PART IV SPECIFICATIONSPRIVATE

PROVIDE/REPLACE CONCRETE and MISCELLANEOUS ITEMS IDIQ CONTRACT

ENG 09012 2J

M.0116693

INDEX

SECTION NO.

DESCRIPTION

DIVISION 1 - GENERAL REQUIREMENTS

01 11 00

Summary of Work

01 33 00

Submittals

DIVISION 2 - SITE WORK

02 41 00 Demolition

DIVISION 3 - CONCRETE

03 20 00 Concrete Reinforcing

03 30 00 Cast-In-Place Concrete

DIVISION 4 – MASONRY

04 20 00

Masonry

DIVISION 5 – METALS

05 52 00

Metal Railings 05 52 14

Pedestrian Guardrail Steel

05 52 15

Pedestrian Guardrail Aluminum

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 12 13 Bituminous Tack and Prime Coats

32.12.13.10 Repair of Bituminous Pavements 32 12 16

Hot-Mix Asphalt (HMA) For Roads

32 32 23 Concrete Segmental Retaining Wall System

32 92 00 Turf

PROVIDE/REPLACE CONCRETE and MISCELLANEOUS ITEMS IDIQ CONTRACT

SECTION 01 11 00

SUMMARY OF WORK

1 DESCRIPTION OF WORK:

1.1 Work to be Done: The work consists of furnishing all plant, labor, equipment, supplies, and materials, and performing all work in accordance with these specifications and drawings as indicated at Fort Leonard Wood, Missouri and the Lake of the Ozarks Recreation Area (LORA).

1.2 Location: The site of the proposed work is in the Training Area and Cantonment Area of the Fort Leonard Wood Military Reservation, Fort Leonard Wood, Missouri and the Lake of the Ozarks Recreation Area (LORA), Linn Creek, Mo seq level1 \h \r0 PRINCIPAL FEATURES: The work to be performed will include, but not be limited to, providing and replacing concrete and other miscellaneous items in accordance with (IAW) the attached Task List in Technical Exhibit A and specifications. This contract will be a delivery order style contract. All work required shall be on a requirement basis as directed by the Contracting Officer on a delivery order. The Contractor will be paid only for actual quantity of work performed for each Task Item.

3seq level1 \h \r0 . BACKFILLING: The Contractor shall backfill as required to return the site to original contour or meet new construction. Ponding water is unacceptable.

4. TURF: The Contractor shall seed, fertilize and mulch all disturbed areas. See Section 32 92 00 Turf.

5 SEQUENCE OF WORK: The area concerned in this project is Government owned and will be in use during the course of this project.

6 SCHEDULING:

6.1 The Contractor shall schedule all activity at the job site through the DPW Buildings and Grounds Branch a minimum of 24 hours in advance of work.

6.2 Contractor shall schedule his working hours to coincide with the working hours of the military reservation. Normal working hours of the reservation are 7:30 a.m. to 4:00 p.m., Monday thru Friday, legal public holidays excepted. The Contractor shall not perform work on the reservations beyond the aforementioned working hours without the written approval of the Contracting Officer.

6.3 If the Contractor, for his convenience, desires to perform work during other than normal working hours or on other than normal workdays, he shall notify the Contracting Officer and the Directorate of Public Works Buildings and Grounds Branch at least 72 hours in advance. The Contractor shall not perform work beyond the normal working hours or normal workdays without written approval of the Contracting Officer and the DPW Buildings and Ground Branch approval. The Contractor shall reimburse the Government for any additional expense occasioned the Government thereby, such as, but not limited to, overtime pay for Government inspectors, utilities service, etc.

6.4 Time extensions due to adverse weather, increase in scope of work (SOW), material lead time or reprioritization of contract by Contracting Officer must be received in writing prior to scheduled completion date.

6.5 If any water/wastewater connection is required, the Prime Construction Contractor enters into a contract with the System Owner (SO)/American Water (AW) for the SO to install and "tap in" the new utility infrastructure from the new facility point of demarcation to the SO's utility system. In this scenario, the Prime Construction Contractor pays directly to the SO. A "Connection Charge Agreement" needs to be signed between the Prime Construction Contractor and the SO. The SO will not be a construction sub-contractor. Final connection to AW Infrastructure will be done by Contractor and coordinated with AW. AW will require total coliform bacterial analysis results prior to connection and will provide oversight of the connection. AW will provide the water/wastewater connection up to 5 feet from the structure or up to the PIV if applicable.

7 UTILITY INTERRUPTIONS: Coordinate with the Contracting Officer, DPW Buildings and Grounds Branch, and the user for any utility work that interrupts service to the facility, any area outside the facility, or any real property facility. Establish a schedule of interruptions listing starting and ending times of disconnection 48 hours prior to interruption.

8 FIELD MEASUREMENTS: The Contractor shall verify all measurements at the project site and shall be responsible for all dimensions, fittings, and the proper installation of all materials and equipment specified.

9 PERMITS: The Contractor shall be responsible for obtaining permits for each worksite.

9.1 Digging: A digging permit is required prior to ANY earthwork operations. The DPW Buildings and Grounds Branch will assist the Contractor in obtaining this free permit.

9. 2 Land Disturbance: A land disturbance permit is required for any projects that disturb one (1) acre or more. Land disturbance is defined as any activity that disturbs the roots of vegetation such as clearing, grubbing and grading.

The Contractor shall apply for the permit from the Missouri Department of Natural Resources (MODNR), after the FLW Environmental Office has approved the permit application. MODNR by law may take up to 180 days to review and issue a permit. Copy of the permit shall be forwarded to the DPW Environmental Office. The Contractor shall not begin land disturbance operations until they have received and complied with the MODNR permit. MODNR charges a fee for the permits.

