About this file
This is a Request for Bids (RFB) document issued by the City of San Bernardino Public Works Department for the Connector Pipe Screen (CPS) Phase 4 Project (Project No. 13683, Contract No. SD 26-003). The project scope consists of construction of connector pipe screens, including cleaning existing catch basins and installing connector pipe screens per project plans and specifications. The work involves furnishing all labor, equipment, materials, tools, services, transportation, permits, utilities, and other items necessary for project completion. The estimated quantity is 120 connector pipe screens to be installed. Bids must be submitted electronically through the Planetbids portal before 3:00 p.m. on November 23, 2026. The last day to submit questions for clarification is November 9, 2026, with clarifications issued by November 12, 2026. No pre-bid meeting is scheduled. Bid evaluation is expected to be completed in November 2026, with vendor selection and City Council approval in December 2026 and vendor award in January 2027. The contract completion time is 90 calendar days from the Notice to Proceed. The City anticipates issuing a Purchase Order in January 2027.
Bidders must submit a bid guarantee (bond, cash, or certified check) equal to 10 percent of the total bid price and are required to provide performance and payment bonds each equal to 100 percent of the contract price. Bidders must hold a valid California Class "A" contractor license or appropriate classification and must be registered with the Department of Industrial Relations. All contractors and subcontractors must comply with prevailing wage requirements as determined by the Department of Industrial Relations for San Bernardino County. Bidders must provide valid Certificates of Reported Compliance (CRC) from the California Air Resources Board for all fleet vehicles subject to Title 13 regulations effective January 1, 2024. The contract will be awarded to the lowest responsive, responsible bidder based on the base bid alone. Minimum insurance requirements include Commercial General Liability of $2,000,000 per occurrence and $4,000,000 aggregate, Automobile Liability of $1,000,000, Employer's Liability of $1,000,000, and Professional Liability of $1,000,000. Liquidated damages are set at $1,500 per calendar day of delay beyond the 90-day completion period. No set-asides are identified in the solicitation documents.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CITY OF SAN BERNARDINO
CONTRACT DOCUMENTS FOR
RFQ F-26-4070
CONNECTOR PIPE SCREEN (CPS) PHASE 4
PROJECT NO. 13683
CONTRACT NO. SD 26-003
Published: October 26, 2026
CITY OF SAN BERNARDINO
Public Works Department
Vanir Tower 290 North D Street
San Bernardino CA 92401
TABLE OF CONTENTS
Page
-i-
00 11 16 – NOTICE INVITING BIDS
00 21 13 – INSTRUCTIONS TO BIDDERS
ARTICLE 1. SECURING DOCUMENTS
ARTICLE 2. EXAMINATION OF SITE AND CONTRACT DOCUMENTS
ARTICLE 3. INTERPRETATION OF DRAWINGS AND DOCUMENTS
ARTICLE 4. PRE-BID CONFERENCE
ARTICLE 5. ADDENDA
ARTICLE 6. ALTERNATE BIDS
ARTICLE 7. COMPLETION OF BID FORMS
ARTICLE 8. MODIFICATIONS OF BIDS
ARTICLE 9. SUBCONTRACTORS
ARTICLE 10 LICENSING REQUIREMENTS REQUIREMENTS
ARTICLE 11.BID GUARANTEE (BOND)
ARTICLE 12.IRAN CONTRACTING ACT OF 2010
ARTICLE 13.NONCOLLUSION DECLARATION
ARTICLE 14.PUBLIC WORKS CONTRACTOR DIR REGISTRATION
CERTIFICATION
ARTICLE 15. BIDDER INFORMATION AND EXPERIENCE FORM
ARTICLE 16. WORKERS' COMPENSATION CERTIFICATION
ARTICLE 17. SIGNING OF BIDS
ARTICLE 18. SUBMISSION OF BIDS
ARTICLE 19. OPENING OF BIDS
ARTICLE 20. WITHDRAWAL OF BID
ARTICLE 21. BIDDERS INTERESTED IN MORE THAN ONE BID
ARTICLE 22. SUBSTITUTION OF SECURITY
ARTICLE 23. PREVAILING WAGES
ARTICLE 24. DEBARMENT OF CONTRACTORS AND SUBCONTRACTORS
ARTICLE 25. INSURANCE REQUIREMENTS
ARTICLE 26. PERFORMANCE BOND AND PAYMENT BOND
REQUIREMENTS
ARTICLE 27. .. SALES AND OTHER APPLICABLE TAXES, PERMITS, LICENSES AND
FEES
ARTICLE 28. FILING OF BID PROTESTS
(continued)
-ii-
ARTICLE 29. BASIS OF AWARD; BALANCED BID
ARTICLE 30. AWARD PROCESS
ARTICLE 31. EXECUTION OF CONTRACT
ARTICLE32. QUESTIONS
00 41 43 – BID FORMS
BID ACKNOWLEDGMENT
BIDSCHEDULE
BIDGUARANTEE
DESIGNATION OF SUBCONTRACTORS
BIDDER INFORMATION AND EXPERIENCE FORM
NON-COLLUSION DECLARATION
IRAN CONTRACTING ACT CERTIFICATION
PUBLIC WORKS CONTRACTOR REGISTRATION CERTIFICATION
CONTRACTOR’S CERTIFICATE REGARDING WORKERS’ COMPENSATION
00 52 13 – CONTRACT FOR CONSTRUCTION
ARTICLE 1. SCOPE OF WORK
ARTICLE 2. TIME FOR COMPLETION
ARTICLE 3. CONTRACT PRICE
ARTICLE 4. LIQUIDATED DAMAGES
ARTICLE 5. COMPONENT PARTS OF THE CONTRACT
ARTICLE 6. PROVISIONS REQUIRED BY LAW AND CONTRACTOR
COMPLIANCE
ARTICLE 7. INDEMNIFICATION
ARTICLE 8. PREVAILING WAGES
ARTICLE 9. FALSE CLAIMS
00 61 13 – BOND FORMS
00 72 00 – GENERAL CONDITIONS
ARTICLE 1 - TERMS; DEFINITIONS
ARTICLE 2 - PRELIMINARY MATTERS
ARTICLE 3 - CONTRACT DOCUMENTS; INTENT
ARTICLE 4 - INDEMNIFICATION; INSURANCE
ARTICLE 5 - CONTRACTOR RESPONSIBILITIES; REGULATORY
REQUIREMENTS
(continued)
-iii-
ARTICLE 6 - MATERIALS; INSPECTION
ARTICLE 7 - SUBSURFACE AND PHYSICAL CONDITIONS; UTILITIES
ARTICLE 8 - PROSECUTION OF THE WORK
ARTICLE 9 - CHANGE ORDERS; DISPUTE RESOLUTION
ARTICLE 10 - MEASUREMENT; PAYMENT
ARTICLE 11 - MISCELLANEOUS
00 73 13 – SPECIAL CONDITIONS
ARTICLE 1 - SCOPE OF WORK
ARTICLE 2 - MODIFICATIONS TO THE GENERAL CONDITIONS
