U.S. Department of the Interior SPECIFICATIONS Bureau of Reclamation Columbia Pacific Northwest Interior Region 9 Boise, Idaho January 2021
Scooteney Park Paving and Asphalt Repair
Columbia Basin Project, Washington Solicitation No. 140R1021B0010
This solicitation issued by Contracting Officer
Columbia Pacific Northwest Interior Region 9 Bureau of Reclamation
1150 North Curtis Road, Suite 100 Boise ID 83706-1234
Phone inquiries regarding this solicitation should be made to Regional Acquisition Management Officer
Telephone Number: (208) 378-5364
Work is located approximately 10 miles west of Connell, Washington in Franklin County. The principal components of the work include reconstructing park roads, campground, and day use area roads and parking lot.
140R1021B0010 Scooteney Park Paving and Asphalt Repair
Columbia Basin Project, Washington
PART I THE SCHEDULE.....................................................................................................A-1 SECTION A SOLICITATION/CONTRACT FORM .....................................................A-1 SECTION B SUPPLIES OR SERVICES AND PRICES/COSTS .................................. B-1
SECTION C DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK ............. C-1
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 Summary of Work 01 14 10 Use of Site 01 29 00 Payment Procedures 01 31 30 Contract Document Management System 01 33 00 Submittals 01 35 10 Safety Data Sheets 01 35 20 Safety and Health 01 35 21 Removal from Work 01 35 30 Contractor’s Onsite Safety Personnel 01 42 10 Reference Standards 01 43 10 Quality Control Testing for Earthwork and Cast-In-Place Concrete 01 46 00 Quality Procedures 01 51 00 Temporary Utilities 01 55 00 Vehicular Access and Parking 01 55 20 Traffic Control 01 56 10 Protection of Existing Installations 01 56 15 Protection of Existing Utilities 01 56 32 Temporary Safety Fence 01 57 20 Environmental Controls 01 57 30 Water Pollution Control 01 57 50 Tree and Plant Protection 01 57 90 Preservation of Historical and Archaeological Data 01 60 00 Product Requirements 01 71 20 Surveying 01 74 00 Cleaning and Waste Management 01 78 30 Project Record Documents
DIVISION 02 – EXISTING CONDITIONS
02 41 13 Selective Site Demolition
DIVISION 03 - CONCRETE
03 20 00 Concrete Reinforcing 03 30 00 Cast-In-Place Concrete
DIVISION 05 – METALS
Columbia Basin Project, Washington
05 50 00 Metal Fabrications
DIVISION 10 – SPECIALTIES
10 14 00 Traffic Signs 10 14 53 Accessible Signs
DIVISION 31 - EARTHWORK
31 02 10 Water for Dust Abatement 31 03 33 Removal of Water from Excavation 31 11 00 Clearing of Vegetation 31 14 10 Stripping 31 23 02 Compacting Earth Materials 31 23 11 Earthwork 31 23 22 Pipe Trench Earthwork 31 23 39 Disposal of Excavated Materials 31 32 32 Geotextile 31 37 00 Riprap
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 11 21 Granular Subbase Course 32 11 23 Aggregate Base Course 32 12 22 Asphalt Surfacing 32 12 36 Asphalt Pavement Seal Coating 32 12 73 Cleaning and Sealing Cracks in Asphalt Pavement 32 17 10 Parking Bumpers 32 17 20 Painted Traffic Lines and Markings 32 92 18 Vegetation of Large Plantings 32 92 20 Seeding and Soil Supplements
DIVISION 33 – UTILITIES
33 05 31 Precast Concrete Drop Inlets 33 41 10 Polyethylene Storm Drains 33 42 30 Corrugated Metal Pipe Culverts 33 42 40 Polyethylene Pipe Culverts
DIVISION 51 – INFORMATION AVAILABLE TO OFFERORS
51 00 00 Information Available to Offerors 51 00 10 Photographs 51 31 03 Geotechnical Engineering Report
DIVISION 52 - DRAWINGS
Columbia Basin Project, Washington
52 00 00 Drawings
SECTION C DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK ......... C-1
SECTION D PACKAGING AND MARKING ............................................................... D-1
SECTION E INPSECTION AND ACCEPTANCE ......................................................... E-1
E.1. 52.236-5 Material and Workmanship (Apr 1984) ........................................................ E-1
E.2. 52.246-12 Inspection of Construction (Aug 1996) ...................................................... E-1
E.3. 52.246-21 Warranty of Construction (Mar 1994), Alternate I (Apr 1984) .................. E-1
SECTION F Section F Deliveries and Performance ........................................................ F-1
F.1. 52.211-10 Commencement, Prosecution, and Completion of Work (Apr 1984), Alternate I (Apr 1984) .......................................................................................................... F-1
F.2. 52.211-12 Liquidated Damages - Construction (Sep 2000) ......................................... F-1
F.3. 52.211-18 Variation in Estimated Quantity (Apr 1984) ............................................... F-1
F.4. 52.242-14 Suspension of Work (Apr 1984) ................................................................. F-1
SECTION G CONTRACT ADMINISTRATION ........................................................... G-1
G.1. Government Point of Contact ..................................................................................... G-1
G.2. 1452.201-70 Authorities and Delegations (Sep 2011) ................................................ G-1
G.3. DOI-AAAP-0028 Electronic Invoicing and Payment Requirements – Invoice Processing Platform (IPP) .................................................................................................. G-2
G.4. WBR 1452.201-80 Contracting Officer’s Representative’s Authorities andLimitations
– Bureau of Reclamation (May 2018) ................................................................................. G-3
SECTION H SPECIAL CONTRACT REQUIREMENTS ............................................ H-1
H.1. DOI-AAAP-0050 Contractor Performance Assessment Reporting System (Feb 2015) ……...……………………………………………………………………………………...H-1
H.2. WBR 1452.209-90 KEY PERSONNEL REQUIREMENTS--BUREAU OF
RECLAMATION--PN REGION (FEB 1995) …………………………………….……H-2
PART II CONTRACT CLAUSES ........................................................................................... I-1