9.3 Hot Work Permit: The Contractor shall obtain a written “Hot Work Permit” (DA Form 5383-R) prior to commencing all hot work outside an approved shop area. Permits will be issued by the FLW Fire & Emergency Services at Fire Station #1, Bldg. 580, Phone: (573) 596-0883. The Contractor shall be liable for any fire loss to Government property attributable to negligence on the part of the Contractor, including failure to comply with fire prevention measures prescribed by terms of this contract. The Buildings and Ground Branch will assist the Contractor in obtaining this free permit

9.4 Confined Space Permit: The Contractor shall obtain a written “Confined Space Permit” prior to commencing all confined space activity above and/or below ground. Title 29 CFR 1910.146 OSHA (Confined Space Entry) and FLW Regulation 385-7 sets forth the definition of confined spaces and establishes responsibility and procedures for protection of personnel that shall be entering, work in, and existing confines space. If a permit is required the Contractor shall contact the FLW Fire Department, Fire Station #1, Assistant Chief of Operations, Bldg 580, Phone: (573) 596-0883 prior to, and after the permit required entry is conducted. The Contractor shall keep the permit copy within the work area until all workers have been accounted for after completion of the workday. The Buildings and Ground Branch will assist the Contractor in obtaining this free permit.

10 SAFETY REQUIRMENTS:

10.1 General Safety: During progress of work, the Contractor shall protect all personnel, whether Government or civilian, from any and all safety hazards caused by the construction operations. The contractor shall follow all Federal, State and local laws in accordance with 29 CFR 1910 (General Industries Standards), and 29 CFR 1926 (Construction Standards).

10.2 Fire Prevention: The current version of FLW Regulation 420-2 “Post Fire Regulations” is by this reference made a part of this solicitation and resultant contract. The Contractor’s operation shall conform to all applicable portions of this document. All personnel entering on duty as Contractor’s employees shall be instructed in the fire prevention program of the Post and shall be advised of the requirement of the Post Fire Regulations as they pertain to this particular contract.

10.3 Traffic Control: Contractor shall provide all temporary signs and markers as necessary to maintain safety in the worksite. All signs shall conform to the latest edition of the Manual of Uniform Control Devices (MUTCD) and shall be coordinated with, and approved by, DPW Buildings and Ground Branch. Contractor shall ensure road user movement is inhibited as little as practical.

11. SPECIAL REQUIREMENTS:

11.1 Use of Fire Hydrants – The temporary use of fire hydrants as sources of water is not authorized without prior approval by the Fire Department, 596-0886. Fire hydrant connections shall include an approved backflow preventer. Use of backflow preventers must comply with Missouri Department of Natural Resources, Division 60, Public Drinking Water Program, Chapter 11 – Backflow Prevention, Title 10CSR60-11. Government furnished backflow preventers shall be utilized and are available at Bldg. 1601, Water Treatment Plant on a first come basis. The Contractor shall be required to sign a hand receipt prior to obtaining a backflow preventer. The Contractor shall be accountable to return the checked out backflow preventer equipment undamaged and as soon as possible. The contractor shall furnish and use an approved fire plug wrench to open and close the hydrant. Pipe wrenches shall not be used. When the hydrant is not being used it shall be shut off. When the need for the hydrant is finished, the hydrant shall be shut off , the temporary connection and backflow preventer shall be removed, the fire hydrant caps shall be replaced and the Fire Department shall be notified that the hydrant will no longer be used.

12. SECURITY:

12.1 In unoccupied facilities, the Contractor shall be responsible for the security of the facility; i.e., all exterior doors shall be locked, windows closed and locked, etc.

12.2 The Contractor shall not be on site without prior notification to the DPW Contract Buildings and Grounds Branch.

12.3 Contractor personnel shall have valid civilian ID’s.

13 APPLICABLE PUBLICATIONS/REFERENCES: The publications referenced herein after shall be the most recent at the time of solicitation, unless otherwise specified at the beginning of each Specification Section under paragraph 1. APPLICABLE PUBLICATIONS and or REFERENCES.

14 WORKSITE HOUSEKEEPING:

14.1 The Contractor shall remove all trash and disposal material from the worksite before the end of each day, to the extent it is consistent with standard construction practices on Government work sites. The Contractor shall take all possible precautions to maintain the work site, at all times, in a condition that will prevent damage or injury to person or property, Government or otherwise. The above precautions shall include protection from weather conditions. The Contractor shall be responsible for all damages caused by the negligent acts or omissions of his employees, sub-contractors, or agents during Contract performance.

14.2 Materials to be used within 1 week of delivery and scrap material to be used as work progresses shall not be required to be in screened area. However, all such items shall be placed in an orderly manner (i.e. dirt, rock, etc., in piles and stackable items such as pipe, brick, lumber, etc., stacked off the ground on pallets in an orderly manner).

14.3 Grass and weeds at work/storage site shall be kept at a height of 4”or less. Work site/storage site shall be policed for trash and disposal material a minimum of once per day.

14.4 All trailer and material storage sites shall have an identification board/sign, with company and job name on it, i.e. ABC Construction – ABC building complex. Signs shall meet the following criteria: min 3’ X 3’ max of 4’ X 8’ in size, 3” high legible print, and be approved by DPW Buildings and Ground Branch.

14.5 Upon Contractor's request, the Contracting Officer will designate another or supplemental area for the Contractor's use and storage of trailers, equipment, and materials. This area may not be in close proximity of the construction site but will be within the installation boundaries. Fencing of materials or equipment will not be required at this site; however, the Contractor is responsible for cleanliness and orderliness of the area used and for the security of any material or equipment stored in this area. Utilities will not be provided to this area by the Government. All construction material shall be stored to meet environmental requirements.