APPENDICES ............................................................ ERROR! BOOKMARK NOT DEFINED.30
APPENDIX “A” – TECHNICAL SPECIFICATIONS ..... ERROR! BOOKMARK NOT DEFINED.30
APPENDIX “B” – CERTIFIED FULL CAPTURE SYSTEM CONFIRGURATION
STANDARDS / TABLES ................................. ERROR! BOOKMARK NOT DEFINED.39
APPENDIX “C” – CATCH BASIN LOCATIONS .......... ERROR! BOOKMARK NOT DEFINED.51
APPENDIX “D” – CITY OF SAN BERNARDINO BUSINESS REGISTRATION
APPLICATION FORM .................................... ERROR! BOOKMARK NOT DEFINED.53
CONNECTOR PIPE SCREEN (CPS) PHASE 4 -1- 00 11 16 – NOTICE INVITING BIDS
00 11 16 – NOTICE INVITING BIDS
NOTICE IS HEREBY GIVEN that the CITY OF SAN BERNARDINO, with its principal place of business at Vanir Tower, 290 North D Street, San Bernardino, California 92401 ("City") invites and will receive Bids before 3:00 P.M. ON NOVEMBER 23, 2026, electronically through the City’s online bid management provider (“Planetbids”), for the furnishing to City of all labor, equipment, materials, tools, services, transportation, permits, utilities, and all other items necessary for CONNECTOR PIPE SCREEN (CPS) PHASE 4 (the “Project”). Bids may NOT be submitted by fax, email, telephone, mail, hand delivery, or other means; any Proposals received through any means other than Planetbids will be returned to the vendor unopened.
THE WORK INCLUDES CONSTRUCTION OF CONNECTOR PIPE SCREENS (CPS),
INCLUDING BUT NOT LIMITED TO CLEANING EXISTING CATCH BASINS AND INSTALLING
CONNECTOR PIPE SCREENS PER PROJECT PLANS AND SPECIFICATIONS.
Bids must be submitted on City’s Bid Forms. Bidders may obtain a copy of the Contract Documents from PLANET BIDS portal, [https://pbsystem.planetbids.com/portal/39495/bo/bo-search]. To the extent required by section 20103.7 of the Public Contract Code, upon request from a contractor plan room service, City shall provide an electronic copy of the Contract Documents at no charge to the contractor plan room.
It is the responsibility of each prospective Bidder to download and print all Bid Documents for review and to verify the completeness of Bid Documents before submitting a bid. Any Addenda will be posted on [https://pbsystem.planetbids.com/portal/39495/bo/bo-search]. It is the responsibility of each prospective Bidder to check [https://pbsystem.planetbids.com/portal/39495/bo/bo-search] on a daily basis through the close of Bids for any applicable Addenda or updates. City does not assume any liability or responsibility based on any defective or incomplete copying, excerpting, scanning, faxing, downloading or printing of the Bid Documents. Information on [https://pbsystem.planetbids.com/portal/39495/bo/bo-search] may change without notice to prospective Bidders. The Contract Documents shall supersede any information posted or transmitted by [https://pbsystem.planetbids.com/portal/39495/bo/bo-search].
Each Bid shall be accompanied by cash, a certified or cashier’s check, or Bid Bond secured from a surety company satisfactory to the City, the amount of which shall not be less than ten percent (10%) of the submitted Total Bid Price, made payable to City of San Bernardino, 290 North D Street, San Bernardino, CA 92401 as bid security. The bid security shall be provided as a guarantee that within ten (10) days after City provides the successful bidder with the Notice of Award, the successful Bidder will enter into a contract and provide the necessary bonds and certificates of insurance. The bid security will be declared forfeited if the successful Bidder fails to comply within said time. No interest will be paid on funds deposited with City.
The successful Bidder will be required to furnish a Faithful Performance Bond and a Labor and Material Payment Bond each in an amount equal to one hundred percent (100%) of the Contract Price. Each bond shall be in the forms set forth herein, shall be secured by a surety company that meets all State of California bonding requirements, as defined in California Code of Civil Procedure Section 995.120, and that is a California admitted surety insurer.
Pursuant to Section 22300 of the Public Contract Code of the State of California, the successful Bidder may substitute certain securities for funds withheld by City to ensure its performance under the Contract.
CONNECTOR PIPE SCREEN (CPS) PHASE 4 -2- 00 11 16 – NOTICE INVITING BIDS
Pursuant to Labor Code Section 1773, City has obtained the prevailing rate of per diem wages and the prevailing wage rate for holiday and overtime work applicable in San Bernardino County from the Director of the Department of Industrial Relations for each craft, classification, or type of worker needed to execute this contract. A copy of these prevailing wage rates may be obtained via the internet at: www.dir.ca.gov/dlsr/
In addition, a copy of the prevailing rate of per-dim wages is available at city’s Public Works Department and shall be made available to interested parties upon request. The successful Bidder shall post a copy of the prevailing wage rates at each job site. It shall be mandatory upon the Bidder to whom the Contract is awarded, and upon any subcontractors, to comply with all Labor Code provisions, which include but are not limited to the payment of not less than the said specified prevailing wage rates to all workers employed by them in the execution of the Contract, employment of apprentices, hours of labor and debarment of contractors and subcontractors.