SECTION I CONTRACT CLAUSES .............................................................................. I-1
I.1. 52.252-2 Clauses Incorporated by Reference (Feb 1998) .............................................. I-1
I.2. 52.202-1 Definitions (June 2020) ................................................................................... I-1
I.3. 52.203-3 Gratuities (Apr 1984) ...................................................................................... I-1
I.4. 52.203-5 Covenant Against Contingent Fees (May 2014) ............................................. I-1
I.5. 52.203-6 Restriction on Subcontractor Sales to the Government (June 2020) .............. I-1
Columbia Basin Project, Washington
I.6. 52.203-7 Anti-Kickback Procedures (May 2014) .......................................................... I-1
I.7. 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity (May 2014) .............................................................................................................. I-1
I.8. 52.203-10 Price or Fee Adjustment for Illegal or Improper Activity (May 2014) ......... I-1
I.9. 52.203-12 Limitations on Payments to Influence Certain Federal Actions (June 2020) ……...…………………………………………………………………...………………….I-1
I.10. 52.203-13 Contractor Code of Business Ethics and Conduct (June 2020) …………..I-1
I.11. 52.203-17 Contractor Employee Whistleblower Rights and Requirement to Inform Employees of Whistleblower Rights (June 2020) ................................................................. I-2
I.12. 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017) ............................................................................................................ I-2
I.13. 1452.203-70 Restrictions on Endorsements – Department of Interior (Jul 1996) ....... I-2
I.14. 52.204-4 Printed or Copied Doubled-Sided on Postconsumer Fiber Content Paper (May 2011) ............................................................................................................................ I-2
I.15. 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (June 2020)… ........................................................................................................................ I-2
I.16. 52.204-12 Unique Entity Identifier Maintenance (Oct 2016).…...…………...……...I-2
I.17. 52.204-13 System for Award Management Maintenance (Oct 2018) ......................... I-2
I.18. 52.204-14 Service Contract Reporting Requirements (Oct 2016) ............................... I-2
I.19. 52.204-18 Commercial and Government Entity Code Maintenance (Jul 2016)……..I-2
I.20. 52.204-19 Incorporation by Reference Representations and Certifications (Dec 2014) ………………………………………………………………………………………….…..I-2
I.21. 52.204-21 Basic Safeguarding of Covered Contractor Information Systems (Jun 2016) …………………………………………………………………………………………………………………..………………………………..I-2
I.22. 52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (Jul 2018)…….….I-4
I.23. 52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment (Aug 2020)…………………………………………..I-4
I.24. 1452.204-70 Release of Claims – Department of Interior (Jul 1996)………..…..…..I-7
I.25. 52.209-6 Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (June 2020) ...........................................I-7
I.26. 52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters
(Oct 2018) ..............................................................................................................................I-7
Columbia Basin Project, Washington
I.27. 52.209-10 Prohibition on Contracting With Inverted Domestic Corporations (Nov 2015)......................................................................................................................................I-7
I.28. 52.214-26 Audit and Records -- Sealed Bidding (June 2020) ......................................I-7
I.29. 52.214-27 Price Reduction for Defective Certified Cost or Pricing Data --
Modifications -- Sealed Bidding (June 2020) .......................................................................I-7
I.30. 52.214-28 Subcontractor Certified Cost or Pricing Data -- Modifications -- Sealed
Bidding (June 2020) ..............................................................................................................I-7
I.31. 52.214-29 Order of Precedence -- Sealed Bidding (Jan 1986) .....................................I-7
I.32. 52.219-6 Notice of Total Small Business Set-Aside (Deviation 2019-01) (Mar 2020)
…………………………………………………………………………………….………..I-7
I.33. 52.219-8 Utilization of Small Business Concerns (Oct 2018) .....................................I-8
I.34. 52.219-14 Limitations on Subcontracting (Marc 2020) (Deviation) ............................ I-8
I.35. 52.219-28 Post Award Small Business Program Rerepresentation (Nov 2020) ........ I-10
I.36. 52.222-3 Convict Labor (Jun 2003) ........................................................................... I-10
I.37. 52.222-4 Contract Work Hours and Safety Standards – Overtime Compensation (Mar
2018)………………………………………………………………………………….…...I-10
I.38. 52.222-6 Construction Wage Rate Requirements (Aug 2018) ................................... I-10
I.39. 52.222-7 Withholding of Funds (May 2014) ............................................................. I-10
I.40. 52.222-8 Payrolls and Basic Records (Feb 2021) ......................................................I-10
I.41. 52.222-9 Apprentices and Trainees (Jul 2005) ........................................................... I-10
I.42. 52.222-10 Compliance with Copeland Act Requirements (Feb 1988) ...................... I-10
I.43. 52.222-11 Subcontracts (Labor Standards) (May 2014) ............................................ I-10
I.44. 52.222-12 Contract Termination – Debarment (May 2014) ...................................... I-10
I.45. 52.222-13 Compliance with Construction Wage Rate Requirements and Relation Regulations (May 2014) ...................................................................................................... I-10
I.46. 52.222-14 Disputes Concerning Labor Standards (Feb 1988) ................................... I-10