15 RESPONSIBLITY FOR DAMAGE

15.1 Damage to Personal Property: The Contractor shall be solely responsible for all damage to Government and occupant personal property caused by the Contractors’ personnel, subcontractors, his agents, or by the performance of his work.

15.2 Damage by Negligence: Damage resulting in gas leaks, electrical outages, loss of heat during cold weather, water leaks, unsecured facilities, weather damage, or oil/hazardous waste spills shall be responded to by the Contractor within 2 hours and repaired within one workday. If the Contractor fails to comply with these requirements, the Government reserves the right to repair the damage and charge the cost to the Contractor. Contractor shall protect all areas through which he will be transporting demolition debris or construction materials. Any damaged turf, sidewalks, roads, vegetation, site amenities, etc, shall be replaced or repaired by the Contractor prior to final Contract closeout.

16 DISPOSAL OF MATERIALS: All materials removed and not reused or designated as salvage material in this project shall become the property of the Contractor, unless otherwise specified, and shall be the Contractor's responsibility for lawful disposal.

16.1 The Contractor may use the Fort Leonard Wood Compost area for the disposal of wood chips, leaves, and grass clippings generated by this project.

16.2 All other wastes generated during Contractor operations shall be disposed of off post by the Contractor at his/her expense.

16.2.1 The disposal of demolition waste is regulated by the Missouri Department of Natural Resources under Chapter 260, Revised Statutes of Missouri and 10 Code of State Regulations Chapter 80-4. Such waste, in types and quantities established by the Department, shall be taken to a demolition landfill or a sanitary landfill off of the Installation for disposal. The Contractor shall provide any information requested by the landfill operator to complete forms required by the Missouri Department of Natural Resources or other Government-required landfill records.

16.2.2 Wastes classified as hazardous wastes under the Resource Conservation and Recovery Act shall be disposed of off the installation, unless otherwise specified in this contract. No hazardous waste shall be disposed of without prior review of the disposal documents, and the approval of the Contracting Officer and the Directorate of Public Works Environmental Coordinator, or his designated representative. The Contractor shall provide an original copy of the disposal document from the approved EPA or State permitted disposal facility for each shipment of hazardous waste generated in this project to the Contracting Officers Representative.

17 ACCESS AND GENERAL PROTECTION/SECURITY POLICY AND PROCEDURES:

17.1 All Contractor and sub-contractor personnel performing tasks on this SOW shall comply with all applicable installation, facility and area commander installation/facility access and local security policies and procedures which will be provided to the Contractor by a Government representative upon written request to the Contracting Officer. Contractor shall provide all information required for background checks to meet installation access requirements as performed by the installation Provost Marshal Office, Director of Emergency Services or Security Office. Requesting Contractor shall submit request for installation pass to the KO at https://vcc1.icmvcc.com/im3500/. There is no charge to the Contractor for this pass. Contractor personnel shall comply with all personal identity verification requirements as directed by DoD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of the base contract to this task order, should the Force Protection Condition (FPCON) at any facility or installation change, the Government may require changes in Contractor security matters or processes.

17.1.1 In the event that the automated system at https://jkodirect.jten.mil is not available (e.g., server problems), Level I AT Awareness Training can be provided by a qualified instructor. However, if the training is not completed online, the Level I AT Awareness Instructor qualification must be coordinated with the Installation Antiterrorism Officer (or Installation Security equivalent) and the resultant name(s) of approved instructors shall be provided to the KO.

17.2 All contractor and sub-contractor employees requiring access to Army installations, facilities and controlled access areas shall complete AT Level I awareness training. IAW AR 525-13, 3 DEC 19, AT Level I Awareness training will be conducted by a certified Level II trained ATO. For contracts that cross fiscal years, or for contracts with option years, all contractor personnel shall complete annual AT Level I awareness training. The Installation AT Office or a certified Level II trained ATO on the installation will provide the training. Contact information for this Government employee will be provided at the kick-off meeting.

The Installation AT Office or a certified Level II trained ATO will provide a one hour training session conducted on FLW for Contractor personnel working on this installation. The COR will coordinate this training at the time of task order modification or award. Contractor personnel working at installations other than FLW shall coordinate with the COR and local AT Offices to obtain training applicable to that installation.

Contractor shall provide a list of personnel trained to the COR within five (5) business days of completion of training.

17.3 iWatch Training: Within 10 calendar days of contract award and within 10 calendar days of new Contractor employees commencing work on this contract, all Contractor and sub-contractor employees shall review the FLW Directorate of Emergency Services (DES) web link for iWatch training located at http://www.wood.army.mil/LEC/iWatch/iWatch.htm. This locally developed training will inform employees of the types of behavior to watch for and how to report suspicious activity. Suspicious activity shall be reported to the KO. There is no charge to the Contractor for this review. The burden to complete this training is approximately 20-minutes per employee.

17.4 The OPSEC Plan and User Agreement: The OPSEC Plan and User Agreement will be available for Contractors to review through the Installation OPSEC Officer. The Contracting Officer’s Representative (COR) will ensure the Contractor is aware of the Installation's OPSEC Plan and is in compliance with the Installation's OPSEC Plan during contract performance.

17.4.1 OPSEC Standard Operating Procedure/Plan: For contracts that require an OPSEC SOP, Contractor shall develop and submit an OPSEC SOP that is in compliance with AR 530-1 within 30 calendar days of contract award to be reviewed and approved by the responsible Government OPSEC Officer. This SOP/Plan will include Government’s critical information, why it needs to be protected, where it is located, who is responsible for it, and how to protect it. In addition, Contractor shall identify an individual who will be an OPSEC Coordinator and is OPSEC Level II certified. Information regarding OPSEC Level II certification is available through the Installation OPSEC Officer.