Pursuant to Labor Code sections 1725.5 and 1771.1, all contractors and subcontractors that wish to bid on, be listed in a bid proposal, or enter into a contract to perform public work must be registered with the Department of Industrial Relations. No Bid will be accepted nor any Contract entered into without proof of the contractor’s and subcontractors’ current registration with the Department of Industrial Relations to perform public work. If awarded a contract, the Bidder and its subcontractors, of any tier, shall maintain active registration with the Department of Industrial Relations for the duration of the Project. Notwithstanding the foregoing, the contractor registration requirements mandated by Labor Code Sections 1725.5 and 1771.1 shall not apply to work performed on a public works project that is exempt pursuant to the small project exemption specified in Labor Code Sections 1725.5 and 1771.1.
This Project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. In bidding on this Project, it shall be the Bidder’s sole responsibility to evaluate and include the cost of complying with all labor compliance requirements under this contract and applicable law in its Bid.
Unless otherwise provided in the Instructions for Bidders, each Bidder shall be a licensed contractor pursuant to sections 7000 et seq. of the Business and Professions Code in the following classification(s) throughout the time it submits its Bid and for the duration of the Contract: Class “A” License Or Appropriate License Classification.
Substitution requests shall be made within 35 calendar days after the award of the Contract.
Pursuant to Public Contract Code Section 3400(b), City may make findings designating that certain additional materials, methods or services by specific brand or trade name other than those listed in the Contract Documents be used for the Project. Such findings, if there are any, as well as the materials, methods or services and their specific brand or trade names that must be used for the Project may be found in the Special Conditions.
The California Air Resources Board (“CARB”) implemented amendments to the In-Use Off-Road Diesel-Fueled Fleets Regulations (“Regulation”) which are effective on January 1, 2024, and apply broadly to all self-propelled off-road diesel vehicles 25 horsepower or greater and other forms of equipment used in California. A copy of the Regulation is available at https://ww2.arb.ca.gov/sites/default/files/barcu/regact/2022/off-roaddiesel/appa-1.pdf. Bidders are required to comply with all CARB and Regulation requirements, including, without limitation, all applicable sections of the Regulation, as codified in Title 13 of the California Code of Regulations section 2449 et seq. throughout the term of the Project. Bidders must provide, with their Bid, copies of Bidder’s and all listed subcontractors the most recent, valid Certificate of
CONNECTOR PIPE SCREEN (CPS) PHASE 4 -3- 00 11 16 – NOTICE INVITING BIDS
Reported Compliance (“CRC”) issued by CARB. Failure to provide valid CRCs as required herein may render the Bid non-responsive.
City shall award the contract for the Project to the lowest responsive, responsible Bidder as determined by City from the BASE BID ALONE. City reserves the right to reject any or all Bids or to waive any irregularities or informalities in any Bids or in the bidding process.
All questions should be submitted before 3:00 PM ON November 9TH, 2026 on PLANET BIDS portal at: https://vendors.planetbids.com/portal/39495/bo/bo-detail/138258
END OF NOTICE INVITING BIDS
https://vendors.planetbids.com/portal/39495/bo/bo-detail/138258
CONNECTOR PIPE SCREEN (CPS) PHASE 4 -4-
REQUEST FOR BIDS CALENDAR
ACTION DATE
RELEASE FOR REQUEST FOR BID OCTOBER 26, 2026
PRE-BID MEETING – NOT APPLICABLE NOT APPLICABLE
LAST DAY TO SUBMIT QUESTIONS FOR
CLARIFICATION RECEIVED BY THE CITY
BEFORE 3:00 PM
NOVEMBER 9, 2026
CLARIFICATIONS ISSUED BY CITY BY END OF DAY NOVEMBER 12, 2026
DEADLINE FOR RECIEPT OF BIDS ON PLANETBIDS
SUBMITTED BEFORE 3:00PM NOVEMBER 23, 2026
EVALUATION OF BIDS COMPLETED NOVEMBER 2026
VENDOR SELECTION NOVEMBER 2026
CITY COUNCIL APPROVAL DECEMBER 2026
VENDOR AWARD (AGREEMENT THROUGH
DOCUSIGN) JANUARY 2027
PURCHASE ORDER ISSUE JANUARY 2027
CONNECTOR PIPE SCREEN (CPS) PHASE 4 -5- 00 21 13 – INSTRUCTIONS TO BIDDERS
00 21 13 – INSTRUCTIONS TO BIDDERS
ARTICLE 1. SECURING DOCUMENTS
Bids must be submitted to City on the Bid Forms which are a part of the Contract Documents for the Project. Contract Documents may be obtained from as specified in the Notice Inviting Bids.
Prospective Bidders are encouraged to telephone in advance to determine the availability of Contract Documents. Any charge for the Contract Documents is stated in the Notice Inviting Bids.
City may also make the Contract Documents available for review at one or more plan rooms, as indicated in the Notice Inviting Bids. Please Note: Prospective Bidders who choose to review the Contract Documents at a plan room must contact City to obtain the required Contract Documents if they decide to submit a Bid for the Project.
ARTICLE 2. EXAMINATION OF SITE AND CONTRACT DOCUMENTS
At its own expense and prior to submitting its Bid, each Bidder shall visit the site of the proposed work and fully acquaint itself with the conditions relating to the construction and labor required so that the Bidder may fully understand the work, including but not limited to difficulties and restrictions attending the execution of the work under the Contract. Each Bidder shall carefully examine the Drawings, and shall read the Specifications, Contract, and all other documents referenced herein and made part of the Contract Documents. Each Bidder shall also determine the local conditions which may in any way affect the performance of the work, including local tax structure, contractors’ licensing requirements, availability of required insurance, the prevailing wages and other relevant cost factors, shall familiarize itself with all federal, state and local laws, ordinances, rules, regulations and codes affecting the performance of the work, including the cost of permits and licenses required for the work, and shall make such surveys and investigations, including investigations of subsurface or latent physical conditions at the site or where work is to be performed as may be required. Bidders are responsible for consulting the standards referenced in the Contract Documents. The failure or omission of any Bidder to receive or examine the Contract Documents, forms, instruments, addenda, or other documents, or to visit the site and acquaint itself with conditions there existing shall in no way relieve any Bidder from any obligation with respect to its Bid or to the Contract and no relief for error or omission will be given except as required under state law. The submission of a Bid shall be taken as conclusive evidence of compliance with this Article.