I.47. 52.222-15 Certification of Eligibility (May 2014) ..................................................... I-10
I.48. 52.222-21 Prohibition of Segregated Facilities (Apr 2015) ....................................... I-10
I.49. 52.222-26 Equal Opportunity (Sep 2016) .................................................................. I-10
Columbia Basin Project, Washington
I.50. 52.222-27 Affirmative Action Compliance Requirements for Construction (Apr 2015) …………………………………………………………………………..………………...I-10
I.51. 52.222-34 Project Labor Agreement (May 2010) ……...…….………………….....I-10
I.52. 52.222-35 Equal Opportunity for Veterans (June 2020) ............................................ I-11
I.53. 52.222-36 Equal Opportunity for Workers With Disabilities (June 2020) ................ I-11
I.54. 52.222-37 Employment Reports on Veterans (Jun 2020) .......................................... I-12
I.55. 52.222-40 Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) ........................................................................................................................... I-12
I.56. 52.222-50 Combating Trafficking of Persons (Oct 2020) .......................................... I-12
I.57. 52.222-54 Employment Eligibility Verification (Oct 2015) ...................................... I-12
I.58. 52.222-55 Minimum Wages Under Executive Order 13658 (Nov 2020) .................. I-12
I.59. 52.222-62 Paid Sick Leave Under Executive Order 13706 (Jan 2017) ..................... I-12
I.60. 52.223-3 Hazardous Materials Identification and Material Safety Data (Jan 1997), Alternate I (Jan 1995) .......................................................................................................... I-19
I.61. 52.223-5 Pollution Prevention and Right-to-Know Information (May 2011) ........... I-19
I.62. 52.223-6 Drug Free Workplace (May 2001) .............................................................. I-19
I.63. 52.223-9 Estimate of Parentage of Recovered Material Content for EPA-Designated Items Alternate I (May 2008) …...………………...…………...…………………………I-19
I.64. 52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving (June 2020) .......................................................................................................................... I-19
I.65. 52.223-20 Aerosols (Jun 2016) .................................................................................. I-19
I.66. 52.223-21 Foams (Jun 2016) ...................................................................................... I-19
I.67. WBR 1452.223-80 Asbestos Free Warranty – Bureau of Reclamation (Oct 1992)...I-19 I.68. WBR 1452.223-81 Safety and Health – Bureau of Reclamation (June 2015) ........... I-19
I.69. WBR 1452.223-82 Protecting Federal Employees and the Public From Exposure to Tobacco Smoke in the Federal Workplace (Dec 2009) ....................................................... I-20
I.70. 52.225-9 Buy-American – Construction Materials (Jan 2021) .................................. I-20
I.71. 52.225-13 Restrictions on Certain Foreign Purchases (Feb 2021) .............................. I-24
I.72. 52.227-1 Authorization and Consent (June 2020) ...................................................... I-24
I.73. 52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement (June 2020)…………….………………………………………………………………………...I-24
I.74. 52.227-4 Patent Indemnity – Construction Contracts (Dec 2007) ............................. I-24
I.75. 52.228-2 Additional Bond Security (Oct 1997) ......................................................... I-24
I.76. 52.228-5 Insurance – Work on a Government Installation (Jan 1997) ...................... I-24
Columbia Basin Project, Washington
I.77. 52.228-11 Pledges of Assets (Feb 2021) ................................................................... I-24
I.78. 52.228-12 Prospective Subcontract Requests for Bonds (May 2014) ........................ I-24
I.79. 52.228-14 Irrevocable Letter of Credit (Nov 2014) ................................................... I-24
I.80. 52.228-15 Performance and Payment Bonds – Construction (June 2020).................I-24
I.81. 1452.228-70 Liability Insurance – Department of Interior (Jul 1996) ....................... I-26
I.82. WBR 1452.228-84 Certification of Representatives for Corporate Sureties (Jul 1993)
………………………………………..……………………………………….…………...I-26
I.83. 52.229-3 Federal, State, and Local Taxes (Feb 2013) ................................................ I-26
I.84. WBR 1452.231-81 Equipment Ownership and Operating Expense (Jul 1998) ......... I-26
I.85. 52.232-5 Payment Under Fixed-Price Construction Contracts (May 2014) .............. I-29
I.86. 52.232-17 Interest (May 2014) .................................................................................. I-29
I.87. 52.232-23 Assignment of Claims (May 2014) ........................................................... I-29
I.88. 52.232-27 Prompt Payment for Construction Contracts (Jan 2017) .......................... I-29
I.89. 52.232-33 Payment by Electronic Funds Transfer – System for Award Management (Oct 2018) ............................................................................................................................ I-29
I.90. 52.232-39 Unenforceability of Unauthorized Obligations (Jun 2013) ....................... I-29
I.91. 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (Dec 2013)……………………………………………………………….……………………...I-29
I.92. WBR 1452.232-81 Payment for Mobilization and Preparatory Work – Bureau of Reclamation (May 2000) ..................................................................................................... I-29
I.93. WBR 1452.232-82 Other Invoice Requirements - Bureau of Reclamation (Dec 2002)…………………………………………………………………………………..…..I-31
I.94. WBR 1452.232-83 Payment for Technical Data -- Bureau of Reclamation (Dec 1994)…………………………………………………………………………………..…..I-31
I.95. 52.233-1 Disputes (May 2014), Alternate I (Dec 1991) ............................................ I-31
I.96. 52.233-3 Protest After Award (Aug 1996) ................................................................. I-31