17.4.2 OPSEC Training: Pursuant to Army Regulation 530-1, all Contractor personnel must complete initial Level I OPSEC training within 30 calendar days of beginning performance on this contract. For contracts that cross fiscal years, or for contracts with option years, all contractor personnel shall complete annual OPSEC awareness training, to be provided by the Installation OPSEC Office or a certified Level II trained OPSEC Officer. Contact information for this Government employee will be provided at the kick-off meeting.

The Installation OPSEC Office, or a certified Level II trained OPSEC Officer, will provide Level I OPSEC training on Fort Leonard Wood for Contractor personnel working on this installation. The COR will coordinate this training at the time of task order modification or award.

Contractor shall provide a list of personnel trained to the COR within five (5) business days of completion of training.

Contractor personnel working at installations other than FLW shall coordinate with the COR and local OPSEC Office to obtain training applicable to that installation.

END OF SECTION

SECTION 01 33 00PRIVATE

SUBMITTALS

1. General: All items of equipment and/or materials that are defined or described in the contract require submission in accordance with this section. Brochures, samples, certificates of compliance, test reports, as applicable, shall be submitted by the Contractor to the Contracting Officer, and approval given by the Contracting Officer before any equipment or material is installed under this contract.

1.1. All of the data required shall be submitted prior to inclusion into the Work. Approval of materials and equipment requiring color selection will be withheld until all of the required information has been submitted and is in the hands of the Contracting Officer. All submissions must be in sufficient detail to adequately determine that the item will meet the requirements of this specification.

1.2. All submittals shall be transmitted to the Contracting Officer for review and approval within 30 calendar days after contract award date on Engineer Form 4025 in quadruplicate. The forms shall be completed as directed. No submittal will be accepted unless it is on the subject form. The forms will be furnished to the Contractor by the Government. All attachments to the transmittal form, such as catalog cuts, brochures, certifications, etc., shall be submitted in four (4) copies.

1.3. The Contractor shall complete and submit to the Contracting Officer for approval, five copies of ENG Form 4288 Submittal register. At a minimum, the submittal register shall include a listing of all items listed in paragraph 2 of this Section. This submittal register shall be provided with the initial set of submittals the Contractor submits for approval. ENG form 4288 will be furnished to the Contractor by the Government. This register will be maintained by the Government to insure that all required materials are submitted and approved IAW the contract requirements.

1.4. Scheduling: A minimum of 14 calendar days will be scheduled for review and approval of material submittals and possible resubmittal of any items subject to approval. For shop drawings submittals, a minimum of 21 calendar days will be allowed for review and approval and possible resubmittal. Unless otherwise specified in the contract, the Notice to Proceed with performance will be issued within 50 calender days after contract award date. If shop drawings are required, Notice to Proceed with performance will be issued within 60 calender days after contract award date. The scheduling shall be coordinated with the approved progress schedule.

2.seq level1 \h \r0 MATERIAL APPROVAL SUBMITTALS:

At a minimum the following list of materials will require approval under the Contract Clause, FAR 52.236‑5, titled Material and Workmanship. The Contracting Officer may require submission of additional materials as deemed necessary. If additional items are required to be submitted a revised ENG form 4288, SUBMITTAL REGISTER, shall be prepared by the Contractor and submitted with the additional material submittals. The Contractor shall not proceed with any work using materials which are subject to approval, until materials are approved.

Sections, material, certificates, and/or procedures requiring approval:

02 41 00 Demolition 03 20 00.00 10 Concrete Reinforcing

03 30 00.00 10 Cast-In-Place Concrete 04 20 00

Unit Masonry

05 52 00

Metal Railings

32 12 13 Bituminous Tack and Prime Coats 32.12.13.10 Repair of Bituminous Pavements 32 12 16

Hot-Mix Asphalt (HMA) For Roads 32 32 23 Concrete Segmental Retaining Wall System

32 92 00 Turf

NOTE: For specific quantities and types of materials to be submitted see the individual SECTIONS

END OF SECTION

SECTION 02 41 00PRIVATE

DEMOLITION

PART 1 ‑ GENERAL

1.1 SUBMITTALS: The procedures proposed for the accomplishment of this contract shall be submitted for approval. The procedures shall provide for safe conduct of the work, careful removal and disposition of materials indicated, protection of property which is to remain undisturbed, coordination with other work in progress, and timely disconnection of utility services. The procedures shall include a detailed description of the methods and equipment to be used for each operation, and the sequence of operations.

1.2 GENERAL REQUIREMENTS: The work includes demolition and/or removal of all construction indicated or specified. All materials resulting from demolition work, except as indicated or specified otherwise, shall become the property of the Contractor and shall be removed from the limits of Government property. Rubbish and debris shall be removed from Government property daily unless otherwise directed so as to not allow accumulation inside or outside the buildings. Materials that cannot be removed daily shall be stored in areas specified by the Contracting Officer. The Contractor shall carefully coordinate the work of this section with all other work.

1.3 DUST CONTROL: The amount of dust resulting from demolition shall be controlled to avoid creation of a nuisance in the surrounding area. Use of water will not be permitted.

1.4

PROTECTION:

1.4.1 Protection of Existing Work: Before beginning any digging or demolition work, the Contractor shall carefully survey the existing work and examine the drawings and specifications to determine the extent of the work. The Contractor shall take all necessary precautions to insure against damage to existing work to remain in place, to be reused, or to remain the property of the Government, and any damage to such work shall be repaired or replaced as approved by the Contracting Officer at no additional cost to the Government. The Contractor shall construct and maintain shoring, bracing, and supports as required. The Contractor shall insure that structural elements are not overloaded and be responsible for increasing structural supports or adding new supports as may be required as a result of any cutting, removal, or demolition work performed under any part of this Contract

1.5 seq level2 \h \r0 BURNING: The use of burning at the project site for the disposal of refuse and debris will not be permitted.

