This is a work package specification containing multiple work items for vessel repairs and maintenance on the USS LEWIS B PULLER (ESB 3) to be performed in Bahrain. The specification (BAHR-004-25) includes detailed requirements for various repair tasks including: bracket replacement, ladder preservation, warning sign replacement, door repairs, deck drain cleaning, ventilation system cleaning, lagging/insulation replacement, preservation work, and office space requirements for the project team.

Key work items involve replacing brackets on the flight deck catwalk, preserving inclined ladders and stairways, replacing A9 weather deck warning signs, repairing various doors and latches, cleaning HVAC systems and deck drains, replacing damaged insulation and lagging, and setting up project team office facilities. The work package provides specific technical requirements, inspection points, testing procedures, and material specifications for each task. Many items require preservation work using specific coatings and paints provided as Government Furnished Material. The contractor must provide qualified technical representatives for certain specialized repairs. The specification includes detailed quality control requirements with numerous verification and inspection points designated as (V)(G) throughout the work items.

View the file

Other files

File Type Posted
1.19 N6817125R0003_Synopsis.pdf PDF
Composite_Work_Package_MSC.pdf PDF
1.19 N6817125R0003_Synopsis.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

4 5

11 03

Standard Item #

Title Change Date Change

009-01 General Criteria; accomplish 09/29/2023 Original

009-02 Environmental Compliance Report for Material Usage; accomplish 09/29/2023 Original

009-03 Toxic and Hazardous Substance; control 09/29/2023 Original

009-04 Quality Management System; provide 03/13/2024 CH-1

009-05 Temporary Access; accomplish 09/29/2023 Original

009-06 Maintaining Protection and Cleanliness from Non-Radioactive Operations; accomplish 09/29/2023 Original

009-07 Confined Space Entry, and Certification; accomplish 09/29/2023 Original

009-08 Shipboard Fire Protection and Fire Prevention; accomplish 09/29/2023 Original

009-10 Asbestos-Containing Material (ACM); control 09/29/2023 Original

009-18 Mine Warfare Ships Magnetic Material; control 09/29/2023 Original

009-19 Provisioning Technical Documentation (PTD); provide 09/29/2023 Original

009-20 Government Property; control 03/13/2024 CH-1

009-21 Alteration Verification, Logistic and Technical Data; provide 09/29/2023 Original

009-23 Interference; remove and install 09/29/2023 Original

009-24 Authorization, Control, Isolation, Blanking, Tagging, and Cleanliness; accomplish 09/29/2023 Original

009-34 Fire Protection of Unmanned Vessel at Contractor Facility; accomplish 09/29/2023 Original

009-39 Technical Manual Contract Requirement (TMCR) for a New Technical Manual for Commercial Equipment/Component; accomplish 09/29/2023 Original

009-40 Contractor Crane, Multi-Purpose Machine and Material Handling Equipment at a Naval Facility;

provide 09/29/2023 Original

009-60 Schedule and Associated Report for CNO Availability; provide and manage 09/29/2023 Original

009-61 Shipboard Use of Fluorocarbons; control 09/29/2023 Original

009-67 Integrated Total Ship Testing; manage 09/05/2023 Original

009-69 Heavy Weather/Mooring Plan; provide 09/29/2023 Original

009-70 Confined Space Entry, Certification, Fire Protection, Fire Prevention and Housekeeping for Unmanned Vessels; accomplish 09/29/2023 Original

009-72 Physical Security at a Private Contractor Facility; accomplish 09/29/2023 Original

009-73 Shipboard Electrical/Electronic Cable Procedure; inspect, test, install, remove, and repair 09/29/2023 Original

009-74 Occupational, Safety and Health Plan; accomplish 09/29/2023 Original

009-80 Ship Facility; maintain 09/05/2023 Original

009-81 Compartment Closeout; accomplish 09/29/2023 Original

009-82 Installation of Equal Component Vice Specified Component; report 09/29/2023 Original

009-84 Threaded Fastener Requirement; accomplish 09/05/2023 Original

009-88 Collection, Holding and Transfer (CHT) and Motor Gasoline (MOGAS) Tank, Space, and Piping, including Sewage or MOGAS-Contaminated Tank, Space, and Piping; certify 09/18/2023 Original

009-93 Emergency Planning and Community Right-to-Know Act (EPCRA) and Pollution Prevention Act (PPA) Information; provide 09/29/2023 Original

009-99 Ship Departure Report; provide 09/29/2023 Original

009-100 Ship's Stability; maintain 09/05/2023 Original

009-101 Ship Transit and Berthing; accomplish 09/29/2023 Original

009-106 Work Authorization Form Coordinator (WAFCOR); provide 09/29/2023 Original

009-109 Non-SUBSAFE Work on SUBSAFE-Certified Vessel; accomplish 09/29/2023 Original

009-110 Non-Nuclear Work on a Nuclear Vessel; accomplish 09/29/2023 Original

009-111 Schedule and Associated Report for Non-CNO Availability; provide and manage 10/01/2023 Original

009-117 Combat Systems, Light-Off Suport; provide 09/29/2023 Original

009-118 CG Deck Loading; accomplish 09/29/2023 Original

009-120 Fact Finding and Critique of Unplanned Event; manage 09/06/2023 Original

009-122 Temporary Padeye; install and remove 08/23/2023 Original

009-125 Boat 65 Feet (20meters) Long and Less; accomplish 09/06/2023 Original

009-126 Schedule Model Review (SMR); accomplish 10/01/2023 Original

INDEX

ITEM THAT ARE STRUCK OUT IN THIS INDEX DO NOT APPLY TO THIS CONTRACT.

CATEGORY I, CH-1. FY-25 STANDARD ITEMS APPLICABLE TO THIS JOB ORDER WITHOUT FURTHER REFERENCE.