ARTICLE 3. INTERPRETATION OF DRAWINGS AND DOCUMENTS
Prospective Bidders unclear as to the true meaning of any part of the Drawings, Specifications or other Contract Documents may submit a written request for interpretation. The prospective Bidder submitting the request is responsible for prompt delivery. Interpretation of the Drawings, Specifications or other Contract Documents will be made only by a written Addendum duly issued and a copy of such Addenda will be mailed or delivered to each prospective Bidder who has purchased a set of Contract Documents. The City will not be responsible for any other explanation or interpretation of the Contract Documents. If a prospective Bidders becomes aware of any errors or omissions in any part of the Contract Documents, it is the obligation of the prospective Bidder to promptly bring it to the attention of the City.
ARTICLE 4. PRE-BID CONFERENCE
NOT APPLICABLE
CONNECTOR PIPE SCREEN (CPS) PHASE 4 -6- 00 21 13 – INSTRUCTIONS TO BIDDERS
ARTICLE 5. ADDENDA
The City reserves the right to revise the Contract Documents prior to the Bid opening date.
Revisions, if any, shall be made by written Addenda. All Addenda issued by the City shall be included in the Bid and made part of the Contract Documents. Pursuant to Public Contract Code Section 4104.5, if the City issues an Addendum which includes material changes to the Project less than 72 hours prior to the deadline for submission of Bids, the City will extend the deadline for submission of Bids. The City may determine, in its sole discretion, whether an Addendum warrants postponement of the Bid submission date. Each prospective Bidder shall provide the City with a name, address, email address, and facsimile number to which Addenda may be sent, as well as a telephone number by which the City can contact the Bidder. Copies of Addenda will be posted on Planetbids without charge to all parties who have obtained a copy of the Contract Documents and provided such current information. Please Note: Bidders are responsible for ensuring that they have received any and all Addenda. To this end, each Bidder should check Planetbids portal for updates to verify that it has received all Addenda issued, if any, prior to the Bid opening. The Bidder shall indicate the Addenda received prior to bidding in the space provided in the Bid Form. Failure to indicate all Addenda may be sufficient cause for rejecting the Bid.
ARTICLE 6. ALTERNATE BIDS
If alternate bid items are called for in the Contract Documents, the time required for completion of the alternate bid items has already been factored into the Contract duration and no additional Contract time will be awarded for any of the alternate bid items. The city may elect to include one or more of the alternate bid items, or to otherwise remove certain work from the Project scope of work. Accordingly, each Bidder must ensure that each Bid item contains a proportionate share of profit, overhead, and other costs or expenses which will be incurred by the Bidder.
ARTICLE 7. COMPLETION OF BID FORMS
Bids shall only be prepared using copies of the Bid Forms which are included in the Contract Documents. The use of substitute Bid Forms other than clear and correct photocopies of those provided by the City will not be permitted. Bids shall be executed by an authorized signatory as described in these Instructions to Bidders. In addition, Bidders shall fill in all blank spaces (including inserting “N/A” where applicable), and initial all interlineations, alterations, or erasures to the Bid Forms. Bidders shall neither delete, modify, nor supplement the printed matter on the Bid Forms nor make substitutions thereon. USE OF BLACK OR BLUE INK, INDELIBLE PENCIL, OR A TYPEWRITER IS REQUIRED. Deviations in the Bid Forms may result in the Bid being deemed non-responsive.
ARTICLE 8. MODIFICATIONS OF BIDS
Each Bidder shall submit its Bid in strict conformity with the requirements of the Contract Documents. Unauthorized additions, modifications, revisions, conditions, limitations, exclusions or provisions attached to a Bid may render it non-responsive and may cause its rejection. Bidders shall not delete, modify, or supplement the printed matter on the Bid Forms, or make substitutions thereon. Oral, telephonic and electronic modifications will not be considered.
ARTICLE 9. SUBCONTRACTORS
Bidder shall set forth the name, address of the place of business, contractor license number, and public works contractor registration number of each subcontractor who will perform work, labor, CONNECTOR PIPE SCREEN (CPS) PHASE 4 -7- 00 21 13 – INSTRUCTIONS TO BIDDERS furnish materials or render services to the bidder on said contract and each subcontractor licensed by the State of California who, under subcontract to bidder, specially fabricates and installs a portion of the Work described in the Contract Documents in an amount in excess of one half of one percent (0.5%) of the total bid price, and shall indicate the portion of the work to be done by such subcontractor in accordance with Public Contract Code Section 4104. Notwithstanding the foregoing, if the work involves the construction of streets and highways, then the Bidder shall list each subcontractor who will perform work or labor or render service to the Bidder in or about the work in an amount in excess of one-half of one percent (0.5%) of the Bidder’s Total Bid Price or $10,000, whichever is greater. If a Bidder fails to specify a subcontractor or if a Bidder specifies more than one subcontractor for the same portion of work, then the Bidder shall be deemed to have agreed that it is fully qualified to perform that portion of work and that it shall perform that portion itself. Substitution of listed subcontractors shall only be permitted in accordance with Public Contract Code Section 4107.
ARTICLE 10. LICENSING REQUIREMENTS
Pursuant to Business and Professions Code Section 7028.15 and Public Contract Code Section 3300, all Bidders must possess proper licenses for performance of this Contract. Subcontractors must possess the appropriate licenses for each specialty subcontracted. Pursuant to Business and Professions Code Section 7028.5, the City shall consider any Bid submitted by a Bidder not currently licensed in accordance with state law and pursuant to the requirements found in the Contract Documents to be nonresponsive, and the City shall reject the Bid. The City shall have the right to request, and Bidders shall provide within ten (10) calendar days, evidence satisfactory to the City of all valid license(s) currently held by that Bidder and each of the Bidder’s subcontractors, before awarding the Contract.