1.6 USE OF EXPLOSIVES: Use of explosives will not be permitted.

1.7 AVAILABILITY OF WORK AREAS: Areas in which demolition work is to be accomplished will be available in accordance with the schedule established by the Contracting Officer.

PART 2

seq level1 \h \r0 ‑ EXECUTION

2.1

EXISTING FACILITIES:

2.1.1 Utilities: When utility lines are encountered that are not indicated on the drawings the Contracting Officer shall be notified.

2.2 seq level2 \h \r0

DISPOSITION OF MATERIAL:

2.2.1 Material for Contractor Salvage: Material for Contractor salvage shall be stored as approved by the Contracting Officer. Salvage materials shall be removed from Government property before completion of the Contract. Material for salvage shall not be sold on the site.

2.3 seq level2 \h \r0

CLEAN‑UP:

2.3.1 Debris and Rubbish: Debris and rubbish shall be removed from area of work and job site as soon as possible.

2.3.2 Debris Control: Debris and Contractor salvage shall be removed and transported in a manner as to prevent spillage on streets or adjacent areas.

END OF SECTION

SECTION 03 20 00

CONCRETE REINFORCING

PART 1

GENERAL

1.1 REFERENCES: The publications listed below form a part of this specification to the extent referenced.

The publications are referred to within the text by the basic designation only.

AMERICAN CONCRETE INSTITUTE INTERNATIONAL (ACI)

ACI 117

(2010; Errata 2011) Specifications for Tolerances for Concrete Construction and Materials and Commentary

ACI 318

(2014; Errata 1-2 2014; Errata 3-5 2015;

Errata 6 206; Errata 7-9 2017)Building Code Requirements for Structural Concrete and Commentary

ACI SP-66

(2004) ACI Detailing Manual AMERICAN WELDING SOCIETY (AWS)

AWS D1.4/D1.4M

(2011) Structural Welding Code - Reinforcing Steel

ASTM INTERNATIONAL (ASTM)

ASTM A1035/A1035M

(2016a) Standard Specification for Deformed and Plain, Low-carbon, Chromium, Steel Bars for Concrete Reinforcement

ASTM A1064/A1064M

(2017) Standard Specification for Carbon-Steel Wire and Welded Wire Reinforcement, Plain and Deformed, for Concrete

ASTM A184/A184M

(2017) Standard Specification for Welded Deformed Steel Bar Mats for Concrete Reinforcement

ASTM A36/A36M

(2014) Standard Specification for Carbon Structural Steel

ASTM A370

(2017a) Standard Test Methods and Definitions for Mechanical Testing of Steel Products

ASTM A53/A53M

(2018) Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless

ASTM A615/A615M

(2016) Standard Specification for Deformed and Plain Carbon-Steel Bars for Concrete Reinforcement

ASTM A675/A675M

(2014) Standard Specification for Steel Bars, Carbon, Hot-Wrought, Special Quality, Mechanical Properties

ASTM A706/A706M

(2016) Standard Specification for

Low-Alloy Steel Deformed and Plain Bars for Concrete Reinforcement

ASTM A767/A767M

(2016) Standard Specification for

Zinc-Coated (Galvanized) Steel Bars for Concrete Reinforcement

ASTM A884/A884M

(2014) Standard Specification for

Epoxy-Coated Steel Wire and Welded Wire Reinforcement

ASTM A934/A934M

(2016) Standard Specification for Epoxy-Coated Prefabricated Steel Reinforcing Bars

CONCRETE REINFORCING STEEL INSTITUTE (CRSI)

CRSI 10MSP

(2009; 28th Ed) Manual of Standard Practice

1.2 SUBMITTALS: Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

Product Data

Reinforcing Steel

Certificates

Reinforcing Steel

1.3 DELIVERY, STORAGE, AND HANDLING:

Store reinforcement and accessories off the ground on platforms, skids, or other supports.

PART 2

PRODUCTS

2.1 DOWELS:

Provide dowels conforming to ASTM A675, Grade 80 or ASTM A1035. Steel pipe conforming to ASTM A53, Schedule 80, may be used as dowels provided the ends are closed with metal or plastic inserts or with mortar.

2.2 REINFORCING STEEL:

Reinforcing steel of deformed bars conforming to ASTM A615, ASTM A706, or ASTM A1035 grades and sizes as indicated. Cold drawn wire used for spiral reinforcement must conform to ASTM A1064.

2.3 WELDED WIRE REINFORCING:

Welded wire reinforcing conforming to ASTM A1064. When directed by the Contracting Officer for special applications, use welded wire reinforcing conforming to ASTM A884. For wire with a specified yield strength (fy) exceeding 60,000 psi, fy must be the stress corresponding to a strain of 0.35 percent.

2.4 WIRE TIES:

Use wire ties that are 16 gauge or heavier black annealed steel wire.

2.5 SUPPORTS:

Design bar supports for formed surfaces in accordance with CRSI 10MSP and fabricate of steel or precast concrete blocks. Provide precast concrete blocks with wire ties and not less than 4 inches square when supporting reinforcement on ground. Precast concrete block must have compressive strength equal to that of the surrounding concrete. Coat steel supports for coated or galvanized bars with electrically compatible material for a distance of at least 2 inches beyond the point of contact with the bar. Where concrete formed surfaces will be exposed to weather or where surfaces are to be painted, use galvanized, plastic protected or stainless steel supports within 1/2 inch of concrete surface. Concrete supports used in concrete exposed to view must have the same color and texture as the finish surface. For slabs on grade and topping slabs on steel deck, supports use precast concrete blocks, plastic coated steel fabricated with bearing plates, or specifically designed wire-fabric supports fabricated of plastic.