SHIP: USS LEWIS B PULLER (ESB 3) BAHR-004-25

BAHR-004-25

Standard Item #

Title Change Change Date

009-11 Insulation and Lagging; accomplish Original 09/29/2023 009-12 Weld, Fabricate, and Inspect; accomplish CH-1 03/13/2024 009-25 Structural Boundary Test; accomplish Original 09/29/2023 009-26 Deck Covering; accomplish Original 09/01/2023 009-32 Cleaning and Painting Requirements; accomplish CH-1 03/13/2024 009-90 Technical Representative; provide Original 09/29/2023

SHIP: USS LEWIS B PULLER (ESB 3)

CATEGORY II, CH-1. Standard Items List - 2025 - CH-1

Work Spec

1 120-00-001

2 130-00-001

3 130-00-002

4 159-11-001

5 167-00-001

6 167-00-002

7 167-11-001

8 167-11-002

9 169-00-001

10 311-11-001

11 508-11-001

12 512-00-001

13 512-00-002

14 516-10-001

15 526-11-001

16 528-00-001

17 588-21-001

18 588-21-002

19 593-31-001

20 631-10-001

21 631-21-001

22 634-11-001

23 637-00-001

24 640-00-001

25 640-00-002

26 644-11-001

27 992-11-001

Title Bracket; replace Inclined Ladder and Mezzanine Ladder; preserve Starboard Inclined Ladder; preserve A9 Weather Deck Warning Sign; replace Joiner Door and Handle; repair A8 Communication Center Door Repair; accomplish Quick Acting Watertight Door Dog Wedge; repair Security Combination Door Lock; install Shower Door Repair; accomplish Kickpipe; replace Lagging and Insulation; replace Ventilation Cleaning; accomplish Split Air Condition Cleaning; accomplish Container (CONEX) Refrigeration Unit Box; clean Flight Deck Drain; preserve Flight Deck Isolation Valve; replace Port Side Roll Up Door Repair; accomplish Helicopter Hangar Door Bottom Bar Assembly; repair Deck Drain and Piping; clean Bulkhead Preservation; accomplish Commercial Broadband Satellite Program (CBSP) Port Cable Pipe; preservation Cosmetic Polymeric (PRC) Deck Covering; replace Overhead Panel; replace Metal Joiner Door Preservation; accomplish Locker Latch Replace; accomplish A8 Level Pipe Preservation; accomplish Project Team Office Space; provide

INDEX

SHIP: USS LEWIS B PULLER (ESB 3) BAHR-004-25

SHIP: USS LEWIS B PULLER (ESB 3) ITEM NO: 120-00-001

COAR: 26 PCN: V101-0761

V101-0762

BWST FILE NO: 000-001 CMP: NONE

REVISED: 05 APR 2019 PLANNER: VIDENA, CELSO

SSP: BAHR-004-25 1 of 2 ITEM NO: 120-00-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Bracket; replace

1.2 Location of Work:

1.2.1 Flight Deck, Starboard Catwalk, A5 Level

1.2.2 Flight Deck, Port Catwalk, A5 Level

1.3 Identification:

1.3.1 Quantity (31 EA); Bracket for Electrical, Mechanical Part, Switch and Button, located in 1.2.1

1.3.1.1 Quantity (3 EA); 6 Inches X 6 Inches

1.3.1.2 Quantity (One EA); 10 Inches X 10 Inches

1.3.1.3 Quantity (One EA); 10 Inches X 14 Inches

1.3.1.4 Quantity (2 EA); 12 Inches X 8 Inches

1.3.1.5 Quantity (2 EA); 12 Inches X 15 Inches

1.3.1.6 Quantity (3 EA); 14 Inches X 14 Inches

1.3.1.7 Quantity (5 EA); 20 Inches X 13 Inches

1.3.1.8 Quantity (2 EA); 20 Inches X 24 Inches

1.3.1.9 Quantity (6 EA); 22 Inches X 15 Inches

1.3.1.10 Quantity (One EA); 28 Inches X 8 Inches

1.3.1.11 Quantity (4 EA); 31 Inches X 14 Inches

1.3.1.12 Quantity (One EA); 42 Inches X 12 Inches

1.3.2 Quantity (8 EA); Bracket for Electrical, Mechanical Part, Switch and Button, located in 1.2.2

1.3.2.1 Quantity (One EA); 8 Inches X 8 Inches

1.3.2.2 Quantity (One EA); 8 Inches X 14 Inches

1.3.2.3 Quantity (One EA); 12 Inches X 14 Inches

1.3.2.4 Quantity (One EA); 13 Inches X 15 Inches

1.3.2.5 Quantity (One EA); 14 Inches X 14 Inches

1.3.2.6 Quantity (3 EA); 22 Inches X 14 Inches

2. REFERENCES:

2.1 Standard Items, (FY25)

2.2 801-8468127 Rev Q, General Arrangement

2.3 MIL-STD-2003-4 Rev B, Electric Plant Installation Standard Methods for Surface Ships and Submarines (Cableways)

SSP: BAHR-004-25 2 of 2 ITEM NO: 120-00-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

2.4 S9086-VD-STM-010/CH-631 Rev 3, ACN 1/R4 Preservation of Ships in Service – General

3. REQUIREMENTS:

(V)(G) "VISUAL INSPECTION"

3.1 Accomplish a visual inspection of each bracket, located in 1.2, identified in 1.3, using 2.2 through 2.4 as guidance and as designated by the SUPERVISOR.

Report: VISUAL INSPECTION (WC) - WORK COMPLETE + 1 day

3.1.1 Submit one legible copy, in hard copy or approved transferable media, of a report listing results of the requirements of 3.1 to the

SUPERVISOR.

3.2 Fabricate and install each new bracket to support and secure each electrical, mechanical part, switch and button, located in 1.2, using 2.3 for guidance and as designated by the SUPERVISOR.

3.2.1 Template exact dimensions and clearances from existing

shipboard conditions.

3.2.2 Chip and grind each surface flush and smooth in way of

removals.

3.3 Accomplish the requirements of 009-12 of 2.1, including Table 3, Column A or D, Lines One through 7.

3.4 Accomplish the requirements of 009-32 of 2.1, including Table 5, Line One Columns A and B for preservation of each new bracket identified in 1.3 and located in 1.2.

3.5 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.

