This document is a Statement of Work related to a federal contract opportunity for irrigation repair and concrete repairs at the Rocky Mountain Regional VA Medical Center in Aurora, Colorado.

The Statement of Work covers two main scopes of work: 1) Repairing an irrigation main pipe and irrigation line in two separate locations, and 2) Repairing two sections of concrete sidewalk near the Colfax and North Entrances that pose slip/trip hazards. The contractor will be responsible for all labor, materials, safety equipment, and quality control to complete the work in 30 consecutive calendar days. The contractor must follow OSHA requirements, coordinate site access with the Contracting Officer's Representative (COR), and provide daily reports and a one-year warranty. The government will provide a site visit prior to the proposal due date upon request. The Place of Performance is the Rocky Mountain Regional VA Medical Center in Aurora, Colorado.

View the file

Other files

File Type Posted
Photo 14_17th and Wheeling_2.jpg JPG image
Photo 1_S-R Driveway.jpg JPG image
Photo 13_17th and Wheeling_1.jpg JPG image
36C25924Q0823_Past Performance Questionnaire_Blank.docx DOCX document
852.219-75 LOS Certification.docx DOCX document
Photo 15_17th and Wheeling N.jpg JPG image
Photo 11_North Entry Walkway.jpg JPG image
Photo 12_North Entry Curb and Sidewalk.jpg JPG image
36C25924Q0823_1.docx DOCX document
Photo 10_Chapel North.jpg JPG image

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

E

T

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

123 4 5 6 7 8 9 10 11 12 13 14

E

FITZIMONS PARKWAY W

U

U U

D U

U U

U

UP

DN

U U U

U

U UP

DN

U

U

U

U U

U U

U

U

U U

U U

DN

U

U

U U U

U U

U

U

N

UPDN

U U SCI

U

DN

DN

COURTYARD

NORTH U

UP

DN

PSN

EAST

U

FUTURE

DEVELOPMENT

C U

U

U

U U

U

U

UP

DN

U

U

U

UPUPDN

UP

U

U

U

ENC

(06)

U

X X X X X X X X X X

UP

UP

IBN

(05)

UPDN

DN DN U

U

SCI

COURTYARD

SOUTHU

IBS

(04)

U

STAFF

COURTYARD

U

U

U

N

U ED COURT

DAT

(03)

RES

(02)

U U

CHAPEL

PVN

(12)

CLC

(07) PSN

(11)

U

SOUTH ENTRY COURT

U

CHAPEL

GARDEN

DNUP

U

B U

U

U

U

U

U

U

U U

U

U

U

U U U

U U

U

U

U

CBN

(08)

CBC

(09)

CBS

(10)

U

NORTH ENTRY COURT

AREA PENDING REDESIGN AND

VA APPROVAL WHEELING STREET

1 OVERALL SITE PLAN

1" = 50'-0"

0' 25' 50' 100' 200'

NORTH

A

CONSULTANTS: Professional Seal ARCHITECT/ENGINEERS:

CDI No. 12 Revisions

1 2

08/31/2012 Date

3 4 5 6

H+L Architecture 1755 Blake Street, Suite 400 Denver, CO 80202

Skidmore, Owings & Merrill LLP 224 South Michigan Avenue Suite 1000 Chicago, IL 60604

Cator, Ruma & Associates 896 Tabor Street Lakewood, CO 80401

S. A. Miro, Inc.

4582 South Ulster Street Pkwy.

Suite 300 Denver, CO 80237

Key Plan Drawing Title

OVERALL SITE PLAN

Approved: Project Director

Project Title

REPLACEMENT MEDICAL CENTER

FACILITY, EASTERN COLORADO

HEALTH CARE SYSTEM

Location

Date

AURORA, COLORADO

Checked Drawn

08/31/12

7 8 9 10 1112 1314

00.LS.100

Drawing Number

Building Number

Project Number

554-501 OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

8/27/2012 12:10:14 PM

C

:\U sers\Jay\D ocum ents\LS-SIT_Jay.rvt

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

T

D

D

D D

X X X XX

E

D

D

FE

V

D

FE

V

FE

V

FE

V

FE

V

FE

V

FE

V

FE

V

FE

V

FE

V

FE

V

FE

V

E 17TH

PLAC

E D

D

D

D

D

ST

AI

R

ST

AI

R

ST

AI

R

A

E E

D

N

D

E

E

E

E

S

D

D

E

E

D D

D

EAST C

O

LFAX AVE.