PART 3

EXECUTION

3.1 REINFORCEMENT:

Fabricate and place reinforcement steel and accessories as specified, as indicated, and as shown on approved shop drawings. Fabrication and placement details of steel and accessories not specified or shown must be in accordance with ACI SP-66 and ACI 318. Cold bend reinforcement unless otherwise authorized. Bending may be accomplished in the field or at the mill. Do not bend bars after embedment in concrete. Place safety caps on all exposed ends of vertical concrete reinforcement bars that pose a danger to life safety. Face wire tie ends away from the forms. Submit detail drawings showing reinforcing steel placement, schedules, sizes, grades, and splicing and bending details. Show support details including types, sizes and spacing.

3.1.1 Placement

Reinforcement must be free from loose rust and scale, dirt, oil, or other deleterious coating that could reduce bond with the concrete. Place reinforcement in accordance with ACI 318 at locations indicated plus or minus one bar diameter. Do not continue reinforcement through expansion joints and place as indicated through construction or contraction joints. Cover with concrete coverage as indicated or as required by ACI 318. If bars are moved more than one bar diameter to avoid interference with other reinforcement, conduits or embedded items, the resulting arrangement of bars, including additional bars required to meet structural requirements, requires approval before concrete is placed.

3.1.2 Placing Tolerances

Conform bar spacing and concrete cover to ACI 117.

3.1.3 Splicing

Conform splices of reinforcement to ACI 318 and make only as required or indicated. Bars may be spliced at alternate or additional locations at no additional cost to the Government subject to approval. Splicing must be by lapping or by mechanical or welded butt connection; except that lap splices must not be used for bars larger than No. 11 unless otherwise indicated.

3.1.3.1 Lap Splices

Place lapped bars in contact and securely tied or spaced transversely apart to permit the embedment of the entire surface of each bar in concrete. Do not space lapped bars farther apart than 1/5 the required length of lap or

6 inches.

3.1.3.2 Butt-Splices

Use butt-splices only for splicing size 14 and 18 bars and for splicing #11 bars to larger bars except where otherwise shown or authorized. Make butt-splices by a method which develops splices suitable for tension, compression and stress reversal applications. Butt-splices must develop 90 percent of the specified minimum ultimate tensile strength of the smallest bar of each splice. Clean bars of all oil, grease, dirt, rust, scale and other foreign substances and flame dry before splicing. Provide jigs and clamps or other devices to support, align and hold the longitudinal centerline of the bars to be butt-spliced in a straight line. Submit proposed procedure for butt-splicing steel bars prior to making the test butt-splices for qualification of the procedure. Include properties and analyses of steel bars and splicing materials in the submitted procedure. Report physical properties of splicing sleeves to include length, inside and outside diameters, and inside surface details.

3.1.3.2.1 Welded Butt Splices

Fabricate welded butt splices in accordance with AWS D1.4.

3.1.3.2.2 Mechanical Butt-Splices

Fabricate mechanical butt-splices in accordance with the mechanical splicing device manufacturer's recommendations. Bars to be spliced by a mechanical butt-splicing process may be sawed, sheared or flame cut provided the ends of sheared bars are reshaped after shearing and all slag is removed from the ends of flame cut bars by chipping and wire brushing prior to splicing. Clean surfaces to be enclosed within a splice sleeve or coupling by wire brushing or other approved method prior to splicing. Make splices using manufacturer's standard jigs, clamps, ignition devices and other required accessories. Longitudinally stagger tension splices of number 14 or smaller bar a minimum of 5 feet or as otherwise indicated so that no more than half of the bars are spliced at any one section. Longitudinally stagger tension splices of number 18 bars a minimum of 5 feet so that no more than 1/3 of the bars are spliced at any one section.

3.2 WELDED-WIRE REINFORCEMENT PLACEMENT

Place welded-wire reinforcement in slabs as indicated. Reinforcement placed in slabs on grade must be continuous between expansion, construction, and contraction joints. Reinforcement placement at joints must be as indicated. May lap splices in such a way that the overlapped area equals the distance between the outermost cross wires plus 2 inches. Stagger laps to avoid continuous laps in either direction. Wire or clip together reinforcement at laps at intervals not to exceed 4 feet. Position reinforcement by the use of supports.

3.3 DOWEL INSTALLATION

Install dowels in slabs on grade at locations indicated and at right angles to joint being doweled. Accurately position and align dowels parallel to the finished concrete surface before concrete placement. Rigidly support dowels during concrete placement. Coat one end of dowels with a bond breaker.

END OF SECTION

SECTION 03 30 00

CAST-IN-PLACE CONCRETE

PART 1

GENERAL

1.1 REFERENCES: The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN CONCRETE INSTITUTE INTERNATIONAL (ACI)

ACI
117
(2010; Errata 2011) Specifications for Tolerances for Concrete Construction and Materials and Commentary
ACI
121R
(2008) Guide for Concrete Construction Quality Systems in Conformance with ISO 9001
ACI
211.1
(1991; R 2009) Standard Practice for Selecting Proportions for Normal, Heavyweight and Mass Concrete
ACI
211.2
(1998; R 2004) Standard Practice for Selecting Proportions for Structural Lightweight Concrete
ACI
213R
(2014; E2017) Guide for Structural Lightweight-Aggregate Concrete
ACI
214R
(2011) Evaluation of Strength Test Results of Concrete
ACI
301
(2016) Specifications for Structural Concrete
ACI
301M
(2016) Metric Specifications for Structural Concrete
ACI
304.2R
(2017) Guide to Placing Concrete by Pumping Methods
ACI
304R
(2000; R 2009) Guide for Measuring, Mixing, Transporting, and Placing Concrete
ACI
305.1
(2014) Specification for Hot Weather Concreting
ACI
306.1
(1990; R 2002) Standard Specification for Cold Weather Concreting
ACI
309R
(2005) Guide for Consolidation of Concrete
ACI
318
(2019; Errata 1-2 2014; Errata 3-5 2015;