3.5.1 Do not paint each item listed in Paragraph 631-8.17 of 2.4.

4. NOTES:

4.1 None.

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

5.3 KITTED MATERIAL:

1. None.

SHIP: USS LEWIS B PULLER (ESB 3) ITEM NO: 130-00-001

COAR: 26 PCN: SERV-L063

V101-0693

BWST FILE NO: 000-001 CMP: NONE

REVISED: 05 APR 2019 PLANNER: VIDENA, CELSO

SSP: BAHR-004-25 1 of 3 ITEM NO: 130-00-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Inclined Ladder and Mezzanine Ladder; preserve

1.2 Location of Work:

1.2.1 A1-A2 Level, Frame 87 Centerline, Mission Deck

1.2.2 Starboard Mezzanine (A6-88-1-L)

1.2.3 Contractor's Facility

1.3 Identification:

1.3.1 Quantity (2 EA), A2 Mezzanine Ladder, located in 1.2.1

1.3.2 Quantity (One EA), A6 Mezzanine Ladder, located in 1.2.2

2. REFERENCES:

2.1 Standard Items, (FY25)

2.2 801-8468127 Rev Q, General Arrangement

2.3 640-8452018 Rev A, Installation and Rip-out Drawing for 621, Additional Teus-Accomodation Teus and Platf

2.4 S9086-VD-STM-010/CH-631 Rev 3, ACN 1/R4 Preservation of Ships in Service – General

2.5 631-8452125 Rev K, Paint Schedule

2.6 631-8393783 Rev E, Outfitting Paint Guidance

2.7 631-8393778 Rev D, Outfit Paint Map

2.8 631-8452132 Rev AA, Paint Code Matrix

2.9 MIL-STD-1310 Rev H, Shipboard Bonding, Grounding, and Other Techniques for Electromagnetic Compatibility and Safety

2.10 803-7081122, Military Sealift Command, General Technical Requirements (GTRs)

3. REQUIREMENTS:

(V)(G) "VISUAL INSPECTION"

3.1 Accomplish the visual inspection of each equipment listed in 1.3 and located in 1.2.1 and 1.2.2 for damages and corroded mounting securing bracket, handrails and fasteners using 2.2 through 2.7 for guidance.

Report: VISUAL INSPECTION (WC) - WORK COMPLETE + 1 day

3.1.1 Submit one legible copy, in hard copy or electronic media, of a report listing results of the requirements of 3.1 to the Supervisor.

SSP: BAHR-004-25 2 of 3 ITEM NO: 130-00-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

3.2 Remove each equipment listed in 1.3, located in 1.2.1 through 1.2.2 and transport to 1.2.3.

3.2.1 Provide crane services to offload and onload of each inclined ladder.

3.3 Accomplish each repair of each broken weld, dent and hole on inclined ladder, A2 Mezzanine ladder and handrail in accordance with 009- 12 of 2.1, as a result of the inspection in 3.1, and as designated by the

SUPERVISOR.

3.3.1 Replace each existing and missing fastener with new CRES fastener of same size.

3.3.2 Replace or repair each broken handrail.

(V)(G) "LOAD TEST"

3.4 Accomplish a load test for equipment located in 1.2 and identified in 1.3 in accordance with reference 2.10, GTR No. 3, Paragraph 9.3 (sheet 7 of 20). Acceptance criteria: No permanent deformation or visible damage after load release.

3.5 Accomplish the requirements of 009-32 of 2.1, including Table 2, Line One, Columns A, B, C and E for surface preparation of the equipment listed in 1.3 and located in 1.2.1 and 1.2.2 in accordance with 2.2 through 2.9.

3.6 Transport from 1.2.3 to 1.2.1 through 1.2.2 and install each inclined ladder and A2 Mezzanine ladder removed in 3.2. Bond and ground each inclined ladder and A2 Mezzanine ladder in accordance with 2.9.

Grounding straps must be CRES 316 for topside equipment.

3.6.1 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column A, Lines One through 7 for the installation of the ladders.

3.6.1.1 Accomplish nondestructive testing, in accordance with Line 10.

3.6.2 Install new CRES fasteners, template exact size and type from existing.

3.7 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.

3.7.1 Do not paint each item listed in Paragraph 631-8.17 of 2.4.

4. NOTES:

4.1 None.

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

TOTAL

QUANTITY

PROVIDED NAME Of PART

PIECE

NO.

REF

NO.

NATIONAL

STOCK

NO.

REQ

PARA NO.

1. 250 GL

Amercoat 240, Buff, MIL-PRF- 23236, 5 Gallon Kit None 2.1 None 3.5

SSP: BAHR-004-25 3 of 3 ITEM NO: 130-00-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

2. 60 GL

Acrylic Epoxy, Amercoat 229T, Yellow None 2.1 None 3.5

3. 250 GL

Amershield, Black, 17038, Part Number AM- 9/1U, 5 Gal None 2.1 None 3.5

5.2 PUSH MATERIAL:

1. None.

SHIP: USS LEWIS B PULLER (ESB 3) ITEM NO: 130-00-002

COAR: 26 PCN: DA01-L028

BWST FILE NO: 000-001 CMP: NONE

REVISED: 05 APR 2019 PLANNER: VIDENA, CELSO

SSP: BAHR-004-25 1 of 2 ITEM NO: 130-00-002

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Starboard Inclined Ladder; preserve

1.2 Location of Work:

1.2.1 Starboard Stairtower, A1 to A5 Level (A1-91.5-1)

1.2.1.1 Starboard Stairtower Level A1 to A2

1.2.1.2 Starboard Stairtower Level A2 to A3

1.2.1.3 Starboard Stairtower Level A3 to A4

1.2.1.4 Starboard Stairtower Level A4 to A5

1.2.2 Contractor's Facility

1.3 Identification:

1.3.1 Quantity (4 EA), Starboard Ladder Inclined, Steel

2. REFERENCES:

2.1 Standard Items, (FY25)

2.2 801-8468127 Rev Q, General Arrangement

2.3 S9086-VD-STM-010/CH-631 Rev 3, ACN 1/R4 Preservation of Ship in Service General

2.4 631-8393783 Rev E, Outfitting Paint Guidance

2.5 631-8393778 Rev D, Outfit Paint Map

2.6 631-8452132 Rev AA, Paint Code Matrix

2.7 631-8452125 Rev K, Paint Schedule

2.8 S9086-VG-STM-010/CH-634 Rev 4, Deck Coverings, General

2.9 MIL-STD-1310H, Shipboard Bonding, Grounding, and Other Techniques for Electromagnetic Compatibility and Safety

2.10 803-7081122, Military Sealift Command, General Technical Requirements (GTRs)

3. REQUIREMENTS:

(V)(G) "VISUAL INSPECTION"

3.1 Accomplish a joint visual inspection with the SUPERVISOR of equipment listed in 1.3.1 and located in 1.2.1 for damages and corroded mounting securing bracket and fasteners using 2.2 through 2.7 for guidance.

Report: VISUAL INSPECTION (WC) - WORK COMPLETE + 1 day

3.1.1 Submit one legible copy, in hard copy or approved

SSP: BAHR-004-25 2 of 2 ITEM NO: 130-00-002

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

transferrable media, of a report listing results of the requirements of 3.1 to the SUPERVISOR

3.2 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column A, Lines One through 7, for the repairs identified in 3.1.

