Concept detail New Location CU 1 and 2.pdf
PDF 336 KB Posted
- Attached to
- Upgrade HVAC B109 Goodfellow AFB Federal contract opportunity
- Solicitation number
- FA303023Q0018
View the file
Other files for this federal contract opportunity
Show all 34
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CU1
New location
6” Concrete Mech. Pad
Existing Air compressor will be removed by 17 CES before construction begins
CU2 New location Must provide a flat level surface for CU2
Existing barricade will be cut to fit and relocated to protect CU2
ON GRADE, LEVEL TOP Concrete Mech. Pad 6” Minimum
Concrete drive slopes to the North away from the building
CU2 Must Locate between Ballard and existing sidewalk
N
File details come from the government source that posted it. Updated .