Errata 6 2016; Errata 7-9 2017) Building Code Requirements for Structural Concrete (ACI 318-19) and Commentary (ACI 318R-19)

ACI
318M
(2019; ERTA 2015) Building Code Requirements for Structural Concrete & Commentary
ACI
SP-15
(2011) Field Reference Manual: Standard Specifications for Structural Concrete ACI

301-05 with Selected ACI References

ASTM INTERNATIONAL (ASTM)

ASTM C1017

(2013; E 2015) Standard Specification for Chemical Admixtures for Use in Producing Flowing Concrete

ASTM C1064

(2017) Standard Test Method for Temperature of Freshly Mixed Hydraulic-Cement Concrete

ASTM C1077

(2017) Standard Practice for Agencies Testing Concrete and Concrete Aggregates for Use in Construction and Criteria for Testing Agency Evaluation

ASTM C1107

(2020) Standard Specification for Packaged Dry, Hydraulic-Cement Grout (Nonshrink)

ASTM C1116

(2010a; R 2015) Standard Specification for Fiber-Reinforced Concrete

ASTM C1157

(2020a) Standard Performance Specification for Hydraulic Cement

ASTM C1240

(2020) Standard Specification for Silica Fume Used in Cementitious Mixtures

ASTM C1260

(2021) Standard Test Method for Potential Alkali Reactivity of Aggregates

(Mortar-Bar Method)

ASTM C131

(2014) Standard Test Method for Resistance to Degradation of Small-Size Coarse Aggregate by Abrasion and Impact in the Los Angeles Machine

ASTM C136

(2019) Standard Test Method for Sieve Analysis of Fine and Coarse Aggregates

ASTM C143

(2020) Standard Test Method for Slump of Hydraulic-Cement Concrete

ASTM C150

(2021) Standard Specification for Portland Cement

ASTM C1567

(2013) Standard Test Method for Potential Alkali-Silica Reactivity of Combinations of Cementitious Materials and Aggregate (Accelerated Mortar-Bar Method)

ASTM C1602

(2012) Standard Specification for Mixing Water Used in Production of Hydraulic Cement Concrete

ASTM C172

(2017) Standard Practice for Sampling Freshly Mixed Concrete

ASTM C173

(2016) Standard Test Method for Air Content of Freshly Mixed Concrete by the Volumetric Method

ASTM C192

(2016a) Standard Practice for Making and Curing Concrete Test Specimens in the Laboratory

ASTM C231

(2017a) Standard Test Method for Air Content of Freshly Mixed Concrete by the Pressure Method

ASTM C260

(2010a; R 2016) Standard Specification for Air-Entraining Admixtures for Concrete

ASTM C309

(2011) Standard Specification for Liquid Membrane-Forming Compounds for Curing Concrete

ASTM C31

(2021a) Standard Practice for Making and Curing Concrete Test Specimens in the Field

ASTM C311

(2018) Standard Test Methods for Sampling and Testing Fly Ash or Natural Pozzolans for Use in Portland-Cement Concrete

ASTM C33

(2018) Standard Specification for Concrete Aggregates

ASTM C330

(2017a) Standard Specification for Lightweight Aggregates for Structural Concrete

ASTM C39

(2021) Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens

ASTM C42

(2020) Standard Test Method for Obtaining and Testing Drilled Cores and Sawed Beams of Concrete

ASTM C494

(2019) Standard Specification for Chemical Admixtures for Concrete

ASTM C496

(2017) Standard Test Method for Splitting Tensile Strength of Cylindrical Concrete Specimens

ASTM C552

(2017; E 2018) Standard Specification for Cellular Glass Thermal Insulation

ASTM C567

(2019) Determining Density of Structural Lightweight Concrete

ASTM C578

(2018) Standard Specification for Rigid, Cellular Polystyrene Thermal Insulation

ASTM C591

(2017) Standard Specification for Unfaced Preformed Rigid Cellular Polyisocyanurate

Thermal Insulation

ASTM C595

(2021) Standard Specification for Blended Hydraulic Cements

ASTM C618

(2019) Standard Specification for Coal Fly Ash and Raw or Calcined Natural Pozzolan for Use in Concrete

ASTM C685

(2017) Standard Specification for Concrete Made by Volumetric Batching and Continuous Mixing

ASTM C78

(2021) Standard Test Method for Flexural Strength of Concrete (Using Simple Beam with Third-Point Loading)

ASTM C937

(2016) Grout Fluidifier for Preplaced-Aggregate Concrete

ASTM C94

(2021a) Standard Specification for Ready-Mixed Concrete

ASTM C989

(2018) Standard Specification for Slag Cement for Use in Concrete and Mortars

ASTM D5759

(2012) Characterization of Coal Fly Ash and Clean Coal Combustion Fly Ash for Potential Uses

ASTM D75

(2014) Standard Practice for Sampling Aggregates

ASTM E1643

(2018a) Standard Practice for Selection, Design, Installation, and Inspection of Water Vapor Retarders Used in Contact with Earth or Granular Fill Under Concrete Slabs

ASTM E1745

(2017) Standard Specification for Water Vapor Retarders Used in Contact with Soil or Granular Fill under Concrete Slabs

ASTM E1993/E1993M

(1998; R 2013; E 2013) Standard

Specification for Bituminous Water Vapor Retarders Used in Contact with Soil or Granular Fill Under Concrete Slabs

