING ENGINEERS LOCAL 4
12/1/2026 $48.73 $17.05 $13.35 $3.25 $0.00 $82.38
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
6/1/2026 $29.21 $10.90 $9.75 $9.21 $0.00 $59.07FLAGGER & SIGNALER (HEAVY & HIGHWAY)
LABORERS
LABORERS - ZONE 2 (HEAVY & HIGHWAY)
12/1/2026 $29.21 $10.90 $9.75 $9.21 $0.00 $59.07
For apprentice rates see "Apprentice- LABORER (Heavy and Highway)
9/1/2026 $60.74 $10.33 $11.47 $8.80 $0.00 $91.34FLOORCOVERER
FLOORCOVERERS LOCAL 2168
FLOORCOVERERS LOCAL 2168 ZONE I
3/1/2027 $62.24 $10.33 $11.47 $8.80 $0.00 $92.84
Apprentice: FLOORCOVERER
Effective Date: 9/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 45.00 $27.33 $10.33 $0.00 $1.76 $0.00 $39.42
2 45.00 $27.33 $10.33 $0.00 $1.76 $0.00 $39.42
3 55.00 $33.41 $10.33 $0.00 $3.52 $0.00 $47.26
4 55.00 $33.41 $10.33 $0.00 $3.52 $0.00 $47.26
5 70.00 $42.52 $10.33 $11.47 $5.28 $0.00 $69.60
6 70.00 $42.52 $10.33 $11.47 $5.28 $0.00 $69.60
7 80.00 $48.59 $10.33 $11.47 $7.04 $0.00 $77.43
8 80.00 $48.59 $10.33 $11.47 $7.04 $0.00 $77.43
Apprentice: FLOORCOVERER
Effective Date: 3/1/2027
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 45.00 $28.01 $10.33 $0.00 $1.76 $0.00 $40.10
2 45.00 $28.01 $10.33 $0.00 $1.76 $0.00 $40.10
3 55.00 $34.23 $10.33 $0.00 $3.52 $0.00 $48.08
4 55.00 $34.23 $10.33 $0.00 $3.52 $0.00 $48.08
5 70.00 $43.57 $10.33 $11.47 $5.28 $0.00 $70.65
6 70.00 $43.57 $10.33 $11.47 $5.28 $0.00 $70.65
7 80.00 $49.79 $10.33 $11.47 $7.04 $0.00 $78.63
Page 11 of 31Wage Request Number: 20260930213626Issue Date: 10/02/2026
Supplemental
Unemployment Total Rate
6/1/2026 $59.38 $17.05 $13.35 $3.25 $0.00 $93.03FORK LIFT/CHERRY PICKER
OPERATING ENGINEERS LOCAL 4
OPERATING ENGINEERS LOCAL 4
12/1/2026 $60.83 $17.05 $13.35 $3.25 $0.00 $94.48
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
6/1/2026 $37.63 $17.05 $13.35 $3.25 $0.00 $71.28GENERATOR/LIGHTING PLANT/HEATERS
OPERATING ENGINEERS LOCAL 4
OPERATING ENGINEERS LOCAL 4
12/1/2026 $38.58 $17.05 $13.35 $3.25 $0.00 $72.23
For apprentice rates see "Apprentice- OPERATING ENGINEERS"
GLAZIER (GLASS PLANK/AIR BARRIER/INTERIOR SYSTEMS)
GLAZIERS LOCAL 35
GLAZIERS LOCAL 35 (ZONE 2)
1/1/2026 $49.06 $10.35 $12.00 $12.60 $0.00 $84.01
6/1/2026 $59.38 $17.05 $13.35 $3.25 $0.00 $93.03HOISTING ENGINEER/CRANES/GRADALLS
OPERATING ENGINEERS LOCAL 4
OPERATING ENGINEERS LOCAL 4
12/1/2026 $60.83 $17.05 $13.35 $3.25 $0.00 $94.48
Apprentice: FLOORCOVERER
Effective Date: 3/1/2027
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
8 80.00 $49.79 $10.33 $11.47 $7.04 $0.00 $78.63
Apprentice Notes
Steps are 750 hrs.