3.2.1 Accomplish a total of 60 linear feet of weld repair.

3.3 Accomplish the requirements of 009-32 of 2.1, including Table 2, Line One, Columns A, B, C and E for surface preparation of the equipment listed in 1.3.1 and located in 1.2.1 in accordance with 2.2 through 2.

10.

3.4 Accomplish the requirements of 009-32 of 2.1, including Table 3, Line 1, Columns A, B, and E for deck preservation of locations listed in

1.2.1 in accordance with 2.2 through 2.10.

3.5 Accomplish the requirements of 009-26 of 2.1, including Attachment G, for installation of Peel and Stick nonskid, in each location listed in 1.2.

4. NOTES:

4.1 None.

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

TOTAL

QUANTITY

PROVIDED NAME Of PART

PIECE

NO.

REF

NO.

NATIONAL

STOCK

NO.

REQ

PARA NO.

1. 100 GL

Amercoat 240, Buff, MIL-PRF- 23236, 5 Gallon Kit None 2.1 None 3.3

2. 125 GL

Amershield, Black, 17038, Part Number AM- 9/1U, 5 Gal None 2.1 None 3.3

3. 30 GL

Acrylic Epoxy, Amercoat 229T, Yellow None 2.1 None 3.3

4. 10 BX

Tread, Non- Metallic, Peel and Stick Non-skid Deck Covering

2040-00-

NIB-0258 2.8

72200157 96870 3.5

5.2 PUSH MATERIAL:

1. None.

SHIP: USS LEWIS B PULLER (ESB 3) ITEM NO: 159-11-001

COAR: 26 PCN: CC01-0275

BWST FILE NO: 000-001 CMP: NONE

REVISED: 05 APR 2019 PLANNER: VIDENA, CELSO

SSP: BAHR-004-25 1 of 2 ITEM NO: 159-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: A9 Weather Deck Warning Sign; replace

1.2 Location of Work:

1.2.1 A9 Weather Deck, Port and Starboard

1.3 Identification:

1.3.1 Quantity (12 EA), Metal Warning Sign Plate

2. REFERENCES:

2.1 Standard Items, (FY25)

2.2 801-8468127 Rev Q, General Arrangement

2.3 605-2540769 Rev D, Label Plate Standards

2.4 S9AA0-AB-GOS-010/GSO Rev 11, General Specifications for Overhaul of Surface Ships

2.5 S9086-VD-STM-010/CH-631 Rev 3, ACN 1/R4 Preservation of Ships in Service – General

3. REQUIREMENTS:

3.1 Accomplish the removal of each metal warning sign for A9 Port and Starboard with all applicable radiation warnings located in 1.2, identify each warning sign label base plate, each damaged fastener and area of damage or distortion, using 2.2 and 2.3 for guidance.

3.1.1 Record exact location of each metal warning sign label plate and tag each applicable radiation warnings prior to removal for fabrication and preservation.

3.1.2 Submit one legible copy, in hard copy or approved

transferrable media, of a report listing results of the requirements of 3.1.1 to the SUPERVISOR.

3.2 Install each new marker identification sign for A9 weather deck Port and Starboard with all applicable radiation warnings identified in 1.3 and located in 1.2 in accordance with Section 602h of 2.4, using 2.2 and

2.3 for guidance and as designated by the SUPERVISOR.

3.2.1 Template and fabricate each stud that hold the sign in place, exact size, configuration, material, and location from existing shipboard conditions and as designated by the SUPERVISOR.

3.2.2 Chip and grind each surface flush and smooth in way of

removals.

3.3 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column A, C or D, Lines One through 7.

3.4 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.

SSP: BAHR-004-25 2 of 2 ITEM NO: 159-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

3.4.1 Do not paint each item listed in Paragraph 631-8.17 of 2.5.

4. NOTES:

4.1 None.

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

TOTAL

QUANTITY

PROVIDED NAME Of PART

PIECE

NO.

REF

NO.

NATIONAL

STOCK

NO.

REQ

PARA NO.

1. 12 EA

Marker Identification, Type I, 12 Inch None 2.4

76900137 75894 3.2

5.2 PUSH MATERIAL:

1. None.

SHIP: USS LEWIS B PULLER (ESB 3) ITEM NO: 167-00-001

COAR: 26 PCN: SERV-L117

BWST FILE NO: 000-001 CMP: NONE

REVISED: 05 APR 2019 PLANNER: VIDENA, CELSO

SSP: BAHR-004-25 1 of 2 ITEM NO: 167-00-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Joiner Door and Handle; repair

1.2 Location of Work:

1.2.1 Forward House, A1-A8 Level

1.3 Identification:

1.3.1 Quantity (12 EA), Metal Joiner Door, Non-Watertight Door, located in 1.2.1

2. REFERENCES:

2.1 Standard Items, (FY25)

2.2 624-8390167 Rev C, Joiner Door Details

2.3 801-8468127 Rev Q, General Arrangement

2.4 S9086-UF-STM-020/CH-600 Rev 2, Non-Structural Closures

2.5 S9086-VD-STM-010/CH-631 Rev 3, ACN 1/R4 Preservation of Ships in Service – General

3. REQUIREMENTS:

(V)(G) "VISUAL INSPECTION"

3.1 Accomplish a visual inspection of each equipment identified in 1.3 and located in 1.2 including each frame, handle, hardware, gasket, locking mechanism and surrounding structure for deterioration, areas of damage or distortion using 2.2 through 2.4 for guidance. Note: Ships Force will identify 1.3.1 required for repair upon arrival located in 1.2.1.

3.1.1 Cycle each door assembly twice (open and close) and check for proper seating, binding or erratic operation.

Report: VISUAL INSPECTION (WC) - WORK COMPLETE + 1 day

3.1.2 Submit one legible copy, in hard copy or approved

transferrable media, of a report listing results of the requirements of 3.1 and 3.1.1 to the SUPERVISOR.

3.2 Template exact size, configuration, and location of each joiner door from existing shipboard condition. Repair equipment based on the result of 3.1.2, identified in 1.3 and located in 1.2, using 2.2 thru 2.4 for guidance.

3.2.1 Remove door from frame, replace each faulty hardware, hinge, handle, hook, hasp, locking mechanism, gasket and associated door assembly with new.