ASTM E96/E96M

2016) Standard Test Methods for Water Vapor Transmission of Materials

CONCRETE REINFORCING STEEL INSTITUTE (CRSI)

CRSI 10MSP

(2009; 28th Ed) Manual of Standard Practice

NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY (NIST)

NIST HB 44

(2018) Specifications, Tolerances, and Other Technical Requirements for Weighing and Measuring Devices

NATIONAL READY MIXED CONCRETE ASSOCIATION (NRMCA)

NRMCA QC 3

(2011) Quality Control Manual: Section 3, Plant Certifications Checklist: Certification of Ready Mixed Concrete Production Facilities

NRMCA TMMB 100

(2001; R 2007) Truck Mixer, Agitator and Front Discharge Concrete Carrier Standards

U.S. ARMY CORPS OF ENGINEERS (USACE)

COE CRD-C 104

(1980) Method of Calculation of the Fineness Modulus of Aggregate

1.2 DEFINITIONS:

1.2.1 Cementitious Material

As used herein, includes all portland cement, pozzolan, fly ash, ground granulated blast-furnace slag.

1.2.2 Chemical Admixtures

Materials in the form of powder or fluids that are added to the concrete to give it certain characteristics not obtainable with plain concrete mixes.

1.2.3 Complementary Cementing Materials (CCM)

Coal fly ash, granulated blast-furnace slag, natural or calcined pozzolans, and ultra-fine coal ash when used in such proportions to replace the portland cement that result in considerable improvement to sustainability, durability.

1.2.4 Design Strength (f'c)

The specified compressive strength of concrete at time(s) specified in this section to meet structural design criteria.

1.2.5 Mass Concrete

Any concrete system that approaches a maximum temperature of 70 degrees C

158 degrees F within the first 72 hours of placement.

In addition, it includes all concrete elements with a section thickness of 1 meter 3 feet or more regardless of temperature.

1.2.6 Mixture Proportioning

The process of designing concrete mixture proportions to enable it to meet the strength, service life and constructability requirements of the project.

1.2.7 Mixture Proportions

The masses or volumes of individual ingredients used to make a unit measure (cubic yard) of concrete.

1.2.8 Pozzolan

Siliceous or siliceous and aluminous material, which in itself possesses little or no cementitious value but will, in finely divided form and in the presence of moisture, chemically react with calcium hydroxide at ordinary temperatures to form compounds possessing cementitious properties.

1.2.9 Workability or Consistency

The ability of a fresh (plastic) concrete mix to fill the form/mould properly with the desired work (vibration) and without reducing the concrete's quality. Workability depends on water content, chemical admixtures, aggregate (shape and size distribution), cementitious content and age (level of hydration).

1.3 SUBMITTALS: Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

Product Data

Cementitious Materials

Grouts/Sealanta

Vapor Retarder

Vapor Barrier

Floor Finish

Floor Hardener

Chemical Admixtures

Concrete wheel stops

Joint filler

Joint sealer

Curing compound

Design Data

Mixture Proportions

Lightweight Aggregate Concrete

Test Reports

Mixture Proportions

Fly Ash

Air Content

Slump

Compressive Strength

Water

Certificates

Ready-Mix Plant

1.4 DELIVERY, STORAGE, AND HANDLING:

Follow ACI 301 and ACI 304R requirements and recommendations. Store cement and other cementitious materials in weathertight buildings, bins, or silos that exclude moisture and contaminants and keep each material completely separated. Arrange and use aggregate stockpiles in a manner to avoid excessive segregation and to prevent contamination with other materials or with other sizes of aggregates. Do not store aggregate directly on ground unless a sacrificial layer is left undisturbed. Store reinforcing bars and accessories above the ground on platforms, skids or other supports. Store other materials in a manner to avoid contamination and deterioration.

Admixtures which have been in storage at the project site for longer than 6 months or which have been subjected to freezing cannot be used unless retested and proven to meet the specified requirements. Materials must be capable of being accurately identified after bundles or containers are opened.

PART 2

PRODUCTS

2.1 SYSTEM DESCRIPTION:

Provide concrete composed of portland cement, other cementitious and pozzolanic materials as specified, aggregates, water and admixtures as specified.

2.1.1 Proportioning Studies-Normal Weight Concrete

Trial design batches, mixture proportions studies, and testing requirements for various types of concrete specified are the responsibility of the Contractor. Base mixture proportions on compressive strength as determined by test specimens fabricated in accordance with ASTM C192 and tested in accordance with ASTM C39. Obtain mix design approval from the Contracting Officer prior to concrete placement.

a. Samples of all materials used in mixture proportioning studies must be representative of those proposed for use in the project and be accompanied by the manufacturer's or producer's test reports indicating compliance with these specifications.

b. Make trial mixtures having proportions, consistencies, and air content suitable for the work based on methodology described in ACI 211.1, using at least three different water-cementitious material ratios for each type of mixture, which produce a range of strength encompassing those required for each type of concrete required on the project.

c. The maximum water-cementitious material ratios allowed in subparagraph WATER-CEMENTITIOUS MATERIAL RATIO below will be the equivalent water-cementitious material ratio as determined by conversion from the weight ratio of water to cement plus pozzolan by the weight equivalency method as described in ACI 211.1.

In the case where silica fume or GGBF slag is used, include the weight of the silica fume and GGBF slag in the equations in ACI 211.1 for the term P, which is used to denote the weight of pozzolan. If pozzolan is used in the concrete mixture, the minimum pozzolan content is 15 percent by weight of the total cementitious material, and the maximum is 35 percent.

d. Design laboratory trial mixtures for maximum permitted slump and air content. Make separate sets of trial mixture studies for each combination of cementitious materials and each combination of admixtures proposed for use.