Concrete Batch Plant SOW Final.pdf
PDF 134 KB Posted
- Attached to
- Concrete Batch Plant Repair Diagnostic
- Solicitation number
- FA524022Q0143
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FA524022Q0143 - Concrete Batch Plant.pdf | ||
| Wage Determination 2015-5693 Revision 17 dated 27 July 2022.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE AIR FORCE
HEADQUARTERS, 36TH WING (PACAF)
ANDERSEN AIR FORCE BASE, GUAM
STATEMENT OF WORK
CONCRETE BATCH PLANT REPAIR DIAGNOSTIC
ON
ANDERSEN AFB, GUAM
30 Aug 2022
Table of Contents
1. DESCRIPTION OF SERVICES
1.1 SCOPE……………………………………………………………………………………….1
1.2 REQUIREMENTS…………………………………………………………………………...1
1.3 INSPECTION AND ACCEPTANCE……………………………………………………
1.4 LIABILITY…………………………………………………………………………………..1
1.5 GOVERNMENT FURNISHED SERVICES…………………………………….…………..1
2. GENERAL INFORMATION………………………………………………………………..2
2.1 HOURS OF OPERATION…………………………………………………………………...2
1. DESCRIPTION OF SERVICES
1.1 SCOPE: Vendor shall supply all personnel, travel, supplies, equipment, labor associated with the work detailed in this statement of work. This requirement is for a diagnostic examination of the machinery and no repair will take place under this contract.
1.2 REQUIREMENTS: The contractor shall inspect, diagnose, and provide a list of all necessary repairs and replacement parts to return the Haganator HM45 concrete batch plant on
Andersen AFB, Guam to full functionality. A function check will be conducted on the portable batch plant, sack cement feeder, radial stacker, batch house, wet belt, and all other parts associated with the function of the Haganator HM45 system. The contractor shall produce an itemized list of all parts and labor that is required to restore the system to operational capability.
This itemized list shall include part numbers or equal and price estimates. This assessment and report shall be completed within 48 hours of arrival on site. Technicians must be experienced with maintaining and repairing Vince Hagan equipment.
1.3 INSPECTION AND ACCEPTANCE: The 554th Redhorse Squadron representative will accomplish inspection and acceptance of the itemized repair list.
1.4 LIABILITY: The contractor shall be liable for any damages resulting from any carelessness or failure to follow proper safety, installation, engineering, or maintenance procedures and standards. All warranties shall be held up to the manufacturer’s standard warranty. Any essential training on equipment shall be provided for the government personnel.
1.5 GOVERNMENT FURNISHED SERVICES: The government will provide emergency medical transportation and treatment if required. The contractor shall reimburse the Government for the cost of these medical services at current rates.
2. GENERAL INFORMATION
2.1 HOURS OF OPERATION: The normal hours of operation for the project are from 0730 to 1630, Monday through Friday, excluding holidays and PACAF Family days.