3.2.1.1 Each door removed must be replaced with a temporary

SSP: BAHR-004-25 2 of 2 ITEM NO: 167-00-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

fire-retardant wooden substitute accordance with Category Two, Type II, of MIL-L-19140 with the functional ability to close from inside and out the door.

3.2.2 Fair and straighten each door and frame using 2.2 through 2.4 for guidance as directed by SUPERVISOR.

3.2.3 Replace each gasket, flush type tower bolt, stainless steel corner cup and new skin for Leafs, using 2.2 through 2.4 for guidance as directed by SUPERVISOR.

(V)(G) "AIRTIGHT TEST"

3.3 Accomplish the requirements of 009-25 of 2.1 for local airtight test of each airtight door repaired in 3.2, identified in 1.3 and located in

1.2 in accordance with 2.4. Allowable leakage: None.

(V)(G) "OPERATIONAL TEST"

3.4 Accomplish an operational test of each newly installed and repaired equipment identified in 1.3 and located in 1.2, opening and closing 4 times each. Allowable binding or sticking: None.

3.5 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.

3.5.1 Do not paint each item listed in Paragraph 631-8.17 of 2.5.

4. NOTES:

4.1 None

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

SHIP: USS LEWIS B PULLER (ESB 3) ITEM NO: 167-00-002

COAR: 26 PCN: CC02-0304

BWST FILE NO: 000-001 CMP: NONE

REVISED: 05 APR 2019 PLANNER: VIDENA, CELSO

SSP: BAHR-004-25 1 of 2 ITEM NO: 167-00-002

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: A8 Communication Center Door Repair; accomplish

1.2 Location of Work:

1.2.1 Comm Center (A8-94-0)

1.3 Identification:

1.3.1 Quantity (One EA), Door (A8-94-2), Locking and Securing Door Mechanism are not functioning properly, Door does not shut securely, hinges and latch are damaged

2. REFERENCES:

2.1 Standard Items, (FY25)

2.2 S9086-UF-STM-010/CH-600 Rev 5, Structural Closures

2.3 624-8468286 Rev H, Joiner Door and Passing Window Schedule

2.4 624-8390167 Rev C, Joiner Door Details

2.5 801-8468127 Rev Q, General Arrangement

2.6 S9086-VD-STM-010/CH-631 Rev 3, ACN 1/R4 Preservation of Ships in Service – General

3. REQUIREMENTS:

(V)(G) "VISUAL INSPECTION"

3.1 Accomplish a visual inspection of each equipment identified in 1.3 and located in 1.2 including each latch, frame, hinge, handle, hardware, gasket, locking mechanism and surrounding structure for deterioration, areas of damage or distortion using 2.2 through 2.5 for guidance.

3.1.1 Cycle each door assembly twice (open and close) and check for proper seating, binding or erratic operation.

Report: VISUAL INSPECTION (WC) - WORK COMPLETE + 1 day

3.1.2 Submit one legible copy, in hard copy or approved

transferrable media, of a report listing results of the requirements of 3.1 and 3.1.1 to the SUPERVISOR.

3.2 Template exact size, configuration, and location of each equipment from existing shipboard condition. Repair equipment based on the result of 3.1.2, identified in 1.3 and located in 1.2, using 2.2 through 2.5 for guidance.

3.2.1 Remove door from frame, replace each faulty hardware, hinge, handle, hook, hasp, locking mechanism, gasket and associated door assembly with new.

3.2.1.1 Each door removed must be replaced with a temporary

SSP: BAHR-004-25 2 of 2 ITEM NO: 167-00-002

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

fire-retardant wooden substitute accordance with Category Two, Type II, of MIL-L-19140 with the functional ability to close from inside and out the door.

3.2.2 Fair and straighten each door and frame using 2.2 through 2.5 for guidance as directed by SUPERVISOR.

(V)(G) "OPERATIONAL TEST"

3.3 Accomplish an operational test of each new repaired door handle, lock, hinge, electronic and mechanical lock by demonstrating that locks open with code and combination be reset. Reject if not operational.

3.3.1 Cycle each door open and close 4 times, door shut/lock

completely. Allowable binding and sticking: None

3.4 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.

3.4.1 Do not paint each item listed in Paragraph 631-8.17 of 2.6.

4. NOTES:

4.1 None.

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

SHIP: USS LEWIS B PULLER (ESB 3) ITEM NO: 167-11-001

COAR: 26 PCN: ER04-L014

ER04-L015

BWST FILE NO: 000-001 CMP: NONE

REVISED: 05 APR 2019 PLANNER: VIDENA, CELSO

SSP: BAHR-004-25 1 of 3 ITEM NO: 167-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Quick Acting Watertight Door Dog Wedge; repair

1.2 Location of Work:

1.2.1 Support Services Room (A1-96-0)

1.2.2 Auxiliary Machinery Room (6-108-0)

1.3 Identification:

1.3.1 Quantity (One EA), Quick Acting Watertight Door #A1-96-1, located in 1.2.1

1.3.2 Quantity (One EA), Quick Acting Watertight Door #A1-97-1, located in 1.2.2

2. REFERENCES:

2.1 Standard Items, (FY25)

2.2 S9086-UF-STM-010/CH-600 Rev 5, Structural Closures

2.3 803-6397268 Rev B, Doors Watertight, Quick Acting Arrangement

2.4 624-8468311 Rev L, Steel Door List

2.5 631-8452125 Rev K, Paint Schedule

2.6 631-8452132 Rev AA, Paint Code Matrix

2.7 605-2540769 Rev D, Label Plate Standards

2.8 S9086-VD-STM-010/CH-631 Rev 3, ACN 1/R4 Preservation of Ships in Service – General

3. REQUIREMENTS:

(V)(G) "VISUAL INSPECTION"

3.1 Accomplish a visual inspection of each door assembly listed in 1.3 and located in 1.2, in accordance with 600-2.2.2.2 of 2.2, including associated framing, hinge assemblies, dog wedges, knife edge, dogged door, striker plate and gasket for structural integrity, deterioration, crack, and areas of wear, damage or distortion, using 2.3 and 2.4 for guidance.

3.1.1 Cycle each door assembly twice (open and close) and check for proper seating, binding or erratic operation.

Report: VISUAL INSPECTION (WC) - WORK COMPLETE + 1 day

3.1.2 Submit one legible copy, in hard copy or approved transferable media, of a report listing results of the requirements of 3.1 and

3.1.1 to the SUPERVISOR.