I.97. 52.233-4 Applicable Law for Breach of Contract Claim (Oct 2004) ......................... I-31
I.98. WBR 1452.233-81 Claims Accounting – Bureau of Reclamation (Jul 1993) ........... I-31
I.99.52.236-2 Differing Site Conditions (Apr 1984) ........................................................... I-31
I.100. 52.236-3 Site Investigation and Conditions Affecting Work (Apr 1984) ................ I-31
I.101. 52.236-4 Physical Data (Apr 1984) .......................................................................... I-31
I.102. 52.236-6 Superintendence by the Contractor (Apr 1984) ........................................ I-32
Columbia Basin Project, Washington
I.103. 52.236-7 Permits and Responsibilities (Nov 1991) .................................................. I-32
I.104. 52.236-8 Other Contracts (Apr 1984) ...................................................................... I-32
I.105. 52.236-9 Protecting Existing Vegetation, Structures, Equipment, Utilities, and Improvements (Apr 1984) ................................................................................................... I-32
I.106. 52.236-10 Operation and Storage Areas (Apr 1984) ................................................ I-32
I.107. 52.236-11 Use and Possession Prior to Completion of Work (Apr 1984)...............I-32
I.108. 52.236-12 Cleaning Up (Apr 1984) .......................................................................... I-32
I.109. 52.236-13 Accident Prevention (Nov 1991), Alternate I (Nov 1991) ...................... I-32
I.110. 52.236-14 Availability and Use of Utility Services (Apr 1984) .............................. I-32
I.111. 52.236-15 Schedules for Construction Contracts(Apr 1984) ................................... I-32
I.112. 52.236-16 Quantity Surveys (Apr 1984), Alternate I (Apr 1984) ........................... I-32
I.113. 52.236-17 Layout of Work (Apr 1984) .................................................................... I-32
I.114. 52.236-21 Specifications and Drawings for Construction (Feb 1997), Alternate I (Apr 1984)………………………………………………………………………………………I-32
I.115. 52.236-26 Preconstruction Conference (Feb 1995) ................................................. I-32
I.116. 1452.236-71 Additive or Deductive Items (Jul 1996) ………………………..……I-32
I.117. WBR 1452.236-84 Preservation of Cultural Resources – Bureau of Reclamation (Feb 2000)…………………………………………………………………………………..…..I-32
I.118. WBR 1452.237-80 Security Requirements - Bureau of Reclamation (Feb 2017)....I-34
I.119. 52.242-13 Bankruptcy (Jul 1995) ............................................................................. I-47
I.120. 52.243-4 Changes (Jun 2007) ................................................................................... I-47
I.121. 52.243-6 Chane Order Accounting (Apr 1984) ........................................................ I-47
I.122. WBR 1452.243-80 Modification Proposals– Bureau of Reclamation, Alternate III
(Jul 1998) ............................................................................................................................. I-47
I.123. 52.244-2 Subcontracts (June 2020) .......................................................................... I-48
I.124. 52.244-6 Subcontracts for Commercial Items (Nov 2020) ...................................... I-48
I.125. 52.248-3 Value Engineering – Construction (Oct 2020), Alternate I (Apr 1984) ... I-48 I.126. 52.249-2 Termination for Convenience of the Government (Fixed Price) (Apr 2012), Alternate I (Sep 1996) ......................................................................................................... I-48
I.127. 52.249-10 Default (Fixed-Price Construction) (Apr 1984) ...................................... I-48
I.128. 52.252-6 Authorized Deviation in Clauses (Nov 2020) ........................................... I-48
Columbia Basin Project, Washington
I.129. 52.253-1 Computer Generated Forms (Nov 2020) .................................................. I-48
I.130. Notice of Washington State Sales Tax--Bureau Of Reclamation--PN Region (Feb 1995) ……………………………………………………………………...……..……..…I-48
PART III List of Documents, Exhibits, and Other Attachments .......................................... J-1
SECTION J LIST OF ATTACHMENTS ........................................................................ J-1
J.1. Department of Labor, General Wage Decision No. WA20210002, Modification No. 0, dated 1/1/2021, 10 pages. ..................................................................................................... J-1
J.2. Drawings, 5 pages………………………………………..……………………………J-1
J.3. Bid Bond, 2 pages……………………………………………………………………..J-1
J.4. Subcontracting Percentage Worksheet, 1 page……………...………………..……… J-1
PART IV Representations and Instructions ........................................................................... K-1
SECTION K REPRESENTATIONS, CERTIFICATIONS, AND OTHER
STATEMENTS OF OFFERORS OR RESPONDENTS ................................................... K-1
K.1. 52.204-8 Annual Representations and Certifications (Mar 2020) .............................. K-1
K.2. 52.204-16 Commercial and Government Entity Code Reporting (Aug 2020) ........... K-5
K.3. 52.204-19 Incorporation by Reference Representations and Certifications (Dec 2014) ………………………………………...………………………………………………..….K-5
K4. 52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment (Oct 2020) ……………………………………….…K-5
K5. 52.209-7 Information Regarding Responsibility Matters (Oct 2018) .......................... K-6
K.6. 52.209-13 Violation of Arms Control Treaties or Agreements-Certification (Feb 2021) ………………………………………………………………………………………….….K-7
SECTION L INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS ... L-1
L.1. 52.252-1 Solicitation Provisions Incorporated by Reference (Feb 1998) .................... L-1
L.2. 52.203-18 Prohibition on Contracting with Entities that Require Certain Internal Confidentiality (Jan 2017) .................................................................................................... L-1