13 - PVS

12 - PVN

11 - PSN

10 - C

BS

09 - C

BC

08 - C

BN

07 - C

LC

06 - EN

C

05 - IBN

D

D

04 - IBS

03 - D

AT

02 - R

ES

01 - C

O N

X X

X X

X X

X X

X X

X X X

X X

X X

X X

X

X

D

X

X

X

X

X

X

X

X

X

X

X

X

X X

X X

X

X X

X X

X

X X

X

X X

X X

X

X X

X X

X

X X

X X

X

X X

X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X X X X X X X X X X X X X X

TV

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

W

X X X

X

X

X

E

E

E

E

E

W

W

D

S

POTOMAC STREET

VHAECHBrakhB Sticky Note

1) The concrete at the dock entry has begun to sink and there is a trip hazard that also interferes with plowing snow.

VHAECHBrakhB Sticky Note Four of the concrete pads have sunk due to the incorrect drainage to the south. This occasionally causes the area to be a safety hazard when it is covered by a layer of ice. Approximate area 125 sf

VHAECHBrakhB Sticky Note There is a considerable drop-off, (trip/fall hazard) between the sidewalk and the landscaping which is partially caused by the difficulty in making that corner in snow removal equipment. This area should be concreted over level with current sidewalk. Approximate area 175 sf

VHAECHBrakhB Sticky Note One square of concrete sidewalk is cracked and will need to be replaced. Approximate area 64 sf

VHAECHBrakhB Sticky Note With the addition of a cell tower in the sidewalk, it is extremely difficult to get by with snow removal equipment. Sidewalk will need to be widened. Approximate area 100 sf

VHAECHBrakhB Typewritten Text

VHAECHBrakhB Typewritten Text

VHAECHBrakhB Typewritten Text

VHAECHBrakhB Typewritten Text

VHAECHBrakhB Typewritten Text

VHAECHBrakhB Typewritten Text

VHAECHBrakhB Typewritten Text

VHAECHBrakhB Typewritten Text

VHAECHBrakhB Typewritten Text

VHAECHBrakhB Typewritten Text

VHAECHBrakhB Typewritten Text

VHAECHBrakhB Typewritten Text

VHAECHBrakhB Typewritten Text

VHAECHBrakhB Typewritten Text

VHAECHBrakhB Typewritten Text

VHAECHBrakhB Typewritten Text

VHAECHBrakhB Typewritten Text

VHAECHBrakhB Sticky Note Sidewalk was cut and poorly re-placed, one pad will need to be replaced. Approximate area 64 sf

VHAECHBrakhB Sticky Note Damage to curb at driveway entrance.

VHAECHBrakhB Sticky Note Snow removal at the sidewalk around the Chapel would be far easier if there was a connection between that sidewalk and the one inside the fence to the west. (9 and 10) approximately 150 sf

VHAECHBrakhB Sticky Note The quarter-round at Wheeling and 17th place would be best if filled in. Approximately 50 sf

VHAECHBrakhB Sticky Note Paving stones were added to expand the sidewalk, (now broken) so that vehicles can negotiate the corner. It would be safer and last longer as an extension of the sidewalk.

VHAECHBrakhB Sticky Note There are several safety hazards on this corner which could be mitigated with extending the sidewalk. Approximately 200 sf

VHAECHBrakhB Sticky Note One square of sidewalk has sunk to one inch below grade causing a trip hazard and snow removal difficulties. approximately 36 sf

VHAECHBrakhB Sticky Note Broken sidewalk which is causing trip hazard, most likely 4 pads need replacement. Approximately 100 sf

VHAECHBrakhB Sticky Note Curb damage at the south side of the entry which would be better repaired with some changes to the sidewalk so that the problem is not repeated. Approximately 25 sf

VHAECHBrakhB Sticky Note Curb damage, 8 linear feet

VHAECHBrakhB Sticky Note Trip hazard, one inch drop. Approximately 64 sf

Sheets and Views
Layout1

File details come from the government source that posted it. Updated .