SSP: BAHR-004-25 2 of 3 ITEM NO: 167-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

3.2 Accomplish repair to each quick acting watertight door assembly and repair each door wedge by weld build-up listed in 1.3 and located in 1.2 in accordance with 600-2.2.3 of 2.2, using 2.3 through 2.6 for guidance.

3.2.1 Remove each door assembly from locations listed in 1.2. Remove each closure classification label plate and retain for reference in templating new. And disassemble each hinge and dogging assembly.

Retaining parts for reassembly.

3.2.2 Each door removed must be replaced with a temporary fire-retardant wooden substitute in accordance with Category Two, Type II, of MIL-L-19140 with the functional ability to close from inside and out the door.

3.2.3 Clean each internal and external door assembly part exposed at removals and disassembly, free of oil, grease, dirt, loose paint and rust.

3.2.4 Accomplish an inspection of each retained part for

deterioration, damage, wear or no longer serviceable for continued use.

3.2.4.1 Submit one legible copy, in hard copy or electronic

media, of a report listing results of the requirements of 3.2.4 to the SUPERVISOR.

3.2.5 Remove existing gasket from gasket retainer.

3.2.6 Straighten each door, frame and fair each knife edge.

3.2.6.1 Verify knife edge for straightness by placing square

rule to knife edge face, utilizing feeler gage, measure gap between rule and knife edge. Gaps must not exceed 0.0625 inch.

3.2.7 Build-up each worn knife edge wedge area by welding and install dog wedge. Grind each built-up area smooth and fair in with surrounding surface and install striker plate.

3.2.7.1 Accomplish the requirements of 009-12 of 2.1, including Table 3, Column A, Lines One through 7.

3.3 Accomplish the requirements of 009-32 of 2.1, including Table 2, Line One Columns A, B, C and G for preservation of each door listed in 1.3, and located in 1.2, using 2.5 and 2.6 for guidance.

3.3.1 Accomplish the requirements of 009-32 of 2.1 and in accordance with paragraph 631-8.17 of 2.8.

3.3.2 The interior of each door must be painted white using 2.5 and

2.6 for guidance.

3.4 Accomplish a visual inspection of each paint coating, finish is free of all runs, sags, drips, flaking, orange peel, over spray and holidays.

Allowable coating in door knife edge, inside gasket channel or striker plate: NONE.

3.5 Install each door assembly preserved in 3.3 to their original location.

3.5.1 Install each new gasket prior door reinstallation.

(V)(G) "CHALK TEST"

SSP: BAHR-004-25 3 of 3 ITEM NO: 167-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

3.5.2 Accomplish the requirements of 009-25 of 2.1, for a chalk test of Quick Acting Watertight Door listed in 1.3 and located in 1.2.

(V)(G) "WATER HOSE TEST"

3.5.3 Accomplish the requirements of 009-25 of 2.1 for a water hose test of each repaired door assembly listed in 1.3 and located in 1.2.

Allowable leakage: None.

3.6 Template from existing and install each new damage control classification label plate, removed and retained in 3.2.1 in accordance with 2.8

(V)(G) "OPERATIONAL TEST"

3.7 Accomplish an operational test of each newly installed and repaired equipment identified in 1.3 and located in 1.2, opening and closing 3 times each. Allowable binding or sticking: None.

3.8 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.

3.8.1 Do not paint each item listed in Paragraph 631-8.17 of 2.8.

4. NOTES:

4.1 None.

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

TOTAL

QUANTITY

PROVIDED NAME Of PART

PIECE

NO.

REF

NO.

NATIONAL

STOCK

NO.

REQ

PARA NO.

1. 5 SL

Gasket, 1/2 Inch Thick x 1-1/4 Inch Wide None 2.2

53300137 17183 3.5.1

2. 10 EA

Plate, Door Striker None 2.2

15600014 69894 3.2.7

3. 10 EA

Wedge, Dog, Door-Hatch None 2.1

53420139 57758 3.2.7

5.2 PUSH MATERIAL:

1. None.

SHIP: USS LEWIS B PULLER (ESB 3) ITEM NO: 167-11-002

COAR: 26 PCN: CC02-0353

CC02-0305

CC02-0320

BWST FILE NO: 000-001 CMP: NONE

REVISED: 05 APR 2019 PLANNER: VIDENA, CELSO

SSP: BAHR-004-25 1 of 2 ITEM NO: 167-11-002

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Security Combination Door Lock; install

1.2 Location of Work:

1.2.1 A8 Training Room (A8-89-2)

1.2.2 Tactical Ops Ctr (A8-91-0)

1.3 Identification:

1.3.1 Quantity (3 EA), Combination Door Lock, Part No. X10 NSN:

5340016132078; APL: X105440VX67

1.3.1.1 Door No. A8-89-2

1.3.1.2 Door No. A8-91-0

1.3.1.3 Door No. A8-90-2

2. REFERENCES:

2.1 Standard Items, (FY25)

2.2 Installation Instructions, X-10 Type 1F High Security Electronic Lock

2.3 S9086-UF-STM-010/CH-600 Rev 5, Structural Closures

3. REQUIREMENTS:

3.1 Remove existing and install new security combination door lock assembly, identified in 1.3.1, for door located in 1.2, accordance with 2.2, using 2.3 for guidance. Note: Combination lock provided by Ship's force.

(I)(G) "OPERATIONAL TEST"

3.2 Accomplish operational test of each new electronic cypher lock and each mechanical cypher lock by demonstrating, lock function, open function with code and combination can be rest Allowable non-operational:

None

3.2.1 Accomplish final door locking adjustments insuring a tight fit.

4. NOTES:

4.1 None.

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

5.2 PUSH MATERIAL:

SSP: BAHR-004-25 2 of 2 ITEM NO: 167-11-002

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. None.

SHIP: USS LEWIS B PULLER (ESB 3) ITEM NO: 169-00-001

COAR: 26 PCN: EE02-0593

BWST FILE NO: 000-001 CMP: NONE

REVISED: 05 APR 2019 PLANNER: VIDENA, CELSO

SSP: BAHR-004-25 1 of 2 ITEM NO: 169-00-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Shower Door Repair; accomplish

1.2 Location of Work:

1.2.1 Forward House (A2-A3 Level)

1.3 Identification:

1.3.1 A2-A3 Level Shower Door Hinges

2. REFERENCES:

2.1 Standard Items, (FY25)

2.2 S9086-UF-STM-020/CH-600, Non Structural Closures

2.3 624-8468286 Rev H, Joiner Door and Passing Window Schedule

2.4 624-8390167 Rev C, Joiner Door Details

2.5 S9086-VD-STM-010/CH-631 Rev 3, ACN 1/R4 Preservation of Ships in Service – General

3. REQUIREMENTS:

(V)(G) "VISUAL INSPECTION"

3.1 Accomplish a visual inspection of each equipment identified in 1.3 and located in 1.2 including each hinge, frame, handle, hardware, gasket, and surrounding structure for deterioration, areas of damage or distortion using 2.2 thru 2.4 for guidance as directed by SUPERVISOR.