L.3. 52.204-7 System for Award Management (Oct 2018) ................................................. L-1
L.4. 52.211-1 Availability of Specifications Listed in the GSA Index of Federal Specifications, Standards and Commercial Item Descriptions, FPMR Part 101-29 (Aug 1998)………….. ................................................................................................................... L-1
L.5. 52.211-2 Availability of Specifications, Standards, and Data Item Descriptions Listed in the Acquisitions Streamlining and Standardization Information System (ASSIST) (Apr 2014)…………………………………………………………………………..…………...L-2
L.6. 52.211-6 Brand Name or Equal (Deviation) (Aug 2015) ………………..…………..L-2
Columbia Basin Project, Washington
L.7. 52.214-3 Amendments to Invitations for Bids (Dec 2016) .......................................... L-3
L.8. 52.214-4 False Statements in Bids (Apr 1984) ..…………………...………………..L-3
L.9. 52.214-5 Submission of Bids (Dec 2016) .................................................................... L-3
L.10. 52.214-6 Explanation to Prospective Bidders (Apr 1984) ......................................... L-3
L.11. 52.214-7 Late Submissions, Modifications, and Withdrawals of Bids (Nov 1999)..L-3
L.12. 52.214-12 Preparation of Bids (Apr 1984) ................................................................. L-3
L.13. 52.214-18 Preparation of Bids -- Construction (Apr 1984) ....................................... L-3
L.14. 52.214-19 Contract Award -- Sealed Bidding -- Construction (Aug 1996) ............... L-3
L.15. 52.214-34 Submission of Offers in the English Language (Apr 1991) ...................... L-3
L.16. 52.214-35 Submission of Offers in U.S. Currency (Apr 1991) ................................. L-3
L.17. 52.216-1 Type of Contract (Apr 1984) ...................................................................... L-3
L.18. 52.222-5 Construction Wage Requirements – Secondary Site of Work (May 2014) ……………………………………………………………………………………………..L-3
L.19. 52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction (Feb 1999) ....................................................... L-4
L.20. Non-Discrimination Notice to U.S. DOI Contractors, Subcontractors, and Lessors (May 2014) ........................................................................................................................... L-5
L.21. 52.225-10 Notice of Buy American Requirement – Construction Materials (May 2014) …………………………………………...…………………………………………L-5
L.22. 52.228-1 Bid Guarantee (Sep 1996) ........................................................................... L-7
L.23. 52.232-13 Notice of Progress Payments (Apr 1984) ................................................. L-7
L.24. 52.232-16 Progress Payments (Jun 2020)………………………………………..…L-7
L.25. 1452.233-2 Service of Protest – Department of Interior (Deviation) (Aug 1996) .... L-7
L.26. 52.236-27 Site Visit (Construction) (Feb 1995), Alternate I (Feb 1995)…………...L-8
L.27. WBR 1452.236-85 Instruction for Mobilization and Preparatory Work Schedule Line Item – Bureau of Reclamation (May 2000) .......................................................................... L-9
L.28. WBR 1452.237-90 Security Requirements – Bureau of Reclamation – PN Region (Nov 2002)…………………………………………………………...…………………….L-9
L.29. 52.252-5 Authorized Deviation in Provisions (Nov 2020) ...................................... L-11
SECTION M EVALUATION FACTORS FOR AWARD ............................................. M-1
M.1. Price Reasonableness Determination (May 2010) .................................................... M-1
M.2. WBR 1452.225-82 Notice of World Trade Organization Government Procurement Agreement Evaluations - Bureau of Reclamation (May 2005) ......................................... M-1
140R1020B0001
Columbia Basin Project, Washington
C-1
SECTION C DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
140R1020B0001
Columbia Basin Project, Washington
D-1
SECTION D PACKAGING AND MARKING
SECTION NOT USED
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
CALL:
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
0040520696
Bureau of Reclamation
Pacific Northwest Region
Regional Office Acquisition Management Division
R10
1150 N. Curtis Road, Ste. 100
Boise ID 83706-1234
Bureau of Reclamation
Attn: Rachel Dyer 1150 N Curtis Rd Boise ID 83706-1234
Rachel Dyer 2083785110 x
02/25/2021
140R1021B0010
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
Project Title: Scooteney Park Paving and Asphalt Repair, Columbia Basin Project, Washington.
This solicitation is set-aside for Total Small Business Concerns.
The construction magnitude is between $1,000,000.00 and $5,000,000.00.
For Site Visit Information refer to 52.236-27 Site Visit (Construction) (Feb 1995), Alternate I (Feb 1995), L.25 within the provision section.
Bids submitted via email will not be accepted. Please refer to Provision L.25 in the solicitation for DETAILED instructions/requirements for the site visits.
Block 11 states the Period of Performance (POP) is 65 days after the Notice to Proceed (NTP) which is correct.
11. The Contractor shall begin performance
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
10 65 calendar days and complete it within ________________ ________________ calendar days after receiving
(Clause F.1)
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ________ _____ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________
STANDARD FORM 1442 (Rev. 4-85)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
May 20, 2021
10:00 AM MT
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document and return (Contractor is not required to sign this document.)
Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.
No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
Bureau of Reclamation Pacific Northwest Region
Regional Office Acquisition Management Division
R10
1150 N. Curtis Road, Ste. 100
Boise ID 83706-1234
Rachel Dyer
28. NEGOTIATED AGREEMENT 29. AWARD
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
STANDARD FORM 1442 (REV. 4-85) BACK
Continued...