Notwithstanding anything contained herein, if the Work involves federal funds, the Contractor shall be properly licensed by the time the Contract is awarded, pursuant to the provisions of Public Contract Code section 20103.5.
ARTICLE 11. BID GUARANTEE (BOND)
Each Bid shall be accompanied by a Bid Bond secured from a surety company satisfactory to the City, the amount of which shall not be less than ten percent (10%) of the Total Bid Price, made payable to City of San Bernardino, 290 North :D” Street, San Bernardino, California 92401 as a bid security. Bidders must provide a copy of the bid bond electronically and send the original bond via mail or delivered, by the due date of the bid to the Public Works office located at 201 North “E” Street, 2nd floor, San Bernardino California 92401.
Personal sureties and unregistered surety companies are unacceptable. The surety insurer shall be California admitted surety insurer, as defined in Code of Civil Procedure Section 995.120. The bid security shall be provided as a guarantee that within ten (10) Days after the City provides the successful Bidder the Notice of Award, the successful Bidder will enter into a Contract and provide the necessary bonds and certificates of insurance. The bid security will be declared forfeited if the successful Bidder fails to comply within said time, and the City may enter into a Contract with the next lowest responsive responsible bidder or may call for new Bids. No interest shall be paid on
CONNECTOR PIPE SCREEN (CPS) PHASE 4 -8- 00 21 13 – INSTRUCTIONS TO BIDDERS
funds deposited with the city. The city will return the security accompanying the bids of all unsuccessful bidders no later than 60 calendar days after award of the contract.
ARTICLE 12. IRAN CONTRACTING ACT OF 2010
In accordance with Public Contract Code Section 2200 et seq., the City requires that any person that submits a Bid with the City of one million dollars ($1,000,000) or more, certify at the time the Bid is submitted that the person is not identified on a list created pursuant to subdivision (b) of Public Contract Code Section 2203 as a person engaging in investment activities in Iran described in subdivision (a) of Public Contract Code Section 2202.5, or as a person described in subdivision
(b) of Public Contract Code Section 2202.5, as applicable.
The form of such Iran Contracting Certificate is included with the Bid Forms and must be signed and dated under penalty of perjury.
ARTICLE 13. NONCOLLUSION DECLARATION
Bidders on all public works contracts are required to submit a declaration of noncollusion with their Bid. This form is included with the Bid Forms and must be signed and dated under penalty of perjury.
ARTICLE 14. PUBLIC WORKS CONTRACTOR DIR REGISTRATION CERTIFICATION
Pursuant to Labor Code sections 1725.5 and 1771.1, all contractors and subcontractors that wish to bid on, be listed in a bid proposal, or enter into a contract to perform public work must be registered with the Department of Industrial Relations. No Bid will be accepted nor any Contract entered into without proof of the contractor’s and subcontractors’ current registration with the Department of Industrial Relations to perform public work. If awarded a contract, the Bidder and its subcontractors, of any tier, shall maintain active registration with the Department of Industrial Relations for the duration of the Project. To this end, Bidder shall sign and submit with its Bid the Public Works Contractor DIR Registration Certification on the form provided, attesting to the facts contained therein. Failure to submit this form may render the bid non-responsive. In addition, each Bidder shall provide the registration number for each listed subcontractor in the space provided in the Designation of Subcontractors form.
ARTICLE 15. BIDDER INFORMATION AND EXPERIENCE FORM
Each Bidder shall complete the questionnaire provided herein and shall submit the questionnaire along with its Bid. Failure to provide all information requested within the questionnaire along with the Bid may cause the bid to be rejected as non-responsive. The City reserves the right to reject any Bid if an investigation of the information submitted does not satisfy the City that the Bidder is qualified to properly carry out the terms of the Contract.
ARTICLE 16. WORKERS' COMPENSATION CERTIFICATION
In accordance with the provisions of Labor Code Section 3700, Contractor shall secure the payment of compensation to its employees. Contractor shall sign and file with the City a Workers' Compensation Certificate prior to performing the work under this Contract. The form of such Workers' Compensation Certificate is included as part of the Bid Forms.
CONNECTOR PIPE SCREEN (CPS) PHASE 4 -9- 00 21 13 – INSTRUCTIONS TO BIDDERS
ARTICLE 17. SIGNING OF BIDS
All Bids submitted shall be executed by the Bidder or its authorized representative. Bidders may be asked to provide evidence in the form of an authenticated resolution of its Board of Directors or a Power of Attorney evidencing the capacity of the person signing the Bid to bind the Bidder to each Bid and to any Contract arising therefrom.
If a Bidder is a joint venture or partnership, it may be asked to submit an authenticated Power of Attorney executed by each joint venturer or partner appointing and designating one of the joint venturers or partners as a management sponsor to execute the Bid on behalf of Bidder. Only that joint venturer or partner shall execute the Bid. The Power of Attorney shall also: (1) authorize that particular joint venturer or partner to act for and bind Bidder in all matters relating to the Bid;
and (2) provide that each venturer or partner shall be jointly and severally liable for any and all of the duties and obligations of Bidder assumed under the Bid and under any Contract arising therefrom. The Bid shall be executed by the designated joint venturer or partner on behalf of the joint venture or partnership in its legal name.
ARTICLE 18. SUBMISSION OF BIDS
Once the Bid and supporting documents have been completed and signed as set forth herein, they shall be submitted, along with the Bid guarantee and other required materials, electronically through the City’s online bid management provider (“Planetbids”). Bids may NOT be submitted by fax, email, telephone, mail, hand delivery, or other means; any Proposals received through any means other than Planetbids will be returned to the vendor unopened. Bids received after the time and day set for the receipt of Bids shall be returned to the Bidder unopened.