Apprentice to Journeyworker Ratio: 1:1
Apprentice: GLAZIER (GLASS PLANK/AIR BARRIER/INTERIOR SYSTEMS)
Effective Date: 1/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 50.00 $24.53 $10.35 $0.00 $0.00 $0.00 $34.88
2 55.00 $26.98 $10.35 $0.00 $6.88 $0.00 $44.21
3 60.00 $29.44 $10.35 $0.00 $7.50 $0.00 $47.29
4 65.00 $31.89 $10.35 $0.00 $8.13 $0.00 $50.37
5 70.00 $34.34 $10.35 $12.00 $8.75 $0.00 $65.44
6 75.00 $36.80 $10.35 $12.00 $9.38 $0.00 $68.53
7 80.00 $39.25 $10.35 $12.00 $10.00 $0.00 $71.60
8 90.00 $44.15 $10.35 $12.00 $11.25 $0.00 $77.75
Apprentice to Journeyworker Ratio: 1:1
Apprentice: HOISTING ENGINEER/CRANES/GRADALLS
Effective Date: 6/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
Page 12 of 31Wage Request Number: 20260930213626Issue Date: 10/02/2026
Supplemental
Unemployment Total Rate
HVAC (DUCTWORK)
SHEETMETAL WORKERS LOCAL 17
SHEETMETAL WORKERS LOCAL 17 - A
2/1/2026 $62.93 $14.91 $18.74 $9.53 $2.98 $109.09
For apprentice rates see "Apprentice- SHEET METAL WORKER"
9/1/2026 $68.78 $13.00 $14.69 $9.00 $0.00 $105.47
3/1/2027 $69.97 $13.00 $14.73 $9.00 $0.00 $106.70
9/1/2027 $71.88 $13.00 $14.79 $9.00 $0.00 $108.67
HVAC (ELECTRICAL CONTROLS)
ELECTRICIANS LOCAL 103
ELECTRICIANS LOCAL 103
3/1/2028 $73.08 $13.00 $14.82 $9.00 $0.00 $109.90
For apprentice rates see "Apprentice- ELECTRICIAN"
HVAC (TESTING AND BALANCING - AIR)
SHEETMETAL WORKERS LOCAL 17
SHEETMETAL WORKERS LOCAL 17 - A
2/1/2026 $62.93 $14.91 $18.74 $9.53 $2.98 $109.09
For apprentice rates see "Apprentice- SHEET METAL WORKER"
HVAC (TESTING AND BALANCING -WATER)
PIPEFITTERS LOCAL 537
PIPEFITTERS LOCAL 537
9/1/2026 $71.71 $14.20 $14.25 $10.00 $0.00 $110.16
For apprentice rates see "Apprentice- PIPEFITTER" or "PLUMBER/PIPEFITTER"
Apprentice: HOISTING ENGINEER/CRANES/GRADALLS
Effective Date: 6/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 55.00 $32.66 $0.00 $0.00 $0.00 $0.00 $32.66
2 60.00 $35.63 $17.05 $13.35 $3.25 $0.00 $69.28
3 65.00 $38.60 $17.05 $13.35 $3.25 $0.00 $72.25
4 70.00 $41.57 $17.05 $13.35 $3.25 $0.00 $75.22
5 75.00 $44.54 $17.05 $13.35 $3.25 $0.00 $78.19
6 80.00 $47.50 $17.05 $13.35 $3.25 $0.00 $81.15
7 85.00 $50.47 $17.05 $13.35 $3.25 $0.00 $84.12
8 90.00 $53.44 $17.05 $13.35 $3.25 $0.00 $87.09
Apprentice: HOISTING ENGINEER/CRANES/GRADALLS
Effective Date: 12/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 55.00 $33.46 $0.00 $0.00 $0.00 $0.00 $33.46
2 60.00 $36.50 $17.05 $13.35 $3.25 $0.00 $70.15
3 65.00 $39.54 $17.05 $13.35 $3.25 $0.00 $73.19
4 70.00 $42.58 $17.05 $13.35 $3.25 $0.00 $76.23
5 75.00 $45.62 $17.05 $13.35 $3.25 $0.00 $79.27
6 80.00 $48.66 $17.05 $13.35 $3.25 $0.00 $82.31
7 85.00 $51.71 $17.05 $13.35 $3.25 $0.00 $85.36
