This is Addendum No. 2 to Request for Quotes CON26-0030 issued by the San Francisco Recreation and Park Department for infrastructure work at Camp Mather in Groveland, California. The project involves installation of a tank liner for a water tank with dimensions of approximately 23 feet in diameter and 16 feet tall. The tank has a fixed roof with access only through a port hole at ground level. Bidders must acknowledge receipt of this addendum and submit it with their bid form. The bid due date is Tuesday, February 3, 2026 by 2:30 p.m., with quotes to be emailed to bridget.webster@sfgov.org. No pre-quote meeting will be held for this opportunity.
The tank liner must meet all requirements established by the State Water Resource Board, pass inspection, and be super-chlorinated before being placed into service. Spray-applied liner is not a viable option due to the existing condition of the water tank walls. A California State License Type A or C-57 is required for bidders. The cost estimate for this infrastructure project is $142,750. This addendum clarifies specifications from the original solicitation and does not extend the previously established bid due date.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
January 29, 2026 To: Prospective Bidders
Contract No. CON26-0030 is amended in accordance with the following Addendum No. 2 which is made part of said Specification:
ADDENDUM NO. 2
TO CONTRACT NO. CON26-0030 Camp Mather Water Tank
Acknowledge receipt of this Addendum in the space provided on this notice below and submit with Bid Form by bid due date. Failure to do so may subject Bid to disqualification.
Bid Due Date: Bids are due no later than Tuesday, February 3, 2026 by 2:30pm, emailed to bridget.webster@sfgov.org
CLARIFICATIONS TO SCOPE:
1. The tank dimensions are approximately 23 feet in diameter and 16 feet tall.
2. The roof is not removable. The only entrance is from a port hole at ground level.
3. The tank liner that is going to be installed must be meet all requirements by the State Water Resource
Board, pass inspection, and be super-chlorinated before putting into use.
4. Spray applied liner is not viable due to condition of the water tank walls.
5. Tank Images:
mailto:bridget.webster@sfgov.org
Sincerely:
Sean McFadden Gabriel Meil Recreation and Park Department Recreation and Park Department
Acknowledgement of Receipt:
Signature of Authorized Representative Print Name and Title