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
3 4
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
140R1021B0010
Legacy Doc #: BOR
Delivery Location Code: 0009909936
Bureau of Reclamation-PN-RO
Pacific Northwest Regional Office
1150 N. Curtis Road
Boise ID 83706-1234 US
Period of Performance: 08/02/2021 to 10/06/2021
00010 Baseline - Large Parking Lot/ Day Use Area
(Price Schedule 1 - CLINS 1 through 25)
(See following Continuation Page(s))
Product/Service Code: Z2LZ
Product/Service Description: REPAIR OR ALTERATION
OF PARKING FACILITIES
Delivery: 10/06/2021
00020 Additive Item 1 - Road "F"
(Price Schedule 2 - CLINS 1 through 13)
(See Following Continuation Page(s))
Product/Service Code: Z2LZ
Product/Service Description: REPAIR OR ALTERATION
OF PARKING FACILITIES
Delivery: 10/06/2021
00030 Additive Item 2: Restroom #2 Parking/Road "B"
(Price Schedule 3 - CLINS 1 through 11)
(See Continuation Page(s))
Product/Service Code: Z2LZ
Product/Service Description: REPAIR OR ALTERATION
OF PARKING FACILITIES
Delivery: 10/06/2021
00040 Additive Item 3: Crack Seal and Seal Coat
(Price Schedule 4 - CLINS 1 through 3)
(See Following Continuation Page(s))
Product/Service Code: Z2LZ
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
4 4
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
140R1021B0010
Product/Service Description: REPAIR OR ALTERATION
OF PARKING FACILITIES
Delivery: 10/06/2021
00050 Additive Item 4: Road "H"
(Price Schedule 5 - CLINS 1 through 5)
(See Following Continuation Page(s))
Product/Service Code: Z2LZ
Product/Service Description: REPAIR OR ALTERATION
OF PARKING FACILITIES
Delivery: 10/06/2021
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
Columbia Basin Project, Washington Solicitation No. 140R1021B0010
Price Schedule B - 1
CONTINUATION OF
SECTION B – SUPPLIES OR SERVICES AND PRICES
B.1 PRICE SCHEDULE
(a) Bids will be considered for award on the following Price Schedule, but no bid will be considered for award on only a part of the Price Schedules.
(1) Bids shall complete Price Schedules 1, 2, 3, 4, and 5. Bids for less than the total of Schedules 1, 2, 3, 4, and 5 will be considered nonresponsive and will not be evaluated for award.
(2) The Government will award Price Schedule 1. Additive Price Schedules 2, 3, 4, and 5 may be awarded depending on available funds.
a. See the contract clause at DIAR 1436.571, Additive and deductive items.
1. Order of priority:
(i) PRICE SCHEDULE 2 – Additive Item 1 - Road “F”
(ii) PRICE SCHEDULE 3 - Additive Item 2 - Restroom #2
Parking/Road “B”
(iii) PRICE SCHEDULE 4 – Additive Item 3 - Crack Seal and Seal Coat
(iv) PRICE SCHEDULE 5 - Additive Item 4 – Road “H”
(b) Bids are subject to the terms and conditions of this solicitation.
(c) Quantities in the Price Schedule are estimated quantities for comparison of bids only.
Except as provided in the contract clause at FAR 52.211-18, Variation in Estimated Quantity, no claim shall be made against the Government for overruns or underruns.
The contract clause at FAR 52.211-18, Variation in Estimated Quantity does not apply to lump sum items.
(d) See the contract clause at WBR 1452.232-81, Payment for Mobilization and Preparatory Work, for CLIN 1.
(e) Definitions:
(1) CLIN – Contract Line Item Number
Price Schedule B - 2
PRICE SCHEDULE 1 – Large Parking Lot/Day Use Area
CLIN Section Supplies or Services
Quantity and Unit Unit Price Amount
1 WBR
1452.232-81
Mobilization and preparatory work For the lump sum of $
2 01 31 30 Contract Document
Management System
For the lump sum of $
3 02 41 13 Removing and Disposing of
Existing Features For the lump sum of $
4 03 30 00 Concrete 92 CY $ $
5 05 50 00 Combination Inlet Frame, Grate, &
Curb Box
2 EA $ $
6 10 14 53 Furnishing and Installing Signs 3 EA $ $
7 31 23 11 Excavation 1,380 CY $ $
8 31 23 11 Stormwater
Infiltration Basin Filter Sand
21 CY $ $
9 31 23 22 Common
Excavation for Pipe Trenches
25 CY $ $
10 31 23 22 Select Material for Pipe Trenches 3 CY $ $
11 31 23 22 Backfill for Pipe Trenches 6 CY $ $
12 31 23 22 Compacting
Backfill for Pipe Trenches
16 CY $ $
Price Schedule B - 3
TOTAL FOR PRICE SCHEDULE 1 – Large Parking Lot/Day Use Area
13 31 32 32 Geotextile 6,054 SY $ $
14 31 37 00 6” Riprap 5 Tons $ $
15 32 11 21 Granular Subbase Course 2,014 CY $ $
16 32 11 23 Aggregate Base Course 1,511 CY $ $
17 32 12 22 Asphalt Surfacing 985 Tons $ $
18 32 17 10 Parking Bumpers 5 EA $ $
19 32 17 20 Traffic Lines and Markings For the lump sum of $
20 32 92 18 Trees For the lump sum of $
21 32 92 18 Irrigation System Repair For the lump sum of $
22 32 92 20 Seeding and Soil Supplements 9,220 SF $ $
23 33 05 31 Precast Concrete Drop Inlets 2 EA $ $
24 33 41 10 Polyethylene Storm Drains 51 LF $ $
25 33 41 10 HDPE flared end for 12" pipe 2 EA $ $
Price Schedule B - 4
PRICE SCHEDULE 2 – Additive Item 1 - Road “F”
CLIN Section Supplies or Services Quantity and Unit
Unit Price Amount
1 02 41 13 Removing and Disposing of
Existing Features For the lump sum of $
2 10 14 00 Furnishing and Installing Signs 1 EA $ $