8 90.00 $54.75 $17.05 $13.35 $3.25 $0.00 $88.40
Apprentice to Journeyworker Ratio: 1:6
Page 13 of 31Wage Request Number: 20260930213626Issue Date: 10/02/2026
Supplemental
Unemployment Total Rate
HVAC MECHANIC
PIPEFITTERS LOCAL 537
PIPEFITTERS LOCAL 537
9/1/2026 $71.71 $14.20 $14.25 $10.00 $0.00 $110.16
For apprentice rates see "Apprentice- PIPEFITTER" or "PLUMBER/PIPEFITTER"
6/1/2026 $42.41 $10.90 $9.75 $9.11 $0.00 $72.17
12/1/2026 $43.85 $10.90 $9.75 $9.11 $0.00 $73.61
6/1/2027 $45.30 $10.90 $9.75 $9.11 $0.00 $75.06
12/1/2027 $46.75 $10.90 $9.75 $9.11 $0.00 $76.51
6/1/2028 $48.25 $10.90 $9.75 $9.11 $0.00 $78.01
HYDRAULIC DRILLS
LABORERS
LABORERS - ZONE 2
12/1/2028 $49.75 $10.90 $9.75 $9.11 $0.00 $79.51
For apprentice rates see "Apprentice- LABORER"
6/1/2026 $42.41 $10.90 $9.75 $9.21 $0.00 $72.27HYDRAULIC DRILLS (HEAVY & HIGHWAY)
LABORERS
LABORERS - ZONE 2 (HEAVY & HIGHWAY)
12/1/2026 $43.85 $10.90 $9.75 $9.21 $0.00 $73.71
For apprentice rates see "Apprentice- LABORER (Heavy and Highway)
INSULATOR (PIPES & TANKS)
HEAT & FROST INSULATORS LOCAL 6
HEAT & FROST INSULATORS LOCAL 6 (BOSTON)
9/1/2026 $59.02 $16.15 $11.46 $11.49 $0.00 $98.12
IRONWORKER/WELDER
IRONWORKERS LOCAL 7
IRONWORKERS LOCAL 7 (BOSTON AREA)
3/16/2026 $58.65 $9.25 $12.75 $15.00 $0.00 $95.65
Apprentice: INSULATOR (PIPES & TANKS)
Effective Date: 9/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 50.00 $29.51 $16.15 $11.21 $5.75 $0.00 $62.62
2 60.00 $35.41 $16.15 $11.26 $6.89 $0.00 $69.71
3 70.00 $41.31 $16.15 $11.31 $8.04 $0.00 $76.81
4 80.00 $47.22 $16.15 $11.36 $9.19 $0.00 $83.92
Apprentice to Journeyworker Ratio: 1:4
Apprentice: IRONWORKER/WELDER
Effective Date: 3/16/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 70.00 $41.06 $9.25 $12.75 $5.00 $0.00 $68.06
2 80.00 $46.92 $9.25 $12.75 $5.00 $0.00 $73.92
3 90.00 $52.79 $9.25 $12.75 $5.00 $0.00 $79.79
4 0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
5 0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
6 0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Apprentice to Journeyworker Ratio: 1:4
Page 14 of 31Wage Request Number: 20260930213626Issue Date: 10/02/2026
Supplemental
Unemployment Total Rate
6/1/2026 $41.91 $10.90 $9.75 $9.11 $0.00 $71.67
12/1/2026 $43.35 $10.90 $9.75 $9.11 $0.00 $73.11
6/1/2027 $44.80 $10.90 $9.75 $9.11 $0.00 $74.56
12/1/2027 $46.25 $10.90 $9.75 $9.11 $0.00 $76.01
6/1/2028 $47.75 $10.90 $9.75 $9.11 $0.00 $77.51
JACKHAMMER & PAVING BREAKER OPERATOR
LABORERS
LABORERS - ZONE 2
12/1/2028 $49.25 $10.90 $9.75 $9.11 $0.00 $79.01
For apprentice rates see "Apprentice- LABORER"
6/1/2026 $41.66 $10.90 $9.75 $9.11 $0.00 $71.42