Note: Ships Force will identify 1.3.1 shower door required for repair upon arrival located in 1.2.1

3.1.1 Inspect door stability, steadiness and sense of balance. Cycle each door assembly twice (open and close) and check for proper seating, binding or erratic operation.

Report: VISUAL INSPECTION (WC) - WORK COMPLETE + 1 day

3.1.2 Submit one legible copy, in hard copy or approved

transferrable media, of a report listing results of the requirements of 3.1 and 3.1.1 to the SUPERVISOR.

3.2 Template exact size, configuration, and location of each shower door from existing shipboard condition, identified in 1.3 and located in 1.2, using 2.2 thru 2.4 for guidance.

3.2.1 Remove door from frame, replace each faulty hardware, hinge, gasket and associated door assembly with new.

3.2.2 Fair and straighten each door and frame using 2.2 through 2.4 for guidance as directed by SUPERVISOR.

(V)(G) "OPERATIONAL TEST"

SSP: BAHR-004-25 2 of 2 ITEM NO: 169-00-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

3.3 Accomplish an operational test of each newly installed and repaired equipment identified in 1.3 and located in 1.2, opening and closing 4 times each. Allowable binding or sticking: None.

3.4 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.

3.4.1 Do not paint each item listed in Paragraph 631-8.17 of 2.5.

4. NOTES:

4.1 None.

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

TOTAL

QUANTITY

PROVIDED NAME Of PART

PIECE

NO.

REF

NO.

NATIONAL

STOCK

NO.

REQ

PARA NO.

1. 6 SL Rubber Strip None 2.1 53300137 17183 3.2.1

5.2 PUSH MATERIAL:

1. None.

SHIP: USS LEWIS B PULLER (ESB 3) ITEM NO: 311-11-001

COAR: 26 PCN: SERV-L082

BWST FILE NO: 000-001 CMP: NONE

REVISED: 05 APR 2019 PLANNER: VIDENA, CELSO

SSP: BAHR-004-25 1 of 2 ITEM NO: 311-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Kickpipe; replace

1.2 Location of Work:

1.2.1 Frame 62 Port Side, A5 Level

1.3 Identification:

1.3.1 Quantity (2 EA), Stuffing Tube Assembly

2. REFERENCES:

2.1 Standard Items, (FY25)

2.2 100-8468266 Rev L, Construction Drawing FC Zone

2.3 801-8468127 Rev Q, General Arrangement

2.4 MIL-STD-2003-4B(SH), Electric Plant Installation Standard Methods for Surface Ships and Submarines

2.5 S9086-VD-STM-010/CH631 Rev 3, ACN 1/R4 Preservation of Ships in Service – General

3. REQUIREMENTS:

3.1 Accomplish the requirements to remove and install each new stuffing tube assembly in 1.3.1, and located in 1.2.1, using 2.2 through 2.4 as guidance. Record electrical hook up data for reconnection.

3.1.1 Electrically disconnect and label wiring for equipment in 3.1.

3.1.2 Manufacture and template exact size, configuration, and location from each existing shipboard conditions.

3.1.2.1 Chip and grind each surface flush in way of each repair.

3.1.3 Provide Man-lift/JLG Boom Lift, fifty foot high, for the removal and installation of each aft flight stuffing tube identified in 1.3 and located in 1.2

(V)(G) "VISUAL INSPECTION"

3.2 Accomplish a visual inspection of the surrounding structure of the main deck area for structure integrity, deterioration, pitting, cracks, and areas of damage of distortion in the locations listed in 1.2, using

2.2 as guidance and as designated by the SUPERVISOR.

Report: VISUAL INSPECTION (WC) - WORK COMPLETE + 1 day

3.2.1 Submit one legible copy, in hard copy or approved transferable media, of a report listing results of the requirements of 3.2 to the

SUPERVISOR.

3.2.2 Accomplish base metal repair for a total of 2 square feet of

SSP: BAHR-004-25 2 of 2 ITEM NO: 311-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

deteriorated plating and structure, as designated by the SUPERVISOR.

3.2.3 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column A, Lines One through 7 and Line 10 for equipment listed in 1.3.1.

3.3 Electrically connect wiring for equipment disconnected in 3.1 using hooking data recorded in 3.1.

(V)(G) "WATER HOSE TEST"

3.4 Accomplish the requirements of 009-25 of 2.1 for a water hose test of each stuffing tube assembly. Allowable leakage: None.

(V)(G) "OPERATIONAL TEST"

3.5 Ship's Force must accomplish an operational test of the system associated with the newly installed stuffing tube. The contractor must be present to correct any discrepancies resulting from work associated with this Work Item.

3.6 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.

3.6.1 Do not paint each item listed in Paragraph 631-8.17 of 2.5.

4. NOTES:

4.1 None.

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

TOTAL

QUANTITY

PROVIDED NAME Of PART

PIECE

NO.

REF

NO.

NATIONAL

STOCK

NO.

REQ

PARA NO.

1. 2 GL

Amercoat 240, Buff, MIL-PRF- 23236, One Gallon Kit None 2.1 None 3.6

2. 2 GL

Amercoat 240, Haze Gray, MIL- PRF-23236, One Gallon Kit None 2.1 None 3.6

3. 5 GL

PSX-700SG Dark Gray None 2.1 None 3.6

5.2 PUSH MATERIAL:

1. None.

SHIP: USS LEWIS B PULLER (ESB 3) ITEM NO: 508-11-001

COAR: 26 PCN: See Attachment A

BWST FILE NO: 000-001 CMP: NONE

REVISED: 05 APR 2019 PLANNER: VIDENA, CELSO

SSP: BAHR-004-25 1 of 3 ITEM NO: 508-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Lagging and Insulation; replace