3 31 23 22 Common Excavation for Pipe Trenches 40 CY $ $
4 31 23 22 Select Material for Pipe Trenches 4 CY $ $
5 31 23 22 Backfill for Pipe Trenches 14 CY $ $
6 31 23 22 Compacting Backfill for Pipe Trenches 20 CY $ $
7 31 32 32 Geotextile 6,781 SY $ $
8 31 37 00 12” Riprap 13 Tons $ $
9 32 11 21 Granular Subbase Course 2,261 CY $ $
10 32 12 23 Aggregate Base Course 1,775 CY $ $
11 32 12 22 Asphalt Surfacing 1,062 Tons $ $
12 33 42 30 24-Inch diameter Corrugated Metal
Pipe Culverts
41 LF $ $
13 33 42 30
Metal Flared End Sections for
Corrugated Metal Pipe
2 EA $ $
TOTAL FOR PRICE SCHEDULE 2 – Additive Item 1 - Road “F”
Price Schedule B - 5
PRICE SCHEDULE 3 - Additive Item 2 - Restroom #2 Parking/Road “B”
TOTAL FOR PRICE SCHEDULE 3 - Additive Item 2 - Restroom #2 Parking/Road “B”
CLIN Section Supplies or Services Quantity and Unit
Unit Price Amount
1 02 41 13 Removing and Disposing of
Existing Features For the lump sum of $
2 03 30 00 Concrete 1 CY $ $
3 10 14 53 Furnishing and Installing Signs 1 EA $ $
4 31 23 11 Excavation 15 CY $ $
5 31 23 11 Stormwater
Infiltration Basin Filter Sand
5 CY $ $
6 31 32 32 Geotextile 310 SY $ $
7 32 11 21 Granular Subbase Course 103 CY $ $
8 32 11 23 Aggregate Base Course 77 CY $ $
9 32 12 22 Asphalt Surfacing 50 Tons $ $
10 32 17 20 Traffic Lines and Markings For the lump sum of $
11 32 92 20 Seeding and Soil Supplements 770 SF $ $
Price Schedule B - 6
PRICE SCHEDULE 4 – Additive Item 3 - Crack Seal and Seal Coat
TOTAL FOR PRICE SCHEDULE 4- Additive Item 3 - Crack Seal and Seal Coat
CLIN Section Supplies or Services Quantity and Unit
Unit Price Amount
1 32 12 36 Furnishing and Placing Seal Coat
130,505
SF $ $
2 32 12 73 Cleaning and Sealing cracks 6,400 LF $ $
3 32 17 20 Traffic Lines and Markings For the lump sum of $
Price Schedule B - 7
PRICE SCHEDULE 5 - Additive Item 4 – Road “H”
TOTAL FOR PRICE SCHEDULE 5 - Additive Item 4 – Road “H”
TOTAL FOR PRICE SCHEDULES 1 THROUGH 5
END OF SECTION
CLIN Section Supplies or Services Quantity and Unit
Unit Price Amount
1 02 41 13 Removing and Disposing of
Existing Features For the lump sum of $
2 31 32 32 Geotextile 300 SY $ $
3 32 11 21 Granular Subbase Course 100 CY $ $
4 31 11 23 Aggregate Base Course 101 CY $ $
5 32 12 22 Asphalt Surfacing 49 Tons $ $
Columbia Pacific Northwest Region Written Solicitation Signature Sheet
Solicitation Number: 140R1021B0010
Project Title: Scooteney Park Paving and Asphalt Repair
Solicitation Title: Scooteney Park Paving and Asphalt Repair
Technical Approval: JEFFREY MCGUIRE Digitally signed by JEFFREY
MCGUIRE
Date: 2021.01.26 17:44:40 -07'00'
Designed by: JOSHUA PEETZ Digitally signed by JOSHUA
PEETZ
Date: 2021.01.26 05:21:36 -07'00'
Checked by: JEFFREY MCGUIRE Digitally signed by JEFFREY
MCGUIRE
Date: 2021.01.26 17:44:03 -07'00'
Prepared by: BYRON VAN ORDEN Digitally signed by BYRON VAN
ORDEN
Date: 2021.01.27 09:11:55 -07'00'
Columbia Basin Project, Washington Solicitation No. 140R1021B00XX
Summary of Work
01 11 00 - 1
SECTION 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1.01 LOCATION
A. Work is located approximately 10 miles west of Connell, Washington in Franklin County.
1.02 PRINCIPAL COMPONENTS OF WORK
A. This project has a baseline project and optional components that may be exercised by the Government as additional funding becomes available.
B. The baseline project includes:
1. Large Parking Area
a. Remove and dispose of approximately 52,000 square feet of existing asphalt, base, and subbase.
b. Remove and dispose of existing vertical curb.
c. Remove existing trees within parking lot islands and constructed slope areas.
d. Remove existing irrigation within parking lot islands and constructed slope areas.
e. Furnish and install concrete traffic curb and gutter as shown on drawings.
f. Grade and place new structural section.
g. Furnish and install 6” cement concrete extruded curb to reconstruct the parking lot islands.
h. Furnish and install ADA pedestrian ramp.
i. Furnish and install 4-foot wide concrete valley gutters.
j. Furnish and install two precast concrete concrete inlets for stormwater drainage.
1) Inlets shall be connected to stormwater infiltration basin with 12” polyethylene pipe.
k. Construct stormwater infiltration basin as shown on drawings.
l. Furnish and install trees and revegetate parking lot islands and constructed slopes.
m. Furnish and install irrigation within parking lot islands and on constructed slopes.
01 11 00 - 2
n. Furnish and install pavement markings for parking stalls.
1) Two parking stalls to be van accessible parking areas with an adjoining access aisle.
a) Accessible parking area and access aisle to be a minimum of 16-feet wide.
b) Pavement markings to be ADA-ABA-AG standard.
c) Slopes must not exceed 2.08% (1:48) including construction tolerances in any direction.
2. Full reconstruction of pavement area on Road “C” between campsites #15 and #17.
a. Saw cut, remove, and dispose of existing asphalt, base, and subbase as shown on the drawings.
b. Grade and place new structural section to match existing elevations.