ARTICLE 19. OPENING OF BIDS
At the time and place set for the opening of Bids, all Bids received electronically prior to the specified date and time for receipt of Bids will be electronically opened and publicly posted. Any Bid received after the specified date and time will not be accepted or considered. It is the Bidder’s sole responsibility to ensure that its Bid is properly submitted through the designated electronic bidding system before the deadline. Bids may be submitted electronically at any time before the specified date and time for receipt of Bids.
The public posting of each Bid will include the following information:
A. The name and business location of the Bidder.
B. The nature and amount of the bid security furnished by the Bidder.
C. The Bid amount.
The City may, in its sole discretion, postpone the electronic opening of the submitted Bids. The City reserves the right to reject any or all Bids and to waive any informality or irregularity in any Bid.
ARTICLE 20. WITHDRAWAL OF BID
Any Bid may be withdrawn either personally or by written request, incurring no penalty, at any time prior to the scheduled closing time for receipt of Bids. Requests to withdraw Bids shall be
CONNECTOR PIPE SCREEN (CPS) PHASE 4 -10- 00 21 13 – INSTRUCTIONS TO BIDDERS
worded so as not to reveal the amount of the original Bid. Withdrawn Bids may be resubmitted until the time and day set for the receipt of Bids, provided that resubmitted Bids are in conformance with the instructions herein.
Bids may be withdrawn after Bid opening only by providing written notice to the City within five (5) working days of the Bid opening and in compliance with Public Contract Code Section 5100 et seq., or as otherwise may be allowed with the consent of the City.
ARTICLE 21. BIDDERS INTERESTED IN MORE THAN ONE BID
No Bidder shall be allowed to make, file or be interested in more than one Bid for the same work unless alternate Bids are specifically called for. A person, firm or corporation that has submitted a sub-proposal to a Bidder, or that has quoted prices of materials to a Bidder, is not thereby disqualified from submitting a sub-proposal or quoting prices to other Bidders or from simultaneously submitting its own Bid as a prime contractor.
ARTICLE 22. SUBSTITUTION OF SECURITY
The Contract Documents call for monthly progress payments for the Work completed. The City will retain a percentage of each progress payment as provided by the Contract Documents. At the request and expense of the successful Bidder, the City will substitute securities for the amount so retained in accordance with Public Contract Code Section 22300.
ARTICLE 23. PREVAILING WAGES
The City has obtained from the Director of the Department of Industrial Relations the general prevailing rate of per diem wages in the locality in which this work is to be performed for each craft or type of worker needed to execute the Contract. These rates are available at the Office of City Engineer, 201 North “D” Street, San Bernardino of the City or may be obtained online at http://www.dir.ca.gov. Bidders are advised that a copy of these rates must be posted by the successful Bidder at the job site(s).
ARTICLE 24. DEBARMENT OF CONTRACTORS AND SUBCONTRACTORS
In accordance with the provisions of the Labor Code, contractors or subcontractors may not perform work on a public works project with a subcontractor who is ineligible to perform work on a public project pursuant to Labor Code Sections 1777.1 or 1777.7. Any contract on a public works project entered into between a contractor and a debarred subcontractor is void as a matter of law. A debarred subcontractor may not receive any public money for performing work as a subcontractor on a public works contract. Any public money that is paid to a debarred subcontractor by the Contractor for the Project shall be returned to the City. The Contractor shall be responsible for the payment of wages to workers of a debarred subcontractor who has been allowed to work on the Project.
ARTICLE 25. INSURANCE REQUIREMENTS
Prior to commencing work, the successful bidder shall purchase and maintain insurance as set forth in the General Conditions.
CONNECTOR PIPE SCREEN (CPS) PHASE 4 -11- 00 21 13 – INSTRUCTIONS TO BIDDERS
ARTICLE 26. PERFORMANCE BOND AND PAYMENT BOND REQUIREMENTS
The successful Bidder will be required to furnish a Labor and Material Payment Bond and a Faithful Performance Bond each in an amount equal to one hundred percent (100%) of the contract price. Each bond shall be secured from a surety company that meets all State of California bonding requirements, as defined in California Code of Civil Procedure Section 995.120 and is admitted by the State of California. Each bond shall be accompanied, upon the request of the City, with all documents required by California Code of Civil Procedure Section 995.660 to the extent required by law. All bonding and insurance requirements shall be completed and submitted to the City within ten (10) Days from the date the City provides the successful bidder with the Notice of Award.
ARTICLE 27. SALES AND OTHER APPLICABLE TAXES, PERMITS, LICENSES AND FEES
Contractor and its subcontractors performing work under this Contract will be required to pay California sales tax and other applicable taxes, and to pay for permits, licenses and fees required by the agencies with authority in the jurisdiction in which the Work will be located, unless otherwise expressly provided by the Contract Documents.
ARTICLE 28. FILING OF BID PROTESTS
Bidders may file a “protest” of a Bid with the City’s City Engineer’s office, 201 North “D” Street, San Bernardino, California 92401. In order for a Bidder’s protest to be considered valid, the protest must:
A. Be filed in writing within five (5) calendar days after the bid opening date or any City determination or recommendation regarding the Bidder’s bid;
B. Clearly identify the specific irregularity or accusation;
C. Clearly identify the specific City staff determination or recommendation being protested;
D. Specify in detail the grounds for protest and the facts supporting the protest; and
E. Include all relevant, supporting documentation with the protest at time of filing.
If the protest does not comply with each of these requirements, the City may reject the protest without further review.
If the protest is timely and complies with the above requirements, the City’s City Engineer or other designated City staff member, shall review the protest, any response from the challenged Bidder(s), and all other relevant information. The City Engineer will provide a written decision to the protestor.
The procedure and time limits set forth in this Article are mandatory and are the sole and exclusive remedy in the event of a Bid protest. Failure to comply with these procedures shall constitute a failure to exhaust administrative remedies and a waiver of any right to further pursue the Bid protest, including filing a Government Code Claim or legal proceedings.
CONNECTOR PIPE SCREEN (CPS) PHASE 4 -12- 00 21 13 – INSTRUCTIONS TO BIDDERS
ARTICLE 29. BASIS OF AWARD; BALANCED BID
The City shall award the Contract to the lowest responsible Bidder submitting a responsive Bid.