1.2 Location of Work:

1.2.1 Solid Waste Management Room (A4-96-0-Q)

1.2.2 Aviation/AMCM Det Armory (A5-94-2)

1.2.3 Hangar Bay, Yellow Gear Storeroom (A5-96-0)

1.2.4 Passageway (A5-96-3)

1.2.5 Fan Room (A6-96-0)

1.2.6 Starboard Mezzanine (A6-88-1-L)

1.2.7 A6 Port Mezzanine, FR 86-89 (A6-88-2-L)

1.2.8 Fan Room/Elec Eqpt (A8-96-0)

1.2.9 Vestibule (A8-94-4)

1.2.10 Weather Deck Door, A3 Level Starboard Side Ladder

1.3 Identification:

1.3.1 Quantity (80 LF), 6 Inch to 8 Inch Chill Water Return and Supply Piping Insulation and Lagging, located in 1.2.1

1.3.2 Quantity (20 LF), Ventilation Lagging, located in 1.2.4

1.3.3 Quantity (20 LF), Chill Water Piping Supply and Return

Insulation and Lagging, located in 1.2.5

1.3.4 Quantity (460 SF), Lagging in most Aft Bulkhead, above the Vent Fan Exhaust, above Starboard Door leading to Weather Deck and next to Squat Rack on the Starboard Mezzanine, located in 1.2.6

1.3.5 Quantity (30 LF), Chill Water Piping Supply and Return

Insulation and Lagging, located in 1.2.9

1.3.6 Quantity (100 SF), Missing Lagging and Insulation to Multiple Buttons, Totaling 24 Buttons, located in 1.2.2

1.3.7 Quantity (100 SF), Damaged Bulkhead Insulation and Lagging, located in 1.2.3

1.3.8 Quantity (30 SF), Lagging on most Forward Port Mezzanine, FR 86-89 Bulkhead near the AC Unit, located in 1.2.7

1.3.9 Quantity (20 LF), Fan Room Insulation and Lagging, located in 1.2.8

1.3.10 Quantity (30 SF), Torn Lagging on Weather Deck Door and Exit Sign, located in 1.2.10

2. REFERENCES:

2.1 Standard Items, (FY25)

SSP: BAHR-004-25 2 of 3 ITEM NO: 508-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

2.2 801-8468127 Rev Q, General Arrangement

2.3 MIL-STD-769K Rev 1, Insulation Requirements for U.S. Naval Vessels

2.4 S9086-VD-STM-010/CH-631 Rev 3, ACN 1/R4 Preservation of Ships in Service – General

3. REQUIREMENTS:

3.1 Accomplish the requirements of 009-11 of 2.1 for Chill Water piping, ventilation system and bulkhead insulation, lagging, ducting and buttons listed in 1.3 and located in 1.2 using 2.2 and 2.3 for guidance.

3.1.1 Remove mold located on piping, ventilation and bulkhead in 1.2 prior to accomplishing 009-11 of 2.1

3.1.2 Record and retain each directional flow arrow, system

identification, and each miscellaneous sign and marking prior to removing or disturbing existing lagging and insulation, identified in

1.3 and located in 1.2.

3.1.3 Accomplish the requirements of 009-32 of 2.1 for new

insulation, lagging, ducting and each reusable cover to match each surrounding area.

(V)(G) "FINAL ACCEPTANCE"

3.2 Accomplish an inspection of the replaced lagging as identified in

1.3 and located in 1.2 for workmanship and proper fit. Acceptance criteria; Loose or sagging: None.

3.3 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.

3.3.1 Do not paint each item listed in Paragraph 631-8.17 of 2.4.

4. NOTES:

4.1 None.

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

TOTAL

QUANTITY

PROVIDED NAME Of PART

PIECE

NO.

REF

NO.

NATIONAL

STOCK

NO.

REQ

PARA NO.

1. 50 GL

Amercoat 240, Buff, MIL-PRF 23236, One Gallon Kit None 2.1 None 3.1.3

2. 50 GL

Amercoat 5450, Soft White, 27880 None 2.1 None 3.1.3

5.2 PUSH MATERIAL:

1. None.

SSP: BAHR-004-25 3 of 3 ITEM NO: 508-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

Attachment A

PCN Identification

EA01-0531 DEGRADED LAGGING ON PIPING

V101-0756 LAGGING REPLACE A6-88-1-L

V101-0758 LAGGING REPLACE A5-94-2

V101-0757 DAMAGE LAGGING A5-96-0

CC02-0299 LAGGING FAN ROOM A8-96-0

EX01-0035 A3 STBD STAIR TOWER DOOR

CC01-0284 PIPE LAGGING A8-94-4-Q

CC02-0283 INSULATION ON CHILL WATER PIPE

CG03-1003 TORN LAGGING A5-96-3

V101-0678 DAMAGED LAGGING A6 PORT FR 86

SHIP: USS LEWIS B PULLER (ESB 3) ITEM NO: 512-00-001

COAR: 26 PCN: ER04-L016

SS03-L003

BWST FILE NO: 000-001 CMP: NONE

REVISED: 05 APR 2019 PLANNER: VIDENA, CELSO

SSP: BAHR-004-25 1 of 3 ITEM NO: 512-00-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Ventilation Cleaning; accomplish

1.2 Location of Work:

1.2.1 Throughout the Ship (FWD House)

1.3 Identification:

1.3.1 Quantity (Various), FWD House Ventilation Systems

2. REFERENCES:

2.1 Standard Items, (FY25)

2.2 S9086-RQ-STM-010/CH-510 Rev 7, Heating, Ventilating, and Air Conditioning Systems for Surface Ships

2.3 512-8468130 Rev D, HVAD Diagram FWD Accommodation

2.4 510-8468302 Rev D, Fan Room Arrangement

2.5 512-7624117 Rev A, Instructions for Ventilation Testing and Balancing

2.6 512-8468337 Rev C, HVAC Diagram Accommodations

2.7 512-8468241 Rev D, Machinery Room Ventilation Diagram

2.8 S9086-RW-STM-010/CH 516 Rev 5, Refrigerant Systems

2.9 S9086-VD-STM-010/CH-631 Rev 3, ACN 1/R4 Preservation of Ships in Service – General

3. REQUIREMENTS:

(V)(G) "VISUAL INSPECTION"

3.1 Accomplish a visual inspection of each HVAC and ventilation system, listed in 1.3 and located in 1.2, inspecting for damage, each missing access cover, screen, terminal, gasket and fastener, using 2.2 through

2.8 for guidance.

Report: VISUAL INSPECTION (WC) - WORK COMPLETE + 1 day

3.1.1 Submit one legible copy, in hard copy or approved transferable…