3. Full reconstruction of three pavement areas in Day Use Area/Road “B”.
a. Reconstruct flexible pavement section in three areas in parking area as shown on the drawings or as approved by the COR.
1) Remove all parking stops.
2) Saw cut, remove, and dispose of existing asphalt, base, and subbase as shown on the drawings.
3) Grade and place new structural section to match existing elevations.
4) Reinstall/Reuse precast parking stops.
4. Construction of new asphalt walkway connecting accessible parking stall in Day
Use Area/Road “B” to existing walkway.
5. Furnish and install accessible parking pavement markings and accessible parking sign for three parking stalls in Day Use Parking Area/Road “B” as indicated on drawings.
a. Pavement markings to be ADA-ABA-AG standard.
b. Van accessible signage meeting current ADA-ABA-AG standard.
C. Optional portions of the project include:
1. Optional Item #1:
a. Road “F” – Main campground entrance from county road to campground entrance.
1) Remove and dispose of existing asphalt, base, and subbase.
2) Remove and dispose of existing 24” CMP.
3) Remove and dispose of existing gate.
01 11 00 - 3
4) Furnish and install new 24” CMP.
5) Grade and place new structural section to a width of 24’-0” for a length of approximately 2,114 feet.
6) Pave approach to Road “H” as shown on drawings.
7) Between station 16+39.00, LT and station 19+40.00, LT asphalt to have thickened edge, as required on drawings.
8) Between station 17+70.00, RT and station 19+40.00, RT grade shoulder to match existing for smooth transition for vehicular access to overflow parking and dumpsters.
9) Grade and place new structural section to a width of 24’-0” for a length of approximately 100 feet at Road “G” as shown on drawings.
10) Furnish and install new speed limit sign.
2. Optional Item #2
a. Parking area in front of “Restroom #2”
1) Remove parking stops (to be reused). Remove and dispose of existing asphalt, base, and subbase. Remove and dispose of existing concrete and sign in front of accessible parking stall.
2) Grade and place new structural section in parking area and slope as shown on drawings.
3) Furnish and install pavement markings for parking areas.
4) Grade in stormwater infiltration swale, as shown on drawings.
5) One parking space to be van accessible parking area with adjoining access isle.
a) Parking area and access aisle to be a minimum of 16-feet wide by 18-feet long.
i. Slopes must not exceed 2.08% (1:48) including construction tolerances in any direction.
6) Pavement markings to be ADA-ABA-AG standard.
a) Furnish and install van accessible signage meeting current
ADA-ABA-AG standard.
7) Reinstall/reuse precast parking stops.
3. Optional Item #3:
a. Road “H”
1) Remove and dispose of existing asphalt, base, and subbase.
2) Grade and place new structural section to a width of 15’-0” for a length of approximately 170 feet, as shown on drawings.
01 11 00 - 4
4. Optional Item #4:
a. Crack Seal and Seal Coat
1) Remove all parking stops.
2) Surface clean asphalt and cracks, repair cracks, and seal coat existing asphalt.
3) Area to be seal coated (two coats) approximately 130,500 square feet.
4) Cleaning and sealing cracks greater than or equal to 1/8-inch and less than or equal to 1-1/2-inches wide, approximately 6,400 linear feet
5) Paint pavement markings as shown on drawings.
a) Furnish materials for repainting parking stalls, accessible parking areas, and other pavement markings, as shown on the drawings.
b) Furnish materials for repainting 12-inch by 12-inch numerals for camp site numbering.
1.03 SPECIFICATIONS REQUIREMENTS
A. Requirements in Division 1, General Requirements, apply to Divisions 2 through 52.
B. Imperative statements in these specifications are Contractor requirements, unless otherwise stated.
C. Where specifications are written in streamlined form, words “shall be” are included by inference where a colon (:) is used within sentence or phrase.
1.04 DEFINITIONS
A. When specifications use a word or term defined in Federal Acquisition Regulations (FAR), definition of the word or term shall be in accordance with FAR parts in effect at the time solicitation was issued.
1.05 ACCESSIBILITY REQUIREMENTS
A. The Contractor shall construct the facility to ensure accessibility as required by law for persons with disabilities in accordance with the Architectural Barriers Act of 1968 (82 Stat. 718), as amended (42 U.S.C. 4151 et seq.) and Section 504 of the Rehabilitation Act of 1973, as amended (29 U.S.C. 794).
B. Specific requirements are set forth in the Americans with Disabilities Act/Architectural Barriers Act Accessibility Guidelines: ABA Chapter 1 (Application & Administration);
Chapter 2 (Scoping Requirements); Chapters 3-10 (Technical Requirements), commonly referred to as ABAAS, and shall be used by the Contractor to ensure compliance with the
01 11 00 - 5 above-listed laws. The finished facility must meet the requirements set forth in ABAAS.
It is the sole responsibility of the Contractor to determine beforehand how to address tolerances to ensure that the finished products comply with Federal standards. Should the finished facility fail to comply, it shall be the responsibility of the Contractor, at its sole expense, to make any adjustments necessary to bring the deficient components into compliance.
1.06 ACRONYMS
A. The following acronyms apply to specifications Divisions 1 through 5:
1. CO: Contracting Officer.
2. COR: Contracting Officer’s Representative.
3. CMP: Corrugated Metal Pipe
4. LT: Left
5. RT: Right
6. WSDOT: Washington State Department of Transportation
7. ADA: Americans with Disabilities Act of 1990 (US)
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
END OF SECTION
Columbia Basin Project, Washington Solicitation No.
Use of Site 01 14 10 - 1
A. Cost:
1. Include in prices offered in the Price Schedule for other items of work.
A. Bureau of Reclamation (USBR)
1. Cleaning Manual-2012 Inspection and Cleaning Manual for Equipment and Vehicles to Prevent…