The lowest Bid will be determined on the basis of the BASE BID.
The City may reject any Bid which, in its opinion when compared to other Bids received or to the City’s internal estimates, does not accurately reflect the cost to perform the Work. The City may reject as non-responsive any Bid which unevenly weights or allocates costs, including but not limited to overhead and profit to one or more particular bid items.
ARTICLE 30. AWARD PROCESS
Once all Bids are opened and reviewed to determine the lowest responsive and responsible Bidder, the City Council may award the Contract. The apparent successful Bidder should begin to prepare the following documents: (1) the Performance Bond; (2) the Payment Bond; and (3) the required insurance certificates and endorsements. Once the City notifies the Bidder of the award, the Bidder will have ten (10) days from the date of this notification to execute the Contract and supply the City with all of the required documents and certifications. Once the City receives all of the properly drafted and executed documents and certifications from the Bidder, the City will issue a Notice to Proceed to that Bidder.
ARTICLE 31. EXECUTION OF CONTRACT
As required herein the Bidder to whom an award is made shall execute the Contract in the amount determined by the Contract Documents. The City may require appropriate evidence that the persons executing the Contract are duly empowered to do so. The Contract and bond forms to be executed by the successful Bidder are included within these Contract Documents and shall not be detached.
ARTICLE 32. QUESTIONS
Questions regarding this Notice Inviting Bids may be directed via Planetbids (https://vendors.planetbids.com/portal/39495/bo/bo-detail/138258). No members of the City’s staff or City Council should be contacted about this procurement during the bidding process.
Any and all inquiries and comments regarding this Bid must be communicated through Planetbids, unless otherwise instructed by the City. The City may, in its sole discretion, disqualify any Bidder who engages in any prohibited communications
All questions to be submitted on or before Monday, November 9, 2026, before 3:00 PM on the PLANET BIDS portal.
ARTICLE 33. FLEET COMPLIANCE CERTIFICATION
The City is a Public Works Awarding Body, as defined under Title 13 California Code of Regulations section 2449(c)(46). Accordingly, Bidders must submit, with their Bids, a valid Certificate of Reported Compliance (“CRC”) for the Bidder’s and its listed subcontractors fleet (including any applicable leased equipment or vehicles) . Bidder must complete and submit the Fleet Compliance Certification, included in the Bid Documents. Failure to provide a CRC for the Bidder, and for all listed subcontractors, or failure to complete the Fleet Compliance Certification, may render the Bid non-responsive.
CONNECTOR PIPE SCREEN (CPS) PHASE 4 -13- 00 41 43 – BID FORMS
00 41 43 – BID FORMS
BID ACKNOWLEDGMENT
Bids will be received electronically through the City’s online bid management provider (“Planetbids”) before 3:00 p.m. on Monday, November 23, 2026.
CONNECTOR PIPE SCREEN (CPS) PHASE 4 PROJECT NO. 13683
NAME OF BIDDER: ______________________________________________
To the CITY OF SAN BERNARDINO, with its principal place of business at Vanir Tower, 290 North D Street, San Bernardino, California 92401.
A. In response to the Notice Inviting Bids dated October 26, 2026, and in accordance with the accompanying Instructions to Bidders, the undersigned hereby proposes to the City to furnish all labor, technical and professional services, supervision, materials and equipment, other than materials and equipment specified as furnished by the City, and to perform all operations necessary and required to construct the Project in accordance with the provisions of the Contract Documents and any addenda thereto, and at the prices stated opposite the respective items set forth in the Bid Schedule.
B. This Bid constitutes a firm offer to the City which cannot be withdrawn for 90 days after the date set for opening of Bids, or until a Contract is executed by the City and a third party, whichever is earlier.
C. The undersigned certifies that it has examined and is fully familiar with all of the provisions of the Contract Documents and any addenda thereto; that it has carefully checked all of the words and figures shown in its Bid Schedule; that it has carefully reviewed the accuracy of all statements in this Bid and attachments hereto; and that it understands and agrees that the City will not be responsible for any errors or omissions on the part of the undersigned in preparing this Bid.
D. If awarded a Contract, the undersigned agrees to execute and deliver to the City within ten (10) days after date of receipt of Notice of Award, a signed Contract and the necessary Performance Bond, Payment Bond, and Certificates of Insurance and Endorsements.
E. The following Bid Forms, which have been completed and executed by the undersigned Bidder, are incorporated by this reference and made a part of this Bid:
1. Bid Schedule
2. Bid Guarantee in the amount of not less than 10% of the Total Bid Price.
3. Completed Designation of Subcontractors form.
4. Fully executed Noncollusion Declaration form.
CONNECTOR PIPE SCREEN (CPS) PHASE 4 -14- 00 41 43 – BID FORMS
5. Completed Iran Contracting Act Certification form.
6. Completed Public Works Contractor DIR Registration Certification form.
7. Completed Contractor’s Certificate Regarding Workers’ Compensation form.
8. Completed Bidder Information and Experience Form.
F. The undersigned is hereby representing that it is and will be properly licensed both at the time that it submits a Bid as well as at the time the Contract is awarded, if the Contract is awarded to the undersigned.
1. Individual Contractor. Undersigned certifies that it is now licensed in accordance with the provisions of the Contractor's License Law of the State of California.
License number
Expiration date
License classification
1. Joint Venture. Undersigned certifies that the individual members of the joint venture are now licensed in accordance with the provisions of the Contractor's License Law of the State of California.
Member No. 1
Name
License number
Expiration date
License classification
Member No. 2
Name
License number
Expiration date
License classification (If there are more than two members of the joint venture, attach a page for the additional member(s) with the above information.)
The undersigned acknowledges receipt, understanding, and full consideration of the following addenda to the Contract Documents:
CONNECTOR PIPE SCREEN (CPS) PHASE 4 -15- 00 41 43 – BID FORMS
Addenda No. ________________________________________________
[SIGNATURE ON FOLLOWING PAGE]
CONNECTOR PIPE SCREEN (CPS) PHASE 4 -16- 00 41 43 – BID FORMS
I hereby certify under penalty of perjury under the laws of the State of California that all of the information submitted in connection with this Bid and all of the representations made herein are true and correct.