12/1/2026 $43.10 $10.90 $9.75 $9.11 $0.00 $72.86
6/1/2027 $44.55 $10.90 $9.75 $9.11 $0.00 $74.31
12/1/2027 $46.00 $10.90 $9.75 $9.11 $0.00 $75.76
6/1/2028 $47.50 $10.90 $9.75 $9.11 $0.00 $77.26
LABORER
LABORERS
LABORERS - ZONE 2
12/1/2028 $49.00 $10.90 $9.75 $9.11 $0.00 $78.76
6/1/2026 $41.66 $10.90 $9.75 $9.21 $0.00 $71.52LABORER (HEAVY & HIGHWAY)
LABORERS
LABORERS - ZONE 2 (HEAVY & HIGHWAY)
12/1/2026 $43.10 $10.90 $9.75 $9.21 $0.00 $72.96
Apprentice: LABORER
Effective Date: 6/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 60.00 $25.00 $10.90 $9.75 $9.11 $0.00 $54.76
2 70.00 $29.16 $10.90 $9.75 $9.11 $0.00 $58.92
3 80.00 $33.33 $10.90 $9.75 $9.11 $0.00 $63.09
4 90.00 $37.49 $10.90 $9.75 $9.11 $0.00 $67.25
Apprentice: LABORER
Effective Date: 12/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 60.00 $25.86 $10.90 $9.75 $9.11 $0.00 $55.62
2 70.00 $30.17 $10.90 $9.75 $9.11 $0.00 $59.93
3 80.00 $34.48 $10.90 $9.75 $9.11 $0.00 $64.24
4 90.00 $38.79 $10.90 $9.75 $9.11 $0.00 $68.55
Apprentice to Journeyworker Ratio: 1:5
Apprentice: LABORER (HEAVY & HIGHWAY)
Effective Date: 6/1/2026
Step Percent Apprentice Base Wage Health Pension Annuity
Supplemental Unemployment
Total Rate
1 60.00 $25.00 $10.90 $9.75 $9.21 $0.00 $54.86
2 70.00 $29.16 $10.90 $9.75 $9.21 $0.00 $59.02
3 80.00 $33.33 $10.90 $9.75 $9.21 $0.00 $63.19
4 90.00 $37.49 $10.90 $9.75 $9.10 $0.00 $67.24
Page 15 of 31Wage Request Number: 20260930213626Issue Date: 10/02/2026
Supplemental
Unemployment Total Rate
6/1/2026 $41.66 $10.90 $9.75 $9.11 $0.00 $71.42
12/1/2026 $43.10 $10.90 $9.75 $9.11 $0.00 $72.86
6/1/2027 $44.55 $10.90 $9.75 $9.11 $0.00 $74.31
12/1/2027 $46.00 $10.90 $9.75 $9.11 $0.00 $75.76
6/1/2028 $47.50 $10.90 $9.75 $9.11 $0.00 $77.26
LABORER: CARPENTER TENDER
LABORERS
LABORERS - ZONE 2
12/1/2028 $49.00 $10.90 $9.75 $9.11 $0.00 $78.76
For apprentice rates see "Apprentice- LABORER"
6/1/2026 $41.66 $10.90 $9.75 $9.11 $0.00 $71.42
12/1/2026 $43.10 $10.90 $9.75 $9.11 $0.00 $72.86
6/1/2027 $44.55 $10.90 $9.75 $9.11 $0.00 $74.31
12/1/2027 $46.00 $10.90 $9.75 $9.11 $0.00 $75.76
6/1/2028 $47.50 $10.90 $9.75 $9.11 $0.00 $77.26
LABORER: CEMENT FINISHER TENDER
LABORERS
LABORERS - ZONE 2
12/1/2028 $49.00 $10.90 $9.75 $9.11 $0.00 $78.76
For apprentice rates see "Apprentice- LABORER"
6/1/2026 $41.75 $10.90 $9.75 $9.65 $0.00 $72.05
12/7/2026 $43.19 $10.90 $9.75 $9.65 $0.00 $73.49
6/7/2027 $44.64 $10.90 $9.75 $9.65 $0.00 $74.94
12/6/2027 $46.09 $10.90 $9.75 $9.65 $0.00 $76.39
6/5/2028 $47.59 $10.90 $9.75 $9.65 $0.00 $77.89
LABORER: HAZARDOUS WASTE/ASBESTOS REMOVER
LABORERS
LABORERS - ZONE 2
12/4/2028 $49.09 $10.90 $9.75 $9.65 $0.00 $79.39
For apprentice rates see "Apprentice- LABORER"