BIDDER: Bidder's Business Address:
(Company Name)
By (Signature)
(Type or print name)
(Title)
(Where signed) (City, State)
(corporate seal) Dated: , 20 State of Incorporation:
(If the Prime Contractor is a corporation, two signatures of corporate officers are required.)
Names and addresses of all partners or joint venturers:
Statement of the authority of signatory to bind Bidder:
CONNECTOR PIPE SCREEN (CPS) PHASE 4 -17- 00 41 43 – BID FORMS
BID SCHEDULE
NO. ITEM DESCRIPTION UNIT OF
MEASURE EST. QTY. UNIT PRICE ITEM COST
1.
Furnish and Install Connector Pipe Screen Per Plans and Technical Specifications
EA 120
BASE BID (BID ITEMS #1) TOTAL $
The basis for award of contract shall be the Contractor’s Base Bid only.
TOTAL BID PRICE BASED ON BID SCHEDULE
BASE BID ONLY
Total Base Bid in Numbers
Total Base Bid in Words
The costs for any Work shown or required in the Contract Documents but not specifically identified as a line item are to be included in the related line items and no additional compensation shall be due to Contractor for the performance of the Work.
All blank spaces appearing above must be filled in. Failure to fill in any blank spaces may render the bid non-responsive. In case of discrepancy between the Unit Price and Item Cost set forth for a unit basis item, the Unit Price shall prevail and be utilized as the basis for determining the lowest responsive, responsible Bidder. However, if the amount set forth as a Unit Price is ambiguous, unintelligible or uncertain for any cause, or is omitted, or is the same amount as the entry in the Item Cost column, then the amount set forth in the Item Cost column for the item shall prevail and shall be divided by the estimated quantity for the item and the price thus obtained shall be the Unit Price.
For purposes of evaluating Bids, the City will correct any apparent errors in the extension of unit prices and any apparent errors in the addition of lump sum and extended prices.
The estimated quantities for Unit Price items are for purposes of comparing Bids only and the City makes no representation that the actual quantities of work performed will not vary from the estimates. Final payment shall be determined by the Engineer from measured quantities of work performed based upon the Unit Price.
CONNECTOR PIPE SCREEN (CPS) PHASE 4 -18- 00 41 43 – BID FORMS
The undersigned agrees that this Bid Schedule constitutes a firm offer to the City which cannot be withdrawn for the number of calendar days indicated in the Notice Inviting Bids from and after the Bid opening, or until a Contract for the Work is fully executed by the City and a third party, whichever is earlier.
If the Contract Documents specify Alternate Bid items, the City can choose to include any, all, or none of the Alternate Bid items in the Work. If the City selects any of the Alternate Bid items, the corresponding Alternate Bid prices shall be added to or deducted from Base Bid Price for the Work. The City can award/select Alternate Bid items at any time(s).
Name of Bidder
Signature
Name and Title
Dated
CONNECTOR PIPE SCREEN (CPS) PHASE 4 -19- 00 41 43 – BID FORMS
BID GUARANTEE
BID BOND
[Note: Not required when other form of Bidder’s Security, e.g. cash, certified check or cashier’s check, accompanies Bid.]
The makers of this bond are, _____________________________________________, as Principal, and ______________________________________________________, as Surety and are held and firmly bound unto the CITY OF SAN BERNARDINO , with its principal place of business at Vanir Tower, 290 North D Street, San Bernardino, California 92401, hereinafter called the City, in the penal sum of TEN PERCENT (10%) OF THE TOTAL BID PRICE of the Principal submitted to the City for the work described below, for the payment of which sum in lawful money of the United States, well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION IS SUCH that whereas the Principal has submitted the accompanying bid dated _____________, 20 ____, for Connector Pipe Screen (CPS) Phase 4 Project No. 13683
If the Principal does not withdraw its Bid within the time specified in the Contract Documents; and if the Principal is awarded the Contract and provides all documents to the City as required by the Contract Documents; then this obligation shall be null and void. Otherwise, this bond will remain in full force and effect.
Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Contract Documents shall affect its obligation under this bond, and Surety does hereby waive notice of any such changes.
In the event a lawsuit is brought upon this bond by the City and judgment is recovered, the Surety shall pay all litigation expenses incurred by the City in such suit, including reasonable attorneys’ fees, court costs, expert witness fees and expenses.
IN WITNESS WHEREOF, the above-bound parties have executed this instrument under their several seals this _______ day of ________________, 20____, the name and corporate seal of each corporation.
(Corporate Seal) Contractor/ Principal
Title
(Corporate Seal) Surety
Attorney-in-Fact
(Attach Attorney-in-Fact Certificate) Title
CONNECTOR PIPE SCREEN (CPS) PHASE 4 -20- 00 41 43 – BID FORMS
Notary Acknowledgment
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document.
STATE OF CALIFORNIA
COUNTY OF ______________
On , 20___, before me, _______________________________, Notary Public, personally Date Name And Title Of Officer (e.g. “Jane Doe, Notary Public”) appeared , who proved to me on the basis of satisfactory Name(s) of Signer(s) evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.
WITNESS my hand and official seal.
Place Notary Seal Above Signature of Notary Public
OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document.
CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT
Individual Corporate Officer
Title(s) Title or Type of Document
Partner(s) Limited General Number of Pages
Attorney-In-Fact
Trustee(s) Guardian/Conservator Date of Document Other:
Signer is representing:
Name Of Person(s) Or Entity(ies)
Signer(s) Other Than Named Above
NOTE: This acknowledgment is to be completed for Contractor/Principal.
CONNECTOR PIPE SCREEN (CPS) PHASE 4 -21- 00 41 43 – BID FORMS
verifies only the identity of the individual who signed the
On , 20___, before me, _______________________________, Notary Public, personally Date Name And Title Of Officer (e.g. “Jane Doe, Notary Public”) appeared , who proved to me on the basis of satisfactory Name(s) of Signer(s) evidence to be the person(s) whose name(s) is/are subscribed